J.F. Sabourin et associés inc. 2368 St-Louis, unité 101, Gatineau, QC J8V 1A2
tél.: 819.243.6858, téléc.: 819.243.8194 Windmill Development Group May 17th, 2016 6 Booth Street (Albert Island) Our file: 1163-04 Ottawa, Ontario K1R 6K8 Attention: Scott Bentley, CD CTech – Project Manager
Object: Findings: Detailed Study of Ville de Gatineau Sanitary Trunk Sewer Connection to the Domtar
Lands Redevelopment - Ontario
Mr Bentley,
JFSA’s services were solicited for the detailed study of Ville de Gatineau sanitary trunk sewer’s residual
capacity to evaluate its ability to accept additional wastewater flow from the Zibi-Ottawa development
project. Hence, a master plan was necessary for subcatchments 56 to 58, as shown in Figure 1, to
estimate the flowrates generated by each area, at their current state as well as their ultimate projected
state. This document serves as an executive summary and a brief description of JFSA’s findings. For
more ample detail, please refer to the complete report (JFSA, 2016).
LOCATION AND TYPE OF PIPE NETWORK
The area of study includes subcatchments 56 to 58 as delimited in the sanitary sewer master plan (JFSA,
2013). Subcatchments 56 and 57 are entirely serviced by a pseudo-sanitary network. As for subcatchment
58, a sanitary network is present. Figure 1 illustrates the limits of each subcatchment studies, drawn in red.
Also shown are Zibi-Ottawa and Zibi-Quebec residential projects, drawn in yellow and green respectively.
Windmill Development Group ND : 1163-04
J.F. Sabourin et associés inc. Experts-conseils en ressources hydriques et en environnement Page 2 de 6
Figure 1 : Location of area of study
Windmill Development Group ND : 1163-04
J.F. Sabourin et associés inc. Experts-conseils en ressources hydriques et en environnement Page 3 de 6
SIMULATION OF ACTUAL AND ULTIMATE PROJECTED CONDITIONS
Considering that the additional wastewater flowrates generated by the Zibi-Ottawa residential project will be
received by the Ville de Gatineau’s network and taking into account that this network will be subject to
considerable densification in the project future, the following scenarios were evaluated:
1) Simulation of actual conditions : Injection of additional wastewater flow from the Zibi-Ottawa project
into the pseudo-sanitary pipe (900 mm) on Eddy Street with actual flows generated by each sub
catchment;
2) Simulation of ultimate projected conditions: Injection of additional wastewater flow from the Zibi-
Ottawa project into the pseudo-sanitary pipe (900 mm) on Eddy Street with flows generated by each
sub catchment at their ultimate projected state. Ville de Gatineau projects a density of 100 housing
units per hectare for land currently being used for residential purposes as well as parking lots.
For the title drain contribution and for each scenario, a 100-year recurrence adjusted for climate changes
was simulated for the evaluation of residual capacity of Ville de Gatineau’s Sanitary Trunk Sewer
Connection to the Domtar Lands Redevelopment. Figure 2 shows pseudo-sanitary pipe servicing Zibi-
Ottawa.
Please note that, with the absence of flow measurement data for either sub catchment, the models used
could not be calibrated for this study.
Table 1 and Table 2 show the capacity of the conduit receiving Zibi-Ottawa’s sanitary flow as well as the
peak flowrates for each subcatchment and residential project, considering actual and ultimate projected
conditions respectively.
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!
!
!
! !
!!
!
!
!
!
!
!
!
!
!!
!
! !
!
!
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!!!
!
Rue Eddy
Rue Laurier
Promenade du Portage
Rue Saint-Jacques
Rue Leduc
Rue Eddy
Rue Eddy
3103231031
31030
28931
28930
81518146
8153
8239
8238
8234
8230
8229
8227
8224
8222
8156
8154
8152
8089
8047
2994029941
28054
29942
29938
29936
28055
Projet :
CONCEPT :DRAWN:
VERIF.REVIEW:
NO. PROJ
DRAWING REF.
Par:
Client:
FIGURE 2MR
1163-04May 2016
Master Plan for Sub catchments 56, 57 et 58
Titre :
Notes:
MR
VCP
Y:\Proj\1163\04 (Plan directeur)\Rapport
¹0 10 20 30 405
Mètres
LegendPseudo ConduitCollector ConduitSanitary Conduit
! Pseudo CB! Collector CB! Sanitary CB
Location of Receiving Conduit
VCP
Windmill Development Group ND : 1163-04
J.F. Sabourin et associés inc. Experts-conseils en ressources hydriques et en environnement Page 5 de 6
Table 1 – Inlet flowrates and residual capacity for actual conditions
Flowrate (m³/s)
Capacity
1
Conduit # 11 231 (900Ø) 0.94
Wastewater inflows
Subcatchment 56 0.145
Subcatchment 57 0.033
Subcatchment 58 0.001
Kruger plant (600Ø full‐flow) 0.340
Zibi‐Ottawa 0.052
Zibi‐Gatineau (blocks 1 to 24) 0.053
Zibi‐Gatineau (blocks 25 and 26) 0.003
Residual Capacity 0.390
Note
1 Full‐flow capacity calculated with PCSWMM
Table 2 : Inlet flowrates and residual capacity for ultimate projected conditions
Flowrates (m³/s)
Capacity
1
Conduit # 11 231 (900Ø) 0.94
Wastewater inflows
Subcatchment 56 0.150
Subcatchment 57 0.033
Subcatchment 58 0.001
Kruger plant (600Ø full‐flow) 0.340
Zibi‐Ottawa 0.052
Zibi‐Gatineau (blocks 1 to 24) 0.053
Zibi‐Gatineau (blocks 25 and 26) 0.003
Residual Capacity 0.347
Note
1 Full‐flow capacity calculated with PCSWMM
Worth noting the diameter of the pipes servicing Zibi-Gatineau’s residential project will have to be increased
to plan for the additional flowrates generated by the Zibi-Ottawa project.
Windmill Development Group ND : 1163-04
J.F. Sabourin et associés inc. Experts-conseils en ressources hydriques et en environnement Page 6 de 6
CONCLUSIONS AND RECOMMENDATIONS
The detailed study performed on Ville de Gatineau’s network has validated its capacity to received additional
flowrates generated by the Zibi-Ottawa residential project located on Chaudière and Albert Islands. The
objective of this study was to evaluate the ability of Ville de Gatineau’s current pipe network to accept
wastewater flowrates generate by the Zibi projects (Ottawa and Quebec), using hydrological and hydraulic
modelling software, for actual and ultimate project states.
The capacity of the existing conduits located on Eddy Street and Alexandre-Taché Boulevard was therefore
analysed in the present study. In fact, the capacity of these conduits is sufficient to pass the required flowrate,
without creating surcharge, from the new Zibi-Ottawa development of 52 L/s. The residual pipe capacities
calculated through simulation for each scenario were 0.39 m³/s and 0.35 m³/s for actual and ultimate projected
respectively. Therefore, we confirm that this conduit can easily accommodate the sanitary flowrates coming
from the Zibi-Ottawa residential project.
Please note that the parameters used in the hydrological model were estimated through hypothesis and with
knowledge of certain characteristics of the sector studied. Hence, if the Ville de Gatineau desires to validate
these parameters, a calibration using flowrate measurements taken at key points should be performed.
Benoit Doré, M. ing. P. Eng.
Vanesa Carolin Pereira, ing. OIQ # 5045387
Marcel Roy, ing,
Directeur général de l’Outaouais
OIQ # 36996
cc Jean-François Sabourin, M. ing, ing, JFSA inc.