Madrid, 1st April 2008

5th SG Meeting

South Gas Regional Initiative

Page 2: Madrid, 1st April 2008

2

5th SG meeting S-GRI- AgendaI. Opening: approval of the agenda. (for approval)

I.1 Welcome

I.2 Approval of the agenda and the last meeting minutes

II. Feedback on the High-Level Meeting with the EC in February

III. Interconnections

III.1 Capacity allocation mechanism of new interconnection capacity

III.1.1 OSP procedure developed by IG and future steps (presentation

by Regulators, for information)

III.1.2 TSOs proposal to develop OS (presentation by TSOs, for

discussion)

III.2 Spanish-Portuguese interconnection capacity study up to 2015

(presentation by TSOs, for information)

IV. Interoperability: CBPs implementation (presentation by Regulators, for

discussion)

V. Transparency: updated French-Spanish joint investment plan (presentation

by TSOs, for information)

VI. Stakeholders point of view on the main concerns/priorities for the future

VII. Next meetings.

VIII. AOB

Page 3: Madrid, 1st April 2008

3

II. High level meeting with EC in February II. High level meeting with EC in February Feedback by regulators

• Meeting on the South-West Europe gas and electricity regional markets

• It took place on 19 February 2008 in Madrid and was the 2nd such meeting (first one took place in June 2007). It was chaired by EC, attended by governments, national regulators, TSOs, power exchanges

• Main focus was on electricity, but gas also got some attention. Main conclusions for gas: • Gas interconnections : “despite revisions to the regional investment plans,

welcome progress has been made on the design of coordinated, transparent and non-discriminatory cross-border allocation mechanisms”

• Market integration : • “Work is progressing with regard to MIBGAS” • “Implementation of Common Business Practices is being analysed”• “Participants of the MIBGAS and North West regional initiative should

ensure that they develop in a compatible way”• “The development of hubs would contribute heplfully to the liquidity of

the market”

• Meetings of the high level group will continue to be held approximatively every six months.

Page 4: Madrid, 1st April 2008

4

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

ROAD COVERED:

Last SG (4th meeting) on 29th October 2007

─ TSOs’ groups working on elaboration of a proposal of OSP and OS for French-Spanish new interconnection capacities

Work on OSP developed up today:

─ 5th IG meeting on 30th Nov 2007

TSOs presented a proposal of OSP for Larrau interconnection

Main comments from participants: capacities reserved for LT/ST, maximum period for the offered capacity, competition safeguards and the need for same treatment for Irún interconnection

TSOs would rewrite the proposal including agreements reached in the meeting. TSOs’ proposal would be reviewed by Regulators

Page 5: Madrid, 1st April 2008

5

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

ROAD COVERED (cont.):

Work on OSP developed up today (cont.):

─ Allocation of capacity in France: GRTgaz North-GRTgaz South and GRTgaz South -TIGF through OSP launched in December 2007

─ 6th IG meeting on 11th Feb 2008

TSOs’ OSP proposal, once amended by Regulators, was presented

Some OSP points still to be defined: capacity values and dates, LT contracts duration (4/10 years) and LT allocation rules.

─ After the meeting

TSOs to send comments on discussion points before 19th Feb 2008

Regulators reviewed and finished the OSP

Page 6: Madrid, 1st April 2008

6

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

ROAD COVERED (cont.):

Progress on the Spanish side:

─ Modification of RD 949/2001 which introduces the possibility of developing different CAMs to “FCFS” at international connections in December 2007

─ Development of a Ministerial Order which describes the procedure to allocate available current and future capacity at French-Spanish capacities up to 2013. A proposal has been elaborated by CNE and sent for consultation of the Consultative Council of Hydrocarbons

─ Next planned step is the Ministerial Order approval by the Ministry

─ Could be possible nowadays not to contact capacity from April 2009 ahead?

Page 7: Madrid, 1st April 2008

7

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

REGULATORS OSP PROPOSAL

MAIN CHARACTERISTICS

Procedure to be developed in May-June 2008 to allocate available capacity at French-Spanish interconnections from 1st April 2009 to 31st March 2013 (4 years)

80% of available capacity for LTC (more than 1 year) and 20% of available capacity for STC (1 year or less)

Short term capacities, corresponding to 20% of the total offered capacity, will be sold yearly, in later OSPs, performed a year before the services’ starting day. The OSP for the LTC will only be organised once

Page 8: Madrid, 1st April 2008

8

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

Provisional conversion factor of: 1 Mm3(n)/day = 11,6264 GWh/day has been considered in the table above.*From December 2012, capacity in the ENAGAS to TIGF direction will move up to 165 GWh/d, which would increase the common value to 110/100 GWh/d. However, because its starting date is so far off, this capacity will be marketed during a subsequent OSP.** and *** Short term capacities will be sold yearly, in later OSPs, performed a year before their starting day

Capacities in GWh/day

April-Oct 09 Nov 09 - March 10

April-Oct 10 Nov 10 - 31st March 2013

ENAGÁS -> TIGF Summer Winter Summer Winter Summer Capacity considered EXIT ENAGÁS

0,00 0,00 0,00 30,00 50,00

Capacity considered ENTRY TIGF

0,00 110,00 100,00 110,00 100,00

Capacity offered under the OSP (common value)

0,00 0,00 0,00 30,00 50,00

OSP (LTC) 0,00 0,00 0,00 24,00 40,00

OSP (STC) 0,00 0,00 0,00 0,00** 0,00**

TIGF -> ENAGÁS Summer Winter Summer Winter Summer Capacity considered EXIT TIGF

22,48 22,48 22,48 22,48 22,48

Capacity considered ENTRY ENAGÁS

29,29 91,29 91,29 91,29 91,29

Capacity offered under the OSP (common value)

22,48 22,48 22,48 22,48 22,48

OSP (LTC) 17,98 17,98 17,98 17,98 17,98

OSP (STC) 4,5 4,5 0,00*** 0,00*** 0,00***

Page 9: Madrid, 1st April 2008

9

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

REGULATORS OSP PROPOSAL (cont.)

MAIN CHARACTERISTICS (cont.)

Allocation in 2 phases, with possibility of withdrawing any or all the requests if capacity assigned in the first phase is not convenient

After the OSP, the remaining capacities, if any, will be allocated under the standard procedures in place in each system

Further interruptible or conditional capacities might be offered by each TSO according to their own rules, once the OSP has been completed

The terms and conditions applicable to the capacities sold under the OSP will not differ from the rules prevailing in each system at any particular time, unless otherwise stated

Page 10: Madrid, 1st April 2008

10

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by regulators

REGULATORS OSP PROPOSAL (cont.)MAIN CHARACTERISTICS (cont.)

Allocation rules: Priority will be given to requests which are matched on both sides of the

border, and according to the period required for the service:Long term capacities:

− first priority for 4 years period requests− second priority for multiannual requests (n consecutive

seasons, with n>2)− third priority for multiseasonal requests (n consecutive winters

or summers, with n>2) Sort term capacities:

− first priority for 1 year period requests− second priority for 1 season period requests− third priority for less than 1 season period requests

Within the same level of priority, capacity will be allocated on a pro-rata basis, season by season/month by month, taking into account the volumes requested

Page 11: Madrid, 1st April 2008

11

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps-presentation by TSOs

QUESTIONS ON OPEN SUSCRIPTION PROCEDURE:

Should all the LT capacity be contracted at the same OSP?

Should ST and LT capacities be sold at the same OSP?

Appropriate advance to sell ST capacity?

Should the OSP be extended to cover 4 years for the last starting LT capacity (from Spain to France)?

Page 12: Madrid, 1st April 2008

12

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.1 OSP developed by IG and future steps

CONCLUSIONS on OSP• Stakeholders have concerns about the persistent lack of capacity in the next

future

• OSP is the appropriate mechanism to allocate capacity when it is scarce resource

• All existing Spanish-French interconnection will be treated in the same way

• OSP in France/Spain will be coordinated as much as possible

• General agreement to contract capacity at French-Spanish interconnections for the period starting April 2009 ahead in both senses (Spain to France and vice versa) only through the OSP

• Current forecasted date of infrastructures will be taken into consideration to define the capacity to be allocated through the OSP. If delays occurs, tariffs will not be invoiced

• A final OSP proposal will be elaborated by TSOs and sent to regulators in one week. Regulators will publish the OSP on ERGEG webpage. Once published, Stakeholder will have 10 days to send comments on the proposal to Regulators.

Page 13: Madrid, 1st April 2008

13

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.2 TSOs’ OS proposal

LAST IG AGREEMENT ON OPEN SEASON (6th IG minutes):

Detailed agendas and procedures for the Western and Eastern corridors would be presented by TSOs in the next meeting

The need to coordinate Open Seasons for Western and Eastern corridors and for North-South GRTGaz capacities would have to be taken into account

The goal was to prepare an information memorandum on OS during 1S 2008 which would be released to the public, after the completion of the OSP for near-term Larrau capacities

Page 14: Madrid, 1st April 2008

14

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.2 TSOs’ OS proposal

QUESTIONS ON OS MECHANISMS:

Differences between OSP and OS

Grade of shippers’ commitment in a OS

Future OSP and OS foreseen in France and/or Spain:

Capacities and infrastructures affected

TSOs involved

Schedule

Relationship with Spanish-France interconnection capacities or gas transmission from the Peninsula to the North of France and vice versa

Page 15: Madrid, 1st April 2008

15

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.1.2 TSOs’ OS proposal

CONCLUSIONS on OS GRT gas will do its best efforts to coordinate the OS inside

France with the rest of the OS in Spain/France, under the supervision of the CRE.

TSOs will present the detailed OS procedure in the next SG meeting, to be held in May 21st. This will include:

Detailed agenda on the process

Preliminary capacities and date of operation proposed

Available capacity on the current infrastructure forecasted

What is the binding compromise the shippers should reach?

When the decision to build and on what grounds will be taken?

Page 16: Madrid, 1st April 2008

16

III. PRIORITY 1. Interconnections III. PRIORITY 1. Interconnections III.2 Portuguese-Spanish interconnection capacity study up to 2015

CONCLUSIONS

• Stakeholders welcome TSOs’ Portugal-Spain study on interconnection capacities up to 2015

• Study performed by TSOs shows no need for further interconnection capacity between Portugal and Spain up to 2015

Page 17: Madrid, 1st April 2008

17

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation-presentation by regulators

CBPs implementation in Spain

1. Harmonization of Units

2. Harmonization of the Nomination and Matching Process

3. Rest of the CBPs already harmonized

Specific working group has been created in the framework of the Group for Network Code Modification, in order to deal with CBPs implementation into Spanish Network Code. Last meeting hold on 28th February.

Page 18: Madrid, 1st April 2008

18

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation-presentation by regulators

1. Harmonization of UnitsCURRENTLY GCV with combustion reference temperature of 0ºCCBPs GCV with combustion reference temperature of 25ºC:

Assessment of the change: energy measured decreases 0,26%

Affected areas:• Energy measured at loading and unloading ships SHIPPERS• Retribution depending on the gas regasificated/distributed INFRASTRUCTURE OPERATORS• TPA tariffs, since less energy will be consumed• Measures procedures• Energy measurement at interconnection with non European

countries • Technical changes not significantly important

Page 19: Madrid, 1st April 2008

19

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation-presentation by regulators

1. Harmonization of Units (cont.)

Network code and protocols to be revised:• NGTS-05: measure (Ministerial Order)• PD-01: measure (Resolution)• PD-05: Procedure to calculate energy unloaded from ships

(Resolution)

Page 20: Madrid, 1st April 2008

20

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation-presentation by regulators

2. Harmonization of the Nomination and Matching Process

CURRENTLY Gas day from 00:00 to 00:00CBPs Gas day from 06:00 to 06:00Harmonization of process also required

Affected areas:• Software of communication and planning equipments• SL-ATR (logistic IT)• Operation protocols• Measures procedures• Interconnections with non European countries (Tarifa

interconnection, Medgaz)• Combine cycles and other clients with regard to maximum

consumption, tariffs

Page 21: Madrid, 1st April 2008

21

2. Harmonization of the Nomination and Matching Process (cont.)

Network code and protocols to be revised:• NGTS-04: Nomination (Ministerial Order)• NGTS-06: Matching (Ministerial Order)• NGTS-07: Balancing (Ministerial Order)• PD-01: Measure (Resolution)• PD-05: Procedure to calculate energy unloaded from ships

(Resolution) • PD-07 and PD-08: planning and nomination of transmission and

distribution facilities (Resolution) • Future PD-11: Nomination for satellite plants belonging to the

consumer (Resolution)

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation-presentation by regulators

Page 22: Madrid, 1st April 2008

22

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation

QUESTIONS ON CBPS IMPLEMENTATION:

Status of CBP on harmonization of units in France and Portugal:

Infrastructures where the CBP has been implemented

Grade of implementation

Agents affected

Advantages and inconveniences

Status of CBP on harmonization of nomination and matching process in France and Portugal:

Grade of development

Relationship with electricity pool

Advantages and inconveniences

Page 23: Madrid, 1st April 2008

23

IV. PRIORITY 2. InteroperabilityIV. PRIORITY 2. InteroperabilityCBPs implementation

CONCLUSIONS

• The SG welcome the information provided for EASSE-gas

• In the next SG the most important CBPs will be presented

• In order to evaluate the CBPs possibilities of implementation, TSOs will coordinate in advance to the SG meeting, together with EASEE-gas

Page 24: Madrid, 1st April 2008

24

V. Stakeholders point of viewV. Stakeholders point of viewMain concerns/priorities for the future

CONCLUSIONS

Cooperation among TSO has been very good even if the outcomes are not yet enough

Interconnection capacity is needed, as soon as possible and in a coordinated way

The Open Season process should be developed as soon as possible

SoS is important for the Region

Third package implementation is crucial for the development of the competition in the Region

Coordination among stakeholders in the initiative is also important

In the last two years of the Initiative progress is very limited regarding the interconnection improvement, but the harmonization of rules is progressing, specially the transparency

Page 25: Madrid, 1st April 2008

25

VI. Next meetingsVI. Next meetings

Next IG meeting: to be defined

Next SG meeting: 21st May 2008