    LOGISTIC SERVICE CENTER BRIEF INTRODUCTION

    PROJECT NAME Logistical Service Center and Meat Processing Plant

    The leading national company in catering market and provides remote site campcatering and integrated services.

    PROJECT EXECUTOR

    PROJECT LAND AND

    LOCATION

    Also the company provides transportation, procurement, office cleaning and

    maintenance services

    The new center will be located along the main road to the east and south provinces

    across 5 hectares of land located 1 km from Bayanzurkh Transportation Center, and

    19kms from the center of Ulaanbaatar. Most of the large mining deposits and reserves

    currently in operation are located in the south and the south-east of Ulaanbaatar; hence the railway is the most common transportation line.

    PROJECT OVERVIEW

    To establish fully-equipped cold storages for meat, dairy products, vegetables,

    warehouses for food, construction, chemical products

    To provide transportation services for dry, refrigerated and frozen products to

    every parts of Mongolia. This service includes packaging and labeling of products

    To establish fully equipped, international standardmeat classification and sorting

    and HACCP certified meat processing plant

    To contribute development of supply chain management in Mongolia.

    International food safety, occupational safety and environmental standards will

    be in all operation

    More than 45 local people will be employed and trained The center operation will influence positively for suppliers and other stakeholders

    Reduced risks associated for procurement, transportation, storage,packaging and

    delivery

    PROJECT BUILDING

    STRUCTURE

    BUILDING AREA

    PROJECT TIMELINE

    TOTAL INVESTMENT

    CO N T A CT

    The 3.2 ha complex will be built across 5 ha area, and an asphalt road will be built to

    mitigate dust. Moreover, trees and green vegetation will be planted in areas other than

    road and parking. Electricity generators will be initially used and waste water cleaning

    system will be built. Going forward, the logistic center will be connected to central

    electric transmission lines, and clean and waste water pipe systems.

    Logistics center of 3,200 m 2

    March 2015 June 2016

    USD 5 , 150 , 000 (100%)

    Write to [email protected] in the reference of PI-06060593

    http://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30http://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30mailto:[email protected]:[email protected]:[email protected]://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30http://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30http://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30http://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30mailto:[email protected]://exiton.mn/summit-2014/web/index.php/home/projectd.php?id=30