WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
Welcome
11
The Highway 1 corridor is a barrier to effi cient and safe pedestrian and bicycle travel on the North Shore.
The City of North Vancouver, in cooperation with the District of North Vancouver and the Ministry of Transportation are working together
to improve transportation connections through the Lynn Valley Road interchange along Boulevard Crescent & Lynn Valley Road.
Thank you for joining us to discuss potential improvements.
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
Project Time Line
22
Project Outcome:The outcome of this study will be the detailed design for improvements to Boulevard Crescent, the section of Lynn Valley Road south of William and the Highway 1 interchange.The detailed design will be used to apply for funding for construction in the future. The fi nal design may be implemented in sections at different times subject to budget availability.
ProjectInitiation
Conceptual Design
Consultation Process
DetailedDesign
Winter 2011 / Spring 2012 Spring 2012Fall 2011August 2011
Future Project
Modifi cations to the Existing Interchange
Casano/ Rufus
OverpassWe are here
The Pedestrian / Cyclist Highway 1 Crossing Improvements Study for the Lynn Valley / Loutet Area was completed in February, 2010. Recommendations: Pursue detailed design and provision of the Casano / Rufus overpass option in conjunction with improvements to the existing Lynn Valley Interchange.
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
Project Scope
Existing Bike Routes
Future Bike Routes
Existing Trails
Legend
Study Area
33
The project scope:The corridor along: Boulevard Crescent / Lynn Valley Road
From: East 19th Street
To: William Avenue
Sections:Section A: Boulevard CresSection B: InterchangeSection C: Lynn Valley road
North
Lynn Valley Road
Will
iam
Ave
nue
East 19th Street
Suth
erla
nd A
venu
e
Morgan Road
Boul
evar
d Cr
esce
nt Highway 1
To Second Narrows
To Lonsdale
Sect
ion
A
Section B
Section C
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
Option 2 (Multi-use path on both sides) has been selected for detailed design.
Results of The First Open House
44
The public open house held in December 2012 presented 6 design options for the Boulevard Crescent section, and 2 design options for both the Interchange and Lynn Valley Road sections.
The results and comments showed that:
Option 6 (Removal of parking with right turn lane and bike lane) was the preferred option (34%), however many of the comments against this option criticised the removal of on-street parking. The proposed north bound right turn lane was strongly supported as were the proposed bike lanes.
The results and comments showed that:
Option 2 (Multi-use path on both sides) was the preferred option (53%).
The comments received refl ected the need for improved pedestrian and bicycle facilities though the intersection.
The results and comments showed that:
Option 2 was the preferred option (58%).
However, further fi nancial analysis determined that changing access to Morgan Road would be better suited as a separate local initiative. Option 1 (Road widening to the east side and narrowing of the median to provide bike lanes) has been selected for detailed design because it provides the same active transportation benefi ts as option 2, with bike lanes on Lynn Valley Road.
Comments have lead us to investigate further options for your consideration
Option 1 (Road widening to the east side and narrowing of the median to provide bike lanes) has been selected for detailed design
9
16 17
48
0
10
20
30
40
50
60
No comment Do Nothing 1 - Multi-use path on the west side
and bicycle lane on the east side
2 - Multi-use paths on both sides
Pref
erre
d O
ptio
ns
6
21
11
3
10
2
6
31
0
5
10
15
20
25
30
35
No comment
Do Nothing 1 -Removal of parking on east side
2 -Removal of Parking on west side
Road widening
to the east side
4 - Road widening
to the east side
5 -Removal of
parking with
shared right turn and bike
lane
6 -Removal of
parking with right turn lane and bike
lane
Pref
erre
d O
ptio
ns
Section A: Boulevard Crescent
Section B: Interchange
Section C: Lynn Valley Road
Action: Action: Action:
9
19
9
52
0
10
20
30
40
50
60
No comment Do Nothing 1 - Bike lanes on Lynn Valley Road
2 - Bike lanes on Lynn Valley Road, and change access to
Morgan Road
Pref
erre
d O
ptio
ns
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012 55
• Provides a Multi-use path on both sides of the interchange
• Connects to trails parallel to the highway
• Gives the maximum separation between pedestrians/ cyclists and vehicle traffi c
• Preferred by 53% of survey respondents
Section B: InterchangeMulti-use path on both sides
Multi-use Path Added
Multi-use Path Added
HWY 1
Lynn
Val
ley
Rd
Cross Section
Cross Section
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Section C: Lynn ValleyBike Lanes
Road Widened
Bike LanesAdded
Median Narrowed
66
• Provides bike lanes on both sides
• Maintains a planted median
• Lower cost option (Estimated $390,000)
Cross Section
Cross Section
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
Boulevard Crescent: Options Evaluation
77
We are seeking your feedback to the 4 proposed options for the Boulevard Crescent section of this project. The table below highlights the differences between the options which are presented on the following 4 boards for your review.
Parking Summary:
Staff surveyed parking on both weekdays and weekend day in February and March of 2012 between the hours of 7am and 10pm
Average Maximum Peak
WestSide
2 6 Evening /Overnight
EastSide
2 5 Evening
A No No 24 23 No None None $0
B Bike Lane Bike Lane 18 0 No None None $35,000
C Bike Lane Bike Lane 8 8 Yes 4Frontages
2Frontages $100,000
D Bike LaneMulti-usepath (2.5 asphalt)
14 16 Yes None 10Frontages $135,000
OptionBike
facility on west side
Bikefacility on east side
Approximateparking on west side
Approximateparking on east side
Estimatedcost
Bou
leva
rd C
resc
ent
NorthBound
right turn lane onto Highway
Workrequired in
theboulevardon west
side
Workrequired in
theboulevard
on east side
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
88
Section A: Boulevard Crescent Options Option A Option B
• No change from existing conditions
• No additional cost
• Provides bicycle facility• Reduced parking on west sides and removes parking on east side
• No improvements to traffi c fl ow• Low cost (Estimated $35,000)
Parking Removed
Boul
evar
d Cr
esce
nt
Boul
evar
d Cr
esce
nt
Bike Lane
Bike Lane
Parking Removed
Parking Removed
Cross Section Cross Section
Cross Section Cross Section
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
99
Section A: Boulevard Crescent Options
• Provides bicycle lanes• Reduced parking on both sides• Improvements to north bound traffi c fl ow
• Medium cost (Estimated $100,000)
Right Turn Lane
Bike LanesAdded
Parking 8 spaces
Bike Lane
• Provides bicycle facility • Reduced parking on both sides• Improvements to north bound traffi c fl ow
• High cost (Estimated $135,000)
Multi-use PathNorth bound Bikes and
2-way pedestians
Right Turn Lane
Parking 16 Spaces
Option C Option D
Parking 4 spaces
Parking 4 spaces
Parking 14 spaces
BikeLane
Boul
evar
d Cr
esce
nt
Boul
evar
d Cr
esce
nt
Cross Section
Cross Section
Cross Section Cross Section
WWW.CNV.ORG/LYNNNVALLEYUNDERPASS APRIL 2012
Lynn
Val
ley
Rd
/ Bou
leva
rd C
res
Cor
ridor
Tra
nspo
rtatio
n Im
prov
emen
ts
Tell Us What You Think
1010
Thank you for attending the second Open House for the proposed Lynn Valley Road / Boulevard Crescent Corridor
Transportation Improvements.
Please provide us with your input by completing the feedback form provided or online at:www.cnv.org/lynnvalleyunderpass
The project team will include your feedback when considering the design concepts to be taken forward.
Thank you for your participation