LOCK OUT/TAG OUT: EACH TIME, EVERY TIME

Mini Module

2

Page 3: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

3

Introduction

Lockout/Tagout: Each Time, Every Time

mini-module is part of a curriculum series

addressing hazards found in areas of grain

handling facilities including grain bins and

their surrounding area. It is accompanied by

a video – Lockout, Tagout, Tryout – Each

Time, Every Time. It’s purpose is to assist

participants to identify and abate hazards in

the work place.

Page 4: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

4

Disclaimers

This material was revised under grant

number SH-26294-60-F-17 from the

Occupational Safety and Health

Administration OSHA), U. S. Department of

Labor. It does not necessarily reflect the

views or policies of the U. S. Department of

Labor, nor does mention of trade names,

commercial products, or organizations imply

endorsement by the U. S. Government.

Page 5: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

Employee Rights

Employees are entitled to:

▪ Safe & healthy working conditions

▪ Fair compensation for all hours worked

▪ Report unsafe conditions without retaliation

• Call, write or email the OSHA area office within 30 days to report employer retaliation

Employers are responsible for providing a safe workplace.

Information www.osha.gov & www.whistleblowers.gov

5

Page 6: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

6

Learning Objectives

At the end of this module,

participants will be able to:

▪ Explain the purpose of LOTO and when it

should be used.

▪ Explain the concept of one lock, one key,

per person.

▪ Describe the basic steps of performing

LOTO.

Page 7: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

7

Reason for Lock Out/Tag Out

▪ OSHA 1910.147

▪ Protects Employees

▪ Written Procedures

▪ Affordable

▪ Best Practice – Farm

▪ Mandatory -

Commercial

Page 8: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

8

Lock Out/Tag Out = Protection

Protects

▪ Injury

▪ Unexpected startup

▪ During service or

maintenance

▪ Work near exposed

electrical

Keeps others from turning

machines on!

Page 9: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

9

LOTO Controls Energy Sources

▪ Control hazardous energy

▪ Isolate power sources-inoperable

▪ De-energize machines/equipment

▪ Use energy isolating device

▪ Stored & residual energy

Energy - electrical, mechanical, hydraulic,

pneumatic, chemical, thermal, gravity, others

Property of

Master Lock®

Page 10: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

10

Lockout Isolates Energy

Lock Out - isolation

of energy from the

system (a machine,

equipment, or process)

which physically locks

the system in a safe

mode.

Page 11: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

11

Tag Out – Warns & Informs

Tag Out – WARNSLabeling system informs others of reason for

LOTO, why it cannot be operated, who did

LOTO.

Page 12: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

12

LOTO Requirements

▪ Authorized employees ONLY perform LOTO

▪ Train ALL employees

▪ Use proper locks & tags

▪ Written LOTO procedures

▪ Review procedures annually

Page 13: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

13

1 Lock, 1 Key, 1 Person

Your lock cannot be

opened with another key.

Page 14: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

14

Multiple People = Multiple Locks

More than 1 person needs LOTO on same

equipment or machine:

Lock for each person Group LOTO

Page 15: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

15

When LOTO Is Needed

▪ Service or maintenance

• Machines & equipment

▪ By-pass or remove guard

• Other safety devices

▪ Any body part in the point of operation

• Danger zone during the operating cycle

▪ Grain bin entry

• Tasks related to grain handling & storage

Page 16: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

16

NO LOTO – Same Protection!

Limited exceptions to not using LOTO:

▪ Exclusive control of power source

• Electric cord

▪ Minor tool changes, adjustments, service

• Documented procedures

▪ Can’t accept lock

• Tagout only

Must have same level of protection

Page 17: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

17

#1 Prepare for Shutdown

▪ Identify energy sources

▪ Notify affected persons of LOTO

Page 18: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

18

#2 Shut Down Machine

▪ Follow written procedures

▪ Turn off or shut down the equipment

Page 19: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

19

#3 Isolate Energy Sources

▪ Disconnect or otherwise isolate ALLenergy sources

▪ Release stored energy

Page 20: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

20

Stored Energy Needs Release

Stored (residual) energy – energy in system not being used. Provides power when released.

Types▪ Mechanical - item under tension

▪ Hydraulic - stored in pressurized liquid

▪ Pneumatic - stored in pressured air

▪ Gravitational - from something falling

Page 21: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

21

Stored Energy is All Around

Stored energy examples:

▪ Battery back-ups

▪ Springs

▪ Capacitors

▪ Flywheels

▪ Gravity – elevated

▪ Hydraulic lift systems

▪ Air, gas, steam, water pressure

Page 22: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

22

Release Energy:

Dissipate - use up the energy

Restrain - keep from use

Methods:

▪ Grounding

▪ Repositioning

▪ Bleeding

▪ Venting

▪ Blocking

Page 23: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

23

# 4 Lock Out & Tag Out

▪ Install locks on energy sources

▪ Attach tags to locks and/or the machine

▪ One lock & tag per person per

machine or equipment

Install Lock Attach Tag

Page 24: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

24

# 5 Try Out!

▪ Test machine

▪ Attempt to start

▪ Verify it is locked

out

Page 25: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

25

#6 Begin work

▪ Begin maintenance or

service work

▪ Complete work

▪ Remove tools & clean

up area

• Account for tools &

parts

▪ Equipment is intact

Page 26: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

26

# 7 Notify Others of Start-Up

▪ Notify persons affected

• Energy being restored

• Machine/equipment being

restarted

▪ Ensure others at safe

distance

Page 27: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

27

# 8 Release Lock Out/Tag Out

▪ Remove lockout &

tagout devices

• Only person who put it

on

▪ Start-up equipment

▪ Verify working properly

Page 28: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

28

Lock Out Devices Only for LOTO

▪ Only use - LOTO

▪ Employer provides

▪ Standardize – color, shape, size

▪ Durable - withstand environment

▪ Substantial – prevent removal

• Need force or tool to remove

▪ Identify person

Property of Master Lock®

Page 29: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

29

Type of LOTO Locks

Pole Breaker

Padlock

Valves

Wall Switch Breaker Lockout

Lockout Hasp

Page 30: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

30

Durable, Locking Tagout Devices

▪ Standardize – print & format

▪ Durable - withstand environment

• Legible & understandable

▪ Substantial – securely attached

• Non-reuseable

• Self locking

• Unlock strength ≥ 50 lbs.

• By hand

▪ Warn - Do Not Operate, etc.

▪ Identify person

Page 31: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

31

Tag Out Devices Durable, Lock

▪ Standardize – print & format

▪ Durable - withstand environment

• Legible & understandable

▪ Substantial – securely attached

• Non-reuseable

• Self locking

• Unlock strength ≥ 50 lbs.

• By hand

▪ Warn - Do Not Operate, etc.

▪ Identify person

Page 32: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

32

Emergency Lock Removal

Employer to remove lock ONLY when

employee is unavailable

▪ Employee NOT at facility

▪ Reasonable effort to inform employee

▪ Employee knows lock removed

• Must know BEFORE return to work

HINT: Keep written documentation

Page 33: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

33

Energy Control Program

LOTO Procedures

Employee Training

Periodic Inspections

Enforcement Policy

Written

Full Employee Protection

Page 34: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

34

Energy Control Procedures

▪ Scope & Purpose – how to use

▪ Steps to control energy

• Shut down, isolate, block, secure

▪ LOTO Devices

• place, remove, transfer

▪ ID responsible person

▪ Try out – specific steps

Try Out in LOTO procedure

Page 35: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

35

EXAMPLE

Page 36: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

36

Who needs LOTO training?

ALL workers need training according

to their exposure to LOTO

OSHA identifies:

Authorized employee performs LOTO

Affected employee operates equipment

or works in area where LOTO is done

Page 37: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

37

LOTO Training ALL Workers

ALL - must know, understand & be able

to follow LOTO procedures

▪ Purpose & function of LOTO

▪ Use of LOTO

▪ Procedures

▪ Prohibit restart - LOTO in place

▪ Limitations – Tag Out only system

Page 38: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

38

Limitations of Tag Out Only

Warning Only!

Does NOT provide physical restraint

▪ False sense of security

▪ Provide full employee protection

▪ Removal by owner ONLY

▪ Prohibit start up

▪ Hold isolating device in “off” position

• Easily seen

Page 39: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

39

Train to Perform LOTO

Authorized employee – Person who performs LOTO

Additional Training

▪ Recognize hazardous energy sources

▪ Type & magnitude of energy sources present

▪ How to isolate & control energy

• Methods

• Means

Page 40: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

40

Retrain When Change Occurs

Retrain employees when:

▪ Change occurs:

• Job assignments

• Equipment

• Procedures & Process

▪ Inspection - need or inadequacy

▪ Certify training – name & date

• Keep training up to date

Page 41: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

41

Periodic Inspection

▪ Annual documentation

▪ Review procedures

▪ Authorized employee conducts

▪ Identify & correct

• Deviations or inadequacies

▪ Review each authorized employee

▪ Review each LOTO procedure

Page 42: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

42

Why LOTO for Farms

• Father & son discussed need to check a cross

auger on top of a bin.

• No responsibility assigned.

• Dad checked auger; did not like what he heard.

• Dad got on top of bin & stuck his arm in the auger.

• Son decided to check the auger.

• Father lost his forearm.

Page 43: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

43

Implement LOTO for Farms

▪ Develop procedures

▪ Communicate

▪ Tag it – Warn others

▪ Use locks

▪ Other locking or secured

mechanism

Farms - Use of LOCKS & TAGS

strongly recommended

Page 44: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

44

GROUP ACTIVITY - LOTO

Page 45: Lock Out/Tag Out - Amazon S3s3-us-west-2.amazonaws.com/.../Lockout-Tagout-GHSC.pdf · LOCK OUT/TAG OUT: EACH TIME, EVERY TIME Mini Module 2. 3 Introduction Lockout/Tagout: Each Time,

Lock Out/Tag Out:Each Time, Every Time

Protect the most valuable resource we have –

“Our Workers!”

QUESTIONS?

For more information visit www.grainsafety.org