MaerskCompleter

375 ft premium jack-up rig

Page 2: Maersk Completer

Maersk Drilling Maersk Completer

Main advantages• High level of safety

• Year-round operation in 375 ft of water in benign areas

• Maximised drilling efficiency and uptime, due to off-line

activities

• Combined drilling load of 1,179 t at 41 ft cantilever reach

(centreline) & 703 t at 70 ft cantilever reach (centreline)

• Dual pipe handling. While one string is working in the well

bore, a second string of drill pipe or bottom hole assembly

can be assembled/disassembled in the mousehole

TYPE

Cantilever Jack-up, Baker Pacific Class 375

BUILT

Jurong Shipyard Pte. Ltd., 2007

CLASS

ABS X A1 self elevating drilling unit

FLAG

Singapore

The Maersk Completer is capable of drilling in water depths

of up to 375 ft and has a rated drilling depth of 30,000 ft.

The rig is capable of operating in Asia Pacific, the Middle East,

the Mediterranean, Latin America and West Africa.

The Rig distances itself from conventional jack ups in

several areas, not least on the drill floor where the highly

mechanized equipment ensures increased safety for the

crew. The sophisticated drilling equipment also makes the

rig qualified for drilling deep and difficult wells, including high

temperature/high pressure wells.

• Fully mechanised tubular handling

• 18 ¾” 15,000 psi BOP system

• 3,400 t variable load

• Prepared for HP/HT operations

• Accommodation for 118 people

Maersk Completer

Page 3: Maersk Completer

Maersk Drilling Maersk Completer

Main particulars

DIMENSIONS IMPERIAL METRIC

Length overall 236.5 ft 72.1 m

Width overall 224.4 ft 68.4 m

Hull depth 27.9 ft 8.5 m

Length of legs 506 ft 154.2 m

Cantilever – max. reach: aft of stern 70 ft 21.3 m

– transverse (STB/PS) 14.8 ft 4.5 m

Equivalent spudcan diameter 55.9 ft 17 m

PARTICULARS IMPERIAL METRIC

Rated drilling depth 30,000 ft 9,150 m

Hook load static w/top drive 1,500,000 lbs 680 t

Rotary load 1,500,000 lbs 680 t

Setback load 900,000 lbs 400 t

Variable load 7,500,000 lbs 3,400 t

Derrick 187 ft x 35 ft x 35 ft 57 m x 10.6 m x 10.6 m

Jacking speed 1.18 ft/min 0.36 m/min

WEATHER/DESIGN CRITERIA IMPERIAL METRIC

Water depth 375 ft 114 m

Wind speed 70 knots 36 m/sec

Penetration 10 ft 3 m

Wave height 45 ft 13.7 m

Current (surface) 1.2 knots 0.64 m/sec

Air gap 50 ft 15.2 m

CAPACITIES IMPERIAL METRIC

Drill water 21,885 bbl 3,480 m³

Potable water 3,558 bbl 565 m³

Fuel oil 3,929 bbl 624 m³

Brine 1,292 bbl 205 m³

Nontoxic oil 1,274 bbl 202 m³

Liquid mud 4,265 bbl 678 m³

Bulk mud 5,829 ft³ 165 m³

Bulk cement 5,829 ft³ 165 m³

Accommodation 118 people 118 people

Page 4: Maersk Completer
Page 5: Maersk Completer

Maersk Drilling Maersk Completer

DRAW WORKS

NOV D3000 AC, 3 each CM-628 AC traction motors, 35” x 72”.

Drum grooved for 1 ⅝” drill line.

TRAVELLING EQUIPMENT

NOV Capacity 680 t, 7 x 60” sheaves grooved for 1 ⅝ ” drill

line.

TOP DRIVE AND PIPE HANDLING

NOV HPS-750, 680 t capacity, 7,500 psi, 1,230 hp, max

continuous torque 65,450 ft/lbs @ 99 rpm, max intermittent

torque 91,800 ft/lbs. NOV HydraRacker pipe handler.

IRON ROUGHNECK

NOV Hydratong 3 ½” to 9 ¾”.

ROTARY TABLE

NOV D 495–7k 49 ½” rotary table. Hydraulically driven, max

torque 20,000 ft/lbs.

MUD PUMPS

Three National Oilwell 14-P-220 Triplex, 7,500 psi.

CEMENTING EQUIPMENT

15,000 psi wp. On free placement agreement.

WELL CONTROL EQUIPMENT

1 each Hydril GX 18 ¾” 10,000 psi annular, 2 each Hydril

18 ¾” – 15,000 LW double Ram BOP, Vetco Gray KFDJ Diverter

system, 500 psi.

MUD RETURN SYSTEM

Four Brandt VSM 100 high performance shale shakers. One

NOV vacuum degasser.

Key features

DRIVE PIPE SUPPORT DECK

Hinged deck for conductor support tensioner system. NOV

Vertical conductor tensioning system consisting of four 115 t

hydraulic cylinders with 1,500 mm stroke.

DRILLING INSTRUMENTATION

NOV Cyberbase

POWER SUPPLY

5 each Caterpillar 3516BDITA with Caterpillar generators,

output 2,150 kva at rotation speed of 1,200 rpm. 1 each

emergency generator, Caterpillar 3508 B output 968 kw at

1,800 rpm.

CRANES

One crane with 36.5 m (120 ft) boom, 50 t at minimum radius.

One crane with 36.5 m (120 ft) boom, 40.8 t at minimum radius.

One crane with 30,5 m (100 ft) boom, 22.7 t at minimum radius.

HELICOPTER DECK

The platform of the helicopter deck is designed and built to

Class, Regulatory, IMO and CAP 437 to accommodate the

Sikorsky S-92A helicopter.

SAFETY EQUIPMENT

Lifesaving and fire fighting equipment in accordance with

rules and regulations.

ACCOMMODATION

Living quarters block is located forward of the platform hull

and is designed to accommodate 118 people. The quarters

hold seven offices in total, of which one are with unrestricted

view of rig floor.

Page 6: Maersk Completer

Maersk Drilling Maersk Completer

Main layoutsTOP VIEW AND DRILL FLOOR

TANK TOP

Page 7: Maersk Completer

Maersk Drilling Maersk Completer

QUARTERS

SIDE VIEW

Page 8: Maersk Completer

“DISCLAIMER: This brochure is for promotional purposes only. All descriptions, specifications and other information contained in this brochure and/or in any accompanying material is: (i) intended to give only a general indication of the sorts of service or equipment or performance that might be available (ii) intended to be no more than an invitation to treat (iii) subject to contract and possible change or alteration at our discretion and without notice to you (iv) not to be relied upon by you for any purposes whatsoever when entering into any legally binding agreement with us.”

Head office:

Maersk Drilling50, Esplanaden1098 Copenhagen KDenmark

Telephone: +45 3363 3363Telefax: +45 3363 3182

E-mail: [email protected]

Follow us to learn more

www.maerskdrilling.com

www.facebook.com/MaerskDrilling

www.linkedin.com/company/maerskdrilling

www.twitter.com/maerskdrilling

www.vimeo.com/maerskdrilling

www.youtube.com/user/Maerskcom

www.instagram.com/maerskdrilling

October 2014