rpsgroup.com LYREEN VIEW APARTMENTS, MILL STREET , MAYNOOTH Drainage Assessment IBE1366 Lyreen View Drainage Assessment 6 03 th July 2019

LYREEN VIEW APARTMENTS, MILL STR EET , MAYNOOTH...storm duration periods of 15 minutes to 10080 minutes. The industry recognised simulation software WinDes has been used to analyse

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • rpsgroup.com

    LYREEN VIEW APARTMENTS, MILL STREET , MAYNOOTH Drainage Assessment

    IBE1366

    Lyreen View Drainage

    Assessment

    6

    03th July 2019

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page ii

    Document status

    Version Purpose of document Authored by Reviewed by Approved by Review date

    2 Final D. Fisher M. Dineen B. Malone March 2018

    3 Final D. Fisher M. Dineen B. Malone May 2018

    4 Final D. Fisher M. Dineen B. Malone June 2018

    5 Final D. Fisher M. Logan B. Malone May 2019

    6 Final D. Fisher M. Logan B. Malone June 2019

    7 Final D. Fisher M. Logan B. Malone July 2019

    8 Final D. Fisher M. Logan B. Malone Sept 2019

    Approval for issue

    [Name] [Signature] [Date]

    This report was prepared by RPS Consulting Engineers Limited (‘RPS’) within the terms of its engagement and in direct response to

    a scope of services. This report is strictly limited to the purpose and the facts and matters stated in it and does not apply directly or

    indirectly and must not be used for any other application, purpose, use or matter. In preparing the report, RPS may have relied upon

    information provided to it at the time by other parties. RPS accepts no responsibility as to the accuracy or completeness of

    information provided by those parties at the time of preparing the report. The report does not take into account any changes in

    information that may have occurred since the publication of the report. If the information relied upon is subsequently determined to

    be false, inaccurate or incomplete then it is possible that the observations and conclusions expressed in the report may have

    changed. RPS does not warrant the contents of this report and shall not assume any responsibility or liability for loss whatsoever to

    any third party caused by, related to or arising out of any use or reliance on the report howsoever. No part of this report, its

    attachments or appendices may be reproduced by any process without the written consent of RPS. All enquiries should be directed

    to RPS.

    Prepared by: Prepared for:

    RPS Comer Property

    Donnla Fisher

    Project Engineer

    David Reilly

    Architect

    Elmwood House

    74 Boucher Road, Belfast

    Co. Antrim BT12 6RZ

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page iii

    T +44 2890 667 914

    E [email protected]

    Contents

    1 INTRODUCTION ........................................................................................................................... 1 2 OVERVIEW OF SITE & PROPOSED DEVELOPMENT .............................................................. 2 2.1 Overview of Site ............................................................................................................................ 2 2.2 The Proposed Development ......................................................................................................... 2 2.3 Existing Drainage Infrastructure .................................................................................................... 3 2.3.1 Kildare County Council – Water services ...................................................................................... 4 3 DRAINAGE ASSESSMENT ......................................................................................................... 6 3.1 Storm Water Discharge ................................................................................................................. 6 3.2 Storm Water Mitigation Measures ................................................................................................. 7 3.3 Wastewater Discharge .................................................................................................................. 7 4 CONCLUSIONS ............................................................................................................................ 8

    Figures

    Figure 1.1 Location Map ............................................................................................................................. 1

    Figure 2.1 Aerial Site Photo ........................................................................................................................ 2

    Figure 2.2 Proposed Site Layout................................................................................................................ 3

    Figure 2.3 Comparison between pre-excavation & proposed 1% AEP flood extents .......................... 5

    Appendices

    Appendix A Irish Water Correspondence

    Appendix B Storm Water Calculations

    Appendix C Foul Sewerage Calculations

    Appendix D Proposed Water and Waste Water Layouts

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 1

    1 INTRODUCTION RPS were commissioned by Ladas Property Company to carry out a Drainage Assessment (DA) in

    relation to a proposed housing development at a site off Mill Street, Maynooth, County Kildare.

    The site is located in the centre of Maynooth, to the rear of St. Mary’s Roman Catholic Church. It is

    situated adjacent to the Lyreen River. Figure 1.1 shows the location of the site. The proposal is to

    construct residential apartments with ground floor commercial units and car parking amenities on the site.

    As the proposed development has more than 100 residential units it is considered a Strategic Housing

    Development and the planning application will be made directly to An Bord Pleanála. The application

    must detail proposals for flood risk and surface water management. This report will address the

    management of the increased surface water generated by the development.

    Figure 1.1 Location Map

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 2

    2 OVERVIEW OF SITE & PROPOSED DEVELOPMENT

    2.1 Overview of Site

    The site currently consists of waste ground of approximately 1.05ha in area. An aerial photo of the site is

    shown in Figure 2.1, with the approximate site boundary marked on in red. The site is bound by Mill

    Road and St Marys Church on the east, the Lyreen River flows adjacent to the site to the south and west

    and waste ground to the north.

    Planning permission was previously granted for a housing scheme on the site (Planning reference

    05/2420). This development was commenced in 2008/2009, with excavation works undertaken on the site

    which significantly reduced the existing ground levels, before construction was halted.

    Figure 2.1 Aerial Site Photo

    2.2 The Proposed Development

    An application is currently being presented to An Bord Pleanála a development comprising of 120

    domestic units, a crèche, a café / restaurant and 3no. office units with parking provision at basement

    level. The proposed layout is shown in Figure 2.2

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 3

    Figure 2.2 Proposed Site Layout

    2.3 Existing Drainage Infrastructure

    A Pre-Connection Enquiry was submitted to Irish Water for the development requesting information on

    the existing public water and sewerage services within the boundary of the site and its immediate

    surrounds to establish if there is capacity within the existing Irish Water network.

    A response was received form Irish Water on 14th September 2017. A copy of the Pre-Connection

    Enquiry application and response can be found within Appendix A. The response indicated that there

    proposed connection to the Irish Water network can be facilitated; however, it advised that the availability

    of capacity does not constitute an offer of connection and that before submitting planning application Irish

    Water be consulted again.

    More detailed calculations and layouts were submitted to Irish water and a letter of acceptance for the

    scheme was received on 3rd July 2019 (Appendix A).

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 4

    In response to the comments from An Bord Pleanála in October 2018 a number of revisions to the

    development were made. Irish Water advised that, provided the number of housing units did not increase,

    a new application would not be required but new layouts would require approval. The final water and

    wastewater infrastructure layouts were submitted to Irish Water from approval in May 2019 and we are

    awaiting a response.

    2.3.1 Kildare County Council – Water services

    An open watercourse, the Lyreen River, is located to the South of the site. The site is presently estimated

    to be at risk of flooding from fluvial events with a frequency of 10% Annual Exceedance Probability (AEP)

    and greater; as identified during the Eastern Catchment-based Flood Risk Assessment and Management

    (CFRAM) Study. A comparison between existing and proposed flood extents is shown below in Figure

    2.3.

    In accordance with the Greater Dublin Strategic Drainage Study, storm water from the site will be

    attenuated to post development greenfield runoff. The discharge rate was determined using the site

    specific characteristics, see Appendix C. Storm discharge for this site will be attenuated to 6.1/s.

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 5

    Figure 2.3 Comparison between existing & proposed 1% AEP flood extents

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 6

    3 DRAINAGE ASSESSMENT

    3.1 Storm Water Discharge

    The catchment area of the existing site is approximately 1.05ha. The Modified Rational Method has been

    used to calculate the existing surface water discharge from the brownfield site for the 1% AEP event.

    This method allows an estimation of the amount of runoff that is likely to be generated from an urban

    area. The Modified Rational Method uses the following equation to calculate peak runoff rate from an

    area:

    Q = 2.78 Cv Cr i A

    Where: Cv = Volumetric Runoff Coefficient

    Cr = 1.3 (Routing Coefficient)

    i = Rainfall Intensity (mm/hr)

    A = Area (Ha)

    2.78 = Coefficient which accounts for the differences in units used for the inputs and the outputs

    of the equation

    Table 3.1-Storm Run-off Flows

    Area of Greenfield

    (ha)

    Area of Hardstanding

    (l/s)

    Runoff

    (l/s)

    Pre – Development 1.05 0 6.16

    Post Development 0.261 0.789 129.907

    Critical storage calculations are based on a 1% AEP storm event (+20% climate change), ranging in

    storm duration periods of 15 minutes to 10080 minutes. The industry recognised simulation software

    WinDes has been used to analyse the required minimum critical storage volume, calculated to be 355m3,

    full calculations are in Appendix B. This volume was calculated based on the assumption that discharge

    would be limited to 6.1l/s and would be controlled using a Hydrobrake, any change to the discharge or

    control method will affect the required volume.

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com Page 7

    3.2 Storm Water Mitigation Measures

    The output of the model confirmed the need to store a volume of 355m3. Roof runoff will be collected and

    discharged at one point for each block. The collected storm water will discharge to a manhole to the east

    of the site, storm water will surcharge in to a geocellular attenuation tank located on eastern boundary

    behind Block B2. The tanks will measure 7m x 33m x 1.6m (w x l x d) and have a storage volume of

    369.9m3. Flow from the storage tank will be discharged to the Lyreen River at a rate of 6.1l/s with a flow

    control system, such as a Hydrobrake, used to restrict flows.

    3.3 Wastewater Discharge

    A Pre-Connection Enquiry was submitted to Irish Water in June 2017, to determine the capacity of the

    Irish Water network. Current floor plans and layouts have been used to estimate the foul flow from the site

    at 4.35l/s, refer to Appendix C for foul flow calculations. A response to the Pre-Connection Enquiry has

    confirmed that there is sufficient capacity within the existing sewer network (Appendix A). Any increases

    in foul flow within the re-development will be subject to subsequent Irish Water application and approval.

    The internal building design will be designed to a designated point for each block, the flows will then be

    conveyed to a pumping station located at the north of the site. Basement storm flows will be discharged

    through an oil interceptor to the site foul sewer to the pumping station; the flows will then be pumped to a

    new gravity network on the west of the site, which conveys flows from the site to the existing sewer on

    Mill Street. The pumping station will pump forward a flow of 4.35l/s and will have a storage capacity of

    60m3, which is 24hrs of Dry Weather Flow.

    Irish Water issued a Design Acceptance letter for the proposal in July 2019, see Appendix A.

    Sewer and water main layouts can be found in Appendix D.

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019

    rpsgroup.com

    4 CONCLUSIONS

    It is proposed to develop the 1.05 ha area of waste land on Mill Street Maynooth and construct a

    development with 120 domestic units, a crèche, a café / restaurant and 3no. office units with parking

    provision at basement level. The sites lies within the flood plain of the Lyreen river and the Flood Risk

    Assessment has recommended that the ground levels are raised, as a minimum, to the calculated 1%

    AEP flood level plus a freeboard of 500mm.

    A pumping station will pump internal building drainage to a manhole at ground level which will convey

    flows to the existing sewer on Mill Street. The drainage for the basement carpark, will be passed through

    an oil interceptor before being connected to the sewer for internal foul drainage and discharged to the

    same pumping station. Preliminary drainage drawings are contained in Appendix D, however these

    designs are subject to Irish Water approval.

    The calculated increased storm water for the site is approximately 123.502 l/s; however, discharge flows

    to the Lyreen River flows will be attenuated to a pre development runoff rate of 6.1l/s. Storm storage

    required has been estimated to be 355m3 based on the discharge rate. The storm water management

    systems recommended are geocellular storm cells used to attenuate storm water. The storm cells will be

    located on the eastern boundary behind Block B2.

    All calculations and drainage layouts within this report are preliminary and are subject to detail design. All

    construction must be done in accordance with Irish Water Code of Practice and with the approval of

    Kildare County Council.

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019

    rpsgroup.com

    Appendix A

    Irish Water Correspondence

  • 1 IW/EF/NC/B/0417

    Pre-connection enquiry formIndustrial and commercial developments, mixed use developments, housing developments, business developments

    Guide to completing the pre-connection enquiry form

    Section A | Applicant details

    1 WPRN number (where available):

    2 Applicant details:

    3 Agent details (if applicable):

    L A D A S P R O P E R T Y

    C O M P A N Y

    5 2 3 0 4 0

    L A D A S P R O P E R T Y C O M P A N Y

    P A L M E R S T O W N H O U S E E S T A T E

    J O H N S T O W N C O . K I L D A R E

    D A V I D R E I L L Y

    M F A R C H I T E C T S

    M A I N S T B U T L E R S B R I D G E

    C O . C A V A N

    0 4 9 4 3 6 5 8 0 0

    d a v i d @ m f a r c h i t e c t s . i e

  • 2 IW/EF/NC/B/0417

    5 Site address:

    6 Irish Grid co-ordinates of site:

    10 Date that previous development was last occupied (if applicable):

    Section B | Site details

    7 Local Authority:

    13 Is the development compliant with the local area development plan? No

    11 Are there poor ground conditions on-site? No

    8 Has full planning permission been granted? No

    9 Previous use of this site (if applicable):

    12 Are there potential contaminated land issues? No

    4 Please indicate whether it is the applicant or agent who should receive future correspondence in relation to the enquiry:

    m i l l s t r e e t m a y n o o t h

    c o . k i l d a r e

    6 9 3 5 8 0 7 3 7 9 9 3

    K i l d a r e c o . C o u n c i l

    0 5 / 2 0 2 4 P R E V I O U S P L A N N I N G

    N / A

  • 3 IW/EF/NC/B/0417

    Pre-development peak hour water demand l/s

    Pre-development average hour water demand l/s

    Post-development peak hour water demand l/s

    Post-development average hour water demand l/s

    19 Please indicate pre-development water demand (if applicable):

    20 Please indicate the domestic water demand (housing developments only):

    14 Is there an existing connection to public water mains at the site?

    15 Is this enquiry for an additional connection to the one already installed?

    16 Is this enquiry to increase the size of an existing water connection?

    17 Is this enquiry for a new water connection?

    18 Approximate date water connection is required:

    Post-development peak hour water demand l/s

    Post-development average hour water demand l/s

    Post-development peak hour water demand l/s

    Post-development average hour water demand l/s

    Section C | Water connection and demand details

    23 What is the existing ground level at the property boundary at connection point (if known) above Malin Head Ordnance Datum?

    24

    0 9 2 0 1 8

    5 5 . 3 8

    5 4 . 3 0

  • 4 IW/EF/NC/B/0417

    27 Do you propose to supplement your potable water supply from other sources? No

    Guide to completing the application form

    l/s

    25 Is on-site water storage being provided?

    28 Is there an existing connection to a public sewer at the site? No

    29 Is this enquiry for an additional connection to one already installed? No

    30 Is this enquiry to increase the size of an existing connection? No

    31 Is this enquiry for a new wastewater connection? No

    32 Approximate date that wastewater connection is required:

    Section D | Wastewater connection and discharge details

    34 Please indicate the domestic wastewater hydraulic load (housing developments only):

    Pre-development peak discharge l/s

    Pre-development average discharge l/s

    Post-development peak discharge l/s

    Post-development average discharge l/s

    33 Please indicate pre-development wastewater discharge (if applicable):

    Post-development peak discharge l/s

    Post-development average discharge l/s

    0 9 2 0 1 8

  • 5 IW/EF/NC/B/0417

    37 Wastewater organic load:

    Temperature range

    pH range

    Characteristic Max concentration (mg/l)Average concentration (mg/l)

    Maximum daily load (kg/day)

    Other

    36

    Post-development peak discharge l/s

    Post-development average discharge l/s

    intends discharging surface water to the combined wastewater collection system:

    39 Do you propose to pump the wastewater?

    40 What is the existing ground level at the property boundary at connection point (if known) above Malin Head Ordnance Datum?

    41

  • 6 IW/EF/NC/B/0417

    Section E | Development details

    42 Please outline the domestic and/or industry/business use proposed:

    Property type Total number of units for this application

    44 Is the development multi-phased? No

    43 Approximate start date of proposed development:

    150 UNITS

    CRECHE AND RETAIL AREA

    0 1 2 0 1 8

  • 7 IW/EF/NC/B/0417

    Section F | Supporting documentation

    Please provide the following additional information:

    >

    >

    >

    >

    >

    Section G | Declaration

    Irish Water PO Box 860

    Cork City

    ___________________________________________________________________________________________________________

    DAVID REILLY Digitally signed by DAVID REILLY Date: 2017.06.13 14:39:34 +01'00' 1 3 0 6 2 0 1 7

    D A V I D R E I L L Y

  • 8 IW/EF/NC/B/0417

    Calculations

  • 9 IW/EF/NC/B/0417

  • 10 IW/EF/NC/B/0417

  • 11 IW/EF/NC/B/0417

  • 12 IW/EF/NC/B/0417

    Guide to completing the pre-connection enquiry form

    Section A | Applicant Details

    Section B | Site details

    Section C | Water connection and demand details

  • 13 IW/EF/NC/B/0417

    Section D | Wastewater connection and discharge details

  • 14 IW/EF/NC/B/0417

    Section E | Development details

    Section F | Supporting documentation

    Section G | Declaration

  • 15 IW/EF/NC/B/0417

    Notes

  • 16 IW/EF/NC/B/0417

    Notes

  • Ladas Property Company c/o Donnla Fisher,

    RPS Consulting Engineers,

    Elmwood House,

    74 Boucher Road,

    Belfast, BT12 6RZ,

    Northern Ireland

    3 July 2019

    Re: Design Submission for Development at Mill Street, Maynooth, Co. Kildare (the

    “Development”) (the “Design Submission”) / CUST17492.

    Dear Donnla,

    Many thanks for your recent Design Submission.

    We have reviewed your proposal for the connection(s) at the Development. Based on the

    information provided, which included the documents outlined in Appendix A to this letter,

    Irish Water has no objection to your proposals.

    This letter does not constitute an offer, in whole or in part, to provide a connection to any

    Irish Water infrastructure. Before you can connect to our network you must sign a

    connection agreement with Irish Water. This can be applied for by completing the

    connection application form at www.water.ie/connections. Irish Water’s current charges for

    water and wastewater connections are set out in the Water Charges Plan as approved by

    the Commission for Regulation of Utilities (CRU) (https://www.cru.ie/document_group/irish-

    waters-water-charges-plan-2018/).

    You the Customer (including any designers/contractors or other related parties appointed

    by you) is entirely responsible for the design and construction of all water and/or

    wastewater infrastructure within the Development which is necessary to facilitate

    connection(s) from the boundary of the Development to Irish Water’s network(s) (the “Self-

    Lay Works”), as reflected in your Design Submission. Acceptance of the Design

    Submission by Irish Water does not, in any way, render Irish Water liable for any elements

    of the design and/or construction of the Self-Lay Works.

    If you have any further questions, please contact your Irish Water Representative

    Name: Fionan Ginty

    Phone: 01 8925734

    Email: [email protected]

    Yours sincerely,

    Maria O’Dwyer

    Connections and Developer Services

    http://www.water.ie/connectionshttps://www.cru.ie/document_group/irish-waters-water-charges-plan-2018/https://www.cru.ie/document_group/irish-waters-water-charges-plan-2018/

  • Appendix A

    Document Title & Revision

    IBE1366/PL/001-D Proposed Drainage Layout

    IBE1366/PL/002-B Proposed Foul Drainage Sections

    IBE1366/PL/003-C Proposed Water Main Layout

    Standard Details/Code of Practice Exemption: N/A

    For further information, visit www.water.ie/connections

    Notwithstanding any matters listed above, the Customer (including any appointed

    designers/contractors, etc.) is entirely responsible for the design and construction of the

    Self-Lay Works. Acceptance of the Design Submission by Irish Water will not, in any way,

    render Irish Water liable for any elements of the design and/or construction of the Self-Lay

    Works.

    http://www.water.ie/connections

  • A: 83.52

    m

    2

    A: 83.52

    m

    2

    Classroom 2

    A: 30.29

    m

    2

    Food Prep Room

    A: 4.61

    m

    2

    Food Prep Room

    A: 10.36

    m

    2

    WC

    A: 12.59

    m

    2

    Classroom 1

    A: 30.46

    m

    2

    Buggy Store

    A: 5.01

    m

    2

    Store

    A: 5.01

    m

    2

    UAWC

    A: 4.71

    m

    2

    Classroom 4

    A: 27.96

    m

    2

    Classroom 3

    A: 20.82

    m

    2

    Food Prep

    A: 10.11

    m

    2

    Lobby

    A: 25.97

    m

    2

    WC

    A: 7.75

    m

    2

    Store

    A: 1.96

    m

    2

    Store

    A: 8.34

    m

    2

    Kitchen-Cooking Area

    A: 24.37

    m

    2

    Lobby

    A: 9.54

    m

    2

    Male WC

    A: 6.29

    m

    2

    Female WC

    A: 6.29

    m

    2

    Store

    A: 3.78

    m

    2

    UAWC

    A: 3.49

    m

    2

    Female WC

    A: 10.57

    m

    2

    Male WC

    A: 7.75

    m

    2

    Lobby

    A: 8.78

    m

    2

    Cafe-Restaurant

    A: 149.26

    m

    2

    Existing Church

    F.F.L 56.94

    Existing Building F.F.L

    52.680

    Existing

    Building

    M

    i

    l

    l

    S

    t

    r

    e

    e

    t

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    L

    y

    r

    e

    e

    n

    R

    iv

    e

    r

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    Pedestrian path

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    P

    a

    t

    h

    C

    y

    c

    l

    e

    P

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    Cycle path

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    Pedestrian path

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    1

    2

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    2

    -

    3

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    5

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    0

    -

    1

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    U

    n

    it

    B

    1

    -

    0

    5

    U

    n

    it

    B

    1

    -

    0

    6

    U

    n

    it

    B

    1

    -

    0

    7

    U

    n

    it

    B

    1

    -

    0

    8

    U

    n

    it

    B

    1

    -

    0

    9

    U

    n

    it

    B

    1

    -

    1

    0

    U

    n

    it

    B

    1

    -

    1

    1

    U

    n

    it

    B

    1

    -

    1

    2

    Existing

    Building

    E

    le

    v

    -

    1

    E

    le

    v

    -

    4

    E

    le

    v

    -

    2

    E

    le

    v

    -

    3

    E

    l

    e

    v

    -

    3

    U

    n

    i

    t

    B

    2

    -

    1

    1

    U

    n

    i

    t

    B

    2

    -

    1

    2

    U

    n

    i

    t

    B

    2

    -

    1

    3

    U

    n

    i

    t

    B

    2

    -

    1

    5

    U

    n

    i

    t

    B

    2

    -

    1

    6

    U

    n

    i

    t

    B

    2

    -

    1

    7

    U

    n

    i

    t

    B

    2

    -

    1

    8

    E

    l

    e

    v

    -

    2

    E

    l

    e

    v

    -

    4

    E

    l

    e

    v

    -

    1

    E

    le

    v

    -

    2

    U

    n

    it

    A

    -

    0

    2

    Block A

    Carraigeway

    U

    n

    i

    t

    C

    -

    0

    6

    U

    n

    i

    t

    C

    -

    0

    7

    U

    n

    i

    t

    C

    -

    0

    8

    U

    n

    i

    t

    C

    -

    0

    9

    U

    n

    i

    t

    C

    -

    1

    0

    E

    l

    e

    v

    -

    1

    E

    l

    e

    v

    -

    2

    E

    l

    e

    v

    -

    4

    E

    l

    e

    v

    -

    3

    52.380

    Cycle

    p

    ath

    Level Platform

    54.190

    54.380

    54.180

    53.610

    53.110

    52.515

    54.180

    53.680

    53.680

    53.680

    54.660

    54.660

    54.110

    53.610

    53.110

    Level Platform

    52.610

    52.750

    52.610

    52.750

    53.610

    53.110

    53.110

    52.610

    52.610

    51.600

    52.100

    51.600

    51.100

    51.100

    50.700

    50.700

    50.370

    50.370

    50.410

    50.530

    50.530

    50.530

    53.860

    53.860

    54.360

    54.360

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    52.450

    52.380

    52.380

    52.380

    54.360

    55.880

    54.360

    54.360

    54.360

    53.435

    52.435

    52.935

    52.935

    Level Platform

    53.935

    53.435

    Level Platform

    53.935

    Level Platform

    54.480

    52.435

    30No.

    Bicycles on 2

    Tier Rack

    System

    52.435

    52.435

    Level Platform

    51.030

    51.030

    Level Platform

    51.530

    51.530

    Level Platform

    52.030

    52.030

    Level Platform

    52.030

    52.435

    52.435Level Platform

    52.015

    52.015

    52.015

    52.015

    52.015

    50.743

    50.743

    51.076

    51.409

    51.702

    51.702

    51.702

    52.035

    52.035

    52.075

    52.035

    52.368

    52.150

    52.200

    52.435

    52.370

    Level Platform

    54.360

    30No.

    Bicycles on 2

    Tier Rack

    System

    51.076

    52.300

    52.075

    52.380

    54.360

    54.360

    55.880

    51.000

    E

    x

    it

    t

    o

    e

    x

    t

    e

    r

    n

    a

    l

    C

    r

    e

    c

    h

    e

    p

    la

    y

    a

    r

    e

    a

    1

    2

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    3

    -

    4

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    1

    0

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    1

    -

    2

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    U

    n

    it

    A

    -

    0

    1

    54.660

    54.660

    F.F.L. 55.00

    55.160

    F.F.L. 55.00

    51.030

    51.030

    51.530

    51.530

    52.030

    52.030

    2

    0

    2

    0

    C

    u

    s

    t

    o

    m

    T

    e

    x

    t

    U

    P

    D

    O

    W

    N

    1

    9

    1

    8

    1

    7

    1

    6

    1

    5

    1

    4

    1

    3

    1

    2

    1

    1

    1

    0

    9

    8

    7

    6

    5

    4

    3

    2

    1

    C

    u

    s

    t

    o

    m

    T

    e

    x

    t

    U

    P

    D

    O

    W

    N

    1

    9

    1

    8

    1

    7

    1

    6

    1

    5

    1

    4

    1

    3

    1

    2

    1

    1

    1

    0

    9

    8

    7

    6

    5

    4

    3

    2

    1

    1

    .

    8

    m

    x

    1

    .

    8

    m

    R

    a

    m

    p

    u

    p

    1

    :

    1

    0

    R

    a

    m

    p

    D

    o

    w

    n

    1

    :

    1

    0

    V

    o

    id

    t

    o

    B

    e

    lo

    w

    E

    x

    it

    C

    o

    u

    n

    t

    e

    r

    E

    x

    it

    E

    x

    it

    C

    a

    n

    o

    p

    y

    O

    v

    e

    r

    h

    e

    a

    d

    L

    o

    c

    k

    e

    r

    s

    1

    .

    8

    m

    x

    1

    .

    8

    m

    E

    x

    it

    1

    .

    8

    m

    x

    1

    .

    8

    m

    M

    I

    L

    L

    S

    T

    R

    E

    E

    T

    50.370

    50.370

    50.370

    50.370

    50.370

    50.370

    RISING MAINDISCHARGE CHAMBER

    CL 54.54IL 52.71

    KLARGESTEROIL & GRITINTECEPTOR

    KLARGESTER HORIZONTALPUMPING STATIONCL - 52.935IL - 46.47

    MH F01ACL 50.76IL 49.49

    MH FS04CL 49.76IL 48.03

    MH FS02CL 49.76IL 48.24

    MH FS01CL 49.76IL 49.00

    MH FS03CL 50.76IL 48.72

    MH FS05CL 52.45IL 47.68

    MH F02CL 52.45IL 47.54

    MH F03CL 52.435IL 46.69

    MH F02CCL 52.40IL 46.76

    MH F01CCL 51.17IL 47.77

    MH 06

    MH F01BCL 53.34IL 49.45

    225mm Ø uPVC FOUL PIPE @ 1:45225m

    m Ø uPVC F

    OUL PIPE @

    1:29

    150mm Ø uPV

    C FOUL PIPE

    @ 1:60

    150mm

    Ø uP

    VC FO

    UL PI

    PE @

    1:15

    225mm Ø uPVC FOUL PIPE @ 1:60

    150mm Ø uPVC FOUL PIPE @ 1:60

    150mm

    Ø uPV

    C FOU

    L PIPE

    @ 1:6

    0

    150m

    m Ø

    uPVC

    FOUL

    PIP

    E @

    1:60

    80mm D

    UCTIL

    E IRON

    FOUL

    PUMP

    ING MA

    IN

    80mm DUCTILE IRON FOUL PUMPING MAIN

    MH F04CL 52.935IL 46.59

    DISCHARGE TORIVER LYREENOUTFALL 50.20(SEE HEADWALL DETAIL)

    MH S012SEALED MANHOLEHYDROBRAKE CHAMBERCL 50.53IL 50.25

    MH S07CL 52.43IL 50.88

    MH S06CL 52.43IL 50.93

    MH S04CL 52.45IL 51.28

    MH S101CL 52.01IL 51.30

    MH S01CL 54.18IL 52.78

    ATTENUATION TANKTOP ENDCL 52.57TWL 52.17IL 50.57

    MH S03BACKDROPCL 53.50IL 51.44

    MH S02CL 53.68IL 52.58

    225mm

    Ø uPVC

    STOR

    M PIPE

    @ 1:15

    0

    225mm

    Ø uPVC

    STOR

    M PIPE

    @ 1:15

    0

    225mm

    Ø uPVC

    STORM

    PIPE @

    1:150

    225mm Ø uPVC STORM PIPE @ 1:150

    225mm Ø uPVC STORM

    PIPE @ 1:150

    225mm Ø uPVC STORM PIPE @ 1:150

    225mm Ø uPVC

    GEOCELLULARATTENUATION TANKVOLUME: 369.6m³DIMS: 7m x 33m x 1.6m

    ATTENUATION TANKBOTTOM ENDCL 52.35TWL 51.95IL 50.35

    KLARGESTER FULLHYDROCARBON ANDSILT INTERCEPTOR

    MH S201CL 52.40IL 51.10

    MH S08CL 52.70IL 50.84

    MH S09CL 52.43IL 50.69 MH S010

    CL 52.43IL 50.62

    MH S011CL 52.02IL 50.59

    225mm

    Ø uPV

    C STO

    RM PIP

    E @ 1:1

    50

    G

    G

    G

    G

    G G

    G

    G

    NOTES

    Drawing Number

    Drawing Status Sheet Size

    Client

    Rev

    Drawing Scale

    drawnamendmentsrev

    Project

    Title

    date

    /

    Initial ReviewProject Leader Drawn By Date

    Proposed Development, Mill Street

    Maynooth, Kildare

    Proposed Foul and Storm

    Drainage Layout

    Planning

    04/11/19

    1:250

    IBE1366

    A1

    PL/001 E

    ML AN DF

    T +44 (0) 28 90 667914

    F +44 (0) 28 90 668286

    W www.rpsgroup.com/ireland

    E [email protected]

    Elmwood House

    74 Boucher Road

    Belfast

    BT12 6RZ

    Ladas Property Company

    1. Verifying Dimensions.The contractor shall verify dimensions against such other drawingsor site conditions as pertain to this part of the work.

    2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.

    3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing.All other formats (dwg, dxf etc.) are deemed to be an uncontrolledissue and any work carried out based on these files is at therecipients own risk. RPS will not accept any responsibility for anyerrors arising from the use of these files, either by human error bythe recipient, listing of un-dimensioned measurements, compatibilityissues with the recipient's software, and any errors arising whenthese files are used to aid the recipients drawing production, orsetting out on site.

    4. SewersAll sewers to be constructed in accordance with Irish Water StandardDetails

    5. All foul sewers to be 150mm Ø uPVC to EN1401

    6. All storm sewers to be 150Ø uPVC to EN1410

    7. Klargester oil and grit interceptor is located after final connection tostorm network to ensure all storm flows are passed throughinterceptor prior to storage and discharge

    8. Legend.

    Site Boundary

    Proposed Foul Sewer

    Proposed Storm Sewer

    Existing Foul Sewer

    5m SCALE 1:250

    A

    AN 30/05/2019Foul Drainage layout updated. Pipe sizes

    and gradients amended.

    B

    DF 31/05/2019Oil & silt inteceptor added to storm network

    C

    DF 21/06/2019New storm layout

    D

    DF 01/07/19Realigned foul line MH FS01 to MHFS02

    E

    DF 04/11/19Gullies and additional notes added

  • Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH FS01 - MH FS05

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50

    51

    52

    Chainage

    Ground Level

    Invert Level

    Pipe Details

    Gradient

    0.0

    45

    .2

    79

    .7

    49

    .7

    6

    49

    .7

    6

    52

    .4

    5

    49

    .0

    0

    48

    .2

    4

    150mm

    uPVC

    G=1:60

    L=45.23

    MH

    F

    S01

    MH

    F

    S02

    150mm

    uPVC

    G=1:60

    L=12.22

    47

    .6

    5

    52

    MH

    F

    S04

    47

    .4

    49

    .7

    64

    8.0

    3

    BASEMENT LEVEL

    MH

    F

    S05

    78

    .1

    52

    .4

    54

    7.6

    8

    150mm

    uPVC

    G=1:60

    L=20.62

    OIL & GRITINTERCEPTOR

    150mm

    uPVC

    G=1:60

    L=1.6

    Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH FS03 - MH FS04

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50

    51

    Chainage

    Ground Level

    Invert Level

    Pipe Details

    Gradient

    0.0

    41

    .1

    50

    .7

    6

    49

    .7

    6

    48

    .7

    2

    48

    .0

    3

    150mm

    uPVC

    G=1:60

    L=41.1

    MH

    F

    S03

    MH

    F

    S04

    Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH F01A - Pumping Station

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50

    51

    52

    Chainage

    Ground Level

    Invert Level

    Pipe Details

    Gradient

    0.0

    57

    .4

    11

    4.8

    50

    .7

    6

    52

    .4

    5

    52

    .9

    4

    49

    .4

    9

    47

    .5

    4

    225mm

    uPVC

    G=1:29

    L=57.42

    MH

    F

    01A

    MH

    F

    02

    46

    .5

    9

    52

    MH

    F

    03

    10

    8.5

    52

    .4

    44

    6.6

    9

    225mm

    uPVC

    G=1:60

    L=51.07

    225mm

    uPVC

    G=1:60

    L=6.15

    BASEMENT LEVEL

    12

    2.6

    52

    .9

    4

    PS

    46

    .4

    7

    PUMPING

    STATION

    225mm

    uPVC

    G=1:60

    L=7.12

    Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH F01B - MH F02

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50

    51

    Chainage

    Ground Level

    Invert Level

    Pipe Details

    Gradient

    0.0

    27

    .6

    53

    .3

    4

    52

    .4

    5

    49

    .4

    5

    47

    .6

    2

    150mm

    uPVC

    G=1:15

    L=27.6

    MH

    F

    01B

    MH

    F

    02

    52

    53

    54

    MH

    F

    04

    47

    .5

    4

    Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH F01C - MH F04

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50

    51

    52

    Chainage

    Ground Level

    Invert Level

    Pipe Details

    Gradient

    0.0

    45

    .4

    53

    .2

    51

    .1

    7

    52

    .4

    0

    52

    .9

    4

    47

    .7

    7

    46

    .7

    6

    225mm

    uPVC

    G=1:45

    L=45.40

    MH

    F

    01C

    MH

    F

    02C

    46

    .5

    9

    52

    150mm

    uPVC

    G=1:45

    L=7.77

    MH

    F

    04

    NOTES

    Drawing Number

    Drawing Status Sheet Size

    Client

    Rev

    Drawing Scale

    drawnamendmentsrev

    Project

    Title

    date

    /

    Initial ReviewProject Leader Drawn By Date

    Proposed Development, Mill Street

    Maynooth, Kildare

    Proposed Foul Drainage

    Longsections

    Planning

    02/07/19

    1:500

    IBE1366

    A1

    PL/002 B

    ML AN DF

    T +44 (0) 28 90 667914

    F +44 (0) 28 90 668286

    W www.rpsgroup.com/ireland

    E [email protected]

    Elmwood House

    74 Boucher Road

    Belfast

    BT12 6RZ

    Ladas Property Company

    1. Verifying Dimensions.The contractor shall verify dimensions against such other drawingsor site conditions as pertain to this part of the work.

    2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.

    3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing.All other formats (dwg, dxf etc.) are deemed to be an uncontrolledissue and any work carried out based on these files is at therecipients own risk. RPS will not accept any responsibility for anyerrors arising from the use of these files, either by human error bythe recipient, listing of un-dimensioned measurements, compatibilityissues with the recipient's software, and any errors arising whenthese files are used to aid the recipients drawing production, orsetting out on site.

    4. SewersAll sewers to be constructed in accordance with Irish Water StandardDetails

    5. All foul sewers to be 150mm Ø uPVC to EN1401

    6. All storm sewers to be 150Ø uPVC to EN1410

    10m SCALE 1:500

    A

    AN 30/05/2019Drainage sections updated.

    B

    DF 02/07/19Drainage Sections Updated

  • A: 83.52

    m

    2

    A: 83.52

    m

    2

    Classroom 2

    A: 30.29

    m

    2

    Food Prep Room

    A: 4.61

    m

    2

    Food Prep Room

    A: 10.36

    m

    2

    WC

    A: 12.59

    m

    2

    Classroom 1

    A: 30.46

    m

    2

    Buggy Store

    A: 5.01

    m

    2

    Store

    A: 5.01

    m

    2

    UAWC

    A: 4.71

    m

    2

    Classroom 4

    A: 27.96

    m

    2

    Classroom 3

    A: 20.82

    m

    2

    Food Prep

    A: 10.11

    m

    2

    Lobby

    A: 25.97

    m

    2

    WC

    A: 7.75

    m

    2

    Store

    A: 1.96

    m

    2

    Store

    A: 8.34

    m

    2

    Kitchen-Cooking Area

    A: 24.37

    m

    2

    Lobby

    A: 9.54

    m

    2

    Male WC

    A: 6.29

    m

    2

    Female WC

    A: 6.29

    m

    2

    Store

    A: 3.78

    m

    2

    UAWC

    A: 3.49

    m

    2

    Female WC

    A: 10.57

    m

    2

    Male WC

    A: 7.75

    m

    2

    Lobby

    A: 8.78

    m

    2

    Cafe-Restaurant

    A: 149.26

    m

    2

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    L

    y

    r

    e

    e

    n

    R

    iv

    e

    r

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    Pedestrian path

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    P

    a

    t

    h

    C

    y

    c

    l

    e

    P

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    Cycle path

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    Pedestrian path

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    Carraigeway

    52.380

    Cycle

    p

    ath

    Level Platform

    54.190

    54.380

    54.180

    53.610

    53.110

    52.515

    54.180

    53.680

    53.680

    53.680

    54.660

    54.660

    54.110

    53.610

    53.110

    Level Platform

    52.610

    52.750

    52.610

    52.750

    53.610

    53.110

    53.110

    52.610

    52.610

    51.600

    52.100

    51.600

    51.100

    51.100

    50.700

    50.700

    50.370

    50.370

    50.410

    50.530

    50.530

    50.530

    53.860

    53.860

    54.360

    54.360

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    52.450

    52.380

    52.380

    52.380

    54.360

    55.880

    54.360

    54.360

    54.360

    53.435

    52.435

    52.935

    52.935

    Level Platform

    53.935

    53.435

    Level Platform

    53.935

    Level Platform

    54.480

    52.435

    52.435

    52.435

    Level Platform

    51.030

    51.030

    Level Platform

    51.530

    51.530

    Level Platform

    52.030

    52.030

    Level Platform

    52.030

    52.435

    52.435Level Platform

    52.015

    52.015

    52.015

    52.015

    52.015

    50.743

    50.743

    51.076

    51.409

    51.702

    51.702

    51.702

    52.035

    52.035

    52.075

    52.035

    52.368

    52.150

    52.200

    52.435

    52.370

    Level Platform

    54.360

    51.076

    52.300

    52.075

    52.380

    54.360

    54.360

    55.880

    51.000

    54.660

    54.660

    F.F.L. 55.00

    55.160

    F.F.L. 55.00

    51.030

    51.030

    51.530

    51.530

    52.030

    52.030

    2

    0

    2

    0

    C

    u

    s

    t

    o

    m

    T

    e

    x

    t

    U

    P

    D

    O

    W

    N

    1

    9

    1

    8

    1

    7

    1

    6

    1

    5

    1

    4

    1

    3

    1

    2

    1

    1

    1

    0

    9

    8

    7

    6

    5

    4

    3

    2

    1

    C

    u

    s

    t

    o

    m

    T

    e

    x

    t

    U

    P

    D

    O

    W

    N

    1

    9

    1

    8

    1

    7

    1

    6

    1

    5

    1

    4

    1

    3

    1

    2

    1

    1

    1

    0

    9

    8

    7

    6

    5

    4

    3

    2

    1

    1

    .

    8

    m

    x

    1

    .

    8

    m

    R

    a

    m

    p

    u

    p

    1

    :

    1

    0

    R

    a

    m

    p

    D

    o

    w

    n

    1

    :

    1

    0

    V

    o

    id

    t

    o

    B

    e

    lo

    w

    E

    x

    it

    C

    o

    u

    n

    t

    e

    r

    E

    x

    it

    E

    x

    it

    C

    a

    n

    o

    p

    y

    O

    v

    e

    r

    h

    e

    a

    d

    L

    o

    c

    k

    e

    r

    s

    1

    .

    8

    m

    x

    1

    .

    8

    m

    E

    x

    it

    1

    .

    8

    m

    x

    1

    .

    8

    m

    M

    I

    L

    L

    S

    T

    R

    E

    E

    T

    50.370

    50.370

    50.370

    50.370

    50.370

    50.370

    SV

    SV

    SV

    M

    Hyd

    M

    BOUNDARY BOX FORCOMMERCIAL PREMISIS

    Hyd

    SVSV

    Hyd

    Hyd

    WashoutHyd

    SCV

    100mm

    Ø Se

    rvice

    Conne

    ction

    100mm Ø Service Connection

    100mm Ø S

    ervice

    Connection

    100mm

    Ø Ser

    vice

    Conne

    ction

    NOTES

    Drawing Number

    Drawing Status Sheet Size

    Client

    Rev

    Drawing Scale

    drawnamendmentsrev

    Project

    Title

    date

    /

    Initial ReviewProject Leader Drawn By Date

    Proposed Development, Mill Street

    Maynooth, Kildare

    Proposed Watermain Layout

    Planning

    02/07/19

    1:250

    IBE1366

    A1

    PL/003 C

    ML AN DF

    T +44 (0) 28 90 667914

    F +44 (0) 28 90 668286

    W www.rpsgroup.com/ireland

    E [email protected]

    Elmwood House

    74 Boucher Road

    Belfast

    BT12 6RZ

    Ladas Property Company

    5m SCALE 1:250

    1. Verifying Dimensions.The contractor shall verify dimensions against such other drawings orsite conditions as pertain to this part of the work.

    2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.

    3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing. Allother formats (dwg, dxf etc.) are deemed to be an uncontrolled issueand any work carried out based on these files is at the recipients ownrisk. RPS will not accept any responsibility for any errors arising fromthe use of these files, either by human error by the recipient, listing ofun-dimensioned measurements, compatibility issues with therecipient's software, and any errors arising when these files are usedto aid the recipients drawing production, or setting out on site.

    4. Water MainsAll watermains shall be constructed in accordance with Irish WaterStandard Details

    5. All watermains shall be HDPE, PE100, SDR17 to IS EN 12201 Part2:2011 and IS EN 12201-3:2011

    6. MetersAll apartments and similar properties shall have meters installedinternally within the premises in accordance with Building ControlAuthority's requirements and subject to review by Irish Water.

    7. Each commercial property shall have its own supply pipe with meterand stop valve.

    8. Legend.

    Site Boundary

    Proposed Water Main

    Proposed Hydrant

    Proposed Sluice Valve

    Proposed Water Meter

    Existing Water Main

    Hyd

    SV

    M

    A ????.??.????Enter line 1

    A

    AN 30/05/2019Watermain Layout amended. Service

    Connections added.

    B

    DF 01/07/19Notes added

    C

    DF 02/07/2019Hydrants and boundary boxes moved

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019

    rpsgroup.com

    Appendix B

    Storm Water Calculations

  • MODIFIED RATIONAL METHOD

    Qp= 2.78 C i A

    A in ha

    i in mm/h 50

    C= Cv CR

    Cv= max proportion of rainfall on catchment which appears as runoff in storm drainage system

    CR= constant value 1.3

    C= 0

    Calculation of Runoff for Catchment

    Pre Development

    Surface Area (ha) Cv Runoff (l/s)

    Hardstanding 0 0.9 0.00

    Surface Area (ha)

    Runoff Rate

    (l/s/ha) Runoff (l/s)

    Green space 1.05 6.1 6.41

    Total runoff Qpre= 6.405 l/s

    Post Development

    Surface Area (ha) Cv Runoff (l/s)

    Hardstanding 0.789 0.9 128.32

    Surface Area (ha)

    Runoff Rate

    (l/s/ha) Runoff (l/s)

    Green space 0.261 6.1 1.59

    Total runoff Qpost= 129.907 l/s

    Increased Runoff Qadd= 123.502 l/s

    Mill Street Maynooth

    STORM DISCHARGE

    Waste ground

    135 domestic units with creche and retail area

  • This report was produced using the greenfield runoff tool developed by HR Wallingford and available at www.uksuds.com. The use of this tool is subject to the UK SuDS terms and conditions and licence agreement, which can both be found at http://uksuds.com/terms-and-conditions.htm. The outputs from this tool have been used to estimate storage volume requirements. The use of these results is the responsibility of the users of this tool. No liability will be accepted by HR Wallingford, the Environment Agency, CEH, Hydrosolutions or any other organisation for use of this data in the design or operational characteristics of any drainage scheme.

    Greenfield runoff estimation for sites

    www.uksuds.com │ Greenfield runoff tool

    This is an estimation of the greenfield runoff rate limits that are needed to meet normal best practice criteria in line with Environment Agency guidance “Preliminary rainfall runoff management for developments”, W5-074/A/TR1/1 rev. E (2012) and the SuDS Manual, C753 (Ciria, 2015). This information on greenfield runoff rates may be the basis for setting consents for the drainage of surface water runoff from sites.

    Site name:

    Calculated by:

    Latitude:

    Longitude:

    Reference:

    Date:

    Site coordinates

    Site location:

    Site characteristicsTotal site area (ha)

    MethodologyQbar estimation methodSPR estimation method

    Default Edited

    SOIL typeHOST classSPR/SPRHOST

    Hydrological characteristics Default EditedSAAR (mm)Hydrological region Growth curve factor: 1 year Growth curve factor: 30 year Growth curve factor: 100 year

    Notes:(1) Is QBAR < 2.0 l/s/ha?

    (2) Are flow rates < 5.0 l/s?

    (3) Is SPR/SPRHOST ≤ 0.3?

    Greenfield runoff rates Default EditedQbar (l/s)1 in 1 year (l/s)1 in 30 years (l/s)1 in 100 years (l/s)

    Methodology IH124

    0.3

    1.99

    2.13for disposal of surface water runoff.

    6.1

    0.85 0.85

    Lower consent flow rates may be set in which case blockage

    12

    1.01

    2019-01-10T15:03:53

    Mill Street, Maynooth

    --- 5.0l/s if blockage from vegetation and other materials is possible.

    6.59216° W

    1.99

    Mixed Use development

    2.34

    donnla fisher

    2.61

    2.34

    Calculate from SOIL type

    53.38274° N

    858858

    Where groundwater levels are low enough the use of

    22

    6.1

    2.61

    Calculate from SPR and SAAR

    12

    ---

    4.97 4.97

    soakaways to avoid discharge offsite may be a requirement

    2.13

    6514656

    work must be addressed by using appropriate drainage elements.

    0.3

    Where flow rates are less than 5.0 l/s consents are usually set at

  • RPS Consulting Engineers Page 1

    Elmwood House

    74 Boucher Road

    Belfast BT12 6RZ

    Date 16/04/2019 16:12 Designed by donnla.fisher

    File STORM ATTENUATION 16041... Checked by

    Micro Drainage Source Control 2016.1.1

    Summary of Results for 100 year Return Period (+20%)

    ©1982-2016 XP Solutions

    Half Drain Time : 513 minutes.

    Storm

    Event

    Max

    Level

    (m)

    Max

    Depth

    (m)

    Max

    Infiltration

    (l/s)

    Max

    Control

    (l/s)

    Max

    Σ Outflow

    (l/s)

    Max

    Volume

    (m³)

    Status

    15 min Summer 49.469 0.639 0.0 6.0 6.0 140.3 O K

    30 min Summer 49.678 0.848 0.0 6.0 6.0 186.1 O K

    60 min Summer 49.878 1.048 0.0 6.0 6.0 229.9 O K

    120 min Summer 50.061 1.231 0.0 6.0 6.0 270.1 O K

    180 min Summer 50.148 1.318 0.0 6.0 6.0 289.3 O K

    240 min Summer 50.195 1.365 0.0 6.0 6.0 299.6 O K

    360 min Summer 50.229 1.399 0.0 6.0 6.0 307.0 O K

    480 min Summer 50.225 1.395 0.0 6.0 6.0 306.2 O K

    600 min Summer 50.215 1.385 0.0 6.0 6.0 303.9 O K

    720 min Summer 50.200 1.370 0.0 6.0 6.0 300.6 O K

    960 min Summer 50.164 1.334 0.0 6.0 6.0 292.8 O K

    1440 min Summer 50.085 1.255 0.0 6.0 6.0 275.5 O K

    2160 min Summer 49.960 1.130 0.0 6.0 6.0 248.0 O K

    2880 min Summer 49.824 0.994 0.0 6.0 6.0 218.2 O K

    4320 min Summer 49.524 0.694 0.0 6.0 6.0 152.3 O K

    5760 min Summer 49.321 0.491 0.0 6.0 6.0 107.7 O K

    7200 min Summer 49.186 0.356 0.0 6.0 6.0 78.2 O K

    8640 min Summer 49.098 0.268 0.0 5.7 5.7 58.9 O K

    10080 min Summer 49.041 0.211 0.0 5.4 5.4 46.3 O K

    15 min Winter 49.549 0.719 0.0 6.0 6.0 157.8 O K

    Storm

    Event

    Rain

    (mm/hr)

    Flooded

    Volume

    (m³)

    Discharge

    Volume

    (m³)

    Time-Peak

    (mins)

    15 min Summer 99.186 0.0 145.5 26

    30 min Summer 66.249 0.0 194.6 40

    60 min Summer 41.735 0.0 246.4 70

    120 min Summer 25.643 0.0 302.8 128

    180 min Summer 19.139 0.0 339.1 186

    240 min Summer 15.518 0.0 366.6 244

    360 min Summer 11.521 0.0 408.2 360

    480 min Summer 9.315 0.0 440.1 436

    600 min Summer 7.895 0.0 466.2 496

    720 min Summer 6.895 0.0 488.6 560

    960 min Summer 5.566 0.0 525.9 692

    1440 min Summer 4.115 0.0 582.8 972

    2160 min Summer 3.041 0.0 647.5 1388

    2880 min Summer 2.453 0.0 696.2 1816

    4320 min Summer 1.809 0.0 770.0 2512

    5760 min Summer 1.457 0.0 827.5 3184

    7200 min Summer 1.231 0.0 874.0 3888

    8640 min Summer 1.073 0.0 913.7 4576

    10080 min Summer 0.955 0.0 948.3 5248

    15 min Winter 99.186 0.0 163.0 26

  • RPS Consulting Engineers Page 2

    Elmwood House

    74 Boucher Road

    Belfast BT12 6RZ

    Date 16/04/2019 16:12 Designed by donnla.fisher

    File STORM ATTENUATION 16041... Checked by

    Micro Drainage Source Control 2016.1.1

    Summary of Results for 100 year Return Period (+20%)

    ©1982-2016 XP Solutions

    Storm

    Event

    Max

    Level

    (m)

    Max

    Depth

    (m)

    Max

    Infiltration

    (l/s)

    Max

    Control

    (l/s)

    Max

    Σ Outflow

    (l/s)

    Max

    Volume

    (m³)

    Status

    30 min Winter 49.787 0.957 0.0 6.0 6.0 209.9 O K

    60 min Winter 50.011 1.181 0.0 6.0 6.0 259.3 O K

    120 min Winter 50.223 1.393 0.0 6.0 6.0 305.7 O K

    180 min Winter 50.329 1.499 0.0 6.0 6.0 329.0 O K

    240 min Winter 50.389 1.559 0.0 6.0 6.0 342.2 O K

    360 min Winter 50.444 1.614 0.0 6.1 6.1 353.8 O K

    480 min Winter 50.454 1.624 0.0 6.1 6.1 355.2 O K

    600 min Winter 50.432 1.602 0.0 6.1 6.1 351.5 O K

    720 min Winter 50.410 1.580 0.0 6.1 6.1 346.7 O K

    960 min Winter 50.363 1.533 0.0 6.0 6.0 336.5 O K

    1440 min Winter 50.244 1.414 0.0 6.0 6.0 310.4 O K

    2160 min Winter 50.049 1.219 0.0 6.0 6.0 267.5 O K

    2880 min Winter 49.834 1.004 0.0 6.0 6.0 220.3 O K

    4320 min Winter 49.382 0.552 0.0 6.0 6.0 121.1 O K

    5760 min Winter 49.148 0.318 0.0 5.9 5.9 69.7 O K

    7200 min Winter 49.033 0.203 0.0 5.4 5.4 44.5 O K

    8640 min Winter 48.974 0.144 0.0 4.9 4.9 31.5 O K

    10080 min Winter 48.952 0.122 0.0 4.4 4.4 26.7 O K

    Storm

    Event

    Rain

    (mm/hr)

    Flooded

    Volume

    (m³)

    Discharge

    Volume

    (m³)

    Time-Peak

    (mins)

    30 min Winter 66.249 0.0 218.0 40

    60 min Winter 41.735 0.0 276.0 68

    120 min Winter 25.643 0.0 339.2 126

    180 min Winter 19.139 0.0 379.8 182

    240 min Winter 15.518 0.0 410.6 240

    360 min Winter 11.521 0.0 457.3 352

    480 min Winter 9.315 0.0 492.9 460

    600 min Winter 7.895 0.0 522.2 558

    720 min Winter 6.895 0.0 547.2 584

    960 min Winter 5.566 0.0 588.9 736

    1440 min Winter 4.115 0.0 652.7 1048

    2160 min Winter 3.041 0.0 725.2 1504

    2880 min Winter 2.453 0.0 779.8 1964

    4320 min Winter 1.809 0.0 862.5 2600

    5760 min Winter 1.457 0.0 926.8 3232

    7200 min Winter 1.231 0.0 978.9 3888

    8640 min Winter 1.073 0.0 1023.4 4496

    10080 min Winter 0.955 0.0 1062.3 5144

  • RPS Consulting Engineers Page 3

    Elmwood House

    74 Boucher Road

    Belfast BT12 6RZ

    Date 16/04/2019 16:12 Designed by donnla.fisher

    File STORM ATTENUATION 16041... Checked by

    Micro Drainage Source Control 2016.1.1

    Rainfall Details

    ©1982-2016 XP Solutions

    Rainfall Model FSR Winter Storms Yes

    Return Period (years) 100 Cv (Summer) 0.750

    Region Scotland and Ireland Cv (Winter) 0.840

    M5-60 (mm) 17.800 Shortest Storm (mins) 15

    Ratio R 0.324 Longest Storm (mins) 10080

    Summer Storms Yes Climate Change % +20

    Time Area Diagram

    Total Area (ha) 0.789

    Time

    From:

    (mins)

    To:

    Area

    (ha)

    Time

    From:

    (mins)

    To:

    Area

    (ha)

    Time

    From:

    (mins)

    To:

    Area

    (ha)

    0 4 0.263 4 8 0.263 8 12 0.263

  • RPS Consulting Engineers Page 4

    Elmwood House

    74 Boucher Road

    Belfast BT12 6RZ

    Date 16/04/2019 16:12 Designed by donnla.fisher

    File STORM ATTENUATION 16041... Checked by

    Micro Drainage Source Control 2016.1.1

    Model Details

    ©1982-2016 XP Solutions

    Storage is Online Cover Level (m) 51.030

    Cellular Storage Structure

    Invert Level (m) 48.830 Safety Factor 2.0

    Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95

    Infiltration Coefficient Side (m/hr) 0.00000

    Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)

    0.000 231.0 231.0 1.700 0.0 359.0

    1.600 231.0 359.0

    Hydro-Brake® Optimum Outflow Control

    Unit Reference MD-SHE-0107-6100-1600-6100

    Design Head (m) 1.600

    Design Flow (l/s) 6.1

    Flush-Flo™ Calculated

    Objective Minimise upstream storage

    Application Surface

    Sump Available Yes

    Diameter (mm) 107

    Invert Level (m) 48.830

    Minimum Outlet Pipe Diameter (mm) 150

    Suggested Manhole Diameter (mm) 1200

    Control Points Head (m) Flow (l/s)

    Design Point (Calculated) 1.600 6.1

    Flush-Flo™ 0.466 6.0

    Kick-Flo® 0.957 4.8

    Mean Flow over Head Range - 5.3

    The hydrological calculations have been based on the Head/Discharge relationship for the

    Hydro-Brake® Optimum as specified. Should another type of control device other than a

    Hydro-Brake Optimum® be utilised then these storage routing calculations will be

    invalidated

    Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)

    0.100 3.6 1.200 5.3 3.000 8.2 7.000 12.2

    0.200 5.4 1.400 5.7 3.500 8.8 7.500 12.6

    0.300 5.8 1.600 6.1 4.000 9.4 8.000 13.0

    0.400 6.0 1.800 6.4 4.500 9.9 8.500 13.4

    0.500 6.0 2.000 6.8 5.000 10.4 9.000 13.8

    0.600 6.0 2.200 7.1 5.500 10.9 9.500 14.1

    0.800 5.6 2.400 7.4 6.000 11.4

    1.000 4.9 2.600 7.6 6.500 11.8

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019

    rpsgroup.com

    Appendix C

    Foul Sewerage Calculations

  • FunctionNo. Of

    Dwellings

    Occupancy

    Rating*PE

    Consumption*

    (l/h/d)

    Total Flow

    (m3/day)

    1 Bed

    Domestic

    Dwelling

    43 2 86 150 12.9

    2 Bed

    Domestic

    Dwelling

    70 3 210 150 31.5

    3 Bed

    Domestic

    Dwelling

    7 5 35 150 5.25

    *Occupancy Rate and Consumption figures in accordance with British Water Design Code of

    Practice - Flow and Loads - 4

    n

    3

    6

    N Factor

    New foul system discharging to an existing foul network

    Foul system discharging to a Pumping Station

    0.57 l/s

    1.72 l/s

    [Millstreet, Maynooth]

    FOUL DISCHARGE

    Average Daily Flow (DWF)

    C=A/86.4

    Peak Design Flow

    D=nC

  • where

    Q l/s

    kDU dimensionless

    DU dimensionless

    Appliance Total Appliances

    Discharge

    Unit/Appliance

    (DU)

    Total Discharge

    Units Notes/Assumption

    WC 15 1.20 18.0 Assumed water efficient toilets

    Hand Basin 8 0.45 3.6 Average

    Urinal 0 0.55 0.0 Average

    Bath 0 1.00 0.0 Average

    Kitchen Sink 5 1.00 5.0 Average

    Washing Machine 1 0.50 0.5Assumed water efficient washing

    machines

    Dishwasher 1 0.50 0.5Assumed half of properties have

    dishwashers

    Shower 0 0.45 0.0Assumed half of properties have

    separate shower

    Commercial Washing

    Machine0 1.25 0.0 Average

    Floor Drains 0 1.30 0.0 Average

    ΣDU 27.6

    KDU value 0.5

    Intermittent 0.5

    Frequent 0.7

    Congested use 1

    Special use 1.2

    2.63 (l/s)

    Equations and discharge units taken from BS EN 752, Annex C

    Total Discharge Units

    Wastewater design flow rate (Q)

    Wastewater Discharge Calculations -

    Probability Method

    Wastewater flow derived from number and type of appliances connected.

    wastewater design flow rate

    frequency factor

    discharge unit

    DUkQDU

    ∑=

    08/05/2019

  • REPORT

    IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019

    rpsgroup.com

    Appendix D

    Proposed Water and Waste Water Layouts

  • A: 83.52

    m

    2

    A: 83.52

    m

    2

    Classroom 2

    A: 30.29

    m

    2

    Food Prep Room

    A: 4.61

    m

    2

    Food Prep Room

    A: 10.36

    m

    2

    WC

    A: 12.59

    m

    2

    Classroom 1

    A: 30.46

    m

    2

    Buggy Store

    A: 5.01

    m

    2

    Store

    A: 5.01

    m

    2

    UAWC

    A: 4.71

    m

    2

    Classroom 4

    A: 27.96

    m

    2

    Classroom 3

    A: 20.82

    m

    2

    Food Prep

    A: 10.11

    m

    2

    Lobby

    A: 25.97

    m

    2

    WC

    A: 7.75

    m

    2

    Store

    A: 1.96

    m

    2

    Store

    A: 8.34

    m

    2

    Kitchen-Cooking Area

    A: 24.37

    m

    2

    Lobby

    A: 9.54

    m

    2

    Male WC

    A: 6.29

    m

    2

    Female WC

    A: 6.29

    m

    2

    Store

    A: 3.78

    m

    2

    UAWC

    A: 3.49

    m

    2

    Female WC

    A: 10.57

    m

    2

    Male WC

    A: 7.75

    m

    2

    Lobby

    A: 8.78

    m

    2

    Cafe-Restaurant

    A: 149.26

    m

    2

    Existing Church

    F.F.L 56.94

    Existing Building F.F.L

    52.680

    Existing

    Building

    M

    i

    l

    l

    S

    t

    r

    e

    e

    t

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    L

    y

    r

    e

    e

    n

    R

    iv

    e

    r

    L

    y

    r

    e

    e

    n

    R

    i

    v

    e

    r

    Pedestrian path

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    P

    a

    t

    h

    C

    y

    c

    l

    e

    P

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    Cycle path

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    Pedestrian path

    C

    y

    c

    l

    e

    p

    a

    t

    h

    C

    y

    c

    l

    e

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    C

    y

    c

    le

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    ia

    n

    p

    a

    t

    h

    P

    e

    d

    e

    s

    t

    r

    i

    a

    n

    p

    a

    t

    h

    1

    2

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    2

    -

    3

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    5

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    0

    -

    1

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    U

    n

    it

    B

    1

    -

    0

    5

    U

    n

    it

    B

    1

    -

    0

    6

    U

    n

    it

    B

    1

    -

    0

    7

    U

    n

    it

    B

    1

    -

    0

    8

    U

    n

    it

    B

    1

    -

    0

    9

    U

    n

    it

    B

    1

    -

    1

    0

    U

    n

    it

    B

    1

    -

    1

    1

    U

    n

    it

    B

    1

    -

    1

    2

    Existing

    Building

    E

    le

    v

    -

    1

    E

    le

    v

    -

    4

    E

    le

    v

    -

    2

    E

    le

    v

    -

    3

    E

    l

    e

    v

    -

    3

    U

    n

    i

    t

    B

    2

    -

    1

    1

    U

    n

    i

    t

    B

    2

    -

    1

    2

    U

    n

    i

    t

    B

    2

    -

    1

    3

    U

    n

    i

    t

    B

    2

    -

    1

    5

    U

    n

    i

    t

    B

    2

    -

    1

    6

    U

    n

    i

    t

    B

    2

    -

    1

    7

    U

    n

    i

    t

    B

    2

    -

    1

    8

    E

    l

    e

    v

    -

    2

    E

    l

    e

    v

    -

    4

    E

    l

    e

    v

    -

    1

    E

    le

    v

    -

    2

    U

    n

    it

    A

    -

    0

    2

    Block A

    Carraigeway

    U

    n

    i

    t

    C

    -

    0

    6

    U

    n

    i

    t

    C

    -

    0

    7

    U

    n

    i

    t

    C

    -

    0

    8

    U

    n

    i

    t

    C

    -

    0

    9

    U

    n

    i

    t

    C

    -

    1

    0

    E

    l

    e

    v

    -

    1

    E

    l

    e

    v

    -

    2

    E

    l

    e

    v

    -

    4

    E

    l

    e

    v

    -

    3

    52.380

    Cycle

    p

    ath

    Level Platform

    54.190

    54.380

    54.180

    53.610

    53.110

    52.515

    54.180

    53.680

    53.680

    53.680

    54.660

    54.660

    54.110

    53.610

    53.110

    Level Platform

    52.610

    52.750

    52.610

    52.750

    53.610

    53.110

    53.110

    52.610

    52.610

    51.600

    52.100

    51.600

    51.100

    51.100

    50.700

    50.700

    50.370

    50.370

    50.410

    50.530

    50.530

    50.530

    53.860

    53.860

    54.360

    54.360

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    Level Platform

    52.450

    52.380

    52.380

    52.380

    54.360

    55.880

    54.360

    54.360

    54.360

    53.435

    52.435

    52.935

    52.935

    Level Platform

    53.935

    53.435

    Level Platform

    53.935

    Level Platform

    54.480

    52.435

    30No.

    Bicycles on 2

    Tier Rack

    System

    52.435

    52.435

    Level Platform

    51.030

    51.030

    Level Platform

    51.530

    51.530

    Level Platform

    52.030

    52.030

    Level Platform

    52.030

    52.435

    52.435Level Platform

    52.015

    52.015

    52.015

    52.015

    52.015

    50.743

    50.743

    51.076

    51.409

    51.702

    51.702

    51.702

    52.035

    52.035

    52.075

    52.035

    52.368

    52.150

    52.200

    52.435

    52.370

    Level Platform

    54.360

    30No.

    Bicycles on 2

    Tier Rack

    System

    51.076

    52.300

    52.075

    52.380

    54.360

    54.360

    55.880

    51.000

    E

    x

    it

    t

    o

    e

    x

    t

    e

    r

    n

    a

    l

    C

    r

    e

    c

    h

    e

    p

    la

    y

    a

    r

    e

    a

    1

    2

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    3

    -

    4

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    1

    0

    N

    o

    .

    C

    h

    ild

    r

    e

    n

    1

    -

    2

    y

    e

    a

    r

    s

    2

    N

    o

    .

    A

    d

    u

    lt

    s

    U

    n

    it

    A

    -

    0

    1

    54.660

    54.660

    F.F.L. 55.00

    55.160

    F.F.L. 55.00

    51.030

    51.030

    51.530

    51.530

    52.030

    52.030

    2

    0

    2

    0

    C

    u

    s

    t

    o

    m

    T

    e

    x

    t

    U

    P

    D

    O

    W

    N

    1

    9

    1

    8

    1

    7

    1

    6

    1

    5

    1

    4

    1

    3

    1

    2

    1

    1

    1

    0

    9

    8

    7

    6

    5

    4

    3

    2

    1

    C

    u

    s

    t

    o

    m

    T

    e

    x

    t

    U

    P

    D

    O

    W

    N

    1

    9

    1

    8

    1

    7

    1

    6

    1

    5

    1

    4

    1

    3

    1

    2

    1

    1

    1

    0

    9

    8

    7

    6

    5

    4

    3

    2

    1

    1

    .

    8

    m

    x

    1

    .

    8

    m

    R

    a

    m

    p

    u

    p

    1

    :

    1

    0

    R

    a

    m

    p

    D

    o

    w

    n

    1

    :

    1

    0

    V

    o

    id

    t

    o

    B

    e

    lo

    w

    E

    x

    it

    C

    o

    u

    n

    t

    e

    r

    E

    x

    it

    E

    x

    it

    C

    a

    n

    o

    p

    y

    O

    v

    e

    r

    h

    e

    a

    d

    L

    o

    c

    k

    e

    r

    s

    1

    .

    8

    m

    x

    1

    .

    8

    m

    E

    x

    it

    1

    .

    8

    m

    x

    1

    .

    8

    m

    M

    I

    L

    L

    S

    T

    R

    E

    E

    T

    50.370

    50.370

    50.370

    50.370

    50.370

    50.370

    RISING MAINDISCHARGE CHAMBER

    CL 54.54IL 52.71

    KLARGESTEROIL & GRITINTECEPTOR

    KLARGESTER HORIZONTALPUMPING STATIONCL - 52.935IL - 46.47

    MH F01ACL 50.76IL 49.49

    MH FS04CL 49.76IL 48.03

    MH FS02CL 49.76IL 48.24

    MH FS01CL 49.76IL 49.00

    MH FS03CL 50.76IL 48.72

    MH FS05CL 52.45IL 47.68

    MH F02CL 52.45IL 47.54

    MH F03CL 52.435IL 46.69

    MH F02CCL 52.40IL 46.76

    MH F01CCL 51.17IL 47.77

    MH 06

    MH F01BCL 53.34IL 49.45

    225mm Ø uPVC FOUL PIPE @ 1:45225m

    m Ø uPVC F

    OUL PIPE @

    1:29

    150mm Ø uPV

    C FOUL PIPE

    @ 1:60

    150mm

    Ø uP

    VC FO

    UL PI

    PE @

    1:15

    225mm Ø uPVC FOUL PIPE @ 1:60

    150mm Ø uPVC FOUL PIPE @ 1:60

    150mm

    Ø uPV

    C FOU

    L PIPE

    @ 1:6

    0

    150m

    m Ø

    uPVC

    FOUL

    PIP

    E @

    1:60

    80mm D

    UCTIL

    E IRON

    FOUL

    PUMP

    ING MA

    IN

    80mm DUCTILE IRON FOUL PUMPING MAIN

    MH F04CL 52.935IL 46.59

    DISCHARGE TORIVER LYREENOUTFALL 50.20(SEE HEADWALL DETAIL)

    MH S012SEALED MANHOLEHYDROBRAKE CHAMBERCL 50.53IL 50.25

    MH S07CL 52.43IL 50.88

    MH S06CL 52.43IL 50.93

    MH S04CL 52.45IL 51.28

    MH S101CL 52.01IL 51.30

    MH S01CL 54.18IL 52.78

    ATTENUATION TANKTOP ENDCL 52.57TWL 52.17IL 50.57

    MH S03BACKDROPCL 53.50IL 51.44

    MH S02CL 53.68IL 52.58

    225mm

    Ø uPVC

    STOR

    M PIPE

    @ 1:15

    0

    225mm

    Ø uPVC

    STOR

    M PIPE

    @ 1:15

    0

    225mm

    Ø uPVC

    STORM

    PIPE @

    1:150

    225mm Ø uPVC STORM PIPE @ 1:150

    225mm Ø uPVC STORM

    PIPE @ 1:150

    225mm Ø uPVC STORM PIPE @ 1:150

    225mm Ø uPVC

    GEOCELLULARATTENUATION TANKVOLUME: 369.6m³DIMS: 7m x 33m x 1.6m

    ATTENUATION TANKBOTTOM ENDCL 52.35TWL 51.95IL 50.35

    KLARGESTER FULLHYDROCARBON ANDSILT INTERCEPTOR

    MH S201CL 52.40IL 51.10

    MH S08CL 52.70IL 50.84

    MH S09CL 52.43IL 50.69 MH S010

    CL 52.43IL 50.62

    MH S011CL 52.02IL 50.59

    225mm

    Ø uPV

    C STO

    RM PIP

    E @ 1:1

    50

    G

    G

    G

    G

    G G

    G

    G

    NOTES

    Drawing Number

    Drawing Status Sheet Size

    Client

    Rev

    Drawing Scale

    drawnamendmentsrev

    Project

    Title

    date

    /

    Initial ReviewProject Leader Drawn By Date

    Proposed Development, Mill Street

    Maynooth, Kildare

    Proposed Foul and Storm

    Drainage Layout

    Planning

    04/11/19

    1:250

    IBE1366

    A1

    PL/001 E

    ML AN DF

    T +44 (0) 28 90 667914

    F +44 (0) 28 90 668286

    W www.rpsgroup.com/ireland

    E [email protected]

    Elmwood House

    74 Boucher Road

    Belfast

    BT12 6RZ

    Ladas Property Company

    1. Verifying Dimensions.The contractor shall verify dimensions against such other drawingsor site conditions as pertain to this part of the work.

    2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.

    3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing.All other formats (dwg, dxf etc.) are deemed to be an uncontrolledissue and any work carried out based on these files is at therecipients own risk. RPS will not accept any responsibility for anyerrors arising from the use of these files, either by human error bythe recipient, listing of un-dimensioned measurements, compatibilityissues with the recipient's software, and any errors arising whenthese files are used to aid the recipients drawing production, orsetting out on site.

    4. SewersAll sewers to be constructed in accordance with Irish Water StandardDetails

    5. All foul sewers to be 150mm Ø uPVC to EN1401

    6. All storm sewers to be 150Ø uPVC to EN1410

    7. Klargester oil and grit interceptor is located after final connection tostorm network to ensure all storm flows are passed throughinterceptor prior to storage and discharge

    8. Legend.

    Site Boundary

    Proposed Foul Sewer

    Proposed Storm Sewer

    Existing Foul Sewer

    5m SCALE 1:250

    A

    AN 30/05/2019Foul Drainage layout updated. Pipe sizes

    and gradients amended.

    B

    DF 31/05/2019Oil & silt inteceptor added to storm network

    C

    DF 21/06/2019New storm layout

    D

    DF 01/07/19Realigned foul line MH FS01 to MHFS02

    E

    DF 04/11/19Gullies and additional notes added

  • Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH FS01 - MH FS05

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50

    51

    52

    Chainage

    Ground Level

    Invert Level

    Pipe Details

    Gradient

    0.0

    45

    .2

    79

    .7

    49

    .7

    6

    49

    .7

    6

    52

    .4

    5

    49

    .0

    0

    48

    .2

    4

    150mm

    uPVC

    G=1:60

    L=45.23

    MH

    F

    S01

    MH

    F

    S02

    150mm

    uPVC

    G=1:60

    L=12.22

    47

    .6

    5

    52

    MH

    F

    S04

    47

    .4

    49

    .7

    64

    8.0

    3

    BASEMENT LEVEL

    MH

    F

    S05

    78

    .1

    52

    .4

    54

    7.6

    8

    150mm

    uPVC

    G=1:60

    L=20.62

    OIL & GRITINTERCEPTOR

    150mm

    uPVC

    G=1:60

    L=1.6

    Le

    ve

    l (m

    )

    PROPOSED FOUL - LONGSECTION

    MH FS03 - MH FS04

    SCALE: H 1:500,V 1:100

    DATUM: 45.000

    46

    47

    48

    49

    50