18
BOILER DEAD AIR SPACE EXPANSION JOINT AIR-IN- LEAKAGE ISSUES Solution: Isomembrane© Technologies PIPE LEAKAGE & MINIMUM- WALL ISSUES TRANSFORMER FIRE Barrier Technology Solution: Buried & General Pipe Repair Services Solution: Luse Fire & Explosion Impact Barrier and other Fire Mitigation Technologies LUSE THERMAL LTT solves issues common to Electric Utilities & Improves Heat Rate!!! TECHNOLOGIES

Ltt isomembrane overview

Embed Size (px)

Citation preview

Page 1: Ltt isomembrane overview

BOILER DEAD AIR SPACE EXPANSION JOINT AIR-

IN-LEAKAGE ISSUES

Solution:

Isomembrane©

Technologies

PIPE LEAKAGE & MINIMUM-WALL ISSUES

TRANSFORMER FIRE Barrier Technology

Solution:

Buried & General Pipe Repair Services

Solution:

Luse Fire & Explosion Impact Barrier and other

Fire Mitigation Technologies

LUSE THERMAL

LTT solves issues common to Electric Utilities & Improves Heat Rate!!!

TECHNOLOGIES

Page 2: Ltt isomembrane overview

The Isomembrane© Advantage

• Retire In Place—Capital vs O&M Budget

• Recover Lost MW’s• High Payback to cost ratio• Installed & performing 15 +

years• Quick Response Time• No Lead Time for Materials• Minimal Installation Period• “ON-LINE” Repairs

• Reduces Safety Risks• LOI reduction• Stops Air in-leakage• Less outage downtime• Improved Heat Rate• Lower NOx Gases• Lower Mass Flow Rate• Substantial Fly-ash

reduction in dead air spaces• Flexible, Ash tight Seal

Benefits:

Page 3: Ltt isomembrane overview

The Isomembrane© Advantage

Applications:

Penthouse SealsLT, SH, & RH PendantsSide Wall SealsVestibulesExpansion JointsDead Air SpacesWindboxesSkin Casing CracksNose ArchesGas & Air Ducts Air Heaters and Associated Expansion JointsBoiler Door & Burner Seals

Page 4: Ltt isomembrane overview

““LTT Proprietary Information”LTT Proprietary Information”

Page 5: Ltt isomembrane overview

Type: 88 MW C-E Boiler built in 1958

BEFORE: Penthouse damaged side wall casing has been cut out and removed, allowing access to the sidewall tubes and outside wall casing for installation of the Isomembrane© application.

Page 6: Ltt isomembrane overview

88 MW C-E Boiler built in 1958

AFTER: A typical Penthouse side wall Isomembrane© ash-tight application. Sidewall casing removed, the Isomembrane© attached to the outside wall casing, sealed around the tubes and the inside floor of the penthouse providing a cost effective solution.

Page 7: Ltt isomembrane overview

Type: 420 MW B&W Cyclone Fired Boiler 1968: Before: Penthouse Super Heat Pendants Air leakage around tubes

Page 8: Ltt isomembrane overview

After: Isomembrane© Installed tubes sealed

Page 9: Ltt isomembrane overview

Type: C-E Boiler 250 MW Built in 1954

Before: Upper Dead Air Sidewall Seal and Front

Wall / Roof Tube Seal Box

After: Sealed Side Wall and Front Wall / Roof

Tube Seal Box

Isomembrane© Technology

Degraded Seal Box & Sidewall Seal

Damaged Areas sealed with Isomembrane®

Page 10: Ltt isomembrane overview
Page 11: Ltt isomembrane overview

Type: 650 MW Foster Wheeler Unit Built 1975Before: Precipitator Outlet Expansion Joint with lagging damaged with

tear 2’ x 8’Unit operating, ID fan limited with excess vibrations

Page 12: Ltt isomembrane overview

After: “ On-Line” Application mobilized in less than 24 hours Isomembrane© installed while the unit was ON-LINE.

Page 13: Ltt isomembrane overview

Type: 360 MW Foster Wheeler Unit Built 1959Before: Air Heater Expansion Joint with dust plate removed for Inside

Isomembrane© application.

Page 14: Ltt isomembrane overview

After: Isomembrane© installed with dust shield installation.

Page 15: Ltt isomembrane overview

Isomembrane© Testimonials:These are samples from just the Midwest but we have hundreds nationally.

• Dynegy– “We used Isomembrane© on the SH Outlet and Sidewall seals in the penthouse and can

attribute a gain of 3-4 MW’s as a result.” Plant Manager

• Michigan South Central Power– “We installed Isomembrane© in our penthouse on the Sidewall Seals and SH Inlet

Pendants and eliminated a 20 year old fly ash problem. It lowered our down time to access the penthouse for inspections and maintenance work as well as eliminated the cost for fly ash removal. We also like the rugged look of the Isomembrane© seals on the Expansion Joints, they last longer than the conventional expansion joints we replaced” Plant Engineer

• KCP&L– “We went with the Isomembrane© seals on our Economizer Expansion Joints and could see

a 10 MW increase just from the partial seals as LTT technicians installed the seals on line, it got too hot for them to work on top so they had to come back to finish the job, on short notice during a weekend forced outage” Plant Maintenance & Engineering

• Duke Energy– “LTT has mobilized several times in less than a 24 hour period to keep us running by

installing partial Isomembrane© Seals on our Precipitator Outlet Expansion Joints that work great”. Plant Engineering

• Midwest Generation– “We are very pleased with the Isomembrane© repair on the precipitator and the results we

have received on fan capacity due to the Isomembrane© application. We are able to run the unit at full load, without de-ratings due to fan.” Project Manager

Page 16: Ltt isomembrane overview

THE LUSE TEAM THANKS YOU FOR THIS

OPPORTUNITY TO SHARE OUR WORLD

WITH YOU. WE REALLY APPRECIATE

YOUR INTEREST AND THE TIME GIVEN US

TODAY

Page 18: Ltt isomembrane overview

HERE TO HELPJohn Provencher Cell: 708.363.3838 Email: [email protected]

Jim Ford Cell: 630 240-6381 Email: [email protected]

Your information requests receive our highest priority!