Loxahatchee River District Water Reclamation | Environmental Education | River Restoration 2500 Jupiter Park Drive, Jupiter, Florida 33458 Telephone (561) 747-5700 •Fax (561) 747-9929 • www.loxahatcheeriver.org D. Albrey Arrington, Ph.D., Executive Director Stephen B. Rockoff Dr. Matt H. Rostock Harvey M. Silverman Gordon M. Boggie James D. Snyder Board Member Board Member Chairman Board Member Board Member LIFT STATION REHABILITATION GENERAL CONSTRUCTION SERVICES ADDENDUM NO. 1 January 8, 2019 The following changes/additions/clarifications have been made to the original Bid Documents for LIFT STATION 114 REHABILITATION. All Bidders must acknowledge receipt of this Addendum No. 1 in the Proposal, Section 2, Page 19. 1. See attached meeting minutes and sign-in sheet from Pre-Bid Meeting 2. Delete the Bid Response and Insert the attached Bid Response. 3. Delete Specifications Section 8.0 Measurement and Payment and insert the attached Specifications Section 8.0 Measurement and Payment. 4. See attached Holiday Schedule. END OF ADDENDUM NO. 1 kd

Loxahatchee River District

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Loxahatchee River District

Loxahatchee River District Water Reclamation | Environmental Education | River Restoration

2500 Jupiter Park Drive, Jupiter, Florida 33458 Telephone (561) 747-5700 •Fax (561) 747-9929 • www.loxahatcheeriver.org

D. Albrey Arrington, Ph.D., Executive Director

Stephen B. Rockoff Dr. Matt H. Rostock Harvey M. Silverman Gordon M. Boggie James D. Snyder

Board Member Board Member Chairman Board Member Board Member

LIFT STATION REHABILITATION GENERAL CONSTRUCTION SERVICES

ADDENDUM NO. 1

January 8, 2019

The following changes/additions/clarifications have been made to the original Bid Documents for LIFT STATION 114

REHABILITATION. All Bidders must acknowledge receipt of this Addendum No. 1 in the Proposal, Section 2, Page 19.

1. See attached meeting minutes and sign-in sheet from Pre-Bid Meeting

2. Delete the Bid Response and Insert the attached Bid Response.

3. Delete Specifications Section 8.0 Measurement and Payment and insert the attached Specifications Section 8.0 Measurement and Payment.

4. See attached Holiday Schedule.

END OF ADDENDUM NO. 1

kd

Page 2: Loxahatchee River District

Loxahatchee River District  Water Reclamation | Environmental Education | River Restoration 

2500 Jupiter Park Drive, Jupiter, Florida 33458 Telephone (561) 747‐5700 •Fax (561) 747‐9929 • www.loxahatcheeriver.org 

D. Albrey Arrington, Ph.D., Executive Director

Stephen B. Rockoff Dr. Matt H. Rostock Harvey M. Silverman Gordon M. Boggie James D. Snyder Board Member Board Member Chairman Board Member Board Member

Lift Station Rehabilitation General Construction Services Pre-Bid Meeting MINUTES January 03, 2019 2:00 pm

1. Introductions:

2. Mandatory Meeting: Sign In: Sign-In Sheet will be record of attendance.

3. Intent: Inform bidders about project. Point out items of interest and ensure bidders understand what the project

entails. Provide an opportunity for each bidder to visit each site. Nothing said in this meeting changes the Bidding Documents. Bid what you see.

4. Scope: A general services contract for the rehabilitation of operating wastewater lift stations. Work to be performedincludes but is not limited to demolition and removal of existing piping, fittings, valves and structures andinstallation of new piping, fittings, valves, structures, resetting existing pumps, rehabilitation of interior walls,relocation and installation of electrical equipment, general site work and all associated labor, materials, equipment,permits and maintenance of traffic to result in a complete and functional installation as shown on the constructionplans and specifications.

5. Bid Date/Time: January 15, 2019 at 2:00 p.m. local time in the Governing Board Room, 2500 Jupiter Park Drive,Jupiter, FL 33458

6. Engineer’s Estimate: $250,000 annually for a 5 2 year period and optional 3 annual renewals.

7. Contract Time Initial Contract Time 24 Months with option of three 12-month renewals Each individual lift station rehabilitation: 60 Days from receipt of purchase order.

8. Renewal Option with Escalator: The contract allows for a price increase at each optional renewal. Increase is basedon US Department of Labor, Bureau of Labor Statistics Consumer Price Index (CPI-U All Items Not SeasonallyAdjusted.

9. Special Conditions, Paragraph 11. Insurance Required: Note coverages and additional insured requirements.Insurance requirements apply to Contractor and all Subcontractors.

10. General Requirements: 1.1.7 Regulatory Permits and Permit Conditions. District will reimburse application andpermit fees. Contractor is responsible to obtain permits.

11. General Requirements. 1.1.15 Working Hours: 7 a.m. to 4 p.m. excluding weekends and District observed holidays.

12. General Requirements. 1.1.35 Shutdowns and Bypass: Read carefully, contractor is responsible to reimburse theDistrict for costs associated with extended shutdowns or bypasses. Times shown are maximum allowable, shorterduration shutdowns and/or bypasses are included in other specifications.

Page 3: Loxahatchee River District

13. Traffic Regulation: MOT plans and all materials and labor for implementation contractors responsibility.

14. Erosion and Sediment Control: Site erosion control applicable to all project sites.

15. Dewatering: Contractor is responsible permitting.

16. Trench Safety Act: Contractor is required for compliance with Chapter 553 of the Florida Administrative Code.

17. Other Standards and Specifications: Applicable standards and specifications are included by reference.

18. Testing – The District will provide testing services for density and concrete.

19. Owner Furnished Equipment: Various materials included in the work will be Owner Furnished Materials. Read the measurement and payment section for each pay item for specifics.

20. Measurement and Payment, 8.1.6 Quantities: Unit Price Bid Sheet Quantities are estimates based on the initial 2 year contract period. Quantities may vary significantly and District may increase/decrease quantities without invalidating the unit price.

21. Questionnaire – Required for all Bidders. Must be complete. Qualification requirements included in questionnaire.

22. Drug Free Work Place Certification – Required for all Bidders

23. Appendix A – General Construction Services Details

24. Appendix B – E: Lift Stations on the list for rehabilitation.

25. Schedule Draft construction schedule is due prior to issuance of an individual PO. Contractor shall prepare and

submit for review. Schedule with District to implement station bypasses a minimum of 14 days in advance. Contractor shall anticipate up to 48 hours after bypass is initiated before release of the lift station for

demolition. Only one station at a time may be removed from service (i.e. bypassing of multiple stations simultaneously

will not be allowed.) Questions issued during the bid and at the prebid meeting.

1. There are 10 mobilizations shown. If there are more than 10 lift station rehabilitations will this quantity be increased? Yes.

2. There are items in the measurement and payment section that are not included in the Bid Response. Correct, this addendum includes corrections to the Bid Response and the Measurement and Payment Section.

3. Is bonding required on this project. No, bid, construction and maintenance bonds are not required. 4. Please provide additional information on what is the electrical scope of work or if it is to be provided by the

owner. The bid form there is 2 panel racks and 2 panel installations. Is this a completely new panel rack with all new meter can, disconnect, terminal J Box, etc. as shown on Sheet SD-4? These are two different pay items on the Bid Response Form and Measurement and Payment Section. The descriptions in the Measurement and Payment Section have been revised. Please see Addendum 1.

5. Please provide additional information on what is the valve vault scope of work. The bid form there is 5 valve vaults. What is the sizes along with there depth? What is the aluminum hatch dimensions for each vault? Are the hatches lockable or require fall protection features? See revised Bid Response Form in Addendum 1.

6. Sheet SD-7 shows chimney replacement with new top slabs. Does this apply to this bid? if so how many and what size is the existing lift station? What would be the riser vertical dimensions for each lift station? Does the hatches require fall protection? See revised Bid Response Form in Addendum 1. Yes, fall protection is required.

Page 4: Loxahatchee River District

7. Please provide additional information on what is required for bypass pumping or it is to be provided by the owner. If bypass is required please provide gpm and total head pressure to be quoted. Is bypassing to be quoted by the day, the week, or the month? Please provide bid item if required. Bypass pumping shall be provided by the District.

8. Are any coatings required for the valve vaults or lift stations? No.

Page 5: Loxahatchee River District
Page 6: Loxahatchee River District
Page 7: Loxahatchee River District

BID RESPONSE – ADDENDUM 1

BID RESPONSE – ADDENDUM 1

ITB # 18-005-LSGENCONSTR

LOXAHATCHEE RIVER ENVIRONMENTAL CONTROL DISTRICT

LIFT STATION REHABILITATION GENERAL CONSTRUCTION SERVICES The contractor agrees to execute an Agreement in strict accordance with the Contract Documents and to provide services at the Unit Prices as included in the following Lift Station Rehabilitation General Construction Services Unit Price Bid Sheet as follows:

NO.  ITEM  QUANTITY  UNIT  PRICE/UNIT  TOTAL 

1  Mobilization/Demobilization   10  LS       

2  Isolation Valve             

   4"  5  EA       

   6"  5  EA       

3  Temporary Bypass Connection Assembly             

   4"  5  EA       

   6"  5  EA       

4  Wetwell Concrete Lid and Hatch (hatch dimensions vary, not to exceed             

   6' Diameter Wetwell  1  EA       

   8' Diameter Wetwell  1  EA       

   10'Diameter Wetwell  1  EA       

5 Demolition of Wetwell Rectangular Chimney and Replacement with Cylindrical Wetwell Section (3' x up to 5' hatch with chimney not to exceed 6' in depth) 

           

   6' Diameter Wetwell  1  EA       

   8' Diameter Wetwell  1  EA       

   10' Diameter Wetwell  1  EA       

6  Valve Vault              

   5' x 5', not to exceed 5' depth  3  EA       

   5' x 7', not to exceed 5' depth  2  EA       

7  Valve Vault Piping Assemble             

   4" Diameter Piping  3  EA       

   6" Diameter Piping  2  EA       

8  Above Grade Piping Assembly             

   4" Diameter Piping  3  EA       

   6" Diameter Piping  2  EA       

9  Discharge Piping Assembly              

    Up to 10' x 4" Diameter Piping  4  EA       

    Up to 10' x 6" Diameter Piping  1  EA       

    Up to 15' x 4" Diameter Piping  4  EA       

    Up to 15' x 6" Diameter Piping  1  EA       

    Up to 20' x 4" Diameter Piping  1  EA       

Page 8: Loxahatchee River District

BID RESPONSE – ADDENDUM 1

    Up to 20' x 6" Diameter Piping  1  EA       

10  Angle Pipe Support             

   6' Diameter Wetwell  12  EA       

   8' Diameter Wetwell  4  EA       

   10' Diameter Wetwell  2  EA       

11  Alternate Angle Pipe Support             

   4' Diameter Wetwell  4  EA       

12  Leveling Floor             

   6' Diameter Wetwell  1  EA       

   8' Diameter Wetwell  1  EA       

   10' Diameter Wetwell  1  EA       

13  Base Plates             

   4" Bases  8  EA       

   6"‐8" Bases  2  EA       

14  Pump Bases             

   4"x4"  8  EA       

   6"x6"  2  EA       

15  Drop Bowl Assembly (less than 10' drop)             

   8"  5  EA       

   10"  3  EA       

16  Abandon Outside Drop (less than 10' drop)             

   8"  4  EA       

   10"  4  EA       

   12"  2  EA       

17  Guiderails Removal and Installation (per pump)             

   2" up to 10'  2  EA       

   2" up to 15'  6  EA       

   2" up to 20'  2  EA       

18  Guiderails             

   2" up to 10'  2  EA       

   2" up to 15'  6  EA       

   2" up to 20'  2  EA       

19  Panel Rack  2  EA       

20  Panel Installation  2  EA       

21  Concrete Demolition ( >0.5 CY/Site )             

   Slabs up to 8" thick  8  EA       

   Structures up to 12" thick  2  EA       

22  Concrete No Reinforcing ( >0.5 CY/Site )  10  CY       

23  Concrete (6 x 6 ‐ W1.4 x W1.4 Reinforcing) ( >0.5CY/Site )  10  CY       

24  Concrete (#5 @ 12" O.C.E.W., Top and Bottom ( >0.5 CY/Site )  10  CY       

25  Stabilized Grass Driveway Section (>20 SY/Site )  100  SY       

26  Grass Paver Driveway Section ( > 20 SY/Site )  100  SY       

Page 9: Loxahatchee River District

BID RESPONSE – ADDENDUM 1

24  Adjust or Replace Manhole Frame and Cover  5  EA       

27  Ductile Iron Fittings  1,000  LBS       

28  Relocation of Radio Telemetry Unit  2  EA       

26  Sod             

   Bahia  100  SY       

   Floratam  100  SY       

28  Dewatering w/Wellpoints     EA       

   First Day  1  EA       

   Each Additional Day  1  EA       

29  Maintenance of Traffic Thoroughfare Roads             

   First Day  1  EA       

   Each Additional Day  1  EA       

29  Maintenance of Traffic NON‐Thoroughfare Roads             

   First Day  1  EA       

   Each Additional Day  1  EA       

30  Maintenance of Traffic ‐ Flagger  1  EA       

31  Maintenance of Traffic ‐ Sign Board  1  EA       

32  Line Stops             

   4"  1  EA       

   6"  1  EA       

   8"  1  EA       

   10"  1  EA       

33  Trench Safety Act  4  EA       

TOTAL BASE BID AMOUNT $    

Total Base Bid Amount in Words __________________________________________________________________Dollars and _______________________________________________________Cents.

All unit prices bid should be within two (2) decimal points. If bidder's pricing exceeds two (2) decimal points, Purchasing reserves the right to round up or down accordingly.

Page 10: Loxahatchee River District

BID RESPONSE – ADDENDUM 1

* PLEASE AFFIX SIGNATURE WHERE INDICATED (FAILURE TO DO SO SHALL RESULT IN THE REJECTION OF

YOUR BID)

By signature on this document, bidder acknowledges and agrees that its offer includes and accepts all terms, conditions, and specifications of the District’s bid solicitation as originally published, without exception, change or alteration of any kind, except as may have been published by the District in official amendments prior to this date of submittal. FIRM NAME: ____________________________________________________

Acknowledgement of Addendums: _____ _____ _____ _____ _____ Is the Questionnaire completed and included with the bid submittal? YES____ _______INITIAL Does bidder clearly understand the Insurance requirement? YES____ _______INITIAL Copy of Violations issued by regulatory agencies, attached? Yes or No Copy of Licenses as specified by Special Conditions 3.c.? Yes or No

PRINT NAME:

* SIGNATURE: PRINT TITLE:

ADDRESS:

CITY / STATE: ZIP CODE: TELEPHONE # ( ) E-MAIL: TOLL FREE # ( ) FAX #: ( ) APPLICABLE LICENSE(S) Federal ID # LICENSE NUMBER # TYPE:

Page 11: Loxahatchee River District

8.0 Measurement and Payment 8.1 GENERAL 8.1.1 Measurement and payment will be based upon Work completed and accepted in accordance with the

Contract Documents. No separate payment will be made for excavation, trenching, backfilling, leakage tests, surveying, density tests or other incidental items of Work not shown in the Agreement.

8.1.2 EQUIPMENT AND MATERIALS IN STORAGE: Partial payment for materials and equipment in proper

storage at the site of the Work will be made for those items for which the Contractor has submitted the following:

A. Invoice for each item in storage. The invoice shall not exceed the value of the item stored as determined

by the amount paid to the manufacturer (subcontractor fabrication costs excluded).

B. List of items in storage. C. With the following pay estimate, a release of lien for 90% of each item listed as stored materials for the

previous pay estimate shall be provided. Any item for which a 90% release of lien is not supplied shall be considered as having been removed from the site.

No payment for any offsite storage of material will be made. Any payment for stored material shall not

include labor or profit by the Contractor or any sub-contractor. The Contractor is specifically advised that this procedure may require full payment for some stored materials or shop work significantly ahead of the time when payment is issued by the Owner.

8.1.3 MEASUREMENT

A. Payment shall be made at the unit prices as listed in the General Construction Services for Wastewater and Reclaimed Water Maintenance/Repair Unit Price Bid Sheet based on measured quantities as described below.

1. Mobilization/Demobilization: Lump sum price per individual project shall include but not be

limited to all mobilization/demobilization costs associated with mobilizing and demobilizing crews, equipment and materials to the job site, general conditions, permitting, permit compliance, superintendent, administrative duties, locates and any costs associated with the project not specifically addressed elsewhere.

2. Isolation Valve: Cost to remove an existing station isolation valve and install a new station isolation valve. See detail SD-1 and SD-27. Price shall include but not be limited to all labor, equipment, materials, dewatering, excavation, pipe cutting, old valve removal and disposal, installation new fittings, restraints, spool pieces, valve, valve box, backfill, and compaction. The District shall provide a maximum 4 hour shutdown for the contractor to perform the installation and place the station back into service. The District shall provide density testing services for backfill from an independent testing laboratory.

3. Temporary Bypass Connection Assembly: Cost to install a District provided bypass connection assembly. Price shall include but not be limited to all labor, equipment, materials, dewatering, excavation, pipe cutting, installation of bypass assembly, removal of bypass assembly when complete and reconnection of station to force main and/or isolation valve. The District shall provide a maximum 4 hour shutdown for the contractor to perform the installation

4. Wetwell Concrete Lid and Hatch: Price to install a rectangular or round concrete wetwell lid and hatch per Wetwell Concrete Lid and Hatch Detail. Price shall include but not be limited to

Page 12: Loxahatchee River District

submittals, removal and disposal of the existing lid and hatch, new lid, hatch and fall protection, grading, leveling, brick, mortar, inspection coordination, back fill and compaction. The new lid and hatch shall comply with the District’s Manual of Minimum Construction Standards, Section 150 and Lift Station Standard Details SD-31.

5. Demolition of Wetwell Rectangular Chimney and Replacement with Cylindrical Wetwell Section: Price to demolish an existing rectangular wetwell chimney, lid and hatch and replace with a cylindrical Wetwell Section. The wetwell section shall comply with the District’s Manual of Minimum Construction Standards, Section 150, Section 121 and Lift Station Standard Details SD-31.

6. Valve Vault: Price to provide a new concrete valve vault per the Valve Vault detail. Price shall include all labor, materials and equipment for the installation including but not limited to excavation, grading, compaction, placement, backfill, vault, lid, hatch, sleeves, drain (including wetwell core and piping) and grout. The new valve vault shall comply with the District’s Manual of Minimum Construction Standards, Section 150, Section 121 and Lift Station Standard Details SD-31.

7. Valve Vault Piping Assembly: Cost to remove the existing lift station piping assembly (buried, above grade or in an existing vault) and replace with new valve vault piping and valving as detailed in the Valve Vault Piping Assembly details.

8. Above Grade Piping Assembly: Cost to remove the existing lift station piping assembly (buried, above grade or in an existing vault) and replace with new above grade piping as detailed in the Above Grade Piping Assembly detail.

9. Discharge Piping Assembly: Cost to remove the existing discharge piping assembly, brackets, supports and anchors complete and install the new Discharge Piping Assembly as detailed in the Discharge Piping Assembly detail. Price shall not include new Angle Support Brackets.

10. Angle Pipe Support: Price to provide one new Angle Pipe Support as shown on the Angle Pipe

Support Detail.

11. Alternate Angle Pipe Support: Price to provide one new Angle Pipe Support as shown on the Alternate Pipe Support Detail.

12. Leveling Floor: Cost to clean and prep the existing wetwell floor and install a min. 6” thick 4000 psi concrete leveling floor with reinforcing as detailed on the Leveling Floor detail. Cost shall not include but not be limited to removal and reinstallation of base plates, pump bases or piping required for the leveling floor to be installed, pressure washing, scouring of existing concrete surface, reinforcing, inspection coordination, concrete, concrete placement and concrete finishing. Concrete shall not drop more than 4’ when placed. Contractor shall use a tremie hopper and chute or other approved method for placement. All placed concrete shall be slumped tested. Slumps shall not exceed manufacturers mix design limits. All concrete shall have 4 compressive strength cylinders taken from placed concrete. Cylinders shall be broken on day 3, 7 and 28. One cylinder shall be held in reserve. Any concrete not meeting 70% design strength in 7 days shall be removed and replaced at the Contractor’s expense. The District shall provide testing services from an independent testing laboratory.

13. Base Plates: Price to install one (1) new base plate. Price shall include all materials and labor including but not limited to all labor, equipment, materials, base plates, anchors, epoxy and grout pad.

Page 13: Loxahatchee River District

14. Pump Bases: Price to install one (1) new pump base on a base plate. Price shall include removal of the old and installation of the new pump base.

15. Drop Bowl Assembly (less than 10’ drop): Price to install a drop bowl assembly per the Drop Bowl Assembly detail. Price shall include all labor, materials and equipment including modifications to the fillet as required to accommodate the drop.

16. Abandon Outside Drop (less than 10’ drop): Price to abandon an outside drop with grout. Price shall include temporary plugging of upstream main, grout and all labor, materials and equipment to grout outside drop. At a minimum grout should extend from the influent piping down the drop 12” and extend from the wetwell wall into the drop 12”. The remainder of the drop may be filled with clean fill or suitably plugged to the satisfaction of the District.

17. Guide Rails Removal Installation: Price to remove and install guiderails per the guide rail detail. Price does not include the cost of the guide rails, brackets, anchors or fasteners.

18. Guide Rails: Price to provide new guide rails, brackets, anchors and fasteners as shown on the Guide Rails detail.

19. Panel and Panel Rack: Price for removal of existing meter, disconnect, junction boxes, panel rack and panel and installation a new panel rack per details provided in Electrical Panel Details and installation of new or existing disconnect, junction boxes, meter and panel on the new panel rack at the same or similar location within 25’ of the original location. Price to include all permitting, labor, equipment and materials including but not limited to aluminum pipe, stainless steel uni-strut and hardware, concrete base, PVC caps, conduit, cable, terminations including junction box terminal strips. New panels, disconnects, junction boxes and meters shall be owner provided and comply with Lift Station Structural and Mechanical Standard Details SD-31 through SD-34. This pay item shall include cost of permitting through the applicable agencies but shall exclude permit fees. Permit fees charged by the applicable agencies shall be reimbursed to the Contractor by the District.

20. Panel Installation: Price for removal of an existing panel, junction boxes, disconnect and meter and installation of the removed or new panel, junction boxes, disconnect and meter at the same or similar location within 25’ of the original location. Price shall include but not be limited to all labor, equipment, material, conduit, cable, terminations including junction box terminal strips. New panels, disconnects, junction boxes and meters shall be owner provided and comply with Lift Station Structural and Mechanical Standard Details SD-31 through SD-34. This pay item shall include cost of permitting through the applicable agencies but shall exclude permit fees. Permit fees charge by the applicable agencies shall be reimbursed to the Contractor by the District.

21. Concrete Demolition Slab: Price for demolition, removal and proper disposal of existing concrete slabs up to 8” thick with or without reinforcing. Price shall include but not be limited to labor, materials, equipment, hauling and disposal fees.

22. Concrete Demolition Structures: Price for demolition, removal and proper disposal of existing concrete structures up to 12” thick with or without reinforcing. Price shall include but not be limited to labor, materials, equipment, hauling and disposal fees.

23. Concrete (no reinforcing): Price to provide poured in place concrete pads without reinforcing, 3,000 psi. Price shall include but not be limited to submittals, grading and compaction, form work, permitting, inspection coordination, concrete and finishing. All placed concrete shall be slumped tested. Slumps shall not exceed manufacturers mix design limits. All placed concrete

Page 14: Loxahatchee River District

shall have 4 compressive strength cylinders taken from placed concrete. Cylinders shall be broken on day 3, 7 and 28. One cylinder shall be held in reserve. Any concrete not meeting 70% design strength in 7 days shall be removed and replaced at the Contractor’s expense.

24. Concrete (6 x 6 - W1.4 x W1.4 reinforcing): Price to provide poured in place concrete pads with 6x6 W1.4xW1.4 reinforcing, 3,000 psi. See Concrete Pad Detail. Price shall include but not be limited to labor, equipment, materials, submittals, grading and compaction, form work, permitting, inspection coordination, concrete, reinforcing and finishing. All placed concrete shall be slumped tested. Slumps shall not exceed manufacturers mix design limits. All placed concrete shall have 4 compressive strength cylinders taken from placed concrete. Cylinders shall be broken on day 3, 7 and 28. One cylinder shall be held in reserve. Any concrete not meeting 70% design strength in 7 days shall be removed and replaced at the Contractor’s expense.

25. Concrete (#5 @ 12” O.C.E.W., Top and Bottom): Price to provide poured in place concrete pads with #5 @ 12” O.C.E.W., Top and Bottom reinforcing, 4,000 psi. See Generator Slab Detail. Price shall include but not be limited to labor, equipment, materials, submittals, grading and compaction, form work, permitting, inspection coordination, concrete, reinforcing and finishing. All placed concrete shall be slumped tested. Slumps shall not exceed manufacturers mix design limits. All placed concrete shall have 4 compressive strength cylinders taken from placed concrete. Cylinders shall be broken on day 3, 7 and 28. One cylinder shall be held in reserve. Any concrete not meeting 70% design strength in 7 days shall be removed and replaced at the Contractor’s expense. The District shall provide testing services from an independent testing laboratory.

26. Stabilized Grass Driveway Section: Price to provide a stabilized grass driveway. See Stabilized Grass Driveway Section Detail. Price shall include but not be limited to labor, equipment, materials, grading, compaction, crushed limestone and sod. The District shall provide density testing services for subgrade and base from an independent testing laboratory.

27. Grass Paver Driveway Section: Price to provide a grass paver driveway. See Grass Paver Driveway Section Detail. Price shall include but not be limited to labor, equipment, materials, grading, compaction, crushed limestone, top soil, bahia plugs and concrete grass paver. The District shall provide density testing services for subgrade and base from an independent testing laboratory.

28. Adjust or Replace Manhole Frame and Cover: Price to adjust elevations on existing manhole frame and covers or to replace an existing manhole frame and cover with an owner furnished manhole frame and cover. See Precast Manhole Detail and Manhole Frame and Cover Detail for frame and cover installation requirements. Price shall include but not be limited to all labor, equipment, materials, brick, mortar, permit compliance and inspection coordination. Maintenance of Traffic for work in a roadway shall be paid under Item 27 – 30.

29. Ductile Iron Fittings: Price to install miscellaneous ductile iron fittings not otherwise accounted for in this bid and measurement and payment section. Price shall include all labor, equipment and materials including restraints as detailed in Force Main Thrust Restraint Chart and Force Main Thrust Restrain Detail

30. Relocation Radio Telemetry Unit (RTU): Price to relocate existing RTU within 25’ LF of control panel and wetwell. Price shall include but not be limited to labor, equipment, materials, conduit, cable, grounding, terminations in RTU panel and control panel. See RTU Detail.

31. Sod/Seed and Mulch

Page 15: Loxahatchee River District

a. Sod: Unit price per SY to furnish and install all labor, equipment and materials for sod (Bahia or St. Augustine) as shown on the construction plans in conformance with FDOT Section 570.

b. Seeding and mulch: Unit price per SY to furnish and install all labor, equipment and materials for seeding mulch in conformance with FDOT Section 570.

32. Dewatering w/Wellpoints

a. First Day: Lump sum price for the first day for all labor, equipment and materials to furnish,

install and operate a complete dewatering system. Lump sum price shall include all costs specific to mobilizing and demobilizing dewatering labor, equipment and materials to the project site, permit compliance, installation, operation and maintenance and removal after no longer in use, abandonment of well points via grouting or other acceptable means to the Engineer and any other incidentals not specifically covered elsewhere for dewatering equipment and materials to provide a dry trench for work.

b. Each Additional Day: Lump sum price per day past the first day for all labor, equipment and materials to furnish, install and operate a complete dewatering system. Lump sum price shall include all costs specific to permit compliance, operation and maintenance and removal after no longer in use, abandonment of well points via grouting or other acceptable means to the Engineer and any other incidentals not specifically covered elsewhere for dewatering equipment and materials to provide a dry trench for pipe installation.

33. Maintenance of Traffic – Signage Only (work within FDOT, PBC, Martin County, Village of Tequesta, Town of Jupiter and/or Town of Juno Beach right of way with permit), Thoroughfare Road. a. First Day: Lump sum price to furnish and install all labor, equipment and materials for a

complete traffic control system in compliance with all applicable regulatory authorities. Lump sum price shall include all costs specific to mobilizing and demobilizing labor, equipment and materials to the project site, permit compliance, installation, operation and maintenance and removal after no longer in use.

b. Each Additional Day: Unit price per day past the first day to furnish and install all labor, equipment and materials for a complete traffic control system in compliance with all applicable regulatory authorities. Lump sum price shall include all costs specific to permit compliance, operation and maintenance.

34. Maintenance of Traffic – Signage Only (work within FDOT, PBC, Martin County, Village of

Tequesta, Town of Jupiter and/or Town of Juno Beach right of way with permit), NON-Thoroughfare Road. a. First Day: Lump sum price to furnish and install all labor, equipment and materials for a

complete traffic control system in compliance with all applicable regulatory authorities. Lump sum price shall include all costs specific to mobilizing and demobilizing labor, equipment and materials to the project site, permit compliance, installation, operation and maintenance and removal after no longer in use.

b. Each Additional Day: Unit price per day past the first day to furnish and install all labor, equipment and materials for a complete traffic control system in compliance with all applicable regulatory authorities. Lump sum price shall include all costs specific to permit compliance, operation and maintenance.

35. Maintenance of Traffic – Flagger: Lump sum price per day to provide two flaggers per day under

7.1.3 Measurement A.10. Cost shall include additional signage for lane closures or work in intersections.

Page 16: Loxahatchee River District

36. Maintenance of Traffic – Sign Board: Lump sum price per day to provide one sign board per day under 7.1.3 Measurement A.10 and /or A.11.

37. Line Stops: Lump sum price per line stop to furnish and install all labor, equipment and materials

for installation of a line stop on an existing main. Payment shall include only cost of line stop contractor, materials (line stop fittings) and equipment (tapping and line stop machine) to perform the line stop. All other labor, equipment and materials associated with preparation for the line stop shall be paid under other applicable line items in the unit price bid schedule.

38. Trench Safety Act: Lump sum price per project for compliance with Chapter 553 of the Florida Administrative Code (Trench Safety act). Payment shall include all equipment, materials and labor necessary for compliance.

8.1.4 PAYMENT: Payment will be made at the lump sum or unit price for each item shown in the Unit Bid Price Schedule, stored and/or installed and accepted, which price and payment shall constitute full compensation for furnishing all materials and performing all Work in connection therewith and incidental thereto. The following schedule shall be adhered to:

A. Last Day of the Month – Cut-off date, confirm quantities with inspector. B. 5th of the Month - Pay estimate to the Engineer C. 10th of the Month - Pay estimate to the Owner. D. 20th of the Month - Payment by the Owner

When the cut-off date occurs on a holiday or weekend, the date shall be the last work day preceding the

end of the month. 8.1.5 PAY ESTIMATE FORMS: The Engineer will supply a pay estimate form for the Contractor to use for

submittal. The Contractor shall make copies to be used for submittal of the pay estimates. Failure of the Contractor to sign the pay estimate or attach appropriate documentation shall be grounds for returning the pay estimate with no action by the Owner or Engineer.

8.1.6 QUANTITIES: The Contractor is specifically advised that quantities listed in the Unit Price Bid Sheet

are estimates. Actual installed quantities may vary significantly. Further, quantities may be increased or diminished without invalidating the unit price in the Unit Price Bid Sheet

Page 17: Loxahatchee River District

2019 LRD Calendar

S M T W T F S S M T W T F S S M T W T F S S M T W T F S1 2 3 4 5 1 2 1 2 1 2 3 4 5 6

6 7 8 9 10 11 12 3 4 5 6 7 8 9 3 4 5 6 7 8 9 7 8 9 10 11 12 1313 14 15 16 17 18 19 10 11 12 13 14 15 16 10 11 12 13 14 15 16 14 15 16 17 18 19 2020 21 22 23 24 25 26 17 18 19 20 21 22 23 17 18 19 20 21 22 23 21 22 23 24 25 26 2727 28 29 30 31 24 25 26 27 28 24 25 26 27 28 29 30 28 29 30

31

S M T W T F S S M T W T F S S M T W T F S S M T W T F S1 2 3 4 1 1 2 3 4 5 6 1 2 3

5 6 7 8 9 10 11 2 3 4 5 6 7 8 7 8 9 10 11 12 13 4 5 6 7 8 9 1012 13 14 15 16 17 18 9 10 11 12 13 14 15 14 15 16 17 18 19 20 11 12 13 14 15 16 1719 20 21 22 23 24 25 16 17 18 19 20 21 22 21 22 23 24 25 26 27 18 19 20 21 22 23 2426 27 28 29 30 31 23 24 25 26 27 28 29 28 29 30 31 25 26 27 28 29 30 31

30

S M T W T F S S M T W T F S S M T W T F S S M T W T F S1 2 3 4 5 6 7 1 2 3 4 5 1 2 1 2 3 4 5 6 78 9 10 11 12 13 14 6 7 8 9 10 11 12 3 4 5 6 7 8 9 8 9 10 11 12 13 1415 16 17 18 19 20 21 13 14 15 16 17 18 19 10 11 12 13 14 15 16 15 16 17 18 19 20 2122 23 24 25 26 27 28 20 21 22 23 24 25 26 17 18 19 20 21 22 23 22 23 24 25 26 27 2829 30 27 28 29 30 31 24 25 26 27 28 29 30 29 30 31

LRD Observed Holidays LRD Pay Day

Nov 11

Jul 04 Independence DaySep 02Feb 18 Presidents' Day

Apr 19 Veterans DayNov 28May 27

FEBRUARY MARCH APRIL

Labor DayGood FridayMemorial Day Thanksgiving Day

Dec 25 Christmas

JUNE JULY AUGUST

Nov 29

Dec 24 Christmas Eve

JANUARY

MAY

Thanksgiving Holiday

SEPTEMBER OCTOBER NOVEMBER DECEMBER

Jan 01 New Year's Day