POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy When Printed Page 1 of 33 Macksville Hospital Development – Early Works Pollution Incident Response Management Plan MHD-EN-MPL-008 PIRMP Rev 0 Rev Description Originator Reviewed Approved Date A Draft for internal review AD JH MG 27/09/18 Details of Revision Amendments

Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 1 of 33

Macksville Hospital Development – Early

Works

Pollution Incident Response Management Plan

MHD-EN-MPL-008 PIRMP Rev 0

Rev Description Originator Reviewed Approved Date

A Draft for internal review AD JH MG 27/09/18

Details of Revision Amendments

Page 2: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 2 of 33

Plan Control

The latest approved version of this Plan will be available for all Project personnel on the Electronic Document

Management System - TeamBinder. The functional manager will maintain, review and update this Plan at least

annually.

Amendments

Each new revision to the Plan will be distributed to all required personnel for review and approval.

The revision number is included at the end of the document number, which is noted in the footer of each page. The

document will be allocated a new revision number each time a change is made to the document.

When a new revision to the document is available, a notification email will be distributed to all project personnel by

the Document Control Team advising of the update.

The functional Manager is responsible for the implementation and review of the Plan. The Project Director will

approve new revisions of the Plan via the review and approval process as detailed in the Document Control

Procedure.

Functional Manager Authorisation Distribution List

Name: Jason Haslett

Date: 28/09/2018

Position: Environment Manager

Signature:

Comments:

Project Director x

Construction Manager x

Quality Manager x

Safety Manager x

Project Director Authorisation Environmental Manager x

Name: Manuel Gil

Date: 28/09/2018

Signature:

Comments:

Finance Manager x

Engineer Manager x

Area Manager x

Human Resources Manager x

Site Foreman x

Health Infrastructure x

Other:

Page 3: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 3 of 33

Contents

Details of Revision Amendments ........................................................................................................................... 1

Terms and Abbreviations ....................................................................................................................................... 5

1. Introduction .............................................................................................................................................. 6

1.1. Project Background .......................................................................................................................................... 6

1.2. Purpose ............................................................................................................................................................ 6

1.3. Scope ............................................................................................................................................................... 6

1.4. Meaning of material harm to the environment .............................................................................................. 7

1.5. Legislation and Other Requirements ............................................................................................................... 7

2. Key Responsibilities and Accountabilities .................................................................................................. 7

2.1. Key Staff ........................................................................................................................................................... 7

2.1.1. Project Director ....................................................................................................................................... 7

2.1.2. Construction Manager / Project Engineers ............................................................................................. 7

2.1.3. Safety Manager ....................................................................................................................................... 8

2.1.4. Environment Manager ............................................................................................................................ 8

2.1.5. Traffic Manager ....................................................................................................................................... 8

2.1.6. Supervisory Personnel (Area Superintendents, Foremen, Site Engineers) ............................................. 8

2.1.7. Workers ................................................................................................................................................... 8

3. Hazard identification and risk assessment Risk assessment methodology............................................... 10

3.1. Environmentally Sensitive Areas ................................................................................................................... 10

3.2. Environmental Hazards .................................................................................................................................. 10

4. Preventative measures ............................................................................................................................ 10

5. PIRMP implementation and notification ................................................................................................. 11

5.1. PIRMP Activation ........................................................................................................................................... 11

5.2. Actions to be taken during or immediately after a pollution incident .......................................................... 11

5.3. Detailed actions to prevent adverse impact to the environment ................................................................. 12

5.4. Additional Resources ..................................................................................................................................... 13

6. Documentation ....................................................................................................................................... 13

6.1. Sensitive Area Maps ...................................................................................................................................... 13

6.2. Inventory of pollutants .................................................................................................................................. 13

6.3. Availability of PIRMP ...................................................................................................................................... 13

7. Continual improvement .......................................................................................................................... 15

7.1. Training and testing ....................................................................................................................................... 15

APPENDICES ......................................................................................................................................................... 16

Appendix 1: Compliance Matrix ........................................................................................................................... 16

Appendix 2: Risk matrix criteria (consequence and likelihood) ............................................................................ 23

Appendix 3: Results of preliminary risk assessment ............................................................................................. 24

Appendix 4 – Pollution Incident Notification Flow Chart ...................................................................................... 29

Page 4: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 4 of 33

............................................................................................................................................................................ 29

............................................................................................................................................................................ 29

............................................................................................................................................................................ 29

............................................................................................................................................................................ 29

Appendix 5: Pollution Notification Protocol ......................................................................................................... 30

Appendix 6: Sensitive Area Plans – Location of Chemical Storage Facilities ......................................................... 32

Appendix 7: Chemical Manifest ........................................................................................................................... 33

Page 5: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 5 of 33

Terms and Abbreviations

ACCIONA ACCIONA Infrastructure Australia Pty Ltd

ALARP As low as reasonably practical

AS/NZS Australian and New Zealand Standard

BAU Business As Usual

CEMP Construction Environmental Management Plan

EDMS Electronic Document Management System (TeamBinder)

EPA NSW Environmental Protection Authority

EPL Environmental Protection Licence

Ferrovial Ferrovial Agroman (Australia) Pty Ltd

HI Health Infrastructure

IMS Integrated Management System

ISO International Standards Organisation

KPI Key Performance Indicator

MHD Macksville Hospital Development – Early Works (The Project)

NSW New South Wales

Pacifico Acciona Ferrovial Joint Venture

PIRMP Pollution Incident Response Management Plan

POEO Act Protection of the Environment Operations Act 1997

PCBU Person Conducting a Business or Undertaking

PMT Project Management Team

SWMS Safe Work Method Statement

Page 6: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 6 of 33

1. Introduction

The Macksville Hospital Development (Early Works) (The Project) is being constructed in a joint venture consisting

of ACCIONA Infrastructures Pty Ltd (ACCIONA) and Ferrovial Agroman (Australia) Pty Ltd (Ferrovial), known as

Pacifico.

This Pollution Incident Response Management Plan (PIRMP) has been prepared to comply with the requirements

set out in part 5.7A of the Protection of the Environment Operations Act 1997 (the POEO Act), stating that holders

of an Environment Protection Licence (EPL) must prepare, implement and test a Pollution Incident Response

Management Plan (PIRMP) in relation to the activity to which that licence relates.

The EPL 21155 for the Project is held by ACCIONA.

1.1. Project Background

The Project consists of the construction of early works associated with the construction of the Macksville Hospital,

Old Coast Road, Macksville. The Project includes:

• Demolition of Existing Structure (House);

• Minor Vegetation Removal

• Bulk Earthworks;

• Construction of Drainage Structures

• Construction of new Public Road off Letitia Close;

• Internal Road Access; and

• Installation of Water, Sewer, Electrical and Telecommunication Services;

The construction of the Project is subject to the licensing provisions of the POEO Act, as a ‘Scheduled activity-

premises based’, due to the following activities:

• crushing, grinding or separating; and

• land-based extractive activities;

1.2. Purpose

This PIRMP has been prepared in accordance with the EPA’s Environmental guidelines: Preparation of pollution

incident response management plans (EPA, 2012).

To comply with the POEO Act, this PIRMP identifies:

• pollution risks and measures that would prevent an incident from occurring;

• further contingency measures that may be applied to minimise the risk of an incident from causing

environmental harm;

• protocols for notifying a pollution incident, to the relevant authorities and stakeholders (including the

community); and

• requirements for training of staff, in relation to the plan and its implementation, and ensure the plan

is regularly reviewed and tested for accuracy, currency and suitability.

This PIRMP is to be implemented in the event that material harm to the environment is caused or threatened.

1.3. Scope

This PIRMP applies to the (the Project), which is being constructed by the Pacifico - Acciona Ferrovial Joint Venture,

Page 7: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 7 of 33

and relates to those activities of the Project premises as defined by the EPL and under the control of Pacifico.

This PIRMP excludes any activities that occur off the premises, for example the transportation of bulk fuel or

hazardous waste by a contractor licensed by the EPA, unless the transportation activity is being undertaken on the

premises under the control of Pacifico.

1.4. Meaning of material harm to the environment

For the purposes of this PIRMP, harm to the environment is material if:

• it involves actual or potential harm to the health or safety of human beings or to ecosystems that is

not trivial, or

• it results in actual or potential loss or property damage of an amount, or amounts in aggregate,

exceeding $10,000 (or such other amount as is prescribed by the regulations)

Loss includes the reasonable costs and expenses that would be incurred in taking all reasonable and practicable

measures to prevent, mitigate or remediate harm to the environment. For the purposes of this Part, it does not

matter that harm to the environment is caused only in the premises where the pollution incident occurs.

The Environment Manager will determine if an incident is likely to cause or threaten material harm to the

environment and if the PIRMP is to be activated. This decision shall be made in consultation with the Project Director.

1.5. Legislation and Other Requirements

Subject to Part 5.7A of the POEO Act, Pacifico is required to prepare and implement a pollution and incident response

plan. Accordingly, all relevant provisions of the POEO Act in regards to pollution incident management have been

reviewed in the preparation of this PIRMP, to comply with the relevant legislative requirements. A compliance

matrix has been established illustrating Pacifico’s compliance to the legislative requirements, and is provided in

Appendix 1.

2. Key Responsibilities and Accountabilities

2.1. Key Staff

The organisational chart and details of key personnel will be maintained on site and displayed in relevant locations.

The roles and responsibilities of the Project Management Team (PMT) and other workers are as described below in

relation to this PIRMP.

All staff will be aware of their responsibilities through specific position descriptions, and shall follow the processes

and procedures as outlined in this PIRMP.

All personnel involved in the Project are responsible for protecting the environment and preventing incidents.

Further responsibilities and accountabilities for key Project staff include:

2.1.1. Project Director

• Responsible for the Project and responsible to ensure that the measures of this PIRMP are followed;

• Responsible for the Project compliance with the POEO Act;

• Responsible for directing works during or immediately after an incident.

2.1.2. Construction Manager / Project Engineers

• Ensure all environmental incidents are notified to the Environment Manager immediately and without

delay;

Page 8: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 8 of 33

• Provide appropriate support and resources to incident response in terms of labour, materials and

resources;

• Assist Project Director and Environment Manager in directing works during or immediately after an

incident;

2.1.3. Safety Manager

• Implement notification protocol for relevant agencies;

• Point of contact with Emergency Services and Workcover in the event of an incident;

• Ensure Emergency Response Plan is consistent with the PIRMP;

• Provide advice in relation to any incident where there is safety risk.

2.1.4. Environment Manager

• Ensure PIRMP is prepared, maintained and tested;

• Ensure environmental monitoring data is collected and displayed on company website;

• First point of contact in relation to an Environmental Incident;

• Assist the Project Director in directing works during or immediately after an incident;

• Activate the PIRMP in the event of an incident which causes or threatens environmental harm;

• Point of contact with EPA and other environmental authorities in the event of an incident;

• Undertake additional risk assessments for high risk activities requiring an EWMS.

2.1.5. Traffic Manager

• Provide traffic control if incident has occurred on the highway or local road;

• Provide assistance to direct works if incident occurs on highway or local road.

2.1.6. Supervisory Personnel (Area Superintendents, Foremen, Site Engineers)

• Ensure all environmental incidents are notified to the Environment Manager immediately and without

delay;

• Assist Project Director in directing on site response to incidents (implementation of preventative and

remedial measures) including allocation of appropriate resources.

2.1.7. Workers

• Immediately notify Superintendent or Environment Manager in the event of any pollution incident

• Assist with the incident response on site at the direction of their supervisor.

Further details of roles and responsibilities is provided in the Environmental Management Plan.

The contact details for those key staff members responsible for this PIRMP are identified in Table 1.

Note – Community Relations Management is being delivered by Health Infrastructure.

Page 9: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 9 of 33

Table 1 Contact Details of Key Personnel Associated with the PIRMP

Role Name

Project Director Manuel Gil

0418 757 639

Construction Manager

Luis Prieto

0412 638 266

Environment Manager

Jason Haslett

0401 006 009

Safety Manager Ian Gadsden

0424163982

Project Foreman Christopher Wheeler

0468 964 439

Note – Community Relations Management is being delivered by Health Infrastructure.

Page 10: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 10 of 33

3. Hazard identification and risk assessment Risk assessment methodology

A risk assessment was undertaken for the construction phase to:

• Identify the activities and related equipment and plant that may cause a ‘Pollution Incident’ for the

various stages of construction

• Assess the risk of an incident occurring (likelihood and severity)

• Identify existing ‘Business as Usual’ (BAU) controls

• Identify any additional controls/ contingency measures required to further mitigate the impacts arising

from any pollution incident.

Risk Criteria applied in the risk assessment is provided in Appendix 2. The results of the risk assessment are provided

in Appendix 3.

Further Risk Assessments will be undertaken for specific work packages during the detailed construction planning

phases and when there is a significant change in project activities. Risk assessments will also be undertaken in the

preparation of Environmental Work Method Statements (EWMS’s) for activities that pose a potential risk to the

environment.

3.1. Environmentally Sensitive Areas

Environmentally Sensitive areas identified by the Risk Assessment include:

• Drainage Lines;

• SEPP 14 Wetlands;

• Koala and Quoll Habitat;

• Ecologically Endangered vegetation Communities;

• Threatened flora species no-go zones;

• Heritage significant sites; and

• Residential areas including Macksville and Macksville Hospital;

Further details are provided in the Environmentally Sensitive Area Plans, provided in Appendix A6 of the CEMP.

Specific EWMS for high risk activities will identify local sensitive environments relevant to the specific activity.

3.2. Environmental Hazards

Potential Environmental Hazards identified by the Risk Assessment include:

• Sediment laden run-off into waterways;

• Mulch – tannin leachate contamination of the waterways;

• Acid Sulfate Soils and contaminated material including low pH leachate run-off into waterways and

acidification of groundwater/soil;

• Fuel – which may be stored in bulk, in small containers or minitankers for use on site;

• Bulk chemicals such as bitumen seal and priming agents;

• Hazardous Storage Containers associated with Construction;

• Miscellaneous Chemicals such as pesticides, sealants, paints, lubricants, oil and grease; and

• Cement dust.

4. Preventative measures

Pre-emptive measures (Environmental Controls) to minimise the risk of an incident occurring that were identified as

Page 11: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 11 of 33

part of the Risk Assessment include:

• Erosion and Sediment Controls (sediment basins/drainage etc);

• Mulch Management Protocol;

• Oil Containment booms, spill kits and absorbent materials;

• Double skinned bunding of bulk fuel storage facilities;

• Fire Fighting equipment kept on site at appropriate locations;

• Storage of chemicals/fuels in bunded and covered areas;

• Vehicle re-fuelling procedure;

• Neutralising agents (for pollutants with High or Low pH); and

• Additional materials such as pumps, hoses, geofabric etc to be deployed if required.

5. PIRMP implementation and notification

5.1. PIRMP Activation

The Environment Manager will be responsible for the activation of the PIRMP if they are satisfied that the incident

has caused or threatened environmental harm.

The PIRMP activation flow chart is provided in Appendix 4. Pollution notification protocols for notification to

Community Stakeholders and to Authorities are provided in Appendix 5.

5.2. Actions to be taken during or immediately after a pollution incident

Actions to be taken immediately in the event of an incident that causes or threatens material harm to the

environment will depend on the incident type and severity. These are summarised in Table 2.

Table 2 List of actions in response to a pollution incident

Action Responsibility Timing

Site actions

Assess the situation, stop work, shut down equipment and evacuate the work area if required.

All Immediately

ONLY IF SAFE TO DO SO: take immediate actions to prevent adverse impact to the environment or community (refer below).

All Immediately

Ensure the cleanup of the incident as appropriate. Specialist contractors may be engaged if required.

Site Supervisor As soon as safe to do so

Undertake appropriate environmental monitoring in environmentally sensitive areas to monitor the impact of the incident and effectiveness of clean up measures so that further mitigative measures can be identified and implemented as appropriate.

Environment Manager

As required

Notifications

In each work area the relevant Supervisor and Foreman are to be notified of the incident (immediately and without delay).

Any witness to the incident

Immediately and without delay

Page 12: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 12 of 33

Action Responsibility Timing

Notify the Environment Manager (refer to table 1) for contact details. Supervisor of Work Area

Immediately and without delay

Notify Project Director, Safety Manager and Health Infrastructure Community Relations Manager.

Environment Manager

Immediately and without delay

Implement Authorities Notification Protocol (refer to Appendices 1 and 2). Environment Manger/Safety Manager

Immediately and without delay

Implement Community Notification Protocol (Health Infrastructure) Health Infrastructure Community Relations Manager

Immediately and without delay

Note: Immediately and without delay means as soon as Pacifico are aware of the incident, not following an initial

investigation to determine the causes etc. EPA have taken regulatory action against projects who do not comply

with this requirement (even when the incident is notified to them within 3-4 hours of the incident occurring).

5.3. Detailed actions to prevent adverse impact to the environment

Detailed Actions to prevent adverse impact to the environment as caused by a pollution incident are described

below:

• If the Pollution Incident cannot be SAFELY controlled or mitigated with the available resources on site

the emergency authorities (Fire Brigade etc) will attend to the incident and implement any necessary

measures. The emergency authorities will control the site.

• If the Pollution Incident can be SAFELY controlled or mitigated with the available resources on site.

The following detailed actions shall be undertaken under the direction of the relevant site supervisor

[CORRECT PPE SHALL BE WORN IN ACCORDANCE WITH RELEVANT SDS].

o Isolate the source of pollution: e.g by shutting off valves, relocating oil drums to bunded area, re-

directing discharge points away from sensitive environmental areas;

o Contain the pollution using available resources on site including spill kits, oil containment booms,

sand bags, mulch material, geofabric;

o Protect any environmentally sensitive area from pollution using available resources;

o Clean up the pollution (both on site and off site) using available resources such as sand, flocculants,

spill kits, oil booms, mulch. Materials to be used will depend on the scale and nature of the

incident;

o If additional resources are required such as sucker trucks, these shall be ordered to site as soon as

it is safe to do so; and

o Dispose of any contamination and materials in accordance with EPA waste classification and

disposal requirements.

• When the pollution incident has been effectively cleaned up, a visual inspection shall be undertaken of

the environment downstream from where the incident occurred. The inspection shall be undertaken

by the Environment Manager to determine whether the mitigation and clean up actions have been

Page 13: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 13 of 33

effective. The Environment Manager shall determine whether or not additional investigations shall be

undertaken. This will depend on the nature of the pollution incident and may include but not be limited

to:

o Additional water testing for relevant contaminants such as suspended solids and hydrocarbons;

o Ecological monitoring to determine the effects of the pollution incident on flora and/or fauna;

o Groundwater or Soil contamination testing; and

o Monitoring of airborne contaminants such as fumes, asbestos.

Further details are provided in the Emergency Response Plan.

5.4. Additional Resources

Additional resources and/or expertise may be required in the event of an incident. Some relevant resources are

provided in Table 3.

Table 3 Suppliers and Specialists Contact List

Specialist area Contact

Project Ecologist Jessica O’Leary (Geolink)

Soil contamination Coffey Geosciences

Groundwater quality Geolink

Sucker truck Cable and Pipe Relocations

Occupational hygienist Banksia

Spill Kits/Oil Booms etc Global Spill

Arborist Arbpro

Project Archaeologist Jacobs Consulting

Project Soil Conservationist Soil Conservation Service

6. Documentation

6.1. Sensitive Area Maps

The Sensitive Area Plans of the CEMP (Appendix A6) will be kept in a visible location on site. The Plans will be kept

up to date.

6.2. Inventory of pollutants

An inventory of pollutants kept or used for the Project has been prepared. The pollutant inventory includes details

of chemicals and fuels stored or used on the premises, the approximate volume and location of storage.

6.3. Availability of PIRMP

Page 14: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 14 of 33

This PIRMP will be available to all Project personnel and will be available at the premises in written and electronic

form. The PIRMP will be made available to an EPA officer on request.

Specific sections of this PIRMP will be made publically available on the ACCIONA website. A hardcopy will be

forwarded to any person making a written request for a copy. The summary statement of the PIRMP will:

• Include procedures for contacting relevant authorities; and

• Include standard procedures for communication with the community.

NOTE – Community Management is being delivered by Health Infrastructure

Page 15: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 15 of 33

7. Continual improvement

7.1. Training and testing

To ensure that the PIRMP is implemented effectively in the event of an incident, the following training and testing

programme shown in Table 4 will be implemented.

Table 4 Training and testing programme

Focus Timing Key personnel

PIRMP key requirements:

• onsite incident response (actions)

• notifications protocol • key safety requirements

• Within 3 months of the commencement of construction

• Project Director • Environment Manager • Project Foreman • Safety Manager

• PIRMP desktop test/Emergency Drill

• Annually • Within 1 month of a major

incident

• Project Director • Environment Manager • Project Foreman • Safety Manager

Note: All relevant workers and subcontractors will be inducted into the requirements of the PIRMP through the site

induction and toolbox training as required, while a targeted training session will be held for those persons with

specific responses relating to PIRMP activation and implementation.

Records of Training will be held by Pacifico Environment Manager

Page 16: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 16 of 33

APPENDICES

Appendix 1: Compliance Matrix

The below table illustrates compliance with the project documents, statutory and legislative requirements.

Legislation Section / Clause

Requirements Pacifico comments

POEO Act Part 5.7A Duty to prepare and implement pollution incident response management plans.

POEO Act 153A 153A Duty of licence holder to prepare pollution incident response management plan

The holder of an environment protection licence must prepare a pollution incident response management plan that complies with this Part in relation to the activity to which the licence relates.

Maximum penalty:

a) in the case of a corporation—$1,000,000 and, in the case of a continuing offence, a further penalty of $120,000 for each day the offence continues, or

b) in the case of an individual—$250,000 and, in the case of a continuing offence, a further penalty of $60,000 for each day the offence continues.

Note. An offence against this section committed by a corporation is an executive liability offence attracting executive liability for a director or other person involved in the management of the corporation—see section 169A.

ACCIONA holds an environmental protection licence. This PIRMP has been prepared by Pacifico to comply with this requirement.

POEO Act 153B 153B EPA may direct other persons to prepare pollution incident response management plan

(1) The EPA may, in accordance with the regulations, require the occupier of premises at which industry is carried out to prepare a pollution incident response management plan that complies with this Part in relation to activities at the premises.

(2) A person must not fail to comply with such a requirement.

Maximum penalty:

(a) in the case of a corporation—$1,000,000 and, in the case of a continuing offence, a further penalty of $120,000 for each day the

ACCIONA holds an environmental protection licence. This PIRMP has been prepared by Pacifico to comply with this requirement.

Page 17: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 17 of 33

Legislation Section / Clause

Requirements Pacifico comments

offence continues, or

(b) in the case of an individual—$250,000 and, in the case of a continuing offence, a further penalty of $60,000 for each day the offence continues.

Note. An offence against subsection (2) committed by a corporation is an executive liability offence attracting executive liability for a director or other person involved in the management of the corporation—see section 169A.

(3) The regulations may make provision for or with respect to:

(a) the class or classes of premises, or industries carried out at premises, that may be the subject of a requirement to prepare a pollution incident response management plan, and

(b) the circumstances in which some or all premises within those classes may be the subject of a requirement to prepare a pollution incident response management plan.

POEO Act 153C 153C Information to be included in plan

A pollution incident response management plan must be in the form required by the regulations and must include the following:

a) the procedures to be followed by the holder of the relevant environment protection licence, or the occupier of the relevant premises, in notifying a pollution incident to:

i. the owners or occupiers of premises in the vicinity of the premises to which the environment protection licence or the direction under section 153B relates, and

ii. the local authority for the area in which the premises to which the environment protection licence or the direction under section 153B relates are located and any area affected, or potentially affected, by the pollution, and

iii. any persons or authorities required to be notified by Part 5.7,

b) a detailed description of the action to be

(a) Section 5, Appendices 4&5

Page 18: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 18 of 33

Legislation Section / Clause

Requirements Pacifico comments

taken, immediately after a pollution incident, by the holder of the relevant environment protection licence, or the occupier of the relevant premises, to reduce or control any pollution,

c) the procedures to be followed for co-ordinating, with the authorities or persons that have been notified, any action taken in combating the pollution caused by the incident and, in particular, the persons through whom all communications are to be made,

(b) Sections 5.3 and 5.4

c) Section 2 and Emergency Response Plan

POEO Act 153D 153D Keeping of plan

A person who is required to prepare a pollution incident response management plan under this Part must ensure that it is kept at the premises to which the relevant environment protection licence relates, or where the relevant activity takes place, and is made available in accordance with the regulations.

Maximum penalty:

a) in the case of a corporation—$1,000,000 and, in the case of a continuing offence, a further penalty of $120,000 for each day the offence continues, or

b) in the case of an individual—$250,000 and, in the case of a continuing offence, a further penalty of $60,000 for each day the offence continues.

Note. An offence against this section committed by a corporation is an executive liability offence attracting executive liability for a director or other person involved in the management of the corporation—see section 169A.

Section 6.3

POEO Act 153E 153E Testing of plan

A person who is required to prepare a pollution incident response management plan under this Part must ensure that it is tested in accordance with the regulations.

Maximum penalty:

a) in the case of a corporation—$1,000,000 and, in the case of a continuing offence, a further penalty of $120,000 for each day the offence continues, or

Section 7.1

Page 19: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 19 of 33

Legislation Section / Clause

Requirements Pacifico comments

b) in the case of an individual—$250,000 and, in the case of a continuing offence, a further penalty of $60,000 for each day the offence continues.

Note. An offence against this section committed by a corporation is an executive liability offence attracting executive liability for a director or other person involved in the management of the corporation—see section 169A.

POEO Act 153F 153F Implementation of plan

If a pollution incident occurs in the course of an activity so that material harm to the environment (within the meaning of section 147) is caused or threatened, the person carrying on the activity must immediately implement the pollution incident response management plan in relation to the activity required by this Part.

Penalties apply

Section 5

POEO(G) Regulation

98C 98C Additional matters to be included in plan

Note. See also section 153C (a)–(c) of the Act.

(1) General

The matters required under section 153C (d) of the Act to be included in a plan are as follows:

(a) a description of the hazards to human health or the environment associated with the activity to which the licence relates (the relevant activity),

(b) the likelihood of any such hazards occurring, including details of any conditions or events that could, or would, increase that likelihood,

(c) details of the pre-emptive action to be taken to minimise or prevent any risk of harm to human health or the environment arising out of the relevant activity,

(d) an inventory of potential pollutants on the premises or used in carrying out the relevant activity,

(e) the maximum quantity of any pollutant that is likely to be stored or held at particular locations (including underground tanks) at or on the premises to which the licence relates,

Section3 3, 4 and 5, and Appendix 2 and 3.

Page 20: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 20 of 33

Legislation Section / Clause

Requirements Pacifico comments

(f) a description of the safety equipment or other devices that are used to minimise the risks to human health or the environment and to contain or control a pollution incident,

(g) the names, positions and 24-hour contact details of those key individuals who:

i. are responsible for activating the plan, and

ii. are authorised to notify relevant authorities under section 148 of the Act, and

iii. are responsible for managing the response to a pollution incident,

(h) the contact details of each relevant authority referred to in section 148 of the Act,

(i) details of the mechanisms for providing early warnings and regular updates to the owners and occupiers of premises in the vicinity of the premises to which the licence relates or where the scheduled activity is carried on,

(j) the arrangements for minimising the risk of harm to any persons who are on the premises or who are present where the scheduled activity is being carried on,

(k) a detailed map (or set of maps) showing the location of the premises to which the licence relates, the surrounding area that is likely to be affected by a pollution incident, the location of potential pollutants on the premises and the location of any stormwater drains on the premises,

(l) a detailed description of how any identified risk of harm to human health will be reduced, including (as a minimum) by means of early warnings, updates and the action to be taken during or immediately after a pollution incident to reduce that risk,

(m) the nature and objectives of any staff training program in relation to the plan,

(n) the dates on which the plan has been tested and the name of the person who

Page 21: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 21 of 33

Legislation Section / Clause

Requirements Pacifico comments

carried out the test,

(o) the dates on which the plan is updated,

(p) the manner in which the plan is to be tested and maintained.

(2) Trackable waste transporters

This section is not applicable to Pacifico works.

POEO(G) Regulation

98D (1) A plan is to be made readily available:

(a) to an authorised officer on request, and

(b) at the premises to which the relevant licence relates, or where the relevant activity takes place, to any person who is responsible for implementing the plan.

(2) A plan is also to be made publicly available in the following manner within 14 days after it is prepared:

(a) in a prominent position on a publicly accessible website of the person who is required to prepare the plan,

(b) if the person does not have such a website—by providing a copy of the plan, without charge, to any person who makes a written request for a copy.

(3) Subclause (2) applies only in relation to that part of a plan that includes the information required under:

(a) section 153C (a) of the Act, and

(b) clause 98C (1) (h) and (i) or (2) (b) and (c) (as the case requires).

(4) Any personal information within the meaning of the Privacy and Personal Information Protection Act 1998 is not required to be included in a plan that is made available to any person other than a person referred to in subclause (1).

Section 6.3

POEO(G) Regulation

98E 98E Testing of plan

(5) The testing of a plan is to be carried out in such a manner as to ensure that the information included in the plan is accurate and up to date and the plan is capable of being implemented in a workable and effective manner.

Section 7.1

Page 22: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 22 of 33

Legislation Section / Clause

Requirements Pacifico comments

(6) Any such test is to be carried out:

(a) routinely at least once every 12 months, and

(b) within 1 month of any pollution incident occurring in the course of an activity to which the licence relates so as to assess, in the light of that incident, whether the information included in the plan is accurate and up to date and the plan is still capable of being implemented in a workable and effective manner.

Page 23: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 23 of 33

Appendix 2: Risk matrix criteria (consequence and likelihood)

Risk Quantification

(Likelihood X Severity)

Minor

This is a Reportable Incident*

No breach of legislation

Low impact – can be easily

rectified without residual

impact to the environment or

heritage values.

Requires only minor changes

to improve procedural

controls

Moderate

This is a Category 2 Incident*

Could cause potential breach of

legislation

Impact to environment or

heritage values requiring

further investigation and or

standard environmental

controls to rectify

No residual impact to

environment or heritage value

High

This is a Category 1 Incident*

Breach of legislation

Requires major investigation

and engineering controls to

rectify

Impact to environment or

heritage values with irreparable

damage or long term

restoration (>1 year)

SEVERITY

LIKELIHOOD 1 2 3

Unlikely

(Has occurred once on a

similar project in past 5

years)

1 L(1) L(2) M(3)

Likely

(Has occurred more

than once on a similar

project in past 5 years)

2 L(2) M(4) H(6)

Almost Certain

(Has occurred in all

similar projects in the

past 5 years)

3 M(3) H(6) H(9)

Low Residual Risk Medium Residual Risk High Residual Risk

Risk is TOLERABLE. No further

preventative action required, consider

cost effective solutions or

improvements that impose no

additional cost.

Work may only start if the risk has been

reduced to As Low as Reasonably

Practicable (ALARP). Consider additional

control measures that reduce the risk

without significantly increasing cost**.

Risk is INTOLERABLE. Do not start work or

continue until risk level is reduced using

suitable control measures to a reasonably

practicable level**.

* Incident – Refer to RMS Environmental Incident Classification and Reporting Procedure (CEMP Appendix A7)

** Control measures are to ensure that residual risks are reduced to as low as reasonably practicable. Where controls fail to

reduce to a TOLERABLE or ALARP level the assessment must be referred to the Pacifico Project Manager.

Page 24: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 24 of 33

Appendix 3: Results of preliminary risk assessment

Construction phase

Sub-activities Plant involved Pollution Incident description

BAU Controls (Pre-Emptive Measures)

Likelihood Severity Risk Additional contingency

measures

Site Establishment

• Amenities • Site buildings • Services • Compound

access • Paving • Fencing • Survey • Fuel storage • Drainage /

erosion and sediment control installation

• Mobile plant • Excavators • Haulage

Trucks • Rollers • Light vehicles • Minitanker

• Minor Fuel Spill (re-fuelling)

• Re-fuelling procedure • Spill kits • EWMS for Site Compound

establishment

2 2 Medium

(4)

• Oil absorbent materials

• Hydrocarbon booms

• Fire fighting equipment

• Major Fuel Spill (catastrophic Failure of bulk fuel storage)

• Double skinned tanks • EWMS for Site Compound

establishment

1 3 Medium

(3)

• Oil absorbent materials

• Hydrocarbon booms

• Sucker trucks • Fire fighting

equipment

• Sediment release

• ERSED Plan • Sedimentation Basin

Management and Discharge Procedure (SWMP Appendix H)

• EWMS for Site Compound establishment

• EWMS Drainage

2 2 Medium

(4)

• Flocculants • Sandbags,

geofabric, mulch, sediment fence etc

• Pumps and hoses

• Acid sulfate soil release

• Acid Sulfate Materials Management Procedure (SWMP Appendix C)

1 2 Low

(2)

• Neutralising agent (lime)

Page 25: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 25 of 33

Construction phase

Sub-activities Plant involved Pollution Incident description

BAU Controls (Pre-Emptive Measures)

Likelihood Severity Risk Additional contingency

measures

• EWMS for Site Compound Establishment

• Contaminated soil release

• Unexpected Discovery of Contaminated land procedure (SWMP Appendix F)

• EWMS for Site Compound Establishment

1 3 Medium

(3)

• Flocculants • Sandbags,

geofabric, mulch, sediment fence etc

• Pumps and hoses

• Minor Chemical Spill

• Bunding of chemicals and fuels

• Pre-start equipment checks maintenance

• EWMS for Site Compound establishment

2 2 Medium

(4)

• Oil absorbent materials

• Hydrocarbon booms

• Pumps and hoses

• Fire fighting equipment

Clearing and grubbing

• Excavation • Ripping • Material Haulage • Mulching

• Tree loppers • Excavators • Mulchers • Mobile fuel

tank

• Tannin release

• Environmental Direction – Management of Tannin from Vegetation Mulch (SWMP Appendix D)

• EWMS for Clearing and Grubbing

2 2 Medium

(4)

• Sandbags, geofabric, sediment fence etc

• Pumps and hoses

• Sediment release

• ERSED Plan • Sedimentation Basin

Management and

2 2 Medium • Sandbags, geofabric, mulch,

Page 26: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 26 of 33

Construction phase

Sub-activities Plant involved Pollution Incident description

BAU Controls (Pre-Emptive Measures)

Likelihood Severity Risk Additional contingency

measures

Discharge Procedure (SWMP Appendix H)

• EWMS for Clearing and Grubbing

(4) sediment fence etc

• Pumps and hoses

• Pollution from unidentified waste and/or drums

• Unexpected Discovery of Contaminated land procedure (SWMP Appendix F)

• EWMS for Clearing and Grubbing

1 2 Low

(2)

• Oil absorbent materials

• Hydrocarbon booms

• Pumps and hoses

• Fire fighting equipment

Bulk earthworks

• Haul Road Construction

• Batter excavation

• Cut / fill activities

• Drainage • Stockpiling • Material Haulage

• Haulage trucks

• Excavators • Rippers • Graders • Rollers

• Sediment release

• ERSED Plan • Sedimentation Basin

Management and Discharge Procedure (SWMP Appendix H)

2 2 Medium

(4)

• Sandbags, geofabric, mulch, sediment fence etc

• Pumps and hoses

• Acid sulfate material release

• Acid Sulfate Materials Management Procedure (SWMP Appendix C)

• ERSED Plan for containment of low pH water

1 3 Medium

(3)

• Neutralising agent (lime)

• Excessive dust emissions

• Air Quality Management Plan

2 2 Medium • Chemical

Page 27: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 27 of 33

Construction phase

Sub-activities Plant involved Pollution Incident description

BAU Controls (Pre-Emptive Measures)

Likelihood Severity Risk Additional contingency

measures

• Water cart use (4) suppressants

• Contaminated soil runoff/release

• Erosion and sediment controls

• Soil and Water Management Plan

1 2 Low

(2)

• Sandbags, geofabric, mulch, sediment fence etc

• Pumps and hoses

• High pH water release

• ERSED Plan • EWMS Drainage • EWMS Concrete Works

2 2 Medium

(4)

• Neutralising agent

• Containment systems for run-off

Pavement Finishing

• Application of bitumen prime seal or other curing compound

• Spray Sealer • Bitumen/che

mical trucks

• Uncontrolled release of bitumen prime seal or other curing compound

• Spill containment booms and bunding

• ERSED Plan • Bunded storage of

chemicals • EWMS Concrete Works

2 3 High

(6)

• Oil absorbent materials

• Hydrocarbon booms

• Pumps and hoses

• Sucker trucks • Fire fighting

equipment

Road Finishes • Linemarking • Installation of

road furniture and signage

• linemarker • small hand

tools • Mobile plant

• Paint/fuel spill

• Spill containment booms and bunding

• Bunded storage of chemicals

2 1 Low

(2)

• Oil absorbent materials

• Hydrocarbon booms

Page 28: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Macksville Hospital Development – Early Works

MHD-EN-MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 28 of 33

Construction phase

Sub-activities Plant involved Pollution Incident description

BAU Controls (Pre-Emptive Measures)

Likelihood Severity Risk Additional contingency

measures

• landscaping • Pumps and hoses

• Sucker trucks • Fire fighting

equipment

• Sediment release

• ERSED Plan • Sedimentation Basin

Management and Discharge Procedure (SWMP Appendix H)

2 1 Low

(2)

• Sandbags, geofabric, mulch, sediment fence etc

• Pumps and hoses

Page 29: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Pacific Highway Upgrade: Warrell Creek to Nambucca Heads

MHD-EN--MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 29 of 33

Appendix 4 – Pollution Incident Notification Flow Chart

Notes:

The Environment Manager will advise

whether or not material environmental

harm is caused or threatened and will

decide if the PIRMP should be activated. In

doing so, the following factors should be

considered:

• Proximity to sensitive receivers (e.g

residents, schools, fisheries,

aquaculture

• Nature of receiving environment

(disturbed vs/pristine)

• Potential for impacts to human

health (through dermal contact,

respiration, fire or explosion)

• Whether the is pollutant is likely to

leave the project boundary

• Cost of clean up

Incident Occurs and Environment

Manager Notified

Material Environmental Harm

Caused or Threatened (Y/N) Notify HI. Notify verbally to EPA

at EM’s discretion

Notify EPA and other

agencies as appropriate

including HI, NSW DPI

(Fisheries) and Nambucca

Shire Council.

AFJV to notify relevant

stakeholders as appropriate

(e.g. oyster farmers)

Pollutant is hazardous to human

health, and/or is combustible ,

toxic or explosive (e.g fuel, prime

sealer, sewage, chemicals, curing

compounds)

At EM’s discretion notify Emergency

Services* (000) then EPA, HI,

Nambucca Shire Council, Department

of Health*, other agencies as

appropriate including NSW DPI

(Fisheries).

AFJV to implement community

notification protocol

*All pollution incidents (causing or threatening environmental harm) are technically required to be reported to all

authorities. However, it is not the best use of resources to report incidents with zero health or safety risk to Emergency

Services and Health Authorities.

No

Yes

Pollutant is not hazardous,

combustible, toxic or explosive

(e.g Tannins, Sediment)

Page 30: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Pacific Highway Upgrade: Warrell Creek to Nambucca Heads

MHD-EN--MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 30 of 33

Appendix 5: Pollution Notification Protocol

Pollution Notification to Community Stakeholders Protocol (Health Infrastructure)

Whether or not the local community stakeholders are notified of a pollution incident will depend on the incident

type and severity, and the potential to impact on the community. Community stakeholder notification is required

for events that will result in an unacceptable health risk to community stakeholders. This could be during an incident

(e.g immediate risk of harm to health) or following an incident (e.g. due to the presence of harmful contaminant in

soil or potential impacts to fisheries) in this circumstance, stakeholders will be notified in a manner that is

appropriate for the type and severity of the incident. The AFJV Environment Manager and the Project Director shall

determine if community notification is required, the mechanisms by which the notification is made and the extent

of the notification.

The notification measures will be directed by the Project Director or delegate may include one or more of the

following:

• Publication of incident related notification on Project website

• Distribution of Letter Box Drops

• Individual briefings of affected residents

Mechanisms for early warnings and ongoing regular updates to the community may include

• Doorknock of residents, businesses and others (e.g schools) potentially impacted by the incident

• Phone contact/messages

• Media notification

• Use of technology such as Variable Message / Motorway signage and radio communications.

In extreme cases, where the emergency services are required to attend site and control the incident, community

notification will be undertaken by the relevant emergency service. For instance, if the incident results in a fire off

site, that threatens the safety of local residents, the local fire brigade will control external communications and will

co-ordinate the necessary evacuations.

Page 31: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Pacific Highway Upgrade: Warrell Creek to Nambucca Heads

MHD-EN--MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 31 of 33

Authority Notification Protocol

Notification to the Authorities must be undertaken in the order as listed in Table 1 Below.

Authority Name 24 Hour Contact No Other Phone Number Pacifico notification accountability

Emergency Services

Fire and Rescue NSW

NSW Police

NSW Ambulance Service

000

000

000

1300 729 579 Safety Manager

Only ring 000 if the incident presents an immediate threat to human health or to property and requires emergency services. If the incident does not require an initial combat agency, or once the 000 call has been made, notify as listed below.

EPA Environment Line 131 555 (02) 9995 5555 Environment Manager

Ministry of Health (North Coast Public Environmental Health Unit)

0428 882 805 (after hours, Environmental Health)

1300 066 055

Environment Manager

WorkCover Authority

Information Line 13 10 50 N/A Safety Manager

Nambucca Shire Council

General

SES

Water

Sewerage

Roads, Bridges

(02) 6658 2555

(02) 6598 8022

0417 285 269

0417 287 397

0417 488 565

13 25 00

Environment Manager

The relevant information to be provided to the authorities in the event of a pollution incident consists of the

following:

• The time, date, nature, duration and location of the incident

• The location of the place where the pollution is occurring or is likely to occur, the nature, the estimated

quantity or volume and the concentration of any pollutants involved, if known

• The circumstances in which the incident occurred (including the cause of incident, if known)

• The action taken or proposed to be taken to deal with the incident and any resulting pollution or threatened

(if known)

Page 32: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Pacific Highway Upgrade: Warrell Creek to Nambucca Heads

MHD-EN--MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 32 of 33

Appendix 6: Sensitive Area Plans – Location of Chemical Storage Facilities

Page 33: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy
Page 34: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

Pacific Highway Upgrade: Warrell Creek to Nambucca Heads

MHD-EN--MPL-008 PIRMP REV: 1

Uncontrolled Copy When Printed Page 33 of 33

Appendix 7: Chemical Manifest

Page 35: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

SDS Register in Alphabetical Order

04-10-18

SDS #No Substance or Goods Name

CurrentSDS

suppliedYes/No

HazardSubstance Yes/No

Dangerous GoodsYes/No

RiskAssessm

entYes/No

SWMSYes/No

AmountTypicallyStored

(Litres/kgetc)

Date of SDS

WorkplaceMonitoring or

HealthSurveillance

Required Y/N

Contract using & Location Supplier Details

1 DY-MARK spray paint  Yes  Yes  Yes  Yes  Yes  10 litres 19-3-2015  No  Geometric2 Spot marking paint  Yes  Yes  Yes  Yes  Yes  10 litres 15-1-2013  No  Geometric3 Ultra protect 30+ sunscreen  Yes  No  No  Yes  No  1 litre 11-7-2016  No  Geometric4 Harpic white and shine bleach gel  Yes  Yes  Yes  Yes  Yes  2 litres 2-7-2013  No AFJV 5 Dettol Antibacterial hand wash  Yes  No  no  Yes  No  2 litres 22-9-2014  No  AFJV6 Sikabond  Yes  Yes  Yes  Yes  Yes  2 tubes 4-12-2014  No  AFJV7 Dettol power and pure multipurpose cleanser  Yes  No  No  Yes  No  2 litres 12-6-2012 No  AFJV8 Palmolive anti bacterial foaming hand wash  Yes  No  No  Yes  No  2 litres 1-9-2014  No  AFJV9 Fairy all in one dishwash liquid  Yes  No  No  Yes  No 2 litres 15-11-2011  No  AFJV10 Raid one shot insect killer  Yes  No  Yes  Yes  Yes  2 litres 1-6-2012  No  AFJV11 Unleaded Petrol Yes Yes Yes  Yes Yes TBA 6-5-2014 No Caltex12 2 Stroke Oil Yes No No  Yes No TBA 15-7-2013 No Stihl Australia13 Aglime Fertilisers Yes No No  Yes No TBA 11-4-2013 No Aglime14 Rapid Set Concrete  Yes Yes No  Yes No TBA 1-9-2014 No Cement Australia15 Line Marker Paint  Yes Yes Yes  Yes No TBA 8-5-2013 No Constructor Safe line Marker Paint16 30 Seconds spray & walk away Concrete Lichen Yes Yes Yes  Yes No TBA 11-8-2016 No Newcombe Sales17 Hydrated Lime Yes Yes No  Yes No TBA 1-9-2014 No Cement Australia18 Bushman insect Repellent Yes Yes Yes  Yes No TBA 17-10-2013 No Juno Ltd19 Accent Silicone Yes No No  Yes No 2 Tubes 23-12-2013 No Accent20 Aust Builders Quickset Concrete Yes Yes No  Yes No 100Kg 1-10-2012 No Australian Builders21 Septone Armour Cologne Yes No No  Yes No 20 Litres 1-1-2013 No Septone22 Septone C-Thru Yes No No  Yes No 20 Litres 1-3-2013 No Septone23 30 Seconds Outdoor Cleaner Concentrate Yes Yes No  Yes No 2 Litre 11-8-2016 No 30 Seconds24 Methylated spirits Yes Yes Yes  Yes No 1 Litre 1-11-2015 No Perriga25 Type N Blue Solvent Yes Yes Yes Yes  Yes No 4 Litres 6-7-2012 No Atherton Chemicals26 Ozseal priming fluid Red Yes Yes Yes  Yes No 4 Litres 6-7-2012 No Atherton Chemicals27 Bynorm 4 Stroke Engine Oil Yes No No  Yes No 4 Litre 5-4-2013 No Peak Lubricants28 WD-40 bulk Liquid Yes Yes Yes  Yes No 1 litre 17-12-2014 No WD-40 Company Australia29 SFR 2522 Multipurpose Grease Yes Yes No  Yes No 4 Litre 26-6-2014 No SFR Corporation30 Protector-Solvent based wax p reperation  Yes Yes Yes  Yes No 4 Litre 1-9-2014 No Cyndan Chemicals31 Diesel Vortex Premium Yes Yes No  Yes No TBA 19-2-2013 No Caltex32 Deodoriser sanitiser Rainforest Yes No No  Yes No 10 Litres 1-10-2014 No Northfolk33 Food Surface Sanitiser Yes Yes No  Yes No 10 Litres 1-10-2014 No Northfolk34 Alpine spray & Wipe Yes No No  Yes No 5 Litres 14-5-2013 No Alpine35 Alpine Hany Hand Cleaner Yes Yes No  Yes No 2 Litres 8-5-2013 No Alpine36 Instant Hand Cleaner Yes Yes Yes  Yes No 1 Litre 30-1-2015 No Clean Plus Chemicals37 Finish Poweball Tabs Yes Yes No  Yes No 5 Kg 5-11-2012 No Reckitt Benckiser38 Nifti Yes No No  Yes No 1 Litre 1-9-2012 No Colgate Palmolive Pty Ltd39 Septone Neutral Lemon Yes Yes No  Yes No 10 Litres 4-11-2013 No Septone40 Chemtools R44 Deox Yes No No  Yes No 1 Litre 1-5-2014 No Chemtools41 Alpine Disinfectant liquid Yes No No  Yes No 5 Litre 16-5-2013 No Alpine42 Finish Powerball Classic Yes Yes Yes  Yes No 1.1kg 17-1-2014 No Reckitt Benckiser43 Officeworks White board Cleaner  Yes No No  Yes No 500ml 20-2-2013 No Office Works44 Chemwatch Odour fresh perfumed Deodorant  Yes Yes Yes  Yes No 10kg 16-5-2013 No Chemwatch

Project: MDH ProjectLast Up Date:

15-10-181 of 5C:\Users\jhaslett\AppData\Local\Temp\Appendix 7 - Chemical Manifest_7FE0EE

Page 36: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

SDS Register in Alphabetical Order

04-10-18

SDS #No Substance or Goods Name

CurrentSDS

suppliedYes/No

HazardSubstance Yes/No

Dangerous GoodsYes/No

RiskAssessm

entYes/No

SWMSYes/No

AmountTypicallyStored

(Litres/kgetc)

Date of SDS

WorkplaceMonitoring or

HealthSurveillance

Required Y/N

Contract using & Location Supplier Details

Project: MDH ProjectLast Up Date:

45 Phosphate Free Eco Wash Yes No No  Yes No 20 Litre 1-2-2015 No Chemtech46 Roundup Powermax weed killer Yes Yes No  Yes No 1 Litre 16-10-2015 No Scotts Aust47 Pestmaster Herbicide Yes No No  Yes No 5 Litres 1-3-2012 No Triox Pty Ltd48 Megapoxy P1- Part A Yes No No  Yes No 10 Litres 13-7-2015 No Vivacity Eng P/L49 Megapoxy P1- Part B Yes No No  Yes No 10 Litres 13-7-2015 No Vivacity Eng P/L50 Bynorm 4 Stroke Engine Oil Yes No No  Yes No 4 Litres 5-4-2013 No Peak Lubricants P/L51 BK Standard Bactericidal Pipe Jointing Lubricant Yes No No  Yes No TBA 1-2-2013 No Thomas Grozier & Sons P/L52 Liquid Nails Original Yes Yes Yes  Yes No 300g 27-8-2014 No Selleys53 Fosroc Renderoc HB 40 Yes Yes No  Yes No 240 Kgs 4-6-2013 No Parchem Construction Supplies54 RIW Flexiseal Pro Primer Base Yes Yes No  Yes No 60 Litres 10-3-2015 No RIW Limited55 Rugasol MH Yes Yes Yes  Yes No TBA 28-8-2014 No Sika Aust Pty Ltd56 Sikadur- 32 (B) Yes Yes Yes  Yes No 9 Kgs 31-5-2014 No Sika Aust Pty Ltd57 Sikadur- 32-N Comp A Yes Yes Yes  Yes No 15Kgs 28-5-2012 No Sika Aust Pty Ltd58 Sika Tite BE Yes No No  Yes No 20 litres 26-5-2014 No Sika Aust Pty Ltd59 Epirez Cr4ak Repairr Epoxy Sealer (123) Yes Yes Yes  Yes No 1.5 Litres 1-1-2013 No ITW Polymers and Fluids60 Epirez Cr4ak Repairr Epoxy Sealer (123) Hardener Yes Yes Yes  Yes No 500ml 1-1-2013 No ITW Polymers and Fluids61 AVS 600M Protectit Yes No No  Yes No 20 litres 13-12-2012 No Bostik Australia Pty Ltd62 Sika Tite BE Yes No No  Yes No 2000 Litres 26-5-2014 No Sika Aust Pty Ltd63 Triple Strike Yes Yes No  Yes No 5 Litres 1-4-2015 No Ultimate Industrial64 Fastdry Roadmarking Waterbased Yes No No  Yes No TBA 15-3-2014 No Apco Coatings65 Eraring Flyash Yes Yes No  Yes No TBA 18-12-2013 No Flyash Australia Pty Ltd66 Southern White Cement Yes Yes No  Yes No TBA 20-8-2012 No Boral Cement67 SikaMono Top 412NFG Yes No Yes  Yes No 100kg 29-4-2014 No Sika Aust Pty Ltd68 Penapatch Structural HB80 Yes Yes No  Yes No 100kg 5-6-2012 No ITLS-TWA Australia Pty Ltd69 Sika Mono Top 723N Yes Yes Yes  Yes No 240kg 28-4-2014 No Sika Aust Pty Ltd70 Konstrukt Construction Adhesive Yes Yes Yes  Yes No 4 x 110g 12-5-2012 No HB Fuller Company71 Konstrukt Roof -Translucent & Grey Silicone Yes No No  Yes No 2 x 110g 11-12-2012 No Synergy Construction & Industrial72 R40 WD Formula Yes Yes Yes  Yes No TBA 1-9-2014 No Chemtools Pty Ltd73 Sikadur 52 Part A Yes Yes Yes  Yes No 360ml 19-5-2014 No Sika Aust Pty Ltd74 Sikadur 52 Part B Yes Yes Yes  Yes No 180ml 19-5-2014 No Sika Aust Pty Ltd75 Bituthene Solvent Primer Yes Yes Yes  Yes No TBA 1-8-2013 No Grace Construction Products76 Polo Haulage DC Yes Yes No  Yes No TBA 1-4-2013 No Polo Citrus Australia Pty Ltd77 194-85773 Tiltwash Yes Yes No  Yes No TBA 1-7-2013 No Dulux Australia78 Plumbers Mate priming fluid Yes Yes Yes  Yes No 4 litres 23-7-2014 No Bostik Aust Pty LTD79 Bostik PVC Pipe Cement blue Yes Yes Yes  Yes No 4 litres 15-10-2014 No Bostik Aust Pty LTD80 Hydrochloric Acid Yes Yes Yes  Yes No TBA 12-11-2015 No Recochem Inc81 Ultra Grip Construction Adehisive Yes Yes Yes  Yes No 40X110g 1-3-2012 No HB Fuller Company82 14 CLA 20 Patch Master Cold Lay Yes No No  Yes No TBA 8-10-2015 No Jaybro Civil Safety Products83 Boral Emulsion Sealant Yes No No  Yes No 20 Litre 29-10-2013 No Boral Asphalt84 Mortein Killa Protect Surface Spray Yes y Yes  Yes No TBA 11-12-2015 No Reckitt Benckiser85 Raid one shot insect killer Yes No Yes  Yes No TBA 1-7-2013 No SC Johnson&Sons PTY LTD86 Septone all purpose thinners Yes y Yes  Yes No TBA 1-1-2013 No Septone Australia87 Dulux Professional Total Prep Yes No No  Yes No 10 Litres 26-2-2016 No Dulux Austra PTY88 Dulux Weathershield X 10 Gloss Yes No No  Yes No 12 litres 12-11-2015 No Dulux Australia

15-10-182 of 5C:\Users\jhaslett\AppData\Local\Temp\Appendix 7 - Chemical Manifest_7FE0EE

Page 37: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

SDS Register in Alphabetical Order

04-10-18

SDS #No Substance or Goods Name

CurrentSDS

suppliedYes/No

HazardSubstance Yes/No

Dangerous GoodsYes/No

RiskAssessm

entYes/No

SWMSYes/No

AmountTypicallyStored

(Litres/kgetc)

Date of SDS

WorkplaceMonitoring or

HealthSurveillance

Required Y/N

Contract using & Location Supplier Details

Project: MDH ProjectLast Up Date:

89 Parchem Avistaq Sealer Stripper Yes Yes No  Yes No TBA 24-2-2015 No Parchem90 Fosroc Nitoprime Zincrich Yes Yes Yes  Yes No TBA 1-11-2012 No Parchem91 Blue Heeler Truck Wash Yes No No  Yes No TBA 1-6-2013 No Septone92 Detach Ultra Bio-Release Agent Yes Yes No  Yes No TBA 13-10-2014 No d93 Dolomite Yes Yes No  Yes No TBA 1-7-2015 No Mudgee Dolomite & Lime PTY Ltd94 Emulsion Crack Sealant yes No No  Yes No TBA 29-10-2013 No Boral95 Coldmix Yes No No  Yes No TBA 29-10-2013 No Boral96 Pro Bloc Sunscreen 50 + Yes No No  Yes No TBA 19-9-2013 No Pro Safety Gear97 Pro Bloc Sunscreen 30 + Yes No No  Yes No TBA 17-9-2013 No Pro Safety Gear98 Aftek High Build Repair Mortar Yes Yes No  Yes No TBA 24-4-2016 No itls99 Water solution of Potassium Hydrogen Phthalate Yes No No  Yes No TBA 1-10-2013 No Australian Scientific100 Buffer solution pH 7.0 Yes No No  Yes No TBA 11-7-2012 No Air Met Scientific101 Ram below ground Petrolatum Tape Yes No No  Yes No TBA 16-2-2016 No AIWC102 Two stroke oil Yes Yes Yes  Yes No TBA 15-7-2013 No Makita103 Raid Commercial Insecticide Residual Surface Yes No Yes  Yes No TBA 24-7-2015 No Diversey104 Armor All Multi purpose cleaner Yes No No  Yes No TBA 1-7-2013 No Armored AutoGroup105 Ajax Spray N Wipe Yes No No  Yes No TBA 1-9-2012 No Ajax106 Prairie rose athmosphere spray Yes No Yes  Yes No TBA 1-1-2015 No Peerless Jal Pty Ltd107 Bleach Liquid Yes Yes No  Yes No TBA 1-12-2012 No Brighton Professional108 Floor Cleaner with Ammonia Yes No No  Yes No TBA 1-12-2012 No Brighton Professional109 Instant Hand Sanitising Gel Yes Yes Yes  Yes No TBA 1-12-2012 No Brighton Professional110 Truck Wash Yes No No  Yes No TBA 1-12-2012 No Brighton Professional111 Window Cleaner Yes No No  Yes No TBA 1-12-2012 No Brighton Professional112 Dishwashing Detergent Yes No No  Yes No TBA 1-12-2012 No Brighton Professional113 Flexi Seal Primer Yes Yes Yes  Yes No TBA 6-3-2015 No AIWC114 Flexi Seal HD Yes No No  Yes No TBA 25-1-2016 No AIWC115 CRS-R Cationic Emulsion Yes Yes No  Yes No TBA 1-5-2016 No Sami Bitumen Technologies116 Acetylene Yes Yes Yes  Yes No TBA 20-3-2015 No BOC117 Ramset Chemset 810 Yes Yes Yes  Yes No TBA 20-3-2015 No Ramset Fasteners118 EP Grease Yes No Yes  Yes No TBA 19-3-2015 No Caltex Australia119 Hydraulic Oil AW68 Yes No No  Yes No TBA 24-4-2012 No Caltex Australia120 Gear Oil SAE 140 Yes No Yes  Yes No TBA 26-4-2012 No Caltex Australia121 CRC 5.56 Aerosol Yes Yes Yes  Yes No TBA 6-6-2014 No CRC Industries122 Sika Viscocrete PC HRF-2 Yes No No  Yes No TBA 25-7-2014 No Sika Aust Pty Ltd123 Sika Retardar N Yes No No  Yes No TBA 19-7-2012 No Sika Aust Pty Ltd124 Sika Plastiment 20 Yes No No  Yes No TBA 5-8-2013 No Sika Aust Pty Ltd125 Sika Air Yes No No  Yes No TBA 19-9-2013 No Sika Aust Pty Ltd126 General Purpose Cement Yes Yes Yes  Yes No TBA 21-1-2015 No Boral Constructions Materials127 Concrete (wet mix) Yes Yes No  Yes No TBA 10-11-2014 No Boral Concrete128 Sika Grout 212/215/212 HP Yes Yes No  Yes No TBA 12-6-2013 No Sika (NZ) Ltd129 Barrell Kleen Safe Yes Yes Yes  Yes No TBA 13-12-2016 No Chemtall (Australasia Pty Ltd)130 Cure Crete Yes No No  Yes No TBA 1-7-2012 No Sika131 Quick Lime Yes No Yes  Yes No TBA 21-1-2015 No Boral Cemant132 Vital Bon-Matt P47-VR1 (IGD) Yes No No Yes No TBA 14-11-2013 No Vital Chemical PTY Ltd

15-10-183 of 5C:\Users\jhaslett\AppData\Local\Temp\Appendix 7 - Chemical Manifest_7FE0EE

Page 38: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

SDS Register in Alphabetical Order

04-10-18

SDS #No Substance or Goods Name

CurrentSDS

suppliedYes/No

HazardSubstance Yes/No

Dangerous GoodsYes/No

RiskAssessm

entYes/No

SWMSYes/No

AmountTypicallyStored

(Litres/kgetc)

Date of SDS

WorkplaceMonitoring or

HealthSurveillance

Required Y/N

Contract using & Location Supplier Details

Project: MDH ProjectLast Up Date:

133 Pasteurized Garden Organics and Course Mulch Yes No No Yes No TBA 2-5-2016 No Pacifico134 Mortein lure n kill cockroache baits Yes TBA 18-12-2015135 Fast action ratsak wax blocks Yes No Yes Yes No TBA 3-5-2016 No Yates136 Antibacterial Surface Spray Cleaner Yes No No Yes No TBA 1-9-2015 No Brighton137 Workshop Degreaser Yes Yes No Yes No TBA 1-12-2012 No Brighton138 Emulsion Bitumen Yes No No Yes No TBA 29-10-2013 No Boral139 Ultracrete Instant Road Repair Yes Yes Yes Yes No TBA 11-12-2012 No Instarmac140 Lightning Fresh Hand Cleaner Yes Yes No Yes No TBA 19-12-2016 No Lightining141 fast Action Weed Kill Concentrate Yes Yes Yes Yes No TBA 1-6-2014 No Brunnings142 Anti Freeze Anit boil Premix Yellow Yes Yes No Yes No TBA 31-7-2013 No Penrite Oil Company143 Renolit EP 2 Yes No No Yes No TBA 25-11-2016 No Fuchs Lubricants144 Constructor Safe Site Marker Paint Yes Yes Yes Yes No TBA 5-8-2013 No Constructor Safe145 Gypsum FG Yes No No Yes No TBA 2-2-2016 No Sibelco Australia Ltd146 Fosroc Renderoc HB70 Yes Yes No Yes No TBA 28-7-2015 No Parchem147 Fosroc Renderoc FC Yes Yes No Yes No TBA 28-7-2015 No Parchem148 Fosroc Nitobond HAR Yes No No Yes No TBA 1-9-2013 No Parchem149 Fosroc Nitobond AR Yes No No Yes No TBA 1-9-2015 No Parchem150 Adhesive Chain Lubricant Yes Yes Yes Yes No TBA 4-10-2015 No CRC Industries . USA151 Cutback Bitumen Primers AMCOO, AMCO & AMC1 Yes Yes Yes Yes No TBA 1-3-2014 No Sami Bitumen Technologies152 Cutback Bitumen Primers AMC5,AMC6,AMC7 Yes Yes Yes Yes No TBA 1-3-2014 No Sami Bitumen Technologies153 Antisol HR Yes Yes Yes Yes No TBA 20-5-2016 No Sika154 Slipway slip agent Yes No No Yes No TBA 15-10-2014 No Victoria Chemical Co.PTY LTD155 Bitumen Class AR450 Yes No Yes Yes No TBA 1-12-2012 No Sami Bitumen Technologies156 Slipway Heavy Duty Yes Yes No Yes No TBA 15-10-2014 No Victoria Chemical Co.PTY LTD157 Cationic Rapid Set Emulsion Yes Yes No Yes No TBA 1-8-2016 No Sami Bitumen Technologies158 SAMIfalt (A10E,A15E,A20E,A25E) Yes No Yes Yes No TBA 1-2-2013 No Sami Bitumen Technologies159 Laboratory Ethanol Denatured (methylated spirits) Yes Yes Yes Yes No TBA 1-6-2013 No Labtech services and supplies160 Hydrated Lime Yes Yes No Yes No TBA 4-11-2014 No Sibelco Australia Ltd161 Klenasol NPB Yes Yes No Yes No TBA 1-1-2015 No Solvents Australia PTY. LTD162 Emer-seal Roadseal Yes No No Yes No TBA 14-9-2015 No Parchem163 Sikadur 31/41 Part B Yes Yes yes Yes No TBA 31-5-2014 No Sikadur164 Sikadur 31/41 Part A Yes Yes Yes Yes No TBA 31-5-2014 No Sikadur165 Xypex concentrate, Xypex Patch' N Plug Yes Yes No Yes No TBA 1-2-2014 No XYPEX166 XYPEX GAMMA CURE Yes No No Yes No TBA 1-2-2014 No XYPEX167 179-Line Accent Exterior Low Sheen Acrylic Yes No No Yes No TBA 6-1-2015 No Dulux168 Penetron Topical Crystalline Products Yes No No Yes No TBA 23-10-2015 No Penetron169 Intercrete 4840 Part A Yes Yes No Yes No TBA 16-6-2014 No International Akzo Bobel Pty Ltd170 Intercrete 4840 Part B Yes Yes No Yes No TBA 16-3-2016 No International Akzo Bobel Pty Ltd171 Fosroc Concure X 90 Yes No No Yes No TBA 1-4-2012 No Parchem Construction Supplies172 Fosroc Concure W 30 Yes No No Yes No TBA 23-9-2015 No Parchem Construction Supplies173 Fosroc Concure B 90 Yes No No Yes No TBA 13-6-2017 No Parchem Construction Supplies174 Fosroc Concure A 99 Yes No No Yes No TBA 22-9-2015 No Parchem Construction Supplies175 AD-TEK Pump (Aqueous solution) Yes Yes No Yes No TBA 7-5-2012 No Ad-Tek Pty Ltd176 Vital bom-matt RDS (S72) Yes No No Yes No TBA 30-7-2013 No Vital Chemical PTY Ltd

15-10-184 of 5C:\Users\jhaslett\AppData\Local\Temp\Appendix 7 - Chemical Manifest_7FE0EE

Page 39: Macksville Hospital Development Early Works...POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Macksville Hospital Development – Early Works MHD-EN-MPL-008 PIRMP REV: 1 Uncontrolled Copy

SDS Register in Alphabetical Order

04-10-18

SDS #No Substance or Goods Name

CurrentSDS

suppliedYes/No

HazardSubstance Yes/No

Dangerous GoodsYes/No

RiskAssessm

entYes/No

SWMSYes/No

AmountTypicallyStored

(Litres/kgetc)

Date of SDS

WorkplaceMonitoring or

HealthSurveillance

Required Y/N

Contract using & Location Supplier Details

Project: MDH ProjectLast Up Date:

177 Vital bon - matt HR Yes No No Yes No TBA 12-3-2014 No Vital Chemical PTY Ltd178 Battery Acid Yes Yes Yes Yes No TBA 30-10-2015 No Various179 Citra-Force Heavy duty degreaser Yes Yes No Yes No 15 L 31-12-2015 No Labtech services and supplies180 WD-40 Pneumativ tool oil Yes No No Yes No 1 litre 31-7-2014 No WD-40 Company Australia181 Nulon Fully Synthetic 5W30 Diesel engine oil Yes Yes Yes No TBA 8-2-2013 No Nulon182 Bituthene liquid Membrane Part A Yes Yes Yes Yes No 20 litre X 6 25-3-2015 No Grace & Co183 Bituthene liquid Membrane Part B Yes Yes Yes Yes No TBA 9-3-2015 No Grace & Co184 Vandex Elasticizer PK 75 Yes No No Yes No TBA 1-9-2013 No Parchem185 Evencure XDS Yes Yes No Yes No TBA 4-8-2015 No EvenRange Concrete solutions186 Shell Spirax HD 80W-90 transmission oil Yes No No Yes No TBA 28-8-2015 No Shell oil products187 Solvit Citrus Clean Yes Yes Yes Yes No TBA 5-4-2016 No Lightining products188 Mineral Turpentine Yes Yes Yes Yes No TBA 16-5-2016 No Recochem Inc189 Buffer solution pH 4 colour coded red Yes No No Yes No TBA 1-5-2014 No Ionode Pty Ltd190 Lanotec Release agent Yes No No Yes No TBA 1-9-2016 No Lanotec191 Xypex Megamix 11 Yes Yes No Yes No TBA 23-11-2016 No Xypex Australia192 Attack An Odour-Indoor Yes Yes Yes Yes No 10 Litres 1-10-2016 No Peerless Jal Pty Ltd193 Gumption Multi Purpose Cleaner Yes No No Yes No TBA 1-11-2013 No Clorox Australia194 New Age Barrier Cream Yes No No Yes No TBA 1-10-2016 No Lightning Products195 Lemon disinfectant Hospital Grade yes No No Yes No 30 Litre 1-5-2016 No Brighton Professional196 Machine Rince Aid dishwasher Yes No No Yes No 30 Litre 1-12-2012 No Brighton Professional197 Harpic Blue & Fresh Foaming Blue Freshener Yes Yes No Yes No TBA 9-9-2015 No Reckitt Benckiser198 Value Liquid Handwash Yes No No Yes No TBA 1-1-2014 No Brighton Professional199 Coolant Radiator Fluid Yes Yes No Yes No 1 Litre 1-12-2012 No Quick Smart200 CT20 Wasn N Wax Yes No No Yes No 1 litre 1-1-2013 No ITW AAM Tech201 Chubb ABE DRY Chemical powder Fire Ext Yes Yes Yes Yes No TBA 1-7-2013 No Chubb fire and security202 Bitumen Emulsions Yes No No Yes No TBA 1-6-2013 No Bituchem Building Products Ltd203 Fosroc Concure WB30 White Yes No No Yes No TBA 8-9-2105 No Parchem

15-10-185 of 5C:\Users\jhaslett\AppData\Local\Temp\Appendix 7 - Chemical Manifest_7FE0EE