LOGISTICS BUSINESS WATERWAY DANUBE
Dr. Ralph Gallob
CEO Industrie-Logistik-Linz GmbH
Danube Macro Region Business Week 2017
04/10/2017, Linz
1
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Agenda
2
Company presentation
Development freight transport (Danube)
Project “High Performance Green Port Giurgiu”
i logistics 4.0
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
ILL - From the North to the Black Sea
3
Company name: Industrie-Logistik-Linz GmbH
Business sector: logistic services
Foundation date: 1993
Employees: 380
Certificates: ISO 9001 und OHSAS 18001
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
ILR Logistica Romania
4
Logistic services for the Romanian market
Situated at the port of Giurgiu
More Information: www.ilr.com.ro
Organisation
51%
49%
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Freight traffic total along the Main-Danube-Canal
5
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Freight handling Danube (ILL / Linz)
6
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Freight handling Danube (ILR / Giurgiu)
7
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Project „High Performance Green Port Giurgiu – Stage II Construction“ - Objectives
8
General Objectives
• Improve connections between the Danube ports and the rail & road network in order to reduce costs and time
• Reduce the port infrastructure quality gap between Romania and the Upper Danube countries
• Increase the degree of using intermodal transport
Specific Objectives
• Upgrade the transport infrastructure in Giurgiu Free Zone port to provide logistics services as competitive as those offerred on the Upper Danube
• Increase the port‘s capacity by procuring cranes and state of the art handling equipment
• Building the 1st all-weather intermodal terminal on the Lower Danube while also transforming Giurgiu Free Zone Port into a Green Port
• Become a model for public-private partnership in Danube port development and a best practice for a brownfield rehabilitation
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Project „High Performance Green Port Giurgiu – Stage II Construction“ – Detailed activities
9
Port of Giurgiu = first state-of-the-art, high performance port in Eastern Europe
Implementation schedule
09/2015 – 08/2018
Member States Involved Romania
Overall project budget
€ 15,594,063
EU Contribution € 13,254,954 (max. 85%)
ILR Logistica Romania SRL
Giurgiu Municipality
SC Administratia Zonei Libere Giurgiu SA
1 Intermodal logistics terminal including: ‐ Fully covered berth: approx. 1500 sqm ‐ Capital dredging ‐ New railway line: approx. 740 m ‐ 1 railway level crossing ‐ Truck parking area: approx. 950 sqm ‐ 2 new cranes & lifting equipment ‐ Eco-friendly design & deployment ‐ Preparatory work for the port
environmental audit
Land preparation for the building of the intermodal terminal: Demolition of the old ferry-boat station
1 railway level crossing
Rehabilitated road infrastructure: 1,38 km
Rehabilitated old quay section: approx.
54 lm
Budget: € 12.963.802,00 Budget: € 2.081.783,00 Budget: € 548.478,00
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Construction works – overview of activities
10
Construction works – Overview of Actions
1
2
3
4
1. Intermodal logistics terminal
2. Railway connection
3. Old quay
4. Road Infrastructure
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Current situation: Demolition (September 2017)
11
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Current situation: Cofferdam construction (September 2017)
12
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
3D-Model of the Trimodal Logistics Center
13
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
i logistics 4.0
14
The fastest connection in business.
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
– what do we understand?
15
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
16
Important topics for ILL in relation to ilogistics 4.0
Truck planning and control (road)
Sequential supply to production
Planned guidance of resources / employees
Wagon planning and control (rail)
Self-steering material
Vessel planning and process control (waterway)
KN
OW
-HO
W D
AS
BEW
EG
T.
KN
OW
-HO
W IS
MO
VIN
G.
Vessel planning and process control
17
KN
OW
-HO
W IS
MO
VIN
G.
Thank you for your attention!