PUBLIC BRIEFING ON LYNAS LANTHANIDES PROJECT
PRESENTER : PUAN AZURI AZIZAH BT. HJ. SAEDON
DEPARTMENT OF ENVIRONMENT PAHANGTINGKAT 4, BANGUNAN ASIA LIFE
JALAN TELUK SISEK25662 KUANTAN
Department of Environment
Ministry of Natural Resources and Environment
Other government Department of Other government
-2-
Other government agencies
Department of Environment (DOE)
Other government agencies
�1975 - Environment Division
�1983 - Department of Environment (DOE)
Roles of Department of Environment (DOE)
� To administer and enforce the Environmental Quality Act, 1974 :
� Prevention, abatement and control of pollution and enhancement of the environment
� There are 34 subsidiary legislations under the Act
-3-
� There are 34 subsidiary legislations under the Act
Lynas must comply to the following Act & Regulations
� Environmental Quality Act 1974 :
� Environmental Impact Assessment (EIA) report � Quantitative Risk Assessment (QRA) report
� Guidelines for Prevention and Control of Soil Erosion and Siltation in Malaysia , October 1996.
Environmental Quality (Sewage, and Industrial Effluents)
-4-
� Environmental Quality (Sewage, and Industrial Effluents) Regulations, 1979
� Environmental Quality (Clean Air) Regulations,1978
� Environmental Quality (Scheduled Wastes) Regulations, 2005
� Planning Guidelines for Environmental Noise Limit and Controls, 2004
Conditions of Approval for Lynas�EIA and QRA prepared by registered environmental consultant�Proper and designated drainage system for the Residue Storage
Facilities (RSF)
� Safety and Emergency control
� AELB’s approval on monitoring, management and disposal ofradioactive containing materials
-5-
radioactive containing materials
� Chemical and scheduled waste management
� Solid waste management
� Environmental management plan (EMP)
� Control and monitoring of :� Air quality - soil condition - Noise� Water quality including underground water
Requirements that Lynas must comply and monitored by DOE�Suspended solid less than 100 mg/l from the silt trap discharge
during construction�Water quality monitoring report on 30 parameters upstream and
downstream of Sungai Balok
� 4 borewells for underground water quality monitoring
� Ambient Air Quality monitoring of parameters CO2, CO, NO2, NO,SO2, HF, H2SO4, PM10, and TSP
-6-
SO2, HF, H2SO4, PM10, and TSP
� Noise monitoring at four (4) stations
� Discharge effluent quality report from the final discharge point
� Stack emission sampling to comply Standard C, Clean Air Regulations, 1978 and AELB’s standards.
� Compliance report
� Environment audit report
Lynas Project : AIRHow will Lynas ensure its Air Emissions meet DOE requirements?
� Lynas will install waste gas treatment systems for the removal of sulfuric acid and sulfur dioxide
� It is a five-stage waste gas scrubbing system
� Lynas also has an emergency scrubbing system to ensure air emission meet DOE requirements at all times
-7-
� Air Quality Modelling has been completed
Lynas Project : WATERHow will Lynas ensure its Industrial Effluents meet DOE requirements?
� Lynas will install a 2-stage waste water treatment system� High Density Sludge Neutralization
� to neutralize acids and remove metals
� Industrial effluent treatment system (IETS), � an activated sludge bio-treatment
� To treat process water to reduce BOD and COD
-8-
� IE discharges to comply to Standard B of Regulation 8(1)(b), Environmental Quality (Sewage, and Industrial Effluents) Regulations, 1979 and AELB’s standards
� Lynas will install an independent storm water system� To ensure Storm water will not be contaminated by process water
� Waste water from the Water Leached Process is recycled back to the process.
Conclusion
� DOE approved the Lynas Project after a detailed review of the EIA and QRA submitted by Environ in Jan 2008. Approval was granted with conditions in Feb 2008.
� DOE separately approve the detailed design of key pollution control equipment prior to installation, and for the Lynas Project this includes the waste water treatment plant and the waste gas treatment plant.
-9-
waste gas treatment plant.
� After EMP approval on Dec 2008, three site visits have been conducted by DOE; construction works complied to EIA conditions.
� DOE, as the regulator, will ensure that Lynas operates consistent with the act and regulations so that the impact to the environment is minimised.
Thank youThank you
W7
W6
Water Quality Monitoring
-11-
W5
W4
W3
W2
W1
S1
S2
S3
S4
S6
S7
Underground Water Quality Monitoring
-12-
S5
S6
Ambient Air Quality Monitoring
A1A3
-13-
A2
A4
Noise Monitoring
N1N3
-14-
N2
N4