2
Specifications Model Number Single-sided LS1500S Double-sided LS1500D Heat Output 9.2kW Star Rating (Minimum) 5.0* Gas Type NG - ULPG Flue Power Flue Heating Area 78 - 133m2 Input MJ/h 14 - 40 Power 3 pin plug. 1.5m power cord - right hand side of appliance Gas Connection 1/2 BSP Terminates inside the heater, lower left hand side Weight Net / Gross 110kg / 140kg Fan 2 Speed Convection Fan Control Remote and Wi-Fi Standard Appliance dimensions (Single / Double-sided (mm): Net: 745h x 1935w x 425d Gross: 931h x 2050w x 530d Glass dimensions (Single / Double-sided (mm): 280h x 1500w Outer Flue Diameter (mm) 75 Inner Flue Diameter (mm) 50 LS1500S - Single-sided Log set *Will vary according to gas type and flue configuration. LS1500D - Double-sided Log set LS1500D - Double-sided Burn media LS 1500 specification guide Application Ideal for living rooms and open plan areas. Versatile power flue system makes for easy installation in almost any living space, including bedrooms. The LS series is ideal for a new build installation into a false (mock) chimney. For further information please refer to rinnai.com.au to view all technical specifications. LS1500S - Single-sided Burn media

LS 1500 specification guide - Rinnai · Glass dimensions 800 800 x 505 mm 1000 1000 x 280 mm 1500 1500 x 280 mm 741 ± 5 mm 400 mm The clearances listed below, measured from the edge

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Specifications

Model Number

Single-sided LS1500S

Double-sided LS1500D

Heat Output 9.2kW

Star Rating (Minimum) 5.0*

Gas Type NG - ULPG

Flue Power Flue

Heating Area 78 - 133m2

Input MJ/h 14 - 40

Power 3 pin plug. 1.5m power cord - right hand side of appliance

Gas Connection 1/2 BSP Terminates inside the heater, lower left hand side

Weight Net / Gross 110kg / 140kg

Fan 2 Speed Convection Fan

Control Remote and Wi-Fi Standard

Appliance dimensions (Single / Double-sided (mm):

Net: 745h x 1935w x 425d Gross: 931h x 2050w x 530d

Glass dimensions (Single / Double-sided (mm): 280h x 1500w

Outer Flue Diameter (mm) 75

Inner Flue Diameter (mm) 50

LS1500S - Single-sided Log set

*Will vary according to gas type and flue configuration.LS1500D - Double-sided Log set

LS1500D - Double-sided Burn media

LS 1500 specification guide

ApplicationIdeal for living rooms and open plan areas. Versatile power flue system makes for easy installation in almost any living space, including bedrooms. The LS series is ideal for a new build installation into a false (mock) chimney. For further information please refer to rinnai.com.au to view all technical specifications.

LS1500S - Single-sided Burn media

16 | Linear installation guide 13563-A d5

Linear 1500 framing dimensions

1950 Min

796

Min

341

*

257

±5

*

1516 *

300

**

~

575

870 Min 1080 Min

990 710 Recommended that lintel is left until fire is installed so minimum clearances can be maintained

403

300

80**

870

1183

** Maintain 25 mm clearance to combustibles for first 300mmof flue

39 Assumes10 mm wallboard

* Wallboard cutout

403 mm assumes a 10 mm wallboardon both sides of a double-sided unit.

415 mm is the min. for a single-sidedunit to maintain 50 mm clearance tothe back of the fire.

• All dimensions are assuming a 10 mm wallboard

• Framing shown is 90 x 45 mm

• Fire platform shown is 18 mm plywood

Note: Install frame prior to plaster.

400 mm

400

mm

1000

mm

Linear installation guide 13563-A d3 | 9

The below diagrams are to assist people who are determining the clearance area around the Linear without having the unit on site.

800

Glass width

400 400

Clearance Clearance

505

Gla

ss h

eigh

t4

00

1600

Minimum above fire

257

± 5

Adjustable firebox feet

1000

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t4

00

1800

Minimum above fire

Adjustable firebox feet

257

± 5

1500

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t4

00

2300

Minimum above fire

Adjustable firebox feet

257

± 5

Lin

ear

800

Lin

ear

1000

Lin

ear

1500

Linear installation guide 13563-A d3 | 7

Unit dimensions (mm)The centre of the glass is NOT the centre of the appliance.Depth dimension is the same for all models.

425 min.singled sided425 face-to-face double sided

966

± 5

mm

Adjustable feet on all models

741 ±

5 m

m

1245 mm

1435 mm

1935 mm

726 mm 519 mm

816 mm 619 mm

1066 mm 869 mm

Glass dimensions

800 800 x 505 mm

1000 1000 x 280 mm

1500 1500 x 280 mm74

1 ± 5

mm

400 mm

The clearances listed below, measured from the edge of the glass, are minimum clearances unless otherwise stated. The Rinnai LS 1500 has an integrated zero clearance box (fire box) that isolates the appliance from combustible materials. This means it can be installed directly into a cavity constructed from materials such as wood or plaster.

400 mm

400

mm

1000

mm

Linear installation guide 13563-A d3 | 9

The below diagrams are to assist people who are determining the clearance area around the Linear without having the unit on site.

800

Glass width

400 400

Clearance Clearance

505

Gla

ss h

eigh

t4

00

1600

Minimum above fire

257

± 5

Adjustable firebox feet

1000

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t4

00

1800

Minimum above fire

Adjustable firebox feet

257

± 5

1500

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t4

00

2300

Minimum above fire

Adjustable firebox feet

257

± 5

Lin

ear

800

Lin

ear

1000

Lin

ear

1500

Linear installation guide 13563-A d3 | 7

Unit dimensions (mm)The centre of the glass is NOT the centre of the appliance.Depth dimension is the same for all models.

425 min.singled sided425 face-to-face double sided

966

± 5

mm

Adjustable feet on all models

741 ±

5 m

m

1245 mm

1435 mm

1935 mm

726 mm 519 mm

816 mm 619 mm

1066 mm 869 mm

Glass dimensions

800 800 x 505 mm

1000 1000 x 280 mm

1500 1500 x 280 mm

741 ±

5 m

m

400 mm

400 mm

400

mm

1000

mm

Linear installation guide 13563-A d3 | 9

The below diagrams are to assist people who are determining the clearance area around the Linear without having the unit on site.

800

Glass width

400 400

Clearance Clearance

505

Gla

ss h

eigh

t4

00

1600

Minimum above fire

257

± 5

Adjustable firebox feet

1000

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t4

00

1800

Minimum above fire

Adjustable firebox feet

257

± 5

1500

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t4

00

2300

Minimum above fire

Adjustable firebox feet

257

± 5

Lin

ear

800

Lin

ear

1000

Lin

ear

1500

Linear installation guide 13563-A d3 | 7

Unit dimensions (mm)The centre of the glass is NOT the centre of the appliance.Depth dimension is the same for all models.

425 min.singled sided425 face-to-face double sided

966

± 5

mm

Adjustable feet on all models

741 ±

5 m

m

1245 mm

1435 mm

1935 mm

726 mm 519 mm

816 mm 619 mm

1066 mm 869 mm

Glass dimensions

800 800 x 505 mm

1000 1000 x 280 mm

1500 1500 x 280 mm

741 ±

5 m

m

400 mm

Linear installation guide 13563-A d3 | 9

800

Glass width

400 400

Clearance Clearance

505

Gla

ss h

eigh

t40

0 1600

Minimum above fire

257

± 5

Adjustable firebox feet

1000

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t40

0

Adjustable firebox feet

1500

Glass width

400 400

Clearance Clearance

280

Gla

ss h

eigh

t40

0

2300

Adjustable firebox feet

Line

ar 8

00Li

near

100

0Li

near

150

0

TV

1800

Minimum above fireTV

Minimum above fireTV

LS 1500 specification guide

Maximum flu length: 8.5m, Maximum number of 90° Bends: 3. For every 90 ° bend, the overall length must be reduced by 1 m.

Side direct and side extended flueing

Up and back direct OR Up and back extended flueing

Down and out flueing Up and over flueing

34 | Linear installation guide 13563-A d3

Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.

The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.

Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three

For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.

The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.

Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.

Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.

up to 1 mESWTERM

ESPIPE900

45 ° bends

EVOKIT03

up to 3 m

ASPDFKASPDFK

ESPIPE900

Wall terminal from ASPDFK

EVOKIT03

45 ° bend

ESPIPE900

up to 1 m in total

ESPIPE900

ESWTERM

45 ° bend

34 | Linear installation guide 13563-A d3

Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.

The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.

Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three

For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.

The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.

Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.

Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.

up to 1 mESWTERM

ESPIPE900

45 ° bends

EVOKIT03

up to 3 m

ASPDFKASPDFK

ESPIPE900

Wall terminal from ASPDFK

EVOKIT03

45 ° bend

ESPIPE900

up to 1 m in total

ESPIPE900

ESWTERM

45 ° bend

34 | Linear installation guide 13563-A d3

Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.

The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.

Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three

For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.

The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.

Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.

Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.

up to 1 mESWTERM

ESPIPE900

45 ° bends

EVOKIT03

up to 3 m

ASPDFKASPDFK

ESPIPE900

Wall terminal from ASPDFK

EVOKIT03

45 ° bend

ESPIPE900

up to 1 m in total

ESPIPE900

ESWTERM

45 ° bend

34 | Linear installation guide 13563-A d3

Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.

The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.

Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three

For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.

The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.

Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.

Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.

up to 1 mESWTERM

ESPIPE900

45 ° bends

EVOKIT03

up to 3 m

ASPDFKASPDFK

ESPIPE900

Wall terminal from ASPDFK

EVOKIT03

45 ° bend

ESPIPE900

up to 1 m in total

ESPIPE900

ESWTERM

45 ° bend

34 | Linear installation guide 13563-A d3

Flueing optionsFor lowest cost, optimal performance, ease of installation and servicing, Rinnai recommend short flued installations are considered before all other options.

The gas pressures of the Linear are factory set for short flue installations, as pictured below. All other installations, greater than 3 m in length, are long flue installations and will require a dip switch change, refer commissioning sheet.

Maximum flue length and number of bends• Maximum flue length = 8.5 m• Maximum number of 90 ° bends = three

For every 90 ° bend, the overall length must be reduced by 1 m. For example, if an installation has three 90 ° bends, the maximum flue length can be 5.5 m.

The Linear flue installation differs slightly to Arriva and Evolve power flue installations as the elbow component of the Adaption flue (EVOKIT03) is not counted a 90 ° bend.

Horizontal flue terminalsAllow for a continuous 2 ° fall from the heater connection point to the wall terminal—there must be a 300 mm clearance between the flue terminal and ground level.

Adaption flue kit (EVOKIT03) condensate trap sectionThe Linear produces little or no condensate. As the EVOKIT03 comes with a condensate trap already attached, it’s important to cap off the drain tube using the cable tie supplied.

up to 1 mESWTERM

ESPIPE900

45 ° bends

EVOKIT03

up to 3 m

ASPDFKASPDFK

ESPIPE900

Wall terminal from ASPDFK

EVOKIT03

45 ° bend

ESPIPE900

up to 1 m in total

ESPIPE900

ESWTERM

45 ° bend

Vertical flueing

Note: All images are for illustration purposes only. Mandatory mesh-guard is not shown for purpose of highlighting the decorative logs and burn media, unique to the LS series. For the most up-to-date information, go to rinnai.com.au

Unit Dimensions Framing Dimensions

Clearances from combustibles

Flueing Options