    OBJECTIVESAs a result of this session, you should be able to:

    OOrrggaanniizzee tthhee iirrrreegguullaarr ggrriidd ppllaannss

    KKnnooww aabboouutt tthhee ccoonnffiigguurraattiioonn ooff ppllaann aanndd eelleevvaattiioonn ooffaa sseelleecctteedd BBuuiillddiinngg ffoorr SSttuuddyy

    APRIL 2010

    Instructors Workbook Module M4/S1

    Description of Building Plan an

    Elevation of selected building f

    Anal sis

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    2/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    DESCRIPTION OF FLOOR PLANS ANDELEVATION/ DISCUSSION OF PREVAILINGPRACTICES

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    3/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    CONTENTS

    1. Introduction ...................................................................................................... 12. The Project ........................................................................................................ 13. The Selected Plan of the Building (Prevailing Practices) ............................. 14. Structural Problem with the Selected Plan .................................................... 65. Modification of plan to make it regular ......................................................... 86. Structural Benefits after modification of Plan ............................................ 12

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    4/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

    1. INTRODUCTION

    This chapter provides you the detail of the selected building under study. The building

    initially selected was with improper configuration and it was made proper with leastchange in its utilities.

    2. THE PROJECT

    The sample project is a four and half storey building with three bays in direction, shorter

    and longer dimension of the building in plan are 9.6m and 11.475m respectively. The

    supports are fixed at plinth level. The dimensions of beams are 230mmX350mm for the

    first trial and Columns are 300mmX300mm.The slab will be a concrete slab 125mm thick.

    3. THE SELECTED PLAN OF THE BUILDING (PREVAILINGPRACTICES)

    The plan of the building selected is shown below. Due to its improper location of column,

    it is named as improper configuration building

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    5/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    6/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    7/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    8/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    9/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

    4. STRUCTURAL PROBLEM WITH THE SELECTED PLAN

    Fig: Grid plan

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    10/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

    There are 4 major discontinuities in frame along grid C, D, E and 2.

    Since the frames along those grids are incomplete, the beam has to resist the expected

    lateral load resulting from the absence of column there.

    The beam has to resist biaxial bending moment (torsion).

    The ductility in this region cannot be expected and it must be designed for the R

    (response reduction factor) times the incoming forces.

    Such joint must be in elastic for extreme lateral loading.

    Overall ductility of the structure will be reduced which causes to decrease the overall

    performance of structure.

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    11/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

    5. MODIFICATION OF PLAN TO MAKE IT REGULAR

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    12/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    13/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1-

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    14/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1-

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    15/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1-

    6. STRUCTURAL BENEFITS AFTER MODIFICATION OF PLAN

    There are no any discontinuities in frame.

    The overall ductility of the structure can be insured.

    The span is not regular so there will be some torsion in the structure and must be checked

    for the safety.

  • 7/31/2019 M4_S1_Description of Floor Plan and ElevationDiscussion Prevailing Practice

    16/16

    I n s t r u c t o r s W o r k b o o k

    Description of Floor plans and elevation/Discussion of prevailing Practices Module M4

    M4/S1-

    UNIT TEST

    1) The Ductility of the structure for the irregular building is

    a) Greater b) Lesser c) No change

    Ans: b) Lesser

    2) The Configuration of the building should be . For best performance

    during Earthquake.

    a) Regular b) irregular

    Ans: a) Regular

    3) Why load path should be complete?

    Ans: Load path should be complete so that the all the inertial forces in the

    building is transferred to the foundation properly.