Lynnhaven River Green Ribbon Committee

SOC/Consent Decree RWWMP/Regionalization

June 27, 2013

Page 2: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Overview of System • Special Order by Consent

– Overview – Prompt Repairs – Private Property I/I - SLIP

• Consent Decree – Condition Assessment

• Consent Decree Stipulation • Consent Decree Modification/Regionalization

Outline

2

Page 3: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Regional/HRSD Sanitary Sewer System

• Regional Network: – 1.6 million

population served – 5,800 miles of

gravity sewer – 1,500 PS – 1,200 miles FM

• HRSD System: – ~430 miles large

diameter FM – ~ 50 miles gravity – 81 PS – 13 STPs

Page 4: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Consent Order Overview

Data Collection and Flow

Monitoring • SSO characterization • Use of existing

information • System mapping (GIS) • Flow monitoring

procedures • Rainfall monitoring • Sewer flow evaluation • Flow evaluation

reporting

SSES Planning

• SSES Basin criteria • Prioritization

Hydraulic Performance Assessment

• Guidelines for development and application of hydraulic model

• Procedures and standards for calibration and verification

Condition Assessment of

Sewers and Pump Stations

• Guidelines for condition assessment

• Assessment standards • Reporting

requirements • Find and fix guidelines

Rehabilitation Planning

• Rehabilitation resulting from SSES work

• Evaluation of effectiveness of rehabilitation on I/I reduction

Regional Wet-Weather

Management Plan Development

• Capacity assessment • Level of service

selection • Capacity enhancement

solutions • Affordability

Data Collection and Flow

Monitoring • SSO characterization • Use of existing

information • System mapping (GIS) • Flow monitoring

procedures • Rainfall monitoring • Sewer flow evaluation • Flow evaluation

reporting

SSES Planning

• SSES Basin criteria • Prioritization

Hydraulic Performance Assessment

• Guidelines for development and application of hydraulic model

• Procedures and standards for calibration and verification

Condition Assessment of

Sewers and Pump Stations

• Guidelines for condition assessment

• Assessment standards • Reporting

requirements • Find and fix guidelines

Page 5: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Model based on Flow Monitoring Data – Minimum 20% of Locality basins

• Truly a Regional Model – Not HRSD Model • Each Basin has Hydrology

• Calibrated using HRSD FPR Monitoring

Regional Hydraulic Model

5

Page 6: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Condition Assessment is performed • Brown and Caldwell reviews inspection results • Prompt Repair Committee review selected

results – Committee Members

Chris Stephan - Chief of North Shore Interceptors David Cooley - Chief of North Shore Engineering Karen Harr - Chief of South Shore Interceptors Phil Hubbard - Special Assistant for Compliance Richard Stahr - Vice President of Brown and Caldwell

• Committee determines if defect requires Prompt Repair

• If not Prompt Repair, goes to Rehabilitation Plan

Prompt Repairs

6

Page 7: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

7

Work Order PR 001 – 41st Street (Cont.)

24-inch gravity sewer and 16-inch force main replacement

Page 8: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

24-inch force main replacement

Work Order PR 013 – Deep Creek

8

Presenter
Presentation Notes
Removed and replaced 750 feet of badly corroded ductile iron pipe force main with new PVC and added main line valve.
Page 9: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

24-inch force main replacement

Work Order PR 013 – Deep Creek (Cont.)

9

Page 10: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Pilot Program – HRSD Commission • Virginia Beach – Harton Circle - Malibu

– $4.4 Million in Replacement – 232 Homes Proposed – 163 Inspected – 18 Lateral Defects

• Localities Perform Comprehensive Rehabilitation – Reduce I/I

• HRSD Private Property – Sewer Lateral Inspection Program (SLIP)

Private Property Program Outline

10

Page 11: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Why Are We Doing Private Property I/I - SLIP?

11

Presenter
Presentation Notes
Discuss SOC, CD, etc.
Page 12: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

What Will Happen During SLIP?

12

Step 1: Test

Step 2: Analyze

Step 3: Repair

Page 13: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Wet weather simulation/television inspection

Step 1: Testing

13

Page 14: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Negotiations – DOJ/EPA/DEQ • Locality 308 Request • 16 Iterations • Effective Date of Consent Decree - February 23,

2010 • Similar to SOC with a few exceptions

– Penalty - $900,000 – FPR – Quality Action Plan (QAP) – Interim System Improvements - $140 million – Condition Assessment – More Stringent – Stipulated Penalties for SSO’s and Projects

Consent Decree

14

Page 15: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Condition Assessment Program

SPECIAL ORDER BY CONSENT – Virginia Department of Environmental Quality

CONSENT DECREE – Environmental Protection Agency

CONDITION ASSESSMENT PLAN

•267,850 feet of gravity sewer (100% of system) •1,278 manholes (100% of system) •255,646 feet of force main (10% of system)

15

Page 16: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Gravity Sewer Inspection – all manholes and sewers 24 inches and smaller – CCTV

Unit price project for inspection and cleaning, $513,200

Gravity Sewer Inspection – sewers greater

than 24 inches in diameter – CCTV, Sonar and Laser

Unit price contract project for inspection and cleaning, $1,941,557

PROJECTS IDENTIFIED

16

267,850 feet of gravity sewer (100% of system) 1,278 manholes (100% of system)

Page 17: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Force Main Inspection Level 1 and Level 2 Project

What is it? A utility type construction project to support special technology inspection tasks

17

SONDE AND DROGUE

Not so simple unit price contract to inspect active pressurized force mains, $7,459,823 Initial Contract Value - CO #1 $2,462,725 Revised Contract Amount $9,992,548

FORCE MAIN AIR VENT INSERTION

Page 18: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Mobilizing equipment I Traffic control I Erosion and sediment control I Saw-cutting concrete and asphalt I Excavation, sheeting and shoring I Hot-tapping I Valve installation I Patching and paving I Specialty inspections I

GPS field record data I Flow augmentation

Construction Elements and Contracting

18

TRAFFIC CONTROL

HOT-TAPPING

FLOW AUGMENTATION

Page 19: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Level 2 Inspection – BEM Wall Thickness

19

Page 20: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Consent Decree – Paragraph 167 – To comply with SOC – RWWMP due November

2013 – Paragraph allowed for RWWMP due date to be

extended until July 31, 2014 – Formal modification to CD

Consent Decree Stipulation

20

Page 21: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Regional Cooperation wavering • Flow Agreements – Localities/HRSD • May 2012 met with DOJ/EPA/DEQ in

Washington – They were receptive – Worked on Modification

Regionalization – CD Modification

21

Page 22: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Regional Study • Regional Hydraulic Model

– Preliminary Peak Flow Estimates – PPFE’s – Private Property I/I

• Comparative Analysis – Cost 2yr and 10 yr – Non-Regionalization – 14 Separate Localities &

HRSD – No one Controls Own interest – Regionalization – One System Owner/Operator –

Controls Own interest • Outlines the due dates for RWWMP • Additional Interim System Improvements

Regionalization – CD Modification

22

Page 23: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

• Study Complete – August 31, 2013 • Localities and HRSD – February 28, 2014 • Work out Transfer – February 28, 2015 • RWWMP

– Report NO – April 30, 2015 – Report Yes – Localities/HRSD NO – Oct. 1,2015 – Report Yes – Localities/HRSD YES –Oct. 1 2016

• Regionalization YES – HRSD Revised MOM – October 1, 2018

• 18 Additional Interim System Improvements

Regionalization – CD Modification

23

Page 24: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Contrast Two Approaches

• Non-Regionalization – Rehab I/I reductions and costs from Locality PPFE – Locality Capacity Enhancements from Locality

Capacity Assessments – Regional Capacity Enhancements based on post rehab

flows from PPFEs – HRSD Committed Improvements Included

• Regionalization – Rehab I/I reductions and costs based on optimum level – Locality and Regional Capacity Enhancements based

on post rehab flows from optimum level – HRSD Committed Improvements Included

Page 25: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Treatment Plant Current Plan, # Catchments Rehab

Regionalized, # Catchments Rehab

Army Base 7 8 Atlantic 198 81 Boat Harbor 134 50 Ches-Liz 42 0 James River 56 19 Nansemond 117 52 VIP 29 36 Williamsburg 75 50 York River 82 22

TOTALS 740 318

Focused Comprehensive Rehabilitation

25 Preliminary Results subject to revisions

Page 26: Lynnhaven River Green Ribbon SOC/Consent Decree RWWMP/Regionalization ·  · 2017-03-17SOC/Consent Decree RWWMP/Regionalization June 27, 2013 ... Gravity Sewer Inspection – all

Questions

8

26