9
100 TA TD TF 102 103 104 105 106 107 108 109 110 111 112 114 116 101 TB 3600 2100 5450 7575 3975 1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 LRS FOR UP TO DATE INFORMATION PLEASE REFER TO HASSELL DRAWINGS. TE 1 29178 2 29178 1 29179 2 29179 1 29175 1 29176 1 29177 115 113 CB07.00.MP01 Mechanical Plant CB07.00.MP02 Cleanroom Plant CB07.00.HP01 Hydraulic Pump Room CB07.00.MP03 Plant CB07.00.ST04 Fire Stair 04 CB07.00.EP01 Electrical Plant MSB CB07.00.HP02 Fire Pump Room CB07.00.CR02 Lobby CB07.00.ST03 Fire Stair 03 CB07.00.LT01 Goods Lift CB07.00.LT02 Lift 02 CB07.00.LT03 Lift 03 CB07.00.005 Water Plant CB07.00.006 Diesel Tank Room CB07.00.003 Cleaners Room CB07.00.001 Accessible/Ambulant WC CB07.00.020g MRI Modality Room CB07.00.020f MRI Computer Room CB07.00.020j CT Modality Room CB07.00.020h Control Room CB07.00.020 Entry + Waiting CB07.00.030a Clean Room A CB07.00.030b PC2 Lab (Bugs) ISO 6 CB07.00.030d PC2 Lab (Mammalian) ISO 6 CB07.00.030c Wasteroom/Autoclave CB07.00.030 Gowning CB07.00.030a Clean Room A CB07.00.021 Possible Laser Ramen NMR CB07.00.031 Vacuum Technology lab CB07.00.020e Reporting Room CB07.00.020d Induction/ Prep/ Hold CB07.00.020c Accessible/Ambulant WC CB07.00.020a Dirty Utility/ Disposal CB07.00.007a Crime Scene Scenario Room 01 CB07.00.007b Crime Scene Scenario Room 02 CB07.00.007c Store CB07.00.007d Prep CB07.00.007e Crime Scene Scenario Room 06 CB07.00.007h Crime Scene Scenario Room 03 CB07.00.007g Crime Scene Scenario Room 04 CB07.00.007f Crime Scene Scenario Room 05 CB07.00.007 Crime Scene Briefing CB07.00.008 Police Subtenancy CB07.00.020b WC TC -2100 CB07.00.004 WC CB07.00.002 WC CB07.00.CR01 Corridor CB07.00.CR02 Corridor CB07.00.CR03 Corridor CB07.00.CR05 Corridor CB07.00.CR06 Corridor 2 29177 REMOVABLE JOINERY BENCH CB07.00.008a WC CB07.00.032 Gas Bottle Cupboard CB07.00.030f Gas Bottle Cupboard CB07.00.030e Gas Bottle Cupboard CB07.00.ELCW Electrical Cupboard CB07.00.FHRW Fire Hose Reel CB07.00.CME Riser CB07.00.ELCE Electrical Cupboard CB07.00.CR04 Corridor DURBACH BLOCK JAGGERS Level 2, 9 Roslyn St. Potts Point NSW 2011 Tel +61 (02) 8297 3500 Fax +61 (02) 8297 3510 www.durbachblockjaggers.com 255 Pitt Street Sydney NSW 2000 Tel +61 (02) 8297 7200 Fax +61 (02) 8297 7299 www.bvn.com.au CONSULTANT PROJECT Original Sheet Size A0 - 1189 x 841mm DRAWING TITLE DRAWN SCALE @ A0 REVIEWED APPROVED REV NO STATUS PROJECT NUMBER NOTES 1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES. 4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACTS, SPECIFICATIONS AND DRAWINGS. THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. REFERENCE MAP NORTH A0 FACILITES MANAGEMENT UNIT Building 10, level 6, 235 Jones St Broadway NSW 2007 Ph: 9514 - 2830 Fax: 9514 - 4690 UTS DRG FILE NO UTS DRG FILE NAME DATE APP + PAPER SIZE © COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVN DONOVAN HILL 15/12/2014 2:38:07 PM c:\REVIT_LOCAL2013\UTS-TST-07-FF&E_ppannell.rvt 1 : 100 4 15/12/14 UTS - Thomas Street, Building 7 67 Thomas Street, Ultimo, NSW, 2007 29000 01999 BVN/DBJ DJ/PP DJ/PP CD CB0700AP CITY BROADWAY CAMPUS BUILDING 7 LEVEL 00 ARCH TST-LEVEL 00-FLOOR PLAN RL -2.100 1 : 100 29000_01 LEVEL 0 - GA FLOOR PLAN 1 REV DESCRIPTION DATE A DESIGN DEVELOPMENT 29/10/2012 B DESIGN DEVELOPMENT 19/11/12 C FOR INFORMATION 21/12/12 D DESIGN DEVELOPMENT 14/01/13 E TENDER ONLY 15/02/13 F FOR INFORMATION 24/04/13 G FOR INFORMATION 24/06/13 H FOR INFORMATION 02/08/13 1 FOR CONSTRUCTION 10/09/13 2 ISSUED FOR CONSTRUCTION 13/02/14 3 FINAL DESIGN ISSUE 03/10/14 4 AS-BUILT 15/12/14

LRS FOR UP TO DATE INFORMATION PLEASE REFER … and GSH Building... · NOTES 1. DO NOT SCALE DRAWINGS. ... H FOR INFORMATION 02/08/13 ... Lecture theatre CB07.02.CR03 Corridor CB07.02.030

Embed Size (px)

Citation preview

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    3600

    2100

    5450

    7575

    3975

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750

    LRSFOR UP TO DATE INFORMATIONPLEASE REFER TO HASSELLDRAWINGS.

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    1

    29177

    115113

    CB07.00.MP01Mechanical Plant

    CB07.00.MP02Cleanroom Plant

    CB07.00.HP01Hydraulic Pump Room

    CB07.00.MP03Plant

    CB07.00.ST04Fire Stair 04

    CB07.00.EP01Electrical Plant MSB

    CB07.00.HP02Fire Pump Room

    CB07.00.CR02Lobby

    CB07

    .00.S

    T03

    Fire S

    tair 0

    3

    CB07.00.LT01Goods Lift

    CB07.00.LT02Lift 02

    CB07.00.LT03Lift 03

    CB07.00.005Water Plant

    CB07.00.006Diesel Tank Room

    CB07.00.003Cleaners Room

    CB07.00.001

    Accessible/AmbulantWC

    CB07.00.020gMRI Modality Room

    CB07.00.020fMRI Computer Room

    CB07.00.020jCT Modality Room

    CB07.00.020hControl Room

    CB07.00.020Entry + Waiting

    CB07.00.030aClean Room A

    CB07.00.030bPC2 Lab (Bugs) ISO 6

    CB07.00.030d

    PC2 Lab (Mammalian)ISO 6 CB07.00.030c

    Wasteroom/Autoclave

    CB07.00.030Gowning

    CB07

    .00.03

    0aCl

    ean R

    oom

    A

    CB07.00.021

    Possible LaserRamen NMR

    CB07.00.031

    Vacuum Technologylab

    CB07.00.020eReporting Room

    CB07.00.020dInduction/ Prep/ Hold

    CB07.00.020c

    Accessible/AmbulantWC CB07.00.020a

    Dirty Utility/ Disposal

    CB07.00.007a

    Crime Scene ScenarioRoom 01

    CB07.00.007b

    Crime Scene ScenarioRoom 02

    CB07.00.007cStore

    CB07.00.007dPrep

    CB07.00.007e

    Crime Scene ScenarioRoom 06

    CB07

    .00.00

    7h

    Crim

    e Sce

    ne S

    cena

    rioRo

    om 03

    CB07

    .00.00

    7g

    Crim

    e Sce

    ne S

    cena

    rioRo

    om 04 CB

    07.00

    .007f

    Crim

    e Sce

    ne S

    cena

    rioRo

    om 05

    CB07.00.007Crime Scene Briefing

    CB07.00.008Police Subtenancy

    CB07

    .00.02

    0bW

    C

    TC

    -2100 CB07.00.004WC

    CB07.00.002WC

    CB07.00.CR01Corridor

    CB07.00.CR02Corridor

    CB07.00.CR03Corridor

    CB07

    .00.C

    R05

    Corri

    dor

    CB07

    .00.C

    R06

    Corri

    dor

    2

    29177

    REMOVABLEJOINERY BENCH

    CB07.00.008aWC

    CB07.00.032Gas Bottle Cupboard

    CB07.00.030fGas Bottle Cupboard

    CB07.00.030eGas Bottle Cupboard

    CB07

    .00.E

    LCW

    Elec

    trical

    Cupb

    oard

    CB07

    .00.F

    HRW

    Fire H

    ose R

    eel

    CB07.00.CMERiser

    CB07.00.ELCEElectrical Cupboard

    CB07

    .00.C

    R04

    Corri

    dor

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:38

    :07 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    4

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29000

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0700AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 00 ARCHTST-LEVEL 00-FLOOR PLAN RL -2.100

    1 : 10029000_01 LEVEL 0 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION 13/02/143 FINAL DESIGN ISSUE 03/10/144 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    3600

    2100

    5450

    7575

    3975

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750

    LRSFOR UP TO DATE INFORMATIONPLEASE REFER TO HASSELLDRAWINGS.

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    1

    29177

    115113

    CB07.01.030SuperLab Store

    CB07.01.031FoS Store

    CB07.01.020Teaching Lab

    CB07.01.020eTSG (comms) rooms

    CB07.01.ST04Fire Stair 04

    CB07.01.MW01Mech Riser

    CB07

    .01.M

    W02

    Mech

    Rise

    r

    CB07.01.020c

    Teaching Lab Prep -Cold room

    CB07.01.020aTeaching Lab Prep

    CB07

    .01.02

    0bTe

    achin

    g Lab

    Pre

    p

    CB07.01.009Female WC

    CB07

    .01.00

    8Cl

    eane

    rs Ro

    om

    CB07.01.007Lobby

    CB07.01.006Accessible WC

    CB07.01.010AV Equipment Store

    CB07.01.ME03Toilet Exhaust

    CB07.01.001Waste Store

    CB07.01.LT01Goods Lift 01

    CB07.01.LT02Lift 02

    CB07.01.LT03Lift 03

    CB07.01.ME02Mech Riser

    CB07.01.ST03Fire Stair 03

    CB07

    .01.M

    E01

    Mech

    Rise

    r

    CB07.01.011Student + Comms

    TC

    2700

    CB07.01.CR001Corridor

    2

    29177 BULKHEAD ABOVE

    2700

    CB07.01.MW05Mech Riser

    CB07

    .01.C

    MERi

    ser

    CB07

    .01.E

    LCE

    Elec

    trical

    Cupb

    oard

    CB07

    .01.H

    YDE

    Hydr

    aulic

    Rise

    r

    CB07

    .01.F

    HRE

    Fire H

    ose R

    eel

    CB07.01.FHRWFire Hose Reel

    CB07.01.ELCWElectrical Cupboard

    DrinkingFountain

    CB07.01.CR02Corridor

    BULKHEAD ABOVE BULKHEAD ABOVE

    CB07.01.005Male WC

    CB07.01.004Lobby

    CB07.01.002Lobby

    CB07.01.003AV Equipment Store

    1000300

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:39

    :33 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    5

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29001

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0701AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 01 ARCHTST-LEVEL 01-FLOOR PLAN RL +2.700

    1 : 10029001_01 LEVEL 1 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR COORDINATION (REV LEVEL

    01)09/05/13

    H FOR INFORMATION 24/06/13I FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION -

    FUME CUPBOARDS REARRANGED04/12/13

    3 ISSUED FOR CONSTRUCTION 13/02/144 FINAL DESIGN ISSUE 03/10/145 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    LRSFOR UP TO DATE INFORMATIONPLEASE REFER TO HASSELLDRAWINGS.

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    1

    29177

    115113

    CB07.02.025Lecture theatre

    CB07.02.CR03Corridor

    CB07.02.030Male WC

    CB07.02.031Female WC CB07.02.033

    TSG (comms) roomsCB07.02.032Accessible WC

    CB07.02.020

    Health ProfessionalTeaching Space

    CB07.02.015

    Health ProfessionalTeaching Space

    CB07.02.020a

    Simulation rooms 3 to6 (Future)

    CB07.02.015a

    Simulation rooms 3 to6 (Future)

    CB07.02.MW02Mech Riser

    CB07.02.MW01Mech Riser

    CB07.02.ST04Fire Stair 04

    CB07.02.LT04Lift 04

    CB07.02.020bFaculty Store

    CB07.02.010c

    Consulting bay -physiotherapy

    CB07.02.010d

    Consulting bay -physiotherapy

    CB07.02.010e

    Consulting bay -physiotherapy

    CB07.02.010f

    Consulting bay -physiotherapy

    CB07.02.010g

    Consulting rooms -psychology

    CB07.02.010h

    Consulting rooms -psychology

    CB07.02.010j

    Consulting rooms -psychology

    CB07.02.010k

    Consulting rooms -psychology

    CB07.02.010u

    Consulting rooms -trials/treatment

    CB07.02.010v

    Consulting rooms -trials/treatment

    CB07.02.010t

    Consulting rooms -trials/treatment

    CB07.02.010w

    Consulting rooms -trials/treatment

    CB07.02.010s

    Consulting rooms -trials/treatment

    CB07.02.010r

    Consulting rooms -trials/treatment

    CB07.02.010mClean Utility

    CB07.02.010nDirty Utility

    CB07.02.010pACC.WC

    CB07.02.010Wait

    CB07.02.010b

    CRTF InternalCirculation

    CB07.02.010b

    CRTF InternalCirculation

    CB07.02.010lEquipment room

    CB07

    .02.M

    E01

    Mech

    Rise

    r

    CB07.02.ST03Fire Stair 03

    CB07.02.LT01Goods Lift 01

    CB07.02.LT02Lift 02

    CB07.02.LT03Lift 03

    CB07.02.ME02Service Riser

    CB07.02.002dHPT Plinth Room

    CB07.02.002HPT Plinth Room

    CB07.02.002cHPT Plinth Room

    CB07.02.002bHPT Plinth Room

    CB07.02.043b

    FoS Store - FreezerRoom - 20

    CB07.02.043a

    FoS Store - ColdRoom

    CB07.02.043FoS Store

    CB07

    .02.04

    2Co

    nsum

    able

    Stor

    e

    CB07.02.055Cryostore

    CB07.02.052General Waste Store

    CB07.02.041Glass Wash

    CB07.02.054CO/N Manifold

    CB07.02.053Coldroom

    CB07.02.040AutoClave

    TC

    8500

    8500

    10210CB07.02.ST01

    Stair 01

    CB07.02.ST02Stair 02

    CB07.02.ST05Stair 05

    CB07.02.CR04Corridor

    CB07.02.CR05Corridor

    Headheight2100 achievedHeadheightbelow 2100

    2

    29177

    CB07.02.ME04Riser

    CB07.02.ELCWElectrical Cupboard

    CB07.02.HYDWHydraulic Riser

    CB07.02.FHRWFire Hose Reel

    CB07

    .02.02

    7Cl

    eane

    rs Ro

    om

    CB07.02.FHRSFire Hose Reel

    CB07.02.FHREFire Hose Reel

    CB07.02.HYDEHydraulic Riser

    CB07.02.ELCEElectrical Cupboard

    CB07.02.CMEComms Cupboard

    CB07.02.ME03Riser

    Drinking Fountain

    3600

    2100

    5450

    7575

    3975

    CB07.02.CR02Corridor

    CB07.02.001Foyer

    CB07.02.050

    ConsumablesShelving and Gas

    Store

    CB07.02.051

    Biological WasteStore

    CB07.02.CR01Lift Lobby

    CB07

    .02.01

    0qW

    C

    CB07.02.002aPlinth Store Room

    -

    ---

    CB07.02.030aGrease Arrestor

    CB07.02.010aReception

    TBC

    365

    176050

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:30

    :55 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    4

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29002

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0702AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 02 ARCHTST-LEVEL 02-FLOOR PLAN RL +8.500

    1 : 10029002_01 LEVEL 2 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION 13/02/143 FINAL DESIGN ISSUE 03/10/144 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    ALUMNI GREENFOR UP TO DATE INFORMATIONPLEASE REFER TO ASPECTLANDSCAPE DRAWINGS.

    RAMP

    THOMAS STREETJO

    NES

    STRE

    ET

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    1

    29177

    115

    BUILDING 4

    113

    CB07.03.030

    Caf + StudentCommons

    CB07.03.026

    TSG- BuildingDistributor Room

    CB07

    .03.02

    7Pa

    rents

    Roo

    m

    CB07.03.LT04Lift 04

    CB07.03.021Female WC

    CB07

    .03.02

    5Ma

    le W

    C

    CB07.03.MW02Riser

    CB07.03.ST04Fire Stair 04

    CB07.03.024Cleaners Room

    CB07.03.022Accessible WC

    CB07.03.010g

    Health professionalteaching space

    CB07.03.010b

    Health professionalteaching space

    CB07.03.010d

    Health professionalteaching space

    CB07.03.010

    Health professionalteaching space

    CB07.03.010f

    Simulation rooms 3 to6 (Future)

    CB07.03.010c

    Simulation rooms 3 to6 (Future)

    CB07

    .03.01

    0e

    Simu

    lation

    room

    1(P

    harm

    acy)

    CB07.03.010a

    Simulation room 2(Pharmacy)

    CB07.03.SSTSub Station

    CB07.03.LT01Goods Lift 01

    CB07.03.LT02Lift 02

    CB07.03.LT03Lift 03

    CB07.03.ME02Riser

    CB07.03.ST03Fire Stair 03

    CB07.03.002Mail Room

    CB07.03.003Fire Control Centre

    CB07

    .03.M

    E01

    Mech

    anica

    l Rise

    r

    CB07.03.ME03LRS Riser

    CB07.03.HP01

    Hydrant + SprinklerBooster Valves

    CB07.03.001Main Entrance

    TC

    CB07.03.ST04aFire Stair 04

    14200

    13800

    11100

    CB07.03.ST06Stair 06

    CB07.03.ST01Stair 01

    CB07.03.ST07Stair 07

    2

    29177

    SITE BOUNDARY

    SITE BOUNDARY

    SITE BOUNDARY

    EXTENT OF BUILDING ABOVE

    EXTENT OF BUILDING ABOVE

    EXTENT OF BUILDING ABOVEEXTENT OF BUILDING ABOVE

    EXTENT OF BUILDING ABOVE

    EXTENT OF BUILDING ABOVE

    CB07

    .03.00

    4Fa

    culty

    Arch

    ive

    CB07.03.HYDWHydraulic Riser

    CB07.03.MZZMezzanine

    CB07.03.CMEComms CupboardCB07.03.ELCE

    Electrical Cupboard

    CB07.03.FHREFire Hose Reel

    CB07.03.HYD3Hydraulic Riser

    CB07.03.FHRWFire Hose Reel

    14200

    CB07

    .03.C

    R03

    Corri

    dor

    CB07.03.CR02Corridor

    CB07

    .03.C

    R04

    Corri

    dor

    MRI HATCH

    VOID VOIDVOID

    EDGE OF FLOOREDGE OF FLOOR SLOPED WALL SLOPED WALLRAMP

    3600

    2100

    5450

    7575

    3975

    CB07.03.023Lobby

    CB07.03.030aStore

    CB07.03.020Lobby

    CB07.03.CR01Lift Lobby

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:32

    :07 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    5

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29003

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0703AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 03 ARCHTST-LEVEL 03-FLOOR PLAN RL +14.200

    1 : 10029003_01 LEVEL 3 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION 13/02/143 ISSUED FOR CONSTRUCTION 08/09/144 FINAL DESIGN ISSUE 03/10/145 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    1

    29177

    115113

    CB07.04.070dTissue Culture 01

    CB07.04.070bTissue Culture 03

    CB07.04.070a

    GenericLaboratory(GSH)

    CB07.04.070hFormulation Room

    CB07.04.070jAnalytical Room

    CB07.04.070PC2 Entry

    CB07.04.ST04Fire Stair 04

    CB07.04.055Storage

    CB07.04.070eLaboratory Lift Lobby

    CB07.04.ME04Riser

    CB07.04.LT01Goods Lift 01

    CB07.04.LT02Lift 02

    CB07.04.LT03Lift 03

    CB07.04.ME02Riser

    CB07.04.ME01Riser

    CB07.04.001Foyer

    CB07.04.010aMeeting Room (Large)

    CB07.04.010

    Collaborative StaffLounge

    CB07.04.009Post Grad Lounge

    CB07.04.007Meeting Room (Small)

    CB07.04.006

    Meeting Room(Medium)

    CB07.04.008Meeting Room (Small)

    CB07.04.003Male WC

    CB07.04.004Female WC

    CB07.04.005Cleaners RoomCB07.04.002

    Accessible WC

    CB07.04.ME03LRS Riser

    TC

    CB07.04.056TSG (comms) rooms

    CB07.04.070fGeneric Laboratory

    CB07.04.070gGeneric Laboratory

    CB07.04.MW04Riser

    CB07.04.MW02Riser

    CB07

    .04.C

    R06

    Corri

    dor

    CB07.04.ELCWElectrical Cupboard

    CB07

    .04.M

    W05

    Rise

    r

    CB07.04.CMEComms Cupboard

    CB07.04.ELCEElectrical Riser

    CB07

    .04.C

    R02

    Corri

    dor

    CB07.04.ST01Stair 01

    CB07

    .04.03

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    4Si

    ngle

    Perso

    n Offic

    eCB07.04.021

    Open Plan HDR /Staff

    CB07.04.020

    Open Plan HDR /Staff

    CB07

    .04.02

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.02

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.02

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.02

    6Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    1Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    6Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    7Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.03

    8Si

    ngle

    Perso

    n Offic

    e

    CB07.04.039Single Person Office

    CB07

    .04.04

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    9Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    8Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    7Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    6Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    5Si

    ngle

    Perso

    n Offic

    eCB

    07.04

    .054

    Sing

    le Pe

    rson O

    ffice

    CB07

    .04.05

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.05

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.05

    1Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.05

    0Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    1Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.04

    0Si

    ngle

    Perso

    n Offic

    e

    CB07.04.CR04Corridor

    CB07

    .04.03

    0Si

    ngle

    Perso

    n Offic

    e

    CB07

    .04.02

    1bUt

    ility

    CB07

    .04.02

    1aUt

    ility

    CB07

    .04.02

    7Si

    ngle

    Perso

    n Offic

    e

    CB07.04.CR01Lift Lobby

    CB07

    .04.C

    R03

    Corri

    dor

    CB07

    .04.C

    R05

    Corri

    dor

    2

    29177

    CB07.04.070cTissue Culture 02

    RL 1842018350

    18350

    EXIS

    TING

    BUI

    LDIN

    G 04

    REFE

    R TO

    2986

    3 FOR

    DEM

    OLIT

    ION

    WOR

    KS A

    ND A

    LTER

    ATIO

    NS

    CB07.04.FHRWFire Hose Reel

    BALC

    ONY-

    MAIN

    TENA

    NCE

    ACCE

    SS O

    NLY

    CB07.04.FHR4Fire Hose Reel

    Directory and Wallphone

    WINDOW TO BELOWSLOPED WALL

    1500

    1550

    VOID

    3600

    2100

    5450

    7575

    3975

    CB07

    .04.01

    0b

    Colla

    bora

    tive S

    taff

    Loun

    ge K

    itche

    nette C

    B07.0

    4.009

    aPo

    st Gr

    ad Lo

    unge

    1:41

    WS04.0210102

    03

    04

    0508

    07

    0612

    13

    14

    17

    18

    26

    27

    28

    35

    36

    37

    51

    52

    53

    56

    57

    66

    67

    71

    7281

    82

    86

    87

    88

    09

    10

    11

    23

    24

    25

    48

    49

    50

    68

    69

    70

    83

    84

    85

    15

    16

    33

    3454

    55

    64

    65

    79

    80

    75 74 73

    78 77 76 63 62 61 47 46 45

    60 59 58 44 43 42

    19

    20

    29

    30

    38

    39

    21

    22

    31

    32

    40

    41

    WORKSTATION NUMBERING:

    WS04.021XX

    e.g WS04.02101

    LEVEL

    3 DIGITS ROOM NO.

    2 DIGITS WORKSTATION NO.

    01

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:32

    :52 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    4

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29004

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0704AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 04 ARCHTST-LEVEL 04-FLOOR PLAN RL +18.350

    1 : 10029004_01 LEVEL 4 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION 13/02/143 FINAL DESIGN ISSUE 03/10/144 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    3600

    2100

    5450

    7575

    3975

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    115113

    CB07.05.070dDark Room

    CB07.05.070bOptics

    CB07.05.MW04Riser

    CB07.05.ST04Fire Stair 04

    CB07.05.054TSG (comms) rooms

    CB07

    .05.M

    W05

    Rise

    r

    CB07.05.070a

    GenericLaboratory(PAM)

    CB07.05.070hStore

    CB07.05.070j

    Dark InstrumentRoom

    CB07.05.070PC2 Entry CB07.05.ME01

    Mechanical Riser

    CB07.05.ME04Riser

    CB07.05.LT01Goods Lift 01

    CB07.05.LT02Lift 02

    CB07.05.LT03Lift 03

    CB07.05.ME02Mechanical Riser

    CB07.05.ME03LRS Riser

    CB07.05.009

    Collaborative StaffLounge

    CB07.05.009bMeeting Room (Large)

    CB07.05.009aMeeting Room (Large)

    CB07.05.006

    Meeting Room(Medium)

    CB07.05.007Meeting Room (Small)

    CB07.05.008Meeting Room (Small)

    CB07.05.003Male WC CB07.05.004

    Female WC

    CB07

    .05.C

    R02

    Lobb

    y

    CB07.05.002Accessible WC

    CB07.05.005Cleaners Room

    CB07.05.001Foyer

    TC

    CB07.05.070eLaboratory Lift Lobby

    CB07.05.070fSpecialised Gasses A

    CB07.05.070gSpecialised Gasses B

    CB07.05.CR04Corridor

    CB07.05.MW02Fume Hood Riser

    CB07.05.ELCWElectrical Cupboard

    CB07

    .05.C

    R06

    Lobb

    y

    CB07.05.ELCEElectrical Cupboard

    CB07.05.FHREFire Hose Reel

    CB07.05.FHR4Fire Hose Reel

    CB07.05.ST01Stair 01CB07.05.053

    Open Plan HDR /Staff

    CB07

    .05.04

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.04

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.04

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.04

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.04

    6Si

    ngle

    Perso

    n Offic

    eCB

    07.05

    .048

    Sing

    le Pe

    rson O

    ffice

    CB07

    .05.04

    9Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.04

    7Ut

    ility

    CB07

    .05.05

    0Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.05

    1Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.05

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    6Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    7Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    8Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    9Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    0Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    1Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    6Si

    ngle

    Perso

    n Offic

    e

    CB07.05.021

    Open Plan HDR /Staff

    CB07

    .05.03

    7Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    8Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.03

    9Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.04

    0Si

    ngle

    Perso

    n Offic

    e

    CB07

    .05.02

    0aUt

    ility

    CB07.05.021dCorridor

    CB07.05.053

    Open Plan HDR /Staff

    22650

    CB07

    .05.C

    R03

    Corri

    dor

    CB07.05.CR01Lift Lobby

    2

    29177

    RL 22680

    22650

    EXIS

    TING

    BUI

    LDIN

    G 04

    REFE

    R TO

    2986

    3 FOR

    DEM

    OLIT

    ION

    WOR

    KS A

    ND A

    LTER

    ATIO

    NS

    CB07.05.FHRWFire Hose Reel

    VOIDDirectory and Wallphone

    CB07

    .05.00

    9c

    Colla

    bora

    tive S

    taff

    Loun

    ge K

    itche

    nette

    CB07

    .05.02

    0Op

    en P

    lan H

    DR/ S

    taff

    CB07

    .05.04

    1Op

    en S

    tore

    CB07.05.53aOpen Store

    1:97

    01

    02

    01

    02

    05

    06

    07

    11

    12

    15

    16

    19

    20

    29

    30

    39

    40

    41

    45

    46

    49

    50

    53

    54

    57

    58

    6163

    64

    67

    68

    23

    24

    25

    33

    34

    35

    03

    04

    08

    09

    10

    13

    14

    17

    18

    31

    32

    42

    43

    44

    47

    48

    51

    52

    55

    56

    59

    60

    65

    66

    6269

    70

    26

    27

    28

    36

    37

    38

    22

    23

    24

    16

    17

    18

    03

    04

    19

    20

    21

    13

    14

    15

    01

    02

    08 07 06

    09101112

    21

    22

    05

    WORKSTATION NUMBERING:

    WS05.021XX

    e.g WS05.02101

    LEVEL

    3 DIGITS ROOM NO.

    2 DIGITS WORKSTATION NO.

    WS05.02101

    3577

    2785

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:33

    :49 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    4

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29005

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0705AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 05 ARCHTST-LEVEL 05-FLOOR PLAN RL +22.650

    1 : 10029005_01 LEVEL 5 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION 13/02/143 FINAL DESIGN ISSUE 03/10/144 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    115113

    TC

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 8725 8200

    CB07.06.070a

    GenericLaboratory(SoE)

    CB07.06.070dMicroscope RM

    CB07.06.070cBio Safety RM

    CB07.06.070b4 DEG Coldroom

    CB07.06.046TSG (comms) rooms

    CB07.06.MW04Riser

    CB07.06.ST04Fire Stair 04

    CB07

    .06.M

    W05

    Rise

    r

    CB07

    .06.C

    R06

    Lobb

    y

    CB07.06.CR04Corridor

    CB07.06.070eLaboratory Lift Lobby

    CB07.06.070h

    Sample ProcessingRM

    CB07.06.070jFridge / Freezer

    CB07.06.070PC2 Entry

    CB07.06.ME01Riser

    CB07.06.ME04Riser

    CB07.06.LT01Goods Lift 01

    CB07.06.LT02Lift 02

    CB07.06.LT03Lift 03

    CB07.06.ME02Riser

    CB07.06.ME03LRS Riser

    CB07.06.002Accessible WC

    CB07.06.005Cleaners Room

    CB07.06.003Male WC

    CB07.06.009aMeeting Room (Large)

    CB07.06.009bMeeting Room (Large)

    CB07.06.009

    Collaborative StaffLounge

    CB07.06.006

    Meeting Room(Medium)

    CB07.06.007Meeting Room (Small)

    CB07.06.001Foyer

    CB07

    .06.M

    W02

    Rise

    r

    CB07.06.ELCWElectrical Cupboard

    CB07.06.ELCEElectrical Cupboard

    CB07.06.FHREFire Hose Reel

    CB07.06.070fGas Bottle Cupboard

    CB07.06.070gGas Bottle Cupboard CB07.06.004

    Female WC

    CB07.06.008Meeting Room (Small)

    CB07.06.ST01Stair 01

    CB07.06.CMEComms Cupboard

    CB07

    .06.03

    7Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    6Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    7Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    9Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    0Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    1Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    2Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    3Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    4Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    5Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    6Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.04

    1Ut

    ility

    CB07

    .06.04

    0Me

    eting

    Roo

    m (S

    mall)

    CB07

    .06.03

    9Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.03

    8Si

    ngle

    Perso

    n Offic

    e

    CB07

    .06.02

    8Si

    ngle

    Perso

    n Offic

    e

    CB07.06.042aLockers

    CB07.06.042Open Plan HDR

    CB07.06.021

    Open Plan HDR /Staff

    CB07

    .06.02

    0aUt

    ility

    CB07

    .06.02

    0dCo

    rrido

    r

    26950

    CB07

    .06.C

    R03

    Corri

    dor

    CB07.06.CR01Lift Lobby

    CB07.06.CR02Lobby

    2

    29177

    ATRIUM

    RL 27000

    26950

    EXIS

    TING

    BUI

    LDIN

    G 04

    REFE

    R TO

    2986

    3 FOR

    DEM

    OLIT

    ION

    WOR

    KS A

    ND A

    LTER

    ATIO

    NS

    CB07.06.FHRWFire Hose Reel

    CB07.06.FHR4Fire Hose Reel

    Directory and Wallphone

    1189

    clea

    r

    3600

    2100

    5450

    7575

    3975

    CB07

    .06.00

    9c

    Colla

    bora

    tive S

    taff

    Loun

    ge K

    itche

    nette

    CB07.06.20

    Open Plan HDR /Staff

    1:58

    01

    02

    01

    02

    05

    06

    09

    10

    13192531

    32

    35

    36

    39

    40

    43

    44

    4749

    50

    53

    54

    01

    02

    03

    21

    22

    23

    33

    34

    3538

    37

    36 24

    25

    26

    04

    05

    06

    55

    56

    51

    52

    4845

    46

    41

    42

    37

    38

    33

    34

    26 20 1411

    12

    07

    08

    03

    04

    29

    30

    23

    24

    17

    18

    27

    28

    21

    22

    15

    16

    10

    14

    09

    13

    08

    12

    07

    11

    17

    20

    16

    19

    15

    18

    29

    32

    28

    31

    27

    30

    WORKSTATION NUMBERING:

    WS06.021XX

    e.g WS06.02101

    LEVEL

    3 DIGITS ROOM NO.

    2 DIGITS WORKSTATION NO.

    WS06.02101

    950

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:34

    :31 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    4

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29006

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0706AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 06 ARCHTST-LEVEL 06-FLOOR PLAN RL +26.950

    1 : 10029006_01 LEVEL 6 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 ISSUED FOR CONSTRUCTION 13/02/143 FINAL DESIGN ISSUE 03/10/144 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29176

    115113

    CB07

    .07.04

    0Ga

    rden

    Stor

    e

    CB07.07.MW04Riser

    CB07.07.030TSG (comms) rooms

    CB07

    .07.S

    T04

    Fire S

    tair 0

    4

    CB07

    .07.M

    W05

    Rise

    r

    CB07

    .07.C

    R06

    Lobb

    y

    CB07.07.ME04Riser

    CB07.07.ME01Riser

    CB07.07.LT01Goods Lift 01

    CB07.07.LT02Lift 02

    CB07.07.LT03Lift 03

    CB07.07.ME02Riser

    CB07.07.ME03LRS Riser

    CB07.07.007

    Staff CollabrativeLounge

    CB07.07.002Accessible WC

    CB07.07.005Cleaners Room

    CB07

    .07.C

    R02

    Lobb

    y

    CB07.07.003Male WC

    TC

    CB07

    .07.M

    W02

    Rise

    r

    CB07.07.ELCWElectrical Cupboard

    CB07.07.004Female WC

    CB07.07.ST01Stair 01

    CB07.07.FHREFire Hose Reel

    CB07.07.CMEComms Cupboard

    CB07.07.031Meeting Room

    CB07.07.023Deans Office

    CB07.07.032Open Plan Workspace

    CB07.07.021Utility

    CB07.07.022Single Person Office

    CB07.07.033Utility

    CB07.07.034Single Person Office

    31250

    CB07.07.CR01Lift Lobby

    CB07.07.001Foyer

    CB07.07.CR03Corridor

    CB07.07.026Single Person Office

    2

    29177

    ATRIUM

    RL 31280

    31250

    EXIS

    TING

    BUI

    LDIN

    G 04

    REFE

    R TO

    2986

    3 FOR

    DEM

    OLIT

    ION

    WOR

    KS A

    ND A

    LTER

    ATIO

    NS

    31250

    ROOF GARDENFOR UP TO DATE INFORMATION PLEASE REFER TOASPECT LANDSCAPE DRAWINGS.

    CB07.07.ELCEElectrical Cupboard

    CB07.07.FHRWFire Hose Reel

    CB07

    .07.02

    7aSt

    ore

    Directory and Wallphone

    3600

    2100

    5450

    7575

    3975

    CB07.07.007a

    Collaborative StaffLounge Kitchenette

    1:97

    CB07.07.006L7 Boardroom

    CB07.07.020Small Meeting Room

    CB07.07.027

    Medium MeetingRoom

    CB07.07.025Single Person Office

    CB07.07.029Single Person Office

    CB07.07.028Small Meeting Room

    12

    09

    13

    10

    14

    11

    06

    03

    07

    04

    08

    05

    15

    18

    16

    19

    17

    20

    27

    29

    28

    30

    31

    33

    32

    34

    11

    14

    12

    15

    13

    16

    17

    20

    18

    21

    19

    22

    23

    25

    24

    26

    0106

    0207

    0308

    0409

    0510

    2124

    2225

    2326

    3537

    3638

    02

    01

    WORKSTATION NUMBERING:

    WS07.024XX

    e.g WS07.02401

    LEVEL

    3 DIGITS ROOM NO.

    2 DIGITS WORKSTATION NO.

    WS07.02401

    CANOPY OVER

    CB07.07.024

    Open PlanWorkstation

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:35

    :04 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    4

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29007

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0707AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 07 ARCHTST-LEVEL 07-FLOOR PLAN RL +31.250

    1 : 10029007_01 LEVEL 7 - GA FLOOR PLAN1

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 FOR CONSTRUCTION - L7 ROOM

    NUMBER UPDATES16/09/13

    3 FINAL DESIGN ISSUE 03/10/144 AS-BUILT 15/12/14

  • 100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    115113

    CB07.08.020Roof Tank Enclosure CB07.08.MW04

    Riser

    CB07

    .08.M

    W02

    Rise

    r

    CB07.08.001Tank Store Room

    CB07.08.LT01Goods Lift 01

    CB07.08.LT02Lift 02

    CB07.08.CR01Lift Lobby

    TC2

    29177

    MECHANICAL RISER BELOW

    EXISTING PARAPET

    EXISTING PLANT

    EXISTING FLOORLEVEL TO BECONFIRMED

    EXIS

    TING

    BUI

    LDIN

    G 04

    REFE

    R TO

    2986

    3 FOR

    DEM

    OLIT

    ION

    WOR

    KS A

    ND A

    LTER

    ATIO

    NS

    35550

    35550

    35550

    ROOF GARDEN BELOWFOR UP TO DATE INFORMATION PLEASEREFER TO ASPECT LANDSCAPE DRAWINGS.

    3600

    2100

    5450

    7575

    3975

    CB07.08.CR03Corridor

    CANOPY BELOW

    CB07.08.MP01Mechanical Plantroom

    WATER COOLER

    SOLAR PANELS

    2355

    365

    215

    100

    TA

    TD

    TF

    102 103 104 105 106 107 108 109 110 111 112 114 116101

    TB

    TE

    1

    29178

    2

    291781

    29179

    2

    29179

    1

    29175

    1

    29176

    115

    Mezzanine Plantroom

    113

    TC

    CB07.09.EP01Diesel Generator CB07.09.HP01

    Hydraulic Hot Water

    CB07.09.HP02Lab Gases

    3600

    2100

    5450

    7575

    3975

    1760 6500 6400 6400 7000 6600 6600 6600 6600 8200 3700 5000 750 7975 2500 5700

    ROOF GARDEN BELOWFOR UP TO DATE INFORMATION PLEASEREFER TO ASPECT LANDSCAPE DRAWINGS.

    CB07.09.MP01Mechanical Plantroom

    PLANTLEVELBELOW

    PLANT LEVELBELOW

    DURBACH BLOCK JAGGERSLevel 2, 9 Roslyn St.Potts Point NSW 2011Tel +61 (02) 8297 3500Fax +61 (02) 8297 3510www.durbachblockjaggers.com

    255 Pitt StreetSydney NSW 2000Tel +61 (02) 8297 7200Fax +61 (02) 8297 7299www.bvn.com.au

    CONSULTANT

    PROJECT

    Original Sheet Size A0 - 1189 x 841mm

    DRAWING TITLE

    DRAWN

    SCALE @ A0

    REVIEWED APPROVED

    REV NO

    STATUS

    PROJECT NUMBER

    NOTES

    1. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN.2. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.3. ALL DIMENSIONS SHALL BE VERIFIED ON SITE BEFORE PROCEEDING

    WITH THE WORK. BVN/DBJ SHALL BE NOTIFIED IN WRITING OF ANY DISCREPANCIES.

    4. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANTCONTRACTS, SPECIFICATIONS AND DRAWINGS.

    THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

    REFERENCE MAP NORTH

    A0

    FACILITES MANAGEMENT UNITBuilding 10, level 6, 235 Jones St Broadway NSW

    2007Ph: 9514 - 2830 Fax: 9514 - 4690

    UTS DRG FILE NOUTS DRG FILE NAME

    DATE APP

    +

    PAPER SIZE

    COPYRIGHT OF THIS DRAWING IS VESTED IN DURBACH BLOCK JAGGERS & BVNDONOVAN HILL

    15/12

    /2014

    2:36

    :11 P

    Mc:\

    REVI

    T_LO

    CAL2

    013\U

    TS-T

    ST-0

    7-FF

    &E_p

    pann

    ell.rv

    t

    1 : 100

    5

    15/12/14

    UTS - Thomas Street, Building 767 Thomas Street,Ultimo, NSW, 2007

    29008

    01999

    BVN/DBJ DJ/PP DJ/PP

    CD

    CB0708AP

    CITY BROADWAY CAMPUSBUILDING 7 LEVEL 08 ARCHTST-LEVEL 08-FLOOR PLAN RL +35.550AND LEVEL 09-FLOOR PLAN RL +38.550

    1 : 10029008_01 LEVEL 8 - GA FLOOR PLAN1

    1 : 10029008_02 LEVEL 9 - GA FLOOR PLAN2

    REV DESCRIPTION DATEA DESIGN DEVELOPMENT 29/10/2012B DESIGN DEVELOPMENT 19/11/12C FOR INFORMATION 21/12/12D DESIGN DEVELOPMENT 14/01/13E TENDER ONLY 15/02/13F FOR INFORMATION 24/04/13G FOR INFORMATION 24/06/13H FOR INFORMATION 02/08/131 FOR CONSTRUCTION 10/09/132 01_ISSUED FOR CONSTRUCTION 13/12/133 ISSUED FOR CONSTRUCTION 13/02/144 FINAL DESIGN ISSUE 03/10/145 AS-BUILT 15/12/14