2
Required Tools Marker Hammer Caulk Gun Tape Measure Nail Punch Polyurethane Constructive Adhesive (PUR-Glue) Miter Saw Nails (4d, 1-1/2” / 3.8 cm) Colour filler Damp Cloth Installation on flooring with an overall thickness of up to 4 mm (0.157”). STEP 1 Install the riser flush to the stair. Leave 1-9/16" (4 cm) distance between the outer edge of the riser and the floor. Put down two lines of construction adhesive as shown. STEP 2 Secure the moulding to the stair with 4d (1-1/2” / 3.8 cm) finishing nails. Use a nail punch to sink the nail in the moulding. Finish up the nails with a colour matching colour filler. LVP/LVT STAIR NOSE INSTALLATION INSTRUCTIONS

LVP/LVT STAIR NOSE INSTALLATION INSTRUCTIONSen.beaulieuasia.com/UpLoadFile/20140110/StairNose_Mouldings... · Stair Riser Finishing Nail Flooring Sub Floor PUR-Glue adhesive Stair

Embed Size (px)

Citation preview

Page 1: LVP/LVT STAIR NOSE INSTALLATION INSTRUCTIONSen.beaulieuasia.com/UpLoadFile/20140110/StairNose_Mouldings... · Stair Riser Finishing Nail Flooring Sub Floor PUR-Glue adhesive Stair

Required ToolsMarker Hammer Caulk GunTape Measure Nail Punch Polyurethane Constructive Adhesive (PUR-Glue)Miter Saw Nails (4d, 1-1/2” / 3.8 cm) Colour fillerDamp Cloth

Installation on flooring with an overall thickness of up to 4 mm (0.157”).

STEP 1Install the riser flush to the stair. Leave 1-9/16" (4 cm) distance between the outer edge of the riser and thefloor. Put down two lines of construction adhesive as shown.

STEP 2Secure the moulding to the stair with 4d (1-1/2” / 3.8 cm) finishing nails. Use a nail punch to sink the nail in the moulding. Finish up the nails with a colour matching colour filler.

LVP/LVT STAIR NOSE

INSTALLATION INSTRUCTIONS

Page 2: LVP/LVT STAIR NOSE INSTALLATION INSTRUCTIONSen.beaulieuasia.com/UpLoadFile/20140110/StairNose_Mouldings... · Stair Riser Finishing Nail Flooring Sub Floor PUR-Glue adhesive Stair

Installation on flooring thicker than 4 to 8 mm (0.157 to 0.315”) in thickness.

STEP 1Install the riser flush to the stair. Leave 1-9/16" (4 cm) distance between the outer edge of the riser and thefloor. Put down two thick lines of construction adhesive.

STEP 2Before securing the moulding, turn it over and apply a line of construction adhesive in the groove. Cut 3/8” (9.5 mm) strips of your flooring to use as a shim to keep the moulding level. Push the shim in place inside the groove.

STEP 3Secure the moulding to the stair with 4d (1-1/2” / 3.8 cm) finishing nails. Use a nail punch to sink the nail in the moulding. Finish up the nails with a colour matching colour filler.

LVP/LVT STAIR NOSE

INSTALLATION INSTRUCTIONS (cont.)