Lock Out and Tag Out Standart Manual

Embed Size (px)

Citation preview

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    1/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 1 of 23

    Rev. A

    1. PURPOSEThis standard specifies minimum locking and tagging procedures necessary to prevent

    injury by the inadvertent operation of power equipment, the inadvertent opening of valves,

    inadvertent release of stored energy, or the energizing of electrical equipment. Once a

    work permit requires an isolation of hazardous energy, an isolation process set forth in this

    policy and procedure must be accomplished prior to issuing the work permit.

    [See Blinding and Blanking]

    [See Positive Isolation]

    Isolation of plant and equipment is required to achieve a safe and controlled means of

    access for maintenance, verification, construction, modification and decommissioning

    activities and doing so ensuring that risks are as low as reasonably practicable.

    The isolation certificate is to certify that the equipment has been isolated and locked off from

    hazardous sources. It also provides a list of isolation locations and devices fitted to achieve

    this. It shall used to record isolations carried out on:

    Mechanical / process systems

    Electrical systems Safety / Emergency systems

    2. POTENTIAL HAZARDS

    All sources of energy (i.e., pressure, electrical, hydraulic) that could result in accidental

    movement of equipment, or otherwise cause damage to person, property or process must

    be locked out and tagged at the main source of energy or control device.

    3. APPLICATION

    This policy and procedures apply to all personnel working on COPI site facilities both

    onshore and offshore. This policy and procedures apply to all isolations required either as

    part of the permit to work system.

    4. DEFINITIONS

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    2/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 2 of 23

    Rev. A

    Authorized employees are employees who have knowledge of the equipment and facility to

    be isolated. Also, they shall have received training in the hazardous energy lockout/tagout

    procedures.

    Designated Group Authorized Super visors are authorized employees formally vested with the

    authority to lockout/tagout equipment for a group of employees in a particular craft.

    Group Lock Boxes are devices designed to secure the keys for group locks. These boxes

    shall be designed in such a manner that keys for group locks is put inside and secured byattaching the personal locks of the authorized employees working on the equipment.

    ENERGY - Mechanical motion; potential energy due to pressure, as in hydraulic,

    pneumatic, or vacuum systems, or it can be due to gravity; or springs; generated or static

    electrical energy; thermal energy resulting from high or low temperatures; radiation energy;

    or the unexpected flow of gas, vapor, or liquid into an open process vessel or piping system

    undergoing maintenance.

    ENERGY SOURCE - Any source of electrical, mechanical, hydraulic, pneumatic, chemical,

    thermal, gravitational, radiation, or other energy.

    Blind Flange - Flange used for isolation purposes rated to the maximum operating or test

    pressure which may be applied. Meets CII standard.

    Block Valve - Ball valve or gate valve normally, butterfly valves are acceptable in water

    flood applications less than 150 psi.

    Full thickness - Solid Metal plate cut to form isolation between faces Skillet of two flanges

    rated to the maximum operating or test pressure which may be applied. Meets CII

    standard and used in conjunction with gaskets meeting the CII standard.

    Single Valve A single closed, locked, non-leaking block valve used Isolation to isolate

    pressure

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    3/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 3 of 23

    Rev. A

    5. TRAINING

    Training shall be provided to ensure that the purpose and function of the lockout / tagout

    program is understood by the employees and that the knowledge and skills required for the

    safe application, usage, and removal of energy controls are acquired by employees.

    This training shall be recorded. Record shall include date, names, and subject matter.

    Retraining shall be provided whenever:

    - there is a change in the employees job assignments

    - there is a change in machines, equipment or processes that present new hazards

    - there is a change in lockout/tagout procedures.

    6. GENERAL REQUIREMENTS

    Hazardous energy lockout/tagout work shall be attempted only by authorized employees,who shall notify the supervisor of the facility before work begin

    The process or mechanical isolation design should be determined and carried out as defined

    in Appendix A, table 1 to 7, and Typical example (Appendix B). However this should not be

    regarded as a replacement for competent technical judgement.

    These policy and procedures support the Work Permit System. The requirement for an

    isolation can not be raised without the appropriate work permit.

    The Site HSE Leader shall have a master or duplicate key that fits all locks in their area of

    responsibility:

    These individuals are the only ones, other than the person who set the lock, with the

    authority to approve lock removal.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    4/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 4 of 23

    Rev. A

    Locks specifically designated for use in the lockout procedure shall be provided by

    ConocoPhillips Indonesia. The locks utilized shall be HIGH SECURITY MASTER PAD

    LOCKS that are keyed differently. Each lock and key shall be stamped in order to identify

    them by location. They shall be assigned individual numbers.

    Each work location is to be equipped with a locked box containing lock and key sets, lockout

    tags, multiple lock devices, and a registration book.

    Entries into the registration Log book must, as a minimum, indicate location and purpose of

    isolation/lockout, dates and times isolation/lockout was initiated and completed, and thecraftsman's name.

    The number of locks required at each location is dependent upon utilization requirements.

    These locks must be put into the lock box at designated controlled area and the lock must be

    administered and controlled.

    All work locations are required to inventory their lock boxes weekly and ensure that the

    correct number of locks and keys are accounted for and to familiarize themselves with logbook entries and active locks in place. Any missing locks or keys are to be reported to the

    master key holder immediately. This inventory check shall be noted in the logbook.

    The authorized employee shall have knowledge of the type and magnitude of the energy, the

    hazards of the energy to be controlled and the method or means to control the energy prior

    to locking out equipment.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    5/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 5 of 23

    Rev. A

    Only the Electrical / System or his designee shall test, energize, de-energize, and/or lockout

    primary electrical equipment. Primary electrical equipment is defined as equipment such as

    generators, switch gear, controllers, transformers and power cables that transmit or control

    electrical power in excess of 600 volts.

    Control devices such as push buttons, selector switches, or electrical interlocks that de-

    energize electric power currents indirectly through contractors, controllers, or electrically

    operating disconnecting devices are not to be utilized as the sole disconnecting means.

    Applicable craft shall remove fuses and positively ensure the circuit is dead when it is notpossible to apply a lock.

    When locks cannot be applied or are not feasible, or when it can be demonstrated that

    tagout procedures will provide equivalent safety, tagouts shall be permitted to be used by

    authorized employees. The use of tagouts shall be accompanied by additional safety pre-

    cautions such as isolating the circuit or opening a connecting device.

    A DANGER tag is to be signed, dated and attached by the applicable craftsman at the pointwhere the circuit is isolated. Tags shall be water proof and conform to OSHA 1910-145.

    Both sides of the tag shall have the word "DANGER" in white on a red background with a

    black border. The inscription on one side of the tag shall have the inscription "DO NOT

    REMOVE THIS TAG" & "SEE OTHER SIDE". This tag shall indicates isolation certificate

    number related to this isolation.

    A qualified person shall physically verify that the equipment cannot be energized or restarted

    once a lockout has been made.

    Further Guidance on process isolation and electrical isolation is defined in Appendix C, D.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    6/25

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    7/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 7 of 23

    Rev. A

    Once the work leader performing the work pick up the work permit to commence the work,

    he/she is subject to keep the lock related to his/her job.

    Upon completion of the work, the work leader return the work permit to the central control

    point to indicate that he finished the work. The work leader who performed isolation

    previously shall accomplish de-isolation after all work permit related to this isolation certificate

    finished. The isolation certificate in the central permit control point must be picked up to

    record de-isolation process and return back to the central permit control point upon

    completion De-isolation.

    The authorized employee and the applicable craftsmen shall conduct a visual inspection to

    ensure the area is safe prior to energizing/starting the equipment/electrical circuit.

    The authorized employee nominated to maintain the lock box shall ensure that all craft locks

    have been removed and returned to the lock box when work is completed.

    Upon completion of work covered by isolation certificate, work permit authorizer must

    complete isolation certificate to indicate the work is complete, all isolations have beenremoved and closed the certificate.

    Annually, each site shall review the site lock and tag procedure to ensure that the procedure

    is adequate and is being implemented.

    A hasp can be used when a multiple work requires a lock at the same lock holder location. If

    this is impractical, one work is only required to lock the isolation drawer of the other work.

    8. OWN ISOLATIONS

    When an R.E.P (Responsible Electrical Person). or, other authorised person, feels that the

    Work Leader is competent to perform their own isolations associated with the work they will

    be carrying out, and conditions 12.6.1 to 12.6.6 apply, then the isolations can be deemed

    own isolations.

    The competent person who will be carrying out the isolations/deisolations and work will be

    responsible for completing the plan if required and signing prepared by and accepted

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    8/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 8 of 23

    Rev. A

    by. He will also be responsible for ensuring isolations and work satisfies 12.6.1 to 12.6.6 at

    all times.

    The REP or other authorised person should write own isolations on the Work permit,

    identifying the equipment/systems to which these isolations apply.

    In all own isolation cases, it will be necessary for the Work Leader to carry out his own

    isolations / de-isolations throughout the course of the work subject to the following criteria:

    The person carrying out "own isolations" must have been assessed as competent to

    carry out such isolations and authorised in accordance with Site Leader.

    Own isolations shall only be carried out by a competent person for work in which

    they are personally involved.

    Own isolations shall remain in place only as long as the competent person is

    actually involved in the work.

    Additional persons under the control of the Work Leader may only work on

    equipment isolated under an Own Isolation if the following conditions are satisfied;

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    9/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 9 of 23

    Rev. A

    (i) An Electrical Work Plan shall be completed.

    And

    (ii) All persons assisting the Work Leader shall agree and sign the Work Plan. The

    Work Leader shall issue each person with their own dedicated Lock & Key and

    ensure that each shall apply their lock along with his own to act as secondary

    isolation and ensure their safety for as long as they are involved in the work.

    The Work Leaders lock shall be the first applied and the last removed, providing

    he has satisfied himself that it is safe to do so.

    or

    (iii) Where it is not possible to apply multiple padlocks all additional personnel shall

    be under the direct and continuous supervision of the Work Leader whilst they

    are at the location of the equipment.

    The Own Isolation shall be recorded on an Own Isolation Certificate and in the local

    Isolation Logbook .

    The Own Isolation Certificate shall be appended to the Work Leaders copy of the

    Work Permit and isolations/de-isolations recorded on the Certificate by the Work

    leader as and when they take place.

    9. SANCTION TO TEST

    Under the current Permit to Work procedure there is no facility to temporarily de-isolate

    equipment for test purposes, when controlled under a Permit and associated Isolation

    Certificate. In this case a separate Permit requires to be raised for testing purposes.

    However, for equipment being worked on under the control of an Own Isolation, the

    isolation can be removed, to facilitate testing, subject to the conditions laid down in Section

    12.6.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    10/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 10 of 23

    Rev. A

    Appendix A.

    Process Isolation Selection Flow Scheme

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    11/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 11 of 23

    Rev. A

    Table 1

    Situation Parameter

    Typical Examples

    Type Description Onshore Offshore

    A Congested or confined equipment or>20 people at risk.

    Offshore there is the potential forescalation resulting in the need forplatform evacuation.

    Crude distiller unit,catalytic cracker

    plant. Village ortown within range oftoxic effects

    Compressionmodule heavily

    populated with pipework and objects of box typeconstruction.

    B Open process storage or producetransfer plant or 11 to 20 people atrisk. Offshore open or less congestedmodules where explosion hazard isminimal or escalation beyond theimmediate area is unlikely. Large fireswith potential for local damage andmultiple fatalities.

    Treater unit, LPGspheres, road-car-loading gantry.

    Module containinglarge cylindricalvessels, such asseparators, widelyseparated.

    C Storage area or 6 to 10 people at risk.Offshore an area where gas is unlikely

    to accumulate to hazardous levels withminor fires contributing the highestrisk.

    Tank farm, pumpingmanifold,

    unprotected controlroom or outsideworkers within rangeof toxic effects.

    Wellhead modulesor other non-

    enclosed spacesopen on two or moresides.

    D Few i tems of equipment in an openarea or 3 to 5 people at risk. Offshoreutility systems with the potential tocause fatalities or structural damage.

    Isolated pumphouse. Modules containingtemperature or high-

    pressure utilitysystems or corrosivesubstances.

    E Remote single items or 1 or 2 peopleat risk. Offshore minor fires that areeasily contained.

    Remote pump orvessel.

    Note:

    The numbers of people at risk includes those not in the immediate vicinity but who

    might be exposed to the hazard in the event of a release of hazardous substance.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    12/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 12 of 23

    Rev. A

    Table 2

    Substance Parameter

    Type

    Description

    1 Toxic gases e.g. HF, CI2, SO2, H2S, HCN, HCI, CO

    Note: Toxic liquids such as CI2 and SO2 require special treatment sinceleaks may cause toxic effects over a wide area. In such cases thehighest standard of isolation should be employed.

    2 LPG, NGL or flammables above a temperature where more than about50% weight would be flash on release. Material above auto-ignition

    temperature.3 Flammable liquids above their flashpoint e.g. condensate.

    4 Flammable gases.

    5 Flammable liquids below their flashpoint e.g. methanol

    6 Other hazardous fluids, e.g. steam, high temperature or lowtemperature (cryogenic) fluids, corrosives, acids, asphyxiants, etc.

    7 Non-hazardous substances (Note that substances such as water andnitrogen may be hazardous in some situations).

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    13/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 13 of 23

    Rev. A

    Table 3

    Effects Matrix

    Situation (from Table 1)

    SubstanceType

    (from Table2)

    A B C D E

    1 10 10 9 8 7

    2 9 8 5 4 3

    3 8 6 4 3 2

    4 5 4 3 2 1

    5 4 3 2 1 1

    6 3 2 1 1 1

    7 1 1 1 1 1

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    14/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 14 of 23

    Rev. A

    Table 4

    Time Matrix

    Duration

    Frequency < 1 Shift > 1 Shift > 7 Days

    Daily 10 10 -

    Weekly 7 10 -

    Monthly 3 7 10

    Annually 2 3 7

    Occasionally 1 2 3

    Table 5

    System Pressure

    Line Size >100

    barg

    >50 barg >20 barg > 10

    barg

    8 10 8 6 5 4

    6 8 6 5 4 3

    4 6 4 3 3 2

    2 4 3 2 2 1

    < 1 3 2 2 1 1

    Note:

    For satellites this is the cumulative time that the platform is manned during

    which the isolation is in place.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    15/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 15 of 23

    Rev. A

    Table 6

    Selection of Isolation Method

    Hazard Factor =

    Release Factor x Time Factor xEffects Factor

    Preferred Isolation Method

    30 single valve

    31 to 150 double valve

    151 to 450 double block and bleed

    451 to 600 single valve, spade andbleed

    >600 double block, bleed andspade

    Table 7

    Special Techniques

    Application

    Technique Process plant Pipelines

    Valves Standard Standard

    Spool removal Standard Standard

    Spades/spectacle blinds Standard Standard

    Pipe stoppers Special Standard

    Line plugs (e.g. stopple) Special Standard

    Line plugs (mechanical seals) Special Special

    Pipe freezing Special Special

    Pigs Not applicable Special

    Inflatable bags Special Special

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    16/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 16 of 23

    Rev. A

    Appendix B

    Typical Examples

    8 inch LPG line at 50 barg in a congested process plant (so there is a VCE

    potential. Isolation is to be carried out once a year for three weeks

    Effects factor = 9(A.2)

    Release factor = 10

    Time Factor = 7

    Hazard factor = 630 (9 x 10 x 7)

    Isolation is Method 5 Double Block and Bleed

    4 inch Condensate line at 10 barg and 20 degrees celsius in a tank farm

    manifold where one or two workers might be present. Pool fire and escalation

    hazard. To be isolated occasionally for several weeks.

    Effects factor = 4(C.3)

    Release factor = 3

    Time factor = 3

    Hazard factor = 36

    Isolation is Method 2 Double Valve

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    17/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 17 of 23

    Rev. A

    Appendix C.

    Process IsolationsPRINCIPLES OF ISOLATION crown copyright 1997

    The Primary objective is to always use the highest level of isolation, which is

    reasonably practicable.

    The adequacy of the isolation should reflect the reasonably foreseeable risk and

    consequences should that risk be realised.

    Isolations should be secure throughout the duration of the activity

    Isolations should be adequately tested to prove effectiveness.

    Plant and equipment should be correctly and clearly identified.

    Isolations applied should be adequately recorded.

    Personnel should be competent in their knowledge and understanding of hazards, the

    process plant and the procedures manual and in the skills necessary to effect and

    remove isolations from the plant.

    The requirement for process isolation shall be identified through a task risk

    assessment and subsequently the permit to work.

    The risk-based methodology to be used for determining process isolation is given inAppendix B. This should be used as a selection tool but not as a

    replacement for competent technical judgement.

    Information to carry out the risk based isolation design will be made available on the

    permit by identifying the system to be isolated and the work to be carried out. Where

    the isolation method identified by best practices is not achievable then a lower level of

    isolations may be used, as long as the risks have been identified as being as low as

    reasonably practicable through risk assessment.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    18/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 18 of 23

    Rev. A

    CONFINED SPACE ENTRY crown copyright 1997

    Entry into confined spaces is the most hazardous activity for anyone who works on

    process plant. Vessels, such as separators, tanks, reactors or distillation columns, are

    the most obvious form of confined space, yet sumps, pig launchers/receivers or work

    inside pipes can present the same dangers. Hazards can arise from the presence of

    flammable or toxic vapours from process materials, or evolve from residues, but the

    less obvious dangers of oxygen depletion or carbon dioxide build-up should not be

    ignored. People can also be drowned by the ingress of water or asphyxiated by

    granular solids. In these circumstances the highest standards of isolation are

    paramount and physical disconnection (spool removal) or the insertion of spectacle

    blind are acceptable methods. It is particularly important that isolation is installed as

    close as possible to the vessel.

    Some confined spaces contain electrical and mechanical equipment with power

    supplied from outside the space. Unless the risk assessment specifically enables the

    system of work to allow power to remain on, either for the purpose of the task being

    undertaken or a vital service (i.e. lighting), vital communications, fire fighting,

    pumping where flooding is a risk, or cables distributing power to other areas) the

    power should be disconnected, separated from the equipment, and a check made to

    ensure isolation has been effective. Check must be made to ensure there is no stored

    energy of any kind left in the system that could activate the equipment inadvertently.

    Isolation Methods

    The isolation method identified from Appendix B Table 6, and from Confined Space

    Entry risk assessment are defined as follows:

    Physical Separation (PS): A method of isolation whereby a complete

    separation between the energy source and the

    plant/equipment is achieved.

    Physical Barrier (PB): By insertion of a spade/spectacle blind of the

    correct rating as close to the section to be isolated.

    Single Isolation Valves (SIV): By the locking of a single isolation valve in the

    closed position.

    Double Block and Bleed Valves: An isolation method consisting of an

    arrangement of two block

    (DBB) valves with a bleed valve located in between.

    The isolation method required shall be applied to all boundaries of interconnecting

    isolatable sections of plant.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    19/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 19 of 23

    Rev. A

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    20/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 20 of 23

    Rev. A

    APPENDIX D.

    ELECTRICAL ISOLATIONS

    Electrical isolations apply to all sources of electrical energy which can give rise to

    electric shock, electrical burns or which cause incendive sparks in hazardous areas.

    The competency required to design, implement and authorise electrical isolations shall

    be met.

    D.1. PREPARATION OF ELECTRICAL WORK PLAN (EXHIBIT B)

    On receipt of electrical isolation request, which requires preparation of "plan, the REP

    or other authorised person must complete the step-by step electrical work plan.

    The step-by-step plan should, where relevant, show the following:

    Alternative power feeding arrangements

    All points of isolation of potential supplies

    All points where circuit main earths and additional earths will be applied

    All positions to be tested dead

    All positions where locks are to be fitted

    Details of work to be done in relation to isolation/deisolation sequence

    Details of testing to be done and precautions when removing earths and

    applying test voltages.

    The person who prepares the plan should sign this plan.

    NOTE:

    For Own Isolations the person doing the isolations will be responsible for

    completion of the plan.

    D.2. ACCEPTANCE OF PLAN

    When the electrical work plan have been completed by the REP, or other authorised

    person, should nominate competent person(s) to perform the isolations/work and sign

    plan prepared by.

    The persons nominated to perform the isolations/work should sign plan accepted by

    if they agree with the plan.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    21/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 21 of 23

    Rev. A

    If required other personnel working on the isolated equipment can view plan for

    assurance and confirmation of isolation methods. If this is done they should sign plan

    agreed by. Where more than one person is working on equipment isolated on an Own

    isolation all persons assisting the Work Leader shall agree and sign the Electrical Work

    Plan.

    D.3. ISOLATIONS / DEISOLATIONS

    As isolations are completed and locked off lock numbers, date and signatures should

    be entered onto the general isolation certificate.

    Permission to de-isolate has to be obtained from the general isolation certificate

    authoriser. This can only be done on completion of all work and cancellation of all

    permits.

    All details of isolations and de-isolations should be recorded in local isolation logs

    which should be kept in every switchroom and at a suitable place when not located in

    a switchroom.

    D.4. PRE-ENERGISATION CHECKS

    Prior to de-isolation or switching operations, all equipment / switchgear should be

    checked for foreign objects which would likewise cause a short circuit i.e. tools, wiringdebris, etc. Field-end equipment should be checked to ensure all cable terminations

    are complete, enclosures are closed-up and cover screws/fixing bolts re-instated.

    Subsequent to the visual inspection of field equipment Insulation Resistance and

    continuity tests shall be carried out at the Switchgear, MCC cubicle or Distribution

    Board to confirm the integrity of the circuit. Proprietary test leads shall be used in all

    cases in accordance with HSE Guidance Note GS38 Electrical Test Equipment for use

    by electricians.

    D.5. ISOLATION PRACTICES

    D.5.1. PROVING DEAD

    Prior to commencing work on equipment that has been electrically isolated the

    equipment conductors should be proved dead at the point(s) of work.

    A proprietary live line tester or Voltage Indicator shall be utilised for the

    purpose of Proving Dead. The rating of the tester/indicator shall be checked

    for suitability against the equipment rating prior to testing. Multi-meters shall

    not be used for proving dead.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    22/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 22 of 23

    Rev. A

    The Live Line Tester or Voltage Indicator shall be inspected for signs of

    damage or deterioration prior to use. The test instrument itself shall be

    proved immediately before and immediately after testing the conductors.

    D.5.2 EARTHING

    Isolation and proving dead will prevent the equipment from becoming charged

    by connection to its own or normal sources of electrical energy. The presence

    of electrical energy as a result of electromagnetic induction, mutual

    capacitance or stored electrical energy should be guarded against by applying

    earth connections for the duration of the work, after initial discharge of the

    circuit. Where possible e.g. on HV Switchgear, these earth connections shouldbe applied by means of purpose-built Circuit Main Earthing facilities.

    The application of earths shall be recorded on the Electrical Work Plan and

    Isolation Certificate. Likewise, upon completion of the work it is important that

    all Circuit Main and Additional Earths are removed and checked off on the

    Isolation Certificate and Electrical Work Plan.

    D.5.3 CONTROL CIRCUIT ISOLATIONS

    In all cases where it is possible to receive a start/close signal from an external

    control circuit, the electrical isolation of plant equipment shall include the

    isolation of the control circuit.

    If energisation of the control circuit is required for function-testing this shall be

    arranged in consultation with the REP and itemised on the Work Plan/Own

    Isolation Certificate.

    D.5.4 MCC STARTER CUBICLES

    Where electrical isolations are applied at MCC Cubicles the following practices

    should be observed;

    Where the isolation is for work involving direct access to the conductors feeding

    the equipment then physical separation of the supply should be ensured. This

    may involve withdrawal of the starter cubicle (if withdrawable), removal of

    fuses or physical disconnection of conductors. The reliance upon isolators or

    isolating switches only as a means of isolation is not permitted.

    Where the isolation is for work not involving direct access to the conductors,

    e.g. mechanical work associated with pump or fan-motor assemblies, then

    reliance upon the isolator/isolating switch may be permitted only if its design

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    23/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 23 of 23

    Rev. A

    conforms with BSEN 60947-3. The above requirements recognise the risk of

    failure to operate of older Isolators/Isolating switches, as evidenced by a

    number if incidents within the Industry in recent years.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    24/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 24 of 23

    Rev. A

    Special techniques

    It may not be always reasonably practicable to isolate a section of pipe using the

    methods previously referred to. In such cases other alternatives may need to be

    considered to effect an isolation. Such methods should only be used following a task-

    specific risk assessment. Isolation methods deemed Special Techniques, and under

    which circumstances they can be used, are identified in Appendix A, Table 7.

    Techniques falling into this category include, but are not restricted to the following.

    Pipe plugs

    Pipe stoppers

    Inflatable bags

    Hot tapping and stoppling

    Pipe freezing

    Pigs

    SHORT DURATION WORK crown copyright 1997

    In some cases the time needed to install a final isolation is substantial and for some

    work it may therefore be acceptable to use a different standard of isolation.

    Two factors need to be considered when deciding what is short duration work:

    the work should take less time to complete than the time needed to

    install and remove the final isolation; and

    the risk of loss of containment from completing the work with the short

    duration standard of isolation should not be greater than the risk of using

    a final standard of isolation. Additional risks associated with the

    installation and the removal of the final isolation can be taken into

    account.

    A decision to use "short duration" standards of isolation should be supported by a risk

    assessment to justify the variation from a more secure "final" isolation method.

    Printed on 5/4/2011

  • 8/6/2019 Lock Out and Tag Out Standart Manual

    25/25

    Applicable International StandardsApplicable National Regulations: N/A

    Document No. HSE-002

    HSE Standards Manual

    Lock-Out & Tag-Out

    Sections L 005Page 25 of 23

    Rev. A

    When using short duration standards, isolation valves need to be proved before

    proceeding, and then monitored for leakage during the work activity. If a short

    duration isolation is in use, the work site should not be left unattended. This will allow

    prompt remedial action if a leak develops. Short duration work should not extend

    beyond one operating shift and measures to be implemented to mitigate the effects of

    a release, e.g. adjacent work activities should be restricted, local gas detection

    equipment provided, and fire fighting equipment made available locally.