Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys – Sponsor (Director of ICT) Howard Noble – Principal investigator (OUCS) Kang Tang – Software engineer (OeRC) Dr. David Wallom – Technical architect (OeRC) http://projects.oucs.ox.ac.uk/lowcarbonict/

Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys

Embed Size (px)

DESCRIPTION

Indication of level of support for service? Paraphrased quotations from this survey question: “Through saving consumption of paper” “Turning PC off (along with other electrical equipment)” “Through enabling remote working practices (so cutting transport)” “Must not impact deliverables or the core strategic goals of the University” “Any change must be measured to ensure new ways of working actually improve the environmental performance of the University”

Citation preview

Page 1: Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys

Low Carbon ICT Project

Project team:

Kate Aydin – Communication’s advice (Estates)

Daniel Curtis – Evaluation and monitoring (OUCE)

Professor Paul Jeffreys – Sponsor (Director of ICT)

Howard Noble – Principal investigator (OUCS)

Kang Tang – Software engineer (OeRC)

Dr. David Wallom – Technical architect (OeRC)

http://projects.oucs.ox.ac.uk/lowcarbonict/

Page 2: Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys

Background

Oxford department asked the computing service to solve this problem:

Electrical power demand of a typical departmental building over a random weekday

0

20

40

60

80

100

120

140

00:00

01:00

02:00

03:00

04:00

05:00

06:00

07:00

08:00

09:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00

00:00

Time of Day

Elec

trici

ty d

eman

d (k

W)

Existing demand profileAnticipated profile with PC power management

Increase in baseload as a result of PCs being left on overnight

Page 3: Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys

Indication of level of support for service?

Paraphrased quotations from this survey question:“Through saving consumption of paper”

“Turning PC off (along with other electrical equipment)”

“Through enabling remote working practices (so cutting transport)”

“Must not impact deliverables or the core strategic goals of the University”

“Any change must be measured to ensure new ways of working actually improve the environmental performance of the University”

Page 4: Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys

Predict and plan

Page 5: Low Carbon ICT Project Project team: Kate Aydin – Communication’s advice (Estates) Daniel Curtis – Evaluation and monitoring (OUCE) Professor Paul Jeffreys

Infrastructure for wake-on-LAN and monitoring service