rpsgroup.com
LYREEN VIEW APARTMENTS, MILL STREET , MAYNOOTH Drainage Assessment
IBE1366
Lyreen View Drainage
Assessment
6
03th July 2019
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page ii
Document status
Version Purpose of document Authored by Reviewed by Approved by Review date
2 Final D. Fisher M. Dineen B. Malone March 2018
3 Final D. Fisher M. Dineen B. Malone May 2018
4 Final D. Fisher M. Dineen B. Malone June 2018
5 Final D. Fisher M. Logan B. Malone May 2019
6 Final D. Fisher M. Logan B. Malone June 2019
7 Final D. Fisher M. Logan B. Malone July 2019
8 Final D. Fisher M. Logan B. Malone Sept 2019
Approval for issue
[Name] [Signature] [Date]
This report was prepared by RPS Consulting Engineers Limited (‘RPS’) within the terms of its engagement and in direct response to
a scope of services. This report is strictly limited to the purpose and the facts and matters stated in it and does not apply directly or
indirectly and must not be used for any other application, purpose, use or matter. In preparing the report, RPS may have relied upon
information provided to it at the time by other parties. RPS accepts no responsibility as to the accuracy or completeness of
information provided by those parties at the time of preparing the report. The report does not take into account any changes in
information that may have occurred since the publication of the report. If the information relied upon is subsequently determined to
be false, inaccurate or incomplete then it is possible that the observations and conclusions expressed in the report may have
changed. RPS does not warrant the contents of this report and shall not assume any responsibility or liability for loss whatsoever to
any third party caused by, related to or arising out of any use or reliance on the report howsoever. No part of this report, its
attachments or appendices may be reproduced by any process without the written consent of RPS. All enquiries should be directed
to RPS.
Prepared by: Prepared for:
RPS Comer Property
Donnla Fisher
Project Engineer
David Reilly
Architect
Elmwood House
74 Boucher Road, Belfast
Co. Antrim BT12 6RZ
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page iii
T +44 2890 667 914
Contents
1 INTRODUCTION ........................................................................................................................... 1 2 OVERVIEW OF SITE & PROPOSED DEVELOPMENT .............................................................. 2 2.1 Overview of Site ............................................................................................................................ 2 2.2 The Proposed Development ......................................................................................................... 2 2.3 Existing Drainage Infrastructure .................................................................................................... 3 2.3.1 Kildare County Council – Water services ...................................................................................... 4 3 DRAINAGE ASSESSMENT ......................................................................................................... 6 3.1 Storm Water Discharge ................................................................................................................. 6 3.2 Storm Water Mitigation Measures ................................................................................................. 7 3.3 Wastewater Discharge .................................................................................................................. 7 4 CONCLUSIONS ............................................................................................................................ 8
Figures
Figure 1.1 Location Map ............................................................................................................................. 1
Figure 2.1 Aerial Site Photo ........................................................................................................................ 2
Figure 2.2 Proposed Site Layout................................................................................................................ 3
Figure 2.3 Comparison between pre-excavation & proposed 1% AEP flood extents .......................... 5
Appendices
Appendix A Irish Water Correspondence
Appendix B Storm Water Calculations
Appendix C Foul Sewerage Calculations
Appendix D Proposed Water and Waste Water Layouts
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 1
1 INTRODUCTION RPS were commissioned by Ladas Property Company to carry out a Drainage Assessment (DA) in
relation to a proposed housing development at a site off Mill Street, Maynooth, County Kildare.
The site is located in the centre of Maynooth, to the rear of St. Mary’s Roman Catholic Church. It is
situated adjacent to the Lyreen River. Figure 1.1 shows the location of the site. The proposal is to
construct residential apartments with ground floor commercial units and car parking amenities on the site.
As the proposed development has more than 100 residential units it is considered a Strategic Housing
Development and the planning application will be made directly to An Bord Pleanála. The application
must detail proposals for flood risk and surface water management. This report will address the
management of the increased surface water generated by the development.
Figure 1.1 Location Map
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 2
2 OVERVIEW OF SITE & PROPOSED DEVELOPMENT
2.1 Overview of Site
The site currently consists of waste ground of approximately 1.05ha in area. An aerial photo of the site is
shown in Figure 2.1, with the approximate site boundary marked on in red. The site is bound by Mill
Road and St Marys Church on the east, the Lyreen River flows adjacent to the site to the south and west
and waste ground to the north.
Planning permission was previously granted for a housing scheme on the site (Planning reference
05/2420). This development was commenced in 2008/2009, with excavation works undertaken on the site
which significantly reduced the existing ground levels, before construction was halted.
Figure 2.1 Aerial Site Photo
2.2 The Proposed Development
An application is currently being presented to An Bord Pleanála a development comprising of 120
domestic units, a crèche, a café / restaurant and 3no. office units with parking provision at basement
level. The proposed layout is shown in Figure 2.2
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 3
Figure 2.2 Proposed Site Layout
2.3 Existing Drainage Infrastructure
A Pre-Connection Enquiry was submitted to Irish Water for the development requesting information on
the existing public water and sewerage services within the boundary of the site and its immediate
surrounds to establish if there is capacity within the existing Irish Water network.
A response was received form Irish Water on 14th September 2017. A copy of the Pre-Connection
Enquiry application and response can be found within Appendix A. The response indicated that there
proposed connection to the Irish Water network can be facilitated; however, it advised that the availability
of capacity does not constitute an offer of connection and that before submitting planning application Irish
Water be consulted again.
More detailed calculations and layouts were submitted to Irish water and a letter of acceptance for the
scheme was received on 3rd July 2019 (Appendix A).
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 4
In response to the comments from An Bord Pleanála in October 2018 a number of revisions to the
development were made. Irish Water advised that, provided the number of housing units did not increase,
a new application would not be required but new layouts would require approval. The final water and
wastewater infrastructure layouts were submitted to Irish Water from approval in May 2019 and we are
awaiting a response.
2.3.1 Kildare County Council – Water services
An open watercourse, the Lyreen River, is located to the South of the site. The site is presently estimated
to be at risk of flooding from fluvial events with a frequency of 10% Annual Exceedance Probability (AEP)
and greater; as identified during the Eastern Catchment-based Flood Risk Assessment and Management
(CFRAM) Study. A comparison between existing and proposed flood extents is shown below in Figure
2.3.
In accordance with the Greater Dublin Strategic Drainage Study, storm water from the site will be
attenuated to post development greenfield runoff. The discharge rate was determined using the site
specific characteristics, see Appendix C. Storm discharge for this site will be attenuated to 6.1/s.
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 5
Figure 2.3 Comparison between existing & proposed 1% AEP flood extents
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 6
3 DRAINAGE ASSESSMENT
3.1 Storm Water Discharge
The catchment area of the existing site is approximately 1.05ha. The Modified Rational Method has been
used to calculate the existing surface water discharge from the brownfield site for the 1% AEP event.
This method allows an estimation of the amount of runoff that is likely to be generated from an urban
area. The Modified Rational Method uses the following equation to calculate peak runoff rate from an
area:
Q = 2.78 Cv Cr i A
Where: Cv = Volumetric Runoff Coefficient
Cr = 1.3 (Routing Coefficient)
i = Rainfall Intensity (mm/hr)
A = Area (Ha)
2.78 = Coefficient which accounts for the differences in units used for the inputs and the outputs
of the equation
Table 3.1-Storm Run-off Flows
Area of Greenfield
(ha)
Area of Hardstanding
(l/s)
Runoff
(l/s)
Pre – Development 1.05 0 6.16
Post Development 0.261 0.789 129.907
Critical storage calculations are based on a 1% AEP storm event (+20% climate change), ranging in
storm duration periods of 15 minutes to 10080 minutes. The industry recognised simulation software
WinDes has been used to analyse the required minimum critical storage volume, calculated to be 355m3,
full calculations are in Appendix B. This volume was calculated based on the assumption that discharge
would be limited to 6.1l/s and would be controlled using a Hydrobrake, any change to the discharge or
control method will affect the required volume.
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com Page 7
3.2 Storm Water Mitigation Measures
The output of the model confirmed the need to store a volume of 355m3. Roof runoff will be collected and
discharged at one point for each block. The collected storm water will discharge to a manhole to the east
of the site, storm water will surcharge in to a geocellular attenuation tank located on eastern boundary
behind Block B2. The tanks will measure 7m x 33m x 1.6m (w x l x d) and have a storage volume of
369.9m3. Flow from the storage tank will be discharged to the Lyreen River at a rate of 6.1l/s with a flow
control system, such as a Hydrobrake, used to restrict flows.
3.3 Wastewater Discharge
A Pre-Connection Enquiry was submitted to Irish Water in June 2017, to determine the capacity of the
Irish Water network. Current floor plans and layouts have been used to estimate the foul flow from the site
at 4.35l/s, refer to Appendix C for foul flow calculations. A response to the Pre-Connection Enquiry has
confirmed that there is sufficient capacity within the existing sewer network (Appendix A). Any increases
in foul flow within the re-development will be subject to subsequent Irish Water application and approval.
The internal building design will be designed to a designated point for each block, the flows will then be
conveyed to a pumping station located at the north of the site. Basement storm flows will be discharged
through an oil interceptor to the site foul sewer to the pumping station; the flows will then be pumped to a
new gravity network on the west of the site, which conveys flows from the site to the existing sewer on
Mill Street. The pumping station will pump forward a flow of 4.35l/s and will have a storage capacity of
60m3, which is 24hrs of Dry Weather Flow.
Irish Water issued a Design Acceptance letter for the proposal in July 2019, see Appendix A.
Sewer and water main layouts can be found in Appendix D.
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 03th July 2019
rpsgroup.com
4 CONCLUSIONS
It is proposed to develop the 1.05 ha area of waste land on Mill Street Maynooth and construct a
development with 120 domestic units, a crèche, a café / restaurant and 3no. office units with parking
provision at basement level. The sites lies within the flood plain of the Lyreen river and the Flood Risk
Assessment has recommended that the ground levels are raised, as a minimum, to the calculated 1%
AEP flood level plus a freeboard of 500mm.
A pumping station will pump internal building drainage to a manhole at ground level which will convey
flows to the existing sewer on Mill Street. The drainage for the basement carpark, will be passed through
an oil interceptor before being connected to the sewer for internal foul drainage and discharged to the
same pumping station. Preliminary drainage drawings are contained in Appendix D, however these
designs are subject to Irish Water approval.
The calculated increased storm water for the site is approximately 123.502 l/s; however, discharge flows
to the Lyreen River flows will be attenuated to a pre development runoff rate of 6.1l/s. Storm storage
required has been estimated to be 355m3 based on the discharge rate. The storm water management
systems recommended are geocellular storm cells used to attenuate storm water. The storm cells will be
located on the eastern boundary behind Block B2.
All calculations and drainage layouts within this report are preliminary and are subject to detail design. All
construction must be done in accordance with Irish Water Code of Practice and with the approval of
Kildare County Council.
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019
rpsgroup.com
Appendix A
Irish Water Correspondence
1 IW/EF/NC/B/0417
Pre-connection enquiry formIndustrial and commercial developments, mixed use developments, housing developments, business developments
Guide to completing the pre-connection enquiry form
Section A | Applicant details
1 WPRN number (where available):
2 Applicant details:
3 Agent details (if applicable):
L A D A S P R O P E R T Y
C O M P A N Y
5 2 3 0 4 0
L A D A S P R O P E R T Y C O M P A N Y
P A L M E R S T O W N H O U S E E S T A T E
J O H N S T O W N C O . K I L D A R E
D A V I D R E I L L Y
M F A R C H I T E C T S
M A I N S T B U T L E R S B R I D G E
C O . C A V A N
0 4 9 4 3 6 5 8 0 0
d a v i d @ m f a r c h i t e c t s . i e
2 IW/EF/NC/B/0417
5 Site address:
6 Irish Grid co-ordinates of site:
10 Date that previous development was last occupied (if applicable):
Section B | Site details
7 Local Authority:
13 Is the development compliant with the local area development plan? No
11 Are there poor ground conditions on-site? No
8 Has full planning permission been granted? No
9 Previous use of this site (if applicable):
12 Are there potential contaminated land issues? No
4 Please indicate whether it is the applicant or agent who should receive future correspondence in relation to the enquiry:
✔
m i l l s t r e e t m a y n o o t h
c o . k i l d a r e
6 9 3 5 8 0 7 3 7 9 9 3
K i l d a r e c o . C o u n c i l
✔
0 5 / 2 0 2 4 P R E V I O U S P L A N N I N G
N / A
✔
✔
✔
3 IW/EF/NC/B/0417
Pre-development peak hour water demand l/s
Pre-development average hour water demand l/s
Post-development peak hour water demand l/s
Post-development average hour water demand l/s
19 Please indicate pre-development water demand (if applicable):
20 Please indicate the domestic water demand (housing developments only):
14 Is there an existing connection to public water mains at the site?
15 Is this enquiry for an additional connection to the one already installed?
16 Is this enquiry to increase the size of an existing water connection?
17 Is this enquiry for a new water connection?
18 Approximate date water connection is required:
Post-development peak hour water demand l/s
Post-development average hour water demand l/s
Post-development peak hour water demand l/s
Post-development average hour water demand l/s
Section C | Water connection and demand details
23 What is the existing ground level at the property boundary at connection point (if known) above Malin Head Ordnance Datum?
24
✔
✔
✔
0 9 2 0 1 8
5 5 . 3 8
5 4 . 3 0
4 IW/EF/NC/B/0417
27 Do you propose to supplement your potable water supply from other sources? No
Guide to completing the application form
l/s
25 Is on-site water storage being provided?
28 Is there an existing connection to a public sewer at the site? No
29 Is this enquiry for an additional connection to one already installed? No
30 Is this enquiry to increase the size of an existing connection? No
31 Is this enquiry for a new wastewater connection? No
32 Approximate date that wastewater connection is required:
Section D | Wastewater connection and discharge details
34 Please indicate the domestic wastewater hydraulic load (housing developments only):
Pre-development peak discharge l/s
Pre-development average discharge l/s
Post-development peak discharge l/s
Post-development average discharge l/s
33 Please indicate pre-development wastewater discharge (if applicable):
Post-development peak discharge l/s
Post-development average discharge l/s
✔
✔
✔
✔
✔
✔
✔
0 9 2 0 1 8
5 IW/EF/NC/B/0417
37 Wastewater organic load:
Temperature range
pH range
Characteristic Max concentration (mg/l)Average concentration (mg/l)
Maximum daily load (kg/day)
Other
36
Post-development peak discharge l/s
Post-development average discharge l/s
intends discharging surface water to the combined wastewater collection system:
39 Do you propose to pump the wastewater?
40 What is the existing ground level at the property boundary at connection point (if known) above Malin Head Ordnance Datum?
41
✔
✔
6 IW/EF/NC/B/0417
Section E | Development details
42 Please outline the domestic and/or industry/business use proposed:
Property type Total number of units for this application
44 Is the development multi-phased? No
43 Approximate start date of proposed development:
150 UNITS
CRECHE AND RETAIL AREA
0 1 2 0 1 8
✔
7 IW/EF/NC/B/0417
Section F | Supporting documentation
Please provide the following additional information:
>
>
>
>
>
Section G | Declaration
Irish Water PO Box 860
Cork City
___________________________________________________________________________________________________________
DAVID REILLY Digitally signed by DAVID REILLY Date: 2017.06.13 14:39:34 +01'00' 1 3 0 6 2 0 1 7
D A V I D R E I L L Y
8 IW/EF/NC/B/0417
Calculations
9 IW/EF/NC/B/0417
10 IW/EF/NC/B/0417
11 IW/EF/NC/B/0417
12 IW/EF/NC/B/0417
Guide to completing the pre-connection enquiry form
Section A | Applicant Details
Section B | Site details
Section C | Water connection and demand details
13 IW/EF/NC/B/0417
Section D | Wastewater connection and discharge details
14 IW/EF/NC/B/0417
Section E | Development details
Section F | Supporting documentation
Section G | Declaration
15 IW/EF/NC/B/0417
Notes
16 IW/EF/NC/B/0417
Notes
Ladas Property Company c/o Donnla Fisher,
RPS Consulting Engineers,
Elmwood House,
74 Boucher Road,
Belfast, BT12 6RZ,
Northern Ireland
3 July 2019
Re: Design Submission for Development at Mill Street, Maynooth, Co. Kildare (the
“Development”) (the “Design Submission”) / CUST17492.
Dear Donnla,
Many thanks for your recent Design Submission.
We have reviewed your proposal for the connection(s) at the Development. Based on the
information provided, which included the documents outlined in Appendix A to this letter,
Irish Water has no objection to your proposals.
This letter does not constitute an offer, in whole or in part, to provide a connection to any
Irish Water infrastructure. Before you can connect to our network you must sign a
connection agreement with Irish Water. This can be applied for by completing the
connection application form at www.water.ie/connections. Irish Water’s current charges for
water and wastewater connections are set out in the Water Charges Plan as approved by
the Commission for Regulation of Utilities (CRU) (https://www.cru.ie/document_group/irish-
waters-water-charges-plan-2018/).
You the Customer (including any designers/contractors or other related parties appointed
by you) is entirely responsible for the design and construction of all water and/or
wastewater infrastructure within the Development which is necessary to facilitate
connection(s) from the boundary of the Development to Irish Water’s network(s) (the “Self-
Lay Works”), as reflected in your Design Submission. Acceptance of the Design
Submission by Irish Water does not, in any way, render Irish Water liable for any elements
of the design and/or construction of the Self-Lay Works.
If you have any further questions, please contact your Irish Water Representative
Name: Fionan Ginty
Phone: 01 8925734
Email: [email protected]
Yours sincerely,
Maria O’Dwyer
Connections and Developer Services
http://www.water.ie/connectionshttps://www.cru.ie/document_group/irish-waters-water-charges-plan-2018/https://www.cru.ie/document_group/irish-waters-water-charges-plan-2018/
Appendix A
Document Title & Revision
IBE1366/PL/001-D Proposed Drainage Layout
IBE1366/PL/002-B Proposed Foul Drainage Sections
IBE1366/PL/003-C Proposed Water Main Layout
Standard Details/Code of Practice Exemption: N/A
For further information, visit www.water.ie/connections
Notwithstanding any matters listed above, the Customer (including any appointed
designers/contractors, etc.) is entirely responsible for the design and construction of the
Self-Lay Works. Acceptance of the Design Submission by Irish Water will not, in any way,
render Irish Water liable for any elements of the design and/or construction of the Self-Lay
Works.
http://www.water.ie/connections
A: 83.52
m
2
A: 83.52
m
2
Classroom 2
A: 30.29
m
2
Food Prep Room
A: 4.61
m
2
Food Prep Room
A: 10.36
m
2
WC
A: 12.59
m
2
Classroom 1
A: 30.46
m
2
Buggy Store
A: 5.01
m
2
Store
A: 5.01
m
2
UAWC
A: 4.71
m
2
Classroom 4
A: 27.96
m
2
Classroom 3
A: 20.82
m
2
Food Prep
A: 10.11
m
2
Lobby
A: 25.97
m
2
WC
A: 7.75
m
2
Store
A: 1.96
m
2
Store
A: 8.34
m
2
Kitchen-Cooking Area
A: 24.37
m
2
Lobby
A: 9.54
m
2
Male WC
A: 6.29
m
2
Female WC
A: 6.29
m
2
Store
A: 3.78
m
2
UAWC
A: 3.49
m
2
Female WC
A: 10.57
m
2
Male WC
A: 7.75
m
2
Lobby
A: 8.78
m
2
Cafe-Restaurant
A: 149.26
m
2
Existing Church
F.F.L 56.94
Existing Building F.F.L
52.680
Existing
Building
M
i
l
l
S
t
r
e
e
t
L
y
r
e
e
n
R
i
v
e
r
L
y
r
e
e
n
R
iv
e
r
L
y
r
e
e
n
R
i
v
e
r
Pedestrian path
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
P
a
t
h
C
y
c
l
e
P
a
t
h
C
y
c
l
e
p
a
t
h
Cycle path
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
le
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
le
p
a
t
h
Pedestrian path
C
y
c
l
e
p
a
t
h
C
y
c
l
e
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
C
y
c
le
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
1
2
N
o
.
C
h
ild
r
e
n
2
-
3
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
5
N
o
.
C
h
ild
r
e
n
0
-
1
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
U
n
it
B
1
-
0
5
U
n
it
B
1
-
0
6
U
n
it
B
1
-
0
7
U
n
it
B
1
-
0
8
U
n
it
B
1
-
0
9
U
n
it
B
1
-
1
0
U
n
it
B
1
-
1
1
U
n
it
B
1
-
1
2
Existing
Building
E
le
v
-
1
E
le
v
-
4
E
le
v
-
2
E
le
v
-
3
E
l
e
v
-
3
U
n
i
t
B
2
-
1
1
U
n
i
t
B
2
-
1
2
U
n
i
t
B
2
-
1
3
U
n
i
t
B
2
-
1
5
U
n
i
t
B
2
-
1
6
U
n
i
t
B
2
-
1
7
U
n
i
t
B
2
-
1
8
E
l
e
v
-
2
E
l
e
v
-
4
E
l
e
v
-
1
E
le
v
-
2
U
n
it
A
-
0
2
Block A
Carraigeway
U
n
i
t
C
-
0
6
U
n
i
t
C
-
0
7
U
n
i
t
C
-
0
8
U
n
i
t
C
-
0
9
U
n
i
t
C
-
1
0
E
l
e
v
-
1
E
l
e
v
-
2
E
l
e
v
-
4
E
l
e
v
-
3
52.380
Cycle
p
ath
Level Platform
54.190
54.380
54.180
53.610
53.110
52.515
54.180
53.680
53.680
53.680
54.660
54.660
54.110
53.610
53.110
Level Platform
52.610
52.750
52.610
52.750
53.610
53.110
53.110
52.610
52.610
51.600
52.100
51.600
51.100
51.100
50.700
50.700
50.370
50.370
50.410
50.530
50.530
50.530
53.860
53.860
54.360
54.360
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
52.450
52.380
52.380
52.380
54.360
55.880
54.360
54.360
54.360
53.435
52.435
52.935
52.935
Level Platform
53.935
53.435
Level Platform
53.935
Level Platform
54.480
52.435
30No.
Bicycles on 2
Tier Rack
System
52.435
52.435
Level Platform
51.030
51.030
Level Platform
51.530
51.530
Level Platform
52.030
52.030
Level Platform
52.030
52.435
52.435Level Platform
52.015
52.015
52.015
52.015
52.015
50.743
50.743
51.076
51.409
51.702
51.702
51.702
52.035
52.035
52.075
52.035
52.368
52.150
52.200
52.435
52.370
Level Platform
54.360
30No.
Bicycles on 2
Tier Rack
System
51.076
52.300
52.075
52.380
54.360
54.360
55.880
51.000
E
x
it
t
o
e
x
t
e
r
n
a
l
C
r
e
c
h
e
p
la
y
a
r
e
a
1
2
N
o
.
C
h
ild
r
e
n
3
-
4
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
1
0
N
o
.
C
h
ild
r
e
n
1
-
2
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
U
n
it
A
-
0
1
54.660
54.660
F.F.L. 55.00
55.160
F.F.L. 55.00
51.030
51.030
51.530
51.530
52.030
52.030
2
0
2
0
C
u
s
t
o
m
T
e
x
t
U
P
D
O
W
N
1
9
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
C
u
s
t
o
m
T
e
x
t
U
P
D
O
W
N
1
9
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
1
.
8
m
x
1
.
8
m
R
a
m
p
u
p
1
:
1
0
R
a
m
p
D
o
w
n
1
:
1
0
V
o
id
t
o
B
e
lo
w
E
x
it
C
o
u
n
t
e
r
E
x
it
E
x
it
C
a
n
o
p
y
O
v
e
r
h
e
a
d
L
o
c
k
e
r
s
1
.
8
m
x
1
.
8
m
E
x
it
1
.
8
m
x
1
.
8
m
M
I
L
L
S
T
R
E
E
T
50.370
50.370
50.370
50.370
50.370
50.370
RISING MAINDISCHARGE CHAMBER
CL 54.54IL 52.71
KLARGESTEROIL & GRITINTECEPTOR
KLARGESTER HORIZONTALPUMPING STATIONCL - 52.935IL - 46.47
MH F01ACL 50.76IL 49.49
MH FS04CL 49.76IL 48.03
MH FS02CL 49.76IL 48.24
MH FS01CL 49.76IL 49.00
MH FS03CL 50.76IL 48.72
MH FS05CL 52.45IL 47.68
MH F02CL 52.45IL 47.54
MH F03CL 52.435IL 46.69
MH F02CCL 52.40IL 46.76
MH F01CCL 51.17IL 47.77
MH 06
MH F01BCL 53.34IL 49.45
225mm Ø uPVC FOUL PIPE @ 1:45225m
m Ø uPVC F
OUL PIPE @
1:29
150mm Ø uPV
C FOUL PIPE
@ 1:60
150mm
Ø uP
VC FO
UL PI
PE @
1:15
225mm Ø uPVC FOUL PIPE @ 1:60
150mm Ø uPVC FOUL PIPE @ 1:60
150mm
Ø uPV
C FOU
L PIPE
@ 1:6
0
150m
m Ø
uPVC
FOUL
PIP
E @
1:60
80mm D
UCTIL
E IRON
FOUL
PUMP
ING MA
IN
80mm DUCTILE IRON FOUL PUMPING MAIN
MH F04CL 52.935IL 46.59
DISCHARGE TORIVER LYREENOUTFALL 50.20(SEE HEADWALL DETAIL)
MH S012SEALED MANHOLEHYDROBRAKE CHAMBERCL 50.53IL 50.25
MH S07CL 52.43IL 50.88
MH S06CL 52.43IL 50.93
MH S04CL 52.45IL 51.28
MH S101CL 52.01IL 51.30
MH S01CL 54.18IL 52.78
ATTENUATION TANKTOP ENDCL 52.57TWL 52.17IL 50.57
MH S03BACKDROPCL 53.50IL 51.44
MH S02CL 53.68IL 52.58
225mm
Ø uPVC
STOR
M PIPE
@ 1:15
0
225mm
Ø uPVC
STOR
M PIPE
@ 1:15
0
225mm
Ø uPVC
STORM
PIPE @
1:150
225mm Ø uPVC STORM PIPE @ 1:150
225mm Ø uPVC STORM
PIPE @ 1:150
225mm Ø uPVC STORM PIPE @ 1:150
225mm Ø uPVC
GEOCELLULARATTENUATION TANKVOLUME: 369.6m³DIMS: 7m x 33m x 1.6m
ATTENUATION TANKBOTTOM ENDCL 52.35TWL 51.95IL 50.35
KLARGESTER FULLHYDROCARBON ANDSILT INTERCEPTOR
MH S201CL 52.40IL 51.10
MH S08CL 52.70IL 50.84
MH S09CL 52.43IL 50.69 MH S010
CL 52.43IL 50.62
MH S011CL 52.02IL 50.59
225mm
Ø uPV
C STO
RM PIP
E @ 1:1
50
G
G
G
G
G G
G
G
NOTES
Drawing Number
Drawing Status Sheet Size
Client
Rev
Drawing Scale
drawnamendmentsrev
Project
Title
date
/
Initial ReviewProject Leader Drawn By Date
Proposed Development, Mill Street
Maynooth, Kildare
Proposed Foul and Storm
Drainage Layout
Planning
04/11/19
1:250
IBE1366
A1
PL/001 E
ML AN DF
T +44 (0) 28 90 667914
F +44 (0) 28 90 668286
W www.rpsgroup.com/ireland
Elmwood House
74 Boucher Road
Belfast
BT12 6RZ
Ladas Property Company
1. Verifying Dimensions.The contractor shall verify dimensions against such other drawingsor site conditions as pertain to this part of the work.
2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.
3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing.All other formats (dwg, dxf etc.) are deemed to be an uncontrolledissue and any work carried out based on these files is at therecipients own risk. RPS will not accept any responsibility for anyerrors arising from the use of these files, either by human error bythe recipient, listing of un-dimensioned measurements, compatibilityissues with the recipient's software, and any errors arising whenthese files are used to aid the recipients drawing production, orsetting out on site.
4. SewersAll sewers to be constructed in accordance with Irish Water StandardDetails
5. All foul sewers to be 150mm Ø uPVC to EN1401
6. All storm sewers to be 150Ø uPVC to EN1410
7. Klargester oil and grit interceptor is located after final connection tostorm network to ensure all storm flows are passed throughinterceptor prior to storage and discharge
8. Legend.
Site Boundary
Proposed Foul Sewer
Proposed Storm Sewer
Existing Foul Sewer
5m SCALE 1:250
A
AN 30/05/2019Foul Drainage layout updated. Pipe sizes
and gradients amended.
B
DF 31/05/2019Oil & silt inteceptor added to storm network
C
DF 21/06/2019New storm layout
D
DF 01/07/19Realigned foul line MH FS01 to MHFS02
E
DF 04/11/19Gullies and additional notes added
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH FS01 - MH FS05
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50
51
52
Chainage
Ground Level
Invert Level
Pipe Details
Gradient
0.0
45
.2
79
.7
49
.7
6
49
.7
6
52
.4
5
49
.0
0
48
.2
4
150mm
uPVC
G=1:60
L=45.23
MH
F
S01
MH
F
S02
150mm
uPVC
G=1:60
L=12.22
47
.6
5
52
MH
F
S04
47
.4
49
.7
64
8.0
3
BASEMENT LEVEL
MH
F
S05
78
.1
52
.4
54
7.6
8
150mm
uPVC
G=1:60
L=20.62
OIL & GRITINTERCEPTOR
150mm
uPVC
G=1:60
L=1.6
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH FS03 - MH FS04
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50
51
Chainage
Ground Level
Invert Level
Pipe Details
Gradient
0.0
41
.1
50
.7
6
49
.7
6
48
.7
2
48
.0
3
150mm
uPVC
G=1:60
L=41.1
MH
F
S03
MH
F
S04
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH F01A - Pumping Station
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50
51
52
Chainage
Ground Level
Invert Level
Pipe Details
Gradient
0.0
57
.4
11
4.8
50
.7
6
52
.4
5
52
.9
4
49
.4
9
47
.5
4
225mm
uPVC
G=1:29
L=57.42
MH
F
01A
MH
F
02
46
.5
9
52
MH
F
03
10
8.5
52
.4
44
6.6
9
225mm
uPVC
G=1:60
L=51.07
225mm
uPVC
G=1:60
L=6.15
BASEMENT LEVEL
12
2.6
52
.9
4
PS
46
.4
7
PUMPING
STATION
225mm
uPVC
G=1:60
L=7.12
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH F01B - MH F02
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50
51
Chainage
Ground Level
Invert Level
Pipe Details
Gradient
0.0
27
.6
53
.3
4
52
.4
5
49
.4
5
47
.6
2
150mm
uPVC
G=1:15
L=27.6
MH
F
01B
MH
F
02
52
53
54
MH
F
04
47
.5
4
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH F01C - MH F04
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50
51
52
Chainage
Ground Level
Invert Level
Pipe Details
Gradient
0.0
45
.4
53
.2
51
.1
7
52
.4
0
52
.9
4
47
.7
7
46
.7
6
225mm
uPVC
G=1:45
L=45.40
MH
F
01C
MH
F
02C
46
.5
9
52
150mm
uPVC
G=1:45
L=7.77
MH
F
04
NOTES
Drawing Number
Drawing Status Sheet Size
Client
Rev
Drawing Scale
drawnamendmentsrev
Project
Title
date
/
Initial ReviewProject Leader Drawn By Date
Proposed Development, Mill Street
Maynooth, Kildare
Proposed Foul Drainage
Longsections
Planning
02/07/19
1:500
IBE1366
A1
PL/002 B
ML AN DF
T +44 (0) 28 90 667914
F +44 (0) 28 90 668286
W www.rpsgroup.com/ireland
Elmwood House
74 Boucher Road
Belfast
BT12 6RZ
Ladas Property Company
1. Verifying Dimensions.The contractor shall verify dimensions against such other drawingsor site conditions as pertain to this part of the work.
2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.
3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing.All other formats (dwg, dxf etc.) are deemed to be an uncontrolledissue and any work carried out based on these files is at therecipients own risk. RPS will not accept any responsibility for anyerrors arising from the use of these files, either by human error bythe recipient, listing of un-dimensioned measurements, compatibilityissues with the recipient's software, and any errors arising whenthese files are used to aid the recipients drawing production, orsetting out on site.
4. SewersAll sewers to be constructed in accordance with Irish Water StandardDetails
5. All foul sewers to be 150mm Ø uPVC to EN1401
6. All storm sewers to be 150Ø uPVC to EN1410
10m SCALE 1:500
A
AN 30/05/2019Drainage sections updated.
B
DF 02/07/19Drainage Sections Updated
A: 83.52
m
2
A: 83.52
m
2
Classroom 2
A: 30.29
m
2
Food Prep Room
A: 4.61
m
2
Food Prep Room
A: 10.36
m
2
WC
A: 12.59
m
2
Classroom 1
A: 30.46
m
2
Buggy Store
A: 5.01
m
2
Store
A: 5.01
m
2
UAWC
A: 4.71
m
2
Classroom 4
A: 27.96
m
2
Classroom 3
A: 20.82
m
2
Food Prep
A: 10.11
m
2
Lobby
A: 25.97
m
2
WC
A: 7.75
m
2
Store
A: 1.96
m
2
Store
A: 8.34
m
2
Kitchen-Cooking Area
A: 24.37
m
2
Lobby
A: 9.54
m
2
Male WC
A: 6.29
m
2
Female WC
A: 6.29
m
2
Store
A: 3.78
m
2
UAWC
A: 3.49
m
2
Female WC
A: 10.57
m
2
Male WC
A: 7.75
m
2
Lobby
A: 8.78
m
2
Cafe-Restaurant
A: 149.26
m
2
L
y
r
e
e
n
R
i
v
e
r
L
y
r
e
e
n
R
iv
e
r
L
y
r
e
e
n
R
i
v
e
r
L
y
r
e
e
n
R
i
v
e
r
Pedestrian path
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
P
a
t
h
C
y
c
l
e
P
a
t
h
C
y
c
l
e
p
a
t
h
Cycle path
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
le
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
le
p
a
t
h
Pedestrian path
C
y
c
l
e
p
a
t
h
C
y
c
l
e
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
C
y
c
le
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
Carraigeway
52.380
Cycle
p
ath
Level Platform
54.190
54.380
54.180
53.610
53.110
52.515
54.180
53.680
53.680
53.680
54.660
54.660
54.110
53.610
53.110
Level Platform
52.610
52.750
52.610
52.750
53.610
53.110
53.110
52.610
52.610
51.600
52.100
51.600
51.100
51.100
50.700
50.700
50.370
50.370
50.410
50.530
50.530
50.530
53.860
53.860
54.360
54.360
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
52.450
52.380
52.380
52.380
54.360
55.880
54.360
54.360
54.360
53.435
52.435
52.935
52.935
Level Platform
53.935
53.435
Level Platform
53.935
Level Platform
54.480
52.435
52.435
52.435
Level Platform
51.030
51.030
Level Platform
51.530
51.530
Level Platform
52.030
52.030
Level Platform
52.030
52.435
52.435Level Platform
52.015
52.015
52.015
52.015
52.015
50.743
50.743
51.076
51.409
51.702
51.702
51.702
52.035
52.035
52.075
52.035
52.368
52.150
52.200
52.435
52.370
Level Platform
54.360
51.076
52.300
52.075
52.380
54.360
54.360
55.880
51.000
54.660
54.660
F.F.L. 55.00
55.160
F.F.L. 55.00
51.030
51.030
51.530
51.530
52.030
52.030
2
0
2
0
C
u
s
t
o
m
T
e
x
t
U
P
D
O
W
N
1
9
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
C
u
s
t
o
m
T
e
x
t
U
P
D
O
W
N
1
9
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
1
.
8
m
x
1
.
8
m
R
a
m
p
u
p
1
:
1
0
R
a
m
p
D
o
w
n
1
:
1
0
V
o
id
t
o
B
e
lo
w
E
x
it
C
o
u
n
t
e
r
E
x
it
E
x
it
C
a
n
o
p
y
O
v
e
r
h
e
a
d
L
o
c
k
e
r
s
1
.
8
m
x
1
.
8
m
E
x
it
1
.
8
m
x
1
.
8
m
M
I
L
L
S
T
R
E
E
T
50.370
50.370
50.370
50.370
50.370
50.370
SV
SV
SV
M
Hyd
M
BOUNDARY BOX FORCOMMERCIAL PREMISIS
Hyd
SVSV
Hyd
Hyd
WashoutHyd
SCV
100mm
Ø Se
rvice
Conne
ction
100mm Ø Service Connection
100mm Ø S
ervice
Connection
100mm
Ø Ser
vice
Conne
ction
NOTES
Drawing Number
Drawing Status Sheet Size
Client
Rev
Drawing Scale
drawnamendmentsrev
Project
Title
date
/
Initial ReviewProject Leader Drawn By Date
Proposed Development, Mill Street
Maynooth, Kildare
Proposed Watermain Layout
Planning
02/07/19
1:250
IBE1366
A1
PL/003 C
ML AN DF
T +44 (0) 28 90 667914
F +44 (0) 28 90 668286
W www.rpsgroup.com/ireland
Elmwood House
74 Boucher Road
Belfast
BT12 6RZ
Ladas Property Company
5m SCALE 1:250
1. Verifying Dimensions.The contractor shall verify dimensions against such other drawings orsite conditions as pertain to this part of the work.
2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.
3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing. Allother formats (dwg, dxf etc.) are deemed to be an uncontrolled issueand any work carried out based on these files is at the recipients ownrisk. RPS will not accept any responsibility for any errors arising fromthe use of these files, either by human error by the recipient, listing ofun-dimensioned measurements, compatibility issues with therecipient's software, and any errors arising when these files are usedto aid the recipients drawing production, or setting out on site.
4. Water MainsAll watermains shall be constructed in accordance with Irish WaterStandard Details
5. All watermains shall be HDPE, PE100, SDR17 to IS EN 12201 Part2:2011 and IS EN 12201-3:2011
6. MetersAll apartments and similar properties shall have meters installedinternally within the premises in accordance with Building ControlAuthority's requirements and subject to review by Irish Water.
7. Each commercial property shall have its own supply pipe with meterand stop valve.
8. Legend.
Site Boundary
Proposed Water Main
Proposed Hydrant
Proposed Sluice Valve
Proposed Water Meter
Existing Water Main
Hyd
SV
M
A ????.??.????Enter line 1
A
AN 30/05/2019Watermain Layout amended. Service
Connections added.
B
DF 01/07/19Notes added
C
DF 02/07/2019Hydrants and boundary boxes moved
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019
rpsgroup.com
Appendix B
Storm Water Calculations
MODIFIED RATIONAL METHOD
Qp= 2.78 C i A
A in ha
i in mm/h 50
C= Cv CR
Cv= max proportion of rainfall on catchment which appears as runoff in storm drainage system
CR= constant value 1.3
C= 0
Calculation of Runoff for Catchment
Pre Development
Surface Area (ha) Cv Runoff (l/s)
Hardstanding 0 0.9 0.00
Surface Area (ha)
Runoff Rate
(l/s/ha) Runoff (l/s)
Green space 1.05 6.1 6.41
Total runoff Qpre= 6.405 l/s
Post Development
Surface Area (ha) Cv Runoff (l/s)
Hardstanding 0.789 0.9 128.32
Surface Area (ha)
Runoff Rate
(l/s/ha) Runoff (l/s)
Green space 0.261 6.1 1.59
Total runoff Qpost= 129.907 l/s
Increased Runoff Qadd= 123.502 l/s
Mill Street Maynooth
STORM DISCHARGE
Waste ground
135 domestic units with creche and retail area
This report was produced using the greenfield runoff tool developed by HR Wallingford and available at www.uksuds.com. The use of this tool is subject to the UK SuDS terms and conditions and licence agreement, which can both be found at http://uksuds.com/terms-and-conditions.htm. The outputs from this tool have been used to estimate storage volume requirements. The use of these results is the responsibility of the users of this tool. No liability will be accepted by HR Wallingford, the Environment Agency, CEH, Hydrosolutions or any other organisation for use of this data in the design or operational characteristics of any drainage scheme.
Greenfield runoff estimation for sites
www.uksuds.com │ Greenfield runoff tool
This is an estimation of the greenfield runoff rate limits that are needed to meet normal best practice criteria in line with Environment Agency guidance “Preliminary rainfall runoff management for developments”, W5-074/A/TR1/1 rev. E (2012) and the SuDS Manual, C753 (Ciria, 2015). This information on greenfield runoff rates may be the basis for setting consents for the drainage of surface water runoff from sites.
Site name:
Calculated by:
Latitude:
Longitude:
Reference:
Date:
Site coordinates
Site location:
Site characteristicsTotal site area (ha)
MethodologyQbar estimation methodSPR estimation method
Default Edited
SOIL typeHOST classSPR/SPRHOST
Hydrological characteristics Default EditedSAAR (mm)Hydrological region Growth curve factor: 1 year Growth curve factor: 30 year Growth curve factor: 100 year
Notes:(1) Is QBAR < 2.0 l/s/ha?
(2) Are flow rates < 5.0 l/s?
(3) Is SPR/SPRHOST ≤ 0.3?
Greenfield runoff rates Default EditedQbar (l/s)1 in 1 year (l/s)1 in 30 years (l/s)1 in 100 years (l/s)
Methodology IH124
0.3
1.99
2.13for disposal of surface water runoff.
6.1
0.85 0.85
Lower consent flow rates may be set in which case blockage
12
1.01
2019-01-10T15:03:53
Mill Street, Maynooth
--- 5.0l/s if blockage from vegetation and other materials is possible.
6.59216° W
1.99
Mixed Use development
2.34
donnla fisher
2.61
2.34
Calculate from SOIL type
53.38274° N
858858
Where groundwater levels are low enough the use of
22
6.1
2.61
Calculate from SPR and SAAR
12
---
4.97 4.97
soakaways to avoid discharge offsite may be a requirement
2.13
6514656
work must be addressed by using appropriate drainage elements.
0.3
Where flow rates are less than 5.0 l/s consents are usually set at
RPS Consulting Engineers Page 1
Elmwood House
74 Boucher Road
Belfast BT12 6RZ
Date 16/04/2019 16:12 Designed by donnla.fisher
File STORM ATTENUATION 16041... Checked by
Micro Drainage Source Control 2016.1.1
Summary of Results for 100 year Return Period (+20%)
©1982-2016 XP Solutions
Half Drain Time : 513 minutes.
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Control
(l/s)
Max
Σ Outflow
(l/s)
Max
Volume
(m³)
Status
15 min Summer 49.469 0.639 0.0 6.0 6.0 140.3 O K
30 min Summer 49.678 0.848 0.0 6.0 6.0 186.1 O K
60 min Summer 49.878 1.048 0.0 6.0 6.0 229.9 O K
120 min Summer 50.061 1.231 0.0 6.0 6.0 270.1 O K
180 min Summer 50.148 1.318 0.0 6.0 6.0 289.3 O K
240 min Summer 50.195 1.365 0.0 6.0 6.0 299.6 O K
360 min Summer 50.229 1.399 0.0 6.0 6.0 307.0 O K
480 min Summer 50.225 1.395 0.0 6.0 6.0 306.2 O K
600 min Summer 50.215 1.385 0.0 6.0 6.0 303.9 O K
720 min Summer 50.200 1.370 0.0 6.0 6.0 300.6 O K
960 min Summer 50.164 1.334 0.0 6.0 6.0 292.8 O K
1440 min Summer 50.085 1.255 0.0 6.0 6.0 275.5 O K
2160 min Summer 49.960 1.130 0.0 6.0 6.0 248.0 O K
2880 min Summer 49.824 0.994 0.0 6.0 6.0 218.2 O K
4320 min Summer 49.524 0.694 0.0 6.0 6.0 152.3 O K
5760 min Summer 49.321 0.491 0.0 6.0 6.0 107.7 O K
7200 min Summer 49.186 0.356 0.0 6.0 6.0 78.2 O K
8640 min Summer 49.098 0.268 0.0 5.7 5.7 58.9 O K
10080 min Summer 49.041 0.211 0.0 5.4 5.4 46.3 O K
15 min Winter 49.549 0.719 0.0 6.0 6.0 157.8 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Discharge
Volume
(m³)
Time-Peak
(mins)
15 min Summer 99.186 0.0 145.5 26
30 min Summer 66.249 0.0 194.6 40
60 min Summer 41.735 0.0 246.4 70
120 min Summer 25.643 0.0 302.8 128
180 min Summer 19.139 0.0 339.1 186
240 min Summer 15.518 0.0 366.6 244
360 min Summer 11.521 0.0 408.2 360
480 min Summer 9.315 0.0 440.1 436
600 min Summer 7.895 0.0 466.2 496
720 min Summer 6.895 0.0 488.6 560
960 min Summer 5.566 0.0 525.9 692
1440 min Summer 4.115 0.0 582.8 972
2160 min Summer 3.041 0.0 647.5 1388
2880 min Summer 2.453 0.0 696.2 1816
4320 min Summer 1.809 0.0 770.0 2512
5760 min Summer 1.457 0.0 827.5 3184
7200 min Summer 1.231 0.0 874.0 3888
8640 min Summer 1.073 0.0 913.7 4576
10080 min Summer 0.955 0.0 948.3 5248
15 min Winter 99.186 0.0 163.0 26
RPS Consulting Engineers Page 2
Elmwood House
74 Boucher Road
Belfast BT12 6RZ
Date 16/04/2019 16:12 Designed by donnla.fisher
File STORM ATTENUATION 16041... Checked by
Micro Drainage Source Control 2016.1.1
Summary of Results for 100 year Return Period (+20%)
©1982-2016 XP Solutions
Storm
Event
Max
Level
(m)
Max
Depth
(m)
Max
Infiltration
(l/s)
Max
Control
(l/s)
Max
Σ Outflow
(l/s)
Max
Volume
(m³)
Status
30 min Winter 49.787 0.957 0.0 6.0 6.0 209.9 O K
60 min Winter 50.011 1.181 0.0 6.0 6.0 259.3 O K
120 min Winter 50.223 1.393 0.0 6.0 6.0 305.7 O K
180 min Winter 50.329 1.499 0.0 6.0 6.0 329.0 O K
240 min Winter 50.389 1.559 0.0 6.0 6.0 342.2 O K
360 min Winter 50.444 1.614 0.0 6.1 6.1 353.8 O K
480 min Winter 50.454 1.624 0.0 6.1 6.1 355.2 O K
600 min Winter 50.432 1.602 0.0 6.1 6.1 351.5 O K
720 min Winter 50.410 1.580 0.0 6.1 6.1 346.7 O K
960 min Winter 50.363 1.533 0.0 6.0 6.0 336.5 O K
1440 min Winter 50.244 1.414 0.0 6.0 6.0 310.4 O K
2160 min Winter 50.049 1.219 0.0 6.0 6.0 267.5 O K
2880 min Winter 49.834 1.004 0.0 6.0 6.0 220.3 O K
4320 min Winter 49.382 0.552 0.0 6.0 6.0 121.1 O K
5760 min Winter 49.148 0.318 0.0 5.9 5.9 69.7 O K
7200 min Winter 49.033 0.203 0.0 5.4 5.4 44.5 O K
8640 min Winter 48.974 0.144 0.0 4.9 4.9 31.5 O K
10080 min Winter 48.952 0.122 0.0 4.4 4.4 26.7 O K
Storm
Event
Rain
(mm/hr)
Flooded
Volume
(m³)
Discharge
Volume
(m³)
Time-Peak
(mins)
30 min Winter 66.249 0.0 218.0 40
60 min Winter 41.735 0.0 276.0 68
120 min Winter 25.643 0.0 339.2 126
180 min Winter 19.139 0.0 379.8 182
240 min Winter 15.518 0.0 410.6 240
360 min Winter 11.521 0.0 457.3 352
480 min Winter 9.315 0.0 492.9 460
600 min Winter 7.895 0.0 522.2 558
720 min Winter 6.895 0.0 547.2 584
960 min Winter 5.566 0.0 588.9 736
1440 min Winter 4.115 0.0 652.7 1048
2160 min Winter 3.041 0.0 725.2 1504
2880 min Winter 2.453 0.0 779.8 1964
4320 min Winter 1.809 0.0 862.5 2600
5760 min Winter 1.457 0.0 926.8 3232
7200 min Winter 1.231 0.0 978.9 3888
8640 min Winter 1.073 0.0 1023.4 4496
10080 min Winter 0.955 0.0 1062.3 5144
RPS Consulting Engineers Page 3
Elmwood House
74 Boucher Road
Belfast BT12 6RZ
Date 16/04/2019 16:12 Designed by donnla.fisher
File STORM ATTENUATION 16041... Checked by
Micro Drainage Source Control 2016.1.1
Rainfall Details
©1982-2016 XP Solutions
Rainfall Model FSR Winter Storms Yes
Return Period (years) 100 Cv (Summer) 0.750
Region Scotland and Ireland Cv (Winter) 0.840
M5-60 (mm) 17.800 Shortest Storm (mins) 15
Ratio R 0.324 Longest Storm (mins) 10080
Summer Storms Yes Climate Change % +20
Time Area Diagram
Total Area (ha) 0.789
Time
From:
(mins)
To:
Area
(ha)
Time
From:
(mins)
To:
Area
(ha)
Time
From:
(mins)
To:
Area
(ha)
0 4 0.263 4 8 0.263 8 12 0.263
RPS Consulting Engineers Page 4
Elmwood House
74 Boucher Road
Belfast BT12 6RZ
Date 16/04/2019 16:12 Designed by donnla.fisher
File STORM ATTENUATION 16041... Checked by
Micro Drainage Source Control 2016.1.1
Model Details
©1982-2016 XP Solutions
Storage is Online Cover Level (m) 51.030
Cellular Storage Structure
Invert Level (m) 48.830 Safety Factor 2.0
Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95
Infiltration Coefficient Side (m/hr) 0.00000
Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)
0.000 231.0 231.0 1.700 0.0 359.0
1.600 231.0 359.0
Hydro-Brake® Optimum Outflow Control
Unit Reference MD-SHE-0107-6100-1600-6100
Design Head (m) 1.600
Design Flow (l/s) 6.1
Flush-Flo™ Calculated
Objective Minimise upstream storage
Application Surface
Sump Available Yes
Diameter (mm) 107
Invert Level (m) 48.830
Minimum Outlet Pipe Diameter (mm) 150
Suggested Manhole Diameter (mm) 1200
Control Points Head (m) Flow (l/s)
Design Point (Calculated) 1.600 6.1
Flush-Flo™ 0.466 6.0
Kick-Flo® 0.957 4.8
Mean Flow over Head Range - 5.3
The hydrological calculations have been based on the Head/Discharge relationship for the
Hydro-Brake® Optimum as specified. Should another type of control device other than a
Hydro-Brake Optimum® be utilised then these storage routing calculations will be
invalidated
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
0.100 3.6 1.200 5.3 3.000 8.2 7.000 12.2
0.200 5.4 1.400 5.7 3.500 8.8 7.500 12.6
0.300 5.8 1.600 6.1 4.000 9.4 8.000 13.0
0.400 6.0 1.800 6.4 4.500 9.9 8.500 13.4
0.500 6.0 2.000 6.8 5.000 10.4 9.000 13.8
0.600 6.0 2.200 7.1 5.500 10.9 9.500 14.1
0.800 5.6 2.400 7.4 6.000 11.4
1.000 4.9 2.600 7.6 6.500 11.8
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019
rpsgroup.com
Appendix C
Foul Sewerage Calculations
FunctionNo. Of
Dwellings
Occupancy
Rating*PE
Consumption*
(l/h/d)
Total Flow
(m3/day)
1 Bed
Domestic
Dwelling
43 2 86 150 12.9
2 Bed
Domestic
Dwelling
70 3 210 150 31.5
3 Bed
Domestic
Dwelling
7 5 35 150 5.25
*Occupancy Rate and Consumption figures in accordance with British Water Design Code of
Practice - Flow and Loads - 4
n
3
6
N Factor
New foul system discharging to an existing foul network
Foul system discharging to a Pumping Station
0.57 l/s
1.72 l/s
[Millstreet, Maynooth]
FOUL DISCHARGE
Average Daily Flow (DWF)
C=A/86.4
Peak Design Flow
D=nC
where
Q l/s
kDU dimensionless
DU dimensionless
Appliance Total Appliances
Discharge
Unit/Appliance
(DU)
Total Discharge
Units Notes/Assumption
WC 15 1.20 18.0 Assumed water efficient toilets
Hand Basin 8 0.45 3.6 Average
Urinal 0 0.55 0.0 Average
Bath 0 1.00 0.0 Average
Kitchen Sink 5 1.00 5.0 Average
Washing Machine 1 0.50 0.5Assumed water efficient washing
machines
Dishwasher 1 0.50 0.5Assumed half of properties have
dishwashers
Shower 0 0.45 0.0Assumed half of properties have
separate shower
Commercial Washing
Machine0 1.25 0.0 Average
Floor Drains 0 1.30 0.0 Average
ΣDU 27.6
KDU value 0.5
Intermittent 0.5
Frequent 0.7
Congested use 1
Special use 1.2
2.63 (l/s)
Equations and discharge units taken from BS EN 752, Annex C
Total Discharge Units
Wastewater design flow rate (Q)
Wastewater Discharge Calculations -
Probability Method
Wastewater flow derived from number and type of appliances connected.
wastewater design flow rate
frequency factor
discharge unit
DUkQDU
∑=
08/05/2019
REPORT
IBE1366 | Lyreen View Drainage Assessment | 6 | 8th May 2019
rpsgroup.com
Appendix D
Proposed Water and Waste Water Layouts
A: 83.52
m
2
A: 83.52
m
2
Classroom 2
A: 30.29
m
2
Food Prep Room
A: 4.61
m
2
Food Prep Room
A: 10.36
m
2
WC
A: 12.59
m
2
Classroom 1
A: 30.46
m
2
Buggy Store
A: 5.01
m
2
Store
A: 5.01
m
2
UAWC
A: 4.71
m
2
Classroom 4
A: 27.96
m
2
Classroom 3
A: 20.82
m
2
Food Prep
A: 10.11
m
2
Lobby
A: 25.97
m
2
WC
A: 7.75
m
2
Store
A: 1.96
m
2
Store
A: 8.34
m
2
Kitchen-Cooking Area
A: 24.37
m
2
Lobby
A: 9.54
m
2
Male WC
A: 6.29
m
2
Female WC
A: 6.29
m
2
Store
A: 3.78
m
2
UAWC
A: 3.49
m
2
Female WC
A: 10.57
m
2
Male WC
A: 7.75
m
2
Lobby
A: 8.78
m
2
Cafe-Restaurant
A: 149.26
m
2
Existing Church
F.F.L 56.94
Existing Building F.F.L
52.680
Existing
Building
M
i
l
l
S
t
r
e
e
t
L
y
r
e
e
n
R
i
v
e
r
L
y
r
e
e
n
R
iv
e
r
L
y
r
e
e
n
R
i
v
e
r
Pedestrian path
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
P
a
t
h
C
y
c
l
e
P
a
t
h
C
y
c
l
e
p
a
t
h
Cycle path
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
le
p
a
t
h
C
y
c
l
e
p
a
t
h
C
y
c
le
p
a
t
h
Pedestrian path
C
y
c
l
e
p
a
t
h
C
y
c
l
e
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
C
y
c
le
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
ia
n
p
a
t
h
P
e
d
e
s
t
r
i
a
n
p
a
t
h
1
2
N
o
.
C
h
ild
r
e
n
2
-
3
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
5
N
o
.
C
h
ild
r
e
n
0
-
1
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
U
n
it
B
1
-
0
5
U
n
it
B
1
-
0
6
U
n
it
B
1
-
0
7
U
n
it
B
1
-
0
8
U
n
it
B
1
-
0
9
U
n
it
B
1
-
1
0
U
n
it
B
1
-
1
1
U
n
it
B
1
-
1
2
Existing
Building
E
le
v
-
1
E
le
v
-
4
E
le
v
-
2
E
le
v
-
3
E
l
e
v
-
3
U
n
i
t
B
2
-
1
1
U
n
i
t
B
2
-
1
2
U
n
i
t
B
2
-
1
3
U
n
i
t
B
2
-
1
5
U
n
i
t
B
2
-
1
6
U
n
i
t
B
2
-
1
7
U
n
i
t
B
2
-
1
8
E
l
e
v
-
2
E
l
e
v
-
4
E
l
e
v
-
1
E
le
v
-
2
U
n
it
A
-
0
2
Block A
Carraigeway
U
n
i
t
C
-
0
6
U
n
i
t
C
-
0
7
U
n
i
t
C
-
0
8
U
n
i
t
C
-
0
9
U
n
i
t
C
-
1
0
E
l
e
v
-
1
E
l
e
v
-
2
E
l
e
v
-
4
E
l
e
v
-
3
52.380
Cycle
p
ath
Level Platform
54.190
54.380
54.180
53.610
53.110
52.515
54.180
53.680
53.680
53.680
54.660
54.660
54.110
53.610
53.110
Level Platform
52.610
52.750
52.610
52.750
53.610
53.110
53.110
52.610
52.610
51.600
52.100
51.600
51.100
51.100
50.700
50.700
50.370
50.370
50.410
50.530
50.530
50.530
53.860
53.860
54.360
54.360
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
Level Platform
52.450
52.380
52.380
52.380
54.360
55.880
54.360
54.360
54.360
53.435
52.435
52.935
52.935
Level Platform
53.935
53.435
Level Platform
53.935
Level Platform
54.480
52.435
30No.
Bicycles on 2
Tier Rack
System
52.435
52.435
Level Platform
51.030
51.030
Level Platform
51.530
51.530
Level Platform
52.030
52.030
Level Platform
52.030
52.435
52.435Level Platform
52.015
52.015
52.015
52.015
52.015
50.743
50.743
51.076
51.409
51.702
51.702
51.702
52.035
52.035
52.075
52.035
52.368
52.150
52.200
52.435
52.370
Level Platform
54.360
30No.
Bicycles on 2
Tier Rack
System
51.076
52.300
52.075
52.380
54.360
54.360
55.880
51.000
E
x
it
t
o
e
x
t
e
r
n
a
l
C
r
e
c
h
e
p
la
y
a
r
e
a
1
2
N
o
.
C
h
ild
r
e
n
3
-
4
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
1
0
N
o
.
C
h
ild
r
e
n
1
-
2
y
e
a
r
s
2
N
o
.
A
d
u
lt
s
U
n
it
A
-
0
1
54.660
54.660
F.F.L. 55.00
55.160
F.F.L. 55.00
51.030
51.030
51.530
51.530
52.030
52.030
2
0
2
0
C
u
s
t
o
m
T
e
x
t
U
P
D
O
W
N
1
9
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
C
u
s
t
o
m
T
e
x
t
U
P
D
O
W
N
1
9
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
1
.
8
m
x
1
.
8
m
R
a
m
p
u
p
1
:
1
0
R
a
m
p
D
o
w
n
1
:
1
0
V
o
id
t
o
B
e
lo
w
E
x
it
C
o
u
n
t
e
r
E
x
it
E
x
it
C
a
n
o
p
y
O
v
e
r
h
e
a
d
L
o
c
k
e
r
s
1
.
8
m
x
1
.
8
m
E
x
it
1
.
8
m
x
1
.
8
m
M
I
L
L
S
T
R
E
E
T
50.370
50.370
50.370
50.370
50.370
50.370
RISING MAINDISCHARGE CHAMBER
CL 54.54IL 52.71
KLARGESTEROIL & GRITINTECEPTOR
KLARGESTER HORIZONTALPUMPING STATIONCL - 52.935IL - 46.47
MH F01ACL 50.76IL 49.49
MH FS04CL 49.76IL 48.03
MH FS02CL 49.76IL 48.24
MH FS01CL 49.76IL 49.00
MH FS03CL 50.76IL 48.72
MH FS05CL 52.45IL 47.68
MH F02CL 52.45IL 47.54
MH F03CL 52.435IL 46.69
MH F02CCL 52.40IL 46.76
MH F01CCL 51.17IL 47.77
MH 06
MH F01BCL 53.34IL 49.45
225mm Ø uPVC FOUL PIPE @ 1:45225m
m Ø uPVC F
OUL PIPE @
1:29
150mm Ø uPV
C FOUL PIPE
@ 1:60
150mm
Ø uP
VC FO
UL PI
PE @
1:15
225mm Ø uPVC FOUL PIPE @ 1:60
150mm Ø uPVC FOUL PIPE @ 1:60
150mm
Ø uPV
C FOU
L PIPE
@ 1:6
0
150m
m Ø
uPVC
FOUL
PIP
E @
1:60
80mm D
UCTIL
E IRON
FOUL
PUMP
ING MA
IN
80mm DUCTILE IRON FOUL PUMPING MAIN
MH F04CL 52.935IL 46.59
DISCHARGE TORIVER LYREENOUTFALL 50.20(SEE HEADWALL DETAIL)
MH S012SEALED MANHOLEHYDROBRAKE CHAMBERCL 50.53IL 50.25
MH S07CL 52.43IL 50.88
MH S06CL 52.43IL 50.93
MH S04CL 52.45IL 51.28
MH S101CL 52.01IL 51.30
MH S01CL 54.18IL 52.78
ATTENUATION TANKTOP ENDCL 52.57TWL 52.17IL 50.57
MH S03BACKDROPCL 53.50IL 51.44
MH S02CL 53.68IL 52.58
225mm
Ø uPVC
STOR
M PIPE
@ 1:15
0
225mm
Ø uPVC
STOR
M PIPE
@ 1:15
0
225mm
Ø uPVC
STORM
PIPE @
1:150
225mm Ø uPVC STORM PIPE @ 1:150
225mm Ø uPVC STORM
PIPE @ 1:150
225mm Ø uPVC STORM PIPE @ 1:150
225mm Ø uPVC
GEOCELLULARATTENUATION TANKVOLUME: 369.6m³DIMS: 7m x 33m x 1.6m
ATTENUATION TANKBOTTOM ENDCL 52.35TWL 51.95IL 50.35
KLARGESTER FULLHYDROCARBON ANDSILT INTERCEPTOR
MH S201CL 52.40IL 51.10
MH S08CL 52.70IL 50.84
MH S09CL 52.43IL 50.69 MH S010
CL 52.43IL 50.62
MH S011CL 52.02IL 50.59
225mm
Ø uPV
C STO
RM PIP
E @ 1:1
50
G
G
G
G
G G
G
G
NOTES
Drawing Number
Drawing Status Sheet Size
Client
Rev
Drawing Scale
drawnamendmentsrev
Project
Title
date
/
Initial ReviewProject Leader Drawn By Date
Proposed Development, Mill Street
Maynooth, Kildare
Proposed Foul and Storm
Drainage Layout
Planning
04/11/19
1:250
IBE1366
A1
PL/001 E
ML AN DF
T +44 (0) 28 90 667914
F +44 (0) 28 90 668286
W www.rpsgroup.com/ireland
Elmwood House
74 Boucher Road
Belfast
BT12 6RZ
Ladas Property Company
1. Verifying Dimensions.The contractor shall verify dimensions against such other drawingsor site conditions as pertain to this part of the work.
2. Existing Services.Any information concerning the location of existing services indicatedon this drawing is intended for general guidance only. It shall be theresponsibility of the contractor to determine and verify the exacthorizontal and vertical alignment of all cables, pipes, etc. (bothunderground and overhead) before work commences.
3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of the drawing.All other formats (dwg, dxf etc.) are deemed to be an uncontrolledissue and any work carried out based on these files is at therecipients own risk. RPS will not accept any responsibility for anyerrors arising from the use of these files, either by human error bythe recipient, listing of un-dimensioned measurements, compatibilityissues with the recipient's software, and any errors arising whenthese files are used to aid the recipients drawing production, orsetting out on site.
4. SewersAll sewers to be constructed in accordance with Irish Water StandardDetails
5. All foul sewers to be 150mm Ø uPVC to EN1401
6. All storm sewers to be 150Ø uPVC to EN1410
7. Klargester oil and grit interceptor is located after final connection tostorm network to ensure all storm flows are passed throughinterceptor prior to storage and discharge
8. Legend.
Site Boundary
Proposed Foul Sewer
Proposed Storm Sewer
Existing Foul Sewer
5m SCALE 1:250
A
AN 30/05/2019Foul Drainage layout updated. Pipe sizes
and gradients amended.
B
DF 31/05/2019Oil & silt inteceptor added to storm network
C
DF 21/06/2019New storm layout
D
DF 01/07/19Realigned foul line MH FS01 to MHFS02
E
DF 04/11/19Gullies and additional notes added
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH FS01 - MH FS05
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50
51
52
Chainage
Ground Level
Invert Level
Pipe Details
Gradient
0.0
45
.2
79
.7
49
.7
6
49
.7
6
52
.4
5
49
.0
0
48
.2
4
150mm
uPVC
G=1:60
L=45.23
MH
F
S01
MH
F
S02
150mm
uPVC
G=1:60
L=12.22
47
.6
5
52
MH
F
S04
47
.4
49
.7
64
8.0
3
BASEMENT LEVEL
MH
F
S05
78
.1
52
.4
54
7.6
8
150mm
uPVC
G=1:60
L=20.62
OIL & GRITINTERCEPTOR
150mm
uPVC
G=1:60
L=1.6
Le
ve
l (m
)
PROPOSED FOUL - LONGSECTION
MH FS03 - MH FS04
SCALE: H 1:500,V 1:100
DATUM: 45.000
46
47
48
49
50