WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012 Lynn Valley Rd / Boulevard Cres Corridor Transportation Improvements Welcome 1 1 The Highway 1 corridor is a barrier to efficient and safe pedestrian and bicycle travel on the North Shore. The City of North Vancouver, in cooperation with the District of North Vancouver and the Ministry of Transportation are working together to improve transportation connections through the Lynn Valley Road interchange along Boulevard Crescent & Lynn Valley Road. Thank you for joining us to discuss potential improvements.

Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

Welcome

11

The Highway 1 corridor is a barrier to effi cient and safe pedestrian and bicycle travel on the North Shore.

The City of North Vancouver, in cooperation with the District of North Vancouver and the Ministry of Transportation are working together

to improve transportation connections through the Lynn Valley Road interchange along Boulevard Crescent & Lynn Valley Road.

Thank you for joining us to discuss potential improvements.

Page 2: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

Project Time Line

22

Project Outcome:The outcome of this study will be the detailed design for improvements to Boulevard Crescent, the section of Lynn Valley Road south of William and the Highway 1 interchange.The detailed design will be used to apply for funding for construction in the future. The fi nal design may be implemented in sections at different times subject to budget availability.

ProjectInitiation

Conceptual Design

Consultation Process

DetailedDesign

Winter 2011 / Spring 2012 Spring 2012Fall 2011August 2011

Future Project

Modifi cations to the Existing Interchange

Casano/ Rufus

OverpassWe are here

The Pedestrian / Cyclist Highway 1 Crossing Improvements Study for the Lynn Valley / Loutet Area was completed in February, 2010. Recommendations: Pursue detailed design and provision of the Casano / Rufus overpass option in conjunction with improvements to the existing Lynn Valley Interchange.

Page 3: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

Project Scope

Existing Bike Routes

Future Bike Routes

Existing Trails

Legend

Study Area

33

The project scope:The corridor along: Boulevard Crescent / Lynn Valley Road

From: East 19th Street

To: William Avenue

Sections:Section A: Boulevard CresSection B: InterchangeSection C: Lynn Valley road

North

Lynn Valley Road

Will

iam

Ave

nue

East 19th Street

Suth

erla

nd A

venu

e

Morgan Road

Boul

evar

d Cr

esce

nt Highway 1

To Second Narrows

To Lonsdale

Sect

ion

A

Section B

Section C

Page 4: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

Option 2 (Multi-use path on both sides) has been selected for detailed design.

Results of The First Open House

44

The public open house held in December 2012 presented 6 design options for the Boulevard Crescent section, and 2 design options for both the Interchange and Lynn Valley Road sections.

The results and comments showed that:

Option 6 (Removal of parking with right turn lane and bike lane) was the preferred option (34%), however many of the comments against this option criticised the removal of on-street parking. The proposed north bound right turn lane was strongly supported as were the proposed bike lanes.

The results and comments showed that:

Option 2 (Multi-use path on both sides) was the preferred option (53%).

The comments received refl ected the need for improved pedestrian and bicycle facilities though the intersection.

The results and comments showed that:

Option 2 was the preferred option (58%).

However, further fi nancial analysis determined that changing access to Morgan Road would be better suited as a separate local initiative. Option 1 (Road widening to the east side and narrowing of the median to provide bike lanes) has been selected for detailed design because it provides the same active transportation benefi ts as option 2, with bike lanes on Lynn Valley Road.

Comments have lead us to investigate further options for your consideration

Option 1 (Road widening to the east side and narrowing of the median to provide bike lanes) has been selected for detailed design

9

16 17

48

0

10

20

30

40

50

60

No comment Do Nothing 1 - Multi-use path on the west side

and bicycle lane on the east side

2 - Multi-use paths on both sides

Pref

erre

d O

ptio

ns

6

21

11

3

10

2

6

31

0

5

10

15

20

25

30

35

No comment

Do Nothing 1 -Removal of parking on east side

2 -Removal of Parking on west side

Road widening

to the east side

4 - Road widening

to the east side

5 -Removal of

parking with

shared right turn and bike

lane

6 -Removal of

parking with right turn lane and bike

lane

Pref

erre

d O

ptio

ns

Section A: Boulevard Crescent

Section B: Interchange

Section C: Lynn Valley Road

Action: Action: Action:

9

19

9

52

0

10

20

30

40

50

60

No comment Do Nothing 1 - Bike lanes on Lynn Valley Road

2 - Bike lanes on Lynn Valley Road, and change access to

Morgan Road

Pref

erre

d O

ptio

ns

Page 5: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012 55

• Provides a Multi-use path on both sides of the interchange

• Connects to trails parallel to the highway

• Gives the maximum separation between pedestrians/ cyclists and vehicle traffi c

• Preferred by 53% of survey respondents

Section B: InterchangeMulti-use path on both sides

Multi-use Path Added

Multi-use Path Added

HWY 1

Lynn

Val

ley

Rd

Cross Section

Cross Section

Page 6: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Section C: Lynn ValleyBike Lanes

Road Widened

Bike LanesAdded

Median Narrowed

66

• Provides bike lanes on both sides

• Maintains a planted median

• Lower cost option (Estimated $390,000)

Cross Section

Cross Section

Page 7: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

Boulevard Crescent: Options Evaluation

77

We are seeking your feedback to the 4 proposed options for the Boulevard Crescent section of this project. The table below highlights the differences between the options which are presented on the following 4 boards for your review.

Parking Summary:

Staff surveyed parking on both weekdays and weekend day in February and March of 2012 between the hours of 7am and 10pm

Average Maximum Peak

WestSide

2 6 Evening /Overnight

EastSide

2 5 Evening

A No No 24 23 No None None $0

B Bike Lane Bike Lane 18 0 No None None $35,000

C Bike Lane Bike Lane 8 8 Yes 4Frontages

2Frontages $100,000

D Bike LaneMulti-usepath (2.5 asphalt)

14 16 Yes None 10Frontages $135,000

OptionBike

facility on west side

Bikefacility on east side

Approximateparking on west side

Approximateparking on east side

Estimatedcost

Bou

leva

rd C

resc

ent

NorthBound

right turn lane onto Highway

Workrequired in

theboulevardon west

side

Workrequired in

theboulevard

on east side

Page 8: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

88

Section A: Boulevard Crescent Options Option A Option B

• No change from existing conditions

• No additional cost

• Provides bicycle facility• Reduced parking on west sides and removes parking on east side

• No improvements to traffi c fl ow• Low cost (Estimated $35,000)

Parking Removed

Boul

evar

d Cr

esce

nt

Boul

evar

d Cr

esce

nt

Bike Lane

Bike Lane

Parking Removed

Parking Removed

Cross Section Cross Section

Cross Section Cross Section

Page 9: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

99

Section A: Boulevard Crescent Options

• Provides bicycle lanes• Reduced parking on both sides• Improvements to north bound traffi c fl ow

• Medium cost (Estimated $100,000)

Right Turn Lane

Bike LanesAdded

Parking 8 spaces

Bike Lane

• Provides bicycle facility • Reduced parking on both sides• Improvements to north bound traffi c fl ow

• High cost (Estimated $135,000)

Multi-use PathNorth bound Bikes and

2-way pedestians

Right Turn Lane

Parking 16 Spaces

Option C Option D

Parking 4 spaces

Parking 4 spaces

Parking 14 spaces

BikeLane

Boul

evar

d Cr

esce

nt

Boul

evar

d Cr

esce

nt

Cross Section

Cross Section

Cross Section Cross Section

Page 10: Lynn Valley Underpass - April Open House (Text Boards/media/A2CFB672E48E4EAC9E448EA152EC335F.pdf · Project Time Line 2 Project Outcome: The outcome of this study will be the detailed

WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012

Lynn

Val

ley

Rd

/ Bou

leva

rd C

res

Cor

ridor

Tra

nspo

rtatio

n Im

prov

emen

ts

Tell Us What You Think

1010

Thank you for attending the second Open House for the proposed Lynn Valley Road / Boulevard Crescent Corridor

Transportation Improvements.

Please provide us with your input by completing the feedback form provided or online at:www.cnv.org/lynnvalleyunderpass

The project team will include your feedback when considering the design concepts to be taken forward.

Thank you for your participation