MAGINO PROJECT
Drill Results – Reported March 3, 2020
Hole Azimuth Dip From (meters)
To (meters)
Length (m) Grade (Au g/t) Estimated True Width
(meters)
MA19-013 186.5 -55 302.70 310.00 7.30 3.25 5.48 and 317.00 330.00 13.00 3.84 9.75
including 320.00 330.00 10.00 4.53 7.50 including 320.00 329.00 9.00 4.81 6.75 including 320.00 323.00 3.00 7.83 2.25 including 327.00 330.00 3.00 6.73 2.25 including 328.00 329.00 1.00 17.20 0.75
and 421.00 436.00 15.00 2.76 11.25 including 425.10 433.50 8.40 4.09 6.30 including 422.80 429.40 6.60 4.59 4.95 including 425.10 429.40 4.30 6.23 3.23 including 426.00 429.40 3.40 6.71 2.55 including 426.00 427.00 1.00 11.80 0.75
MA19-014 157.3 -62.3 166.00 169.00 3.00 1.11 2.25
including 166.00 168.00 2.00 1.54 1.50 including 166.00 167.00 1.00 2.34 0.75
and 388.00 390.00 2.00 2.99 1.50 and 439.00 441.10 2.00 5.41 1.50
including 440.10 441.10 1.00 10.96 0.75 including 440.60 441.10 0.50 20.40 0.38
MA19-015 159.1 -79.2 316.00 318.00 2.00 3.64 1.00
including 316.00 316.70 0.70 8.58 0.35 and 355.00 357.00 2.00 1.75 1.00
including 356.00 357.00 1.00 2.18 0.50 and 379.00 382.00 3.00 2.66 1.50
including 380.00 382.00 2.00 3.39 1.00 including 381.00 382.00 1.00 5.26 0.50
and 551.00 554.00 3.00 1.96 2.25 including 552.00 554.00 2.00 2.93 1.50 including 552.00 553.00 1.00 5.85 0.75
and 575.00 577.00 2.00 8.52 1.50 including 576.00 577.00 1.00 9.90 0.75
and 620.00 622.00 2.00 4.00 1.50 including 620.75 622.00 1.25 5.69 0.94
MA19-016 185.4 -62.0 292.00 301.00 9.00 3.71 6.75
including 292.00 293.00 1.00 18.50 0.75
MAGINO PROJECT
Drill Results – Reported March 3, 2020
including 301.00 301.00 1.00 13.30 0.75 and 355.00 374.00 19.00 7.39 14.25
including 360.00 374.00 14.00 9.63 10.50 including 360.00 372.00 12.00 10.96 9.00 including 360.00 371.00 11.00 11.68 8.25 including 364.00 371.00 7.00 15.54 5.25
and 439.30 441.50 2.25 5.47 1.69 including 439.30 440.50 1.30 8.23 0.98
MA19-017 170.1 -61.2 674.00 676.30 2.30 3.03 1.61
including 675.05 676.30 1.25 5.41 0.88 including 674.00 675.55 1.55 3.28 1.09 including 675.05 675.55 0.50 10.40 0.35
and 1127.35 1127.85 0.50 2.35 0.38 and 1141.00 1145.50 4.50 6.62 3.38
including 1142.00 1142.50 0.50 57.20 0.38
MA19-018 349.6 -75.2 781.00 784.85 3.85 4.14 2.50 including 781.00 784.00 3.00 4.90 1.95 including 782.00 784.00 2.00 5.96 1.30 including 782.00 783.00 1.00 8.16 0.65
and 984.00 1012.20 28.20 3.27 21.15 including 984.00 986.00 2.00 17.26 1.50 including 985.00 986.00 1.00 30.80 0.75
and 995.00 996.00 1.00 8.45 0.75 and 1011.20 1012.20 1.00 46.70 0.75
MA19-019 351.8 -71.5 695.00 696.00 1.00 2.34 0.70 and 879.00 880.00 1.00 8.95 0.70
Remaining Assays Still Pending
MA19-020 172.8 -70.1 786.00 788.00 2.00 3.84 1.50 including 786.00 787.00 1.00 7.43 0.75
and 812.00 814.10 2.10 4.76 1.58 including 812.00 813.00 1.00 7.12 0.75
and 831.00 844.00 13.00 5.37 9.75 including 833.00 839.00 6.00 10.79 4.50 including 833.00 837.00 4.00 15.66 3.00 including 834.05 837.00 2.95 21.07 2.21
2019/2020 DRILL PROGRAM UPDATEMAGINO PROJECT, Ontario Canada
March 1, 2020
NAD83 ZONE 16N (1:8,500 SCALE)
represents Longitudinal Section LineA1 to A2
LEGEND
Interpreted Structural Gold Zone
0m 250m 500m125m
MAGINO RESOURCEAPPROXIMATE OUTLINEOF 2.0 g/t Au PROJECTEDTO SURFACE
VERTICALLY PROJECTEDRESOURCE BLOCKS>5.0 g/t Au
AlamosProperty
ArgonautProperty
A1
A2
MA19-005
MA19-004MA19-014
MA19-006MA19-012
MA19-007MA19-009MA19-011MA19-013
MA19-002MA19-008
MA19-003MA19-010
MA19-017
MA19-015
MA19-018
MA19-016
MA19-019
MA19-020
MA20-022MA20-024
MA19-001
MA20-021
MA20-023
LONGITUDINAL SECTION - Looking NorthMAGINO PROJECT, Ontario CanadaMarch 3, 2020
A1 A2LONGITUDINAL SECTION - Looking NorthVe
rtic
al D
epth
Fro
m S
urfa
ce *
Proj
ectio
n =
82.0
Deg
rees
Nor
th +
/- 50
m
MA19-0041.5m @ 14.49* g/t Au (E.T.W.)
MA19-0095.0m @ 9.47 g/t Au
MA19-0094.1m @ 9.64 g/t Au
MA19-0075.0m @ 6.99* g/t Au
MA19-0075.0m @ 5.54* g/t Au
MA19-0041.9m @ 8.10* g/t Au (E.T.W.)
MA19-0112.0m @ 8.39* g/t Au
MA19-012 18.1m @ 8.28* g/t Au
MA19-01611.0m @ 11.68 g/t Au2.25m @ 5.47 g/t Au
CENTRAL ZONE
MA20-0206.0m @ 10.79 g/t Au
MA19-01310.0m @ 4.53 g/t Auincluding 9.0m @4.81 g/t Au
0m 300m
LEGEND
10.0 to 25.0 g/t Au
> 25.0 g/t Au
Recent intercept
Drill Hole Intercepts
Higher Grade Zones(shoots)
Projection = 82.0 Degrees North +/- 50m
Estimated True WidthE.T.W.Metallic screen fire assay(improved intersection grade)
5.54*
0m
49m
245m
440m
638m
P-51MUSTANG
ZONE
MAGINOWEST ZONEEXTENSIONMCCARTHY-WEBB
IRON RANGE
LOVELLLAKEZONE
LOCHALSH ZONE
ISLAND GOLDMINE
NO.3 ZONE
21 ZONE
P&P 2.14 Moz AuM&I 4.20 Moz Au
MA11-2062.0m @ 2.93 g/t Au
MA11-1882.0m @ 20.88 g/t Au
8.76 g/t Au
5.08 g/t Au
10.5 g/t Au 3.0 g/t Au
368 g/t Au121 g/t Au
7.67 g/t Au5.36 g/t Au
30.6 g/t Au
89.8 g/t Au
2020 EXPLORATION TARGETSMAGINO PROJECT, Ontario Canada
March 3, 2020
LEGEND