June 28, 2013 DSWG Loads in SCED 1.0 Paul Wattles ERCOT Market Design & Development

Loads in SCED 1.0

  • Upload
    conway

  • View
    63

  • Download
    0

Embed Size (px)

DESCRIPTION

Loads in SCED 1.0. Paul Wattles ERCOT Market Design & Development. Loads in SCED 1.0 -- Background. Pre-2010: Due to complexity, SCED dispatch of demand response not developed for initial Nodal market launch 2011: DSWG Subgroup met throughout the year to evaluate the concept - PowerPoint PPT Presentation

Citation preview

Page 1: Loads in SCED 1.0

June 28, 2013DSWG

Loads in SCED 1.0

Paul WattlesERCOT Market Design & Development

Page 2: Loads in SCED 1.0

2

Loads in SCED 1.0 -- Background

• Pre-2010: Due to complexity, SCED dispatch of demand response not developed for initial Nodal market launch

• 2011: DSWG Subgroup met throughout the year to evaluate the concept – Lack of consensus on whether/how to move forward– White Paper at Key Docs:

http://www.ercot.com/committees/board/tac/wms/dswg/• 2012: Market Enhancements Task Force considered Real Time

Commitment/Real Time Dispatch platform– Would have supported Load participation in SCED – Lack of consensus; METF disbanded– White Paper also at above link

• 2013: Objective is to find a way for DR to contribute to price formation– ERCOT evaluated what could be implemented by Summer 2014– Concept document developed; NPRR draft now posted

Loads in SCED 1.0June 10, 2013

Page 3: Loads in SCED 1.0

3

Loads in SCED 1.0 -- Timeline

• To meet summer 2014 goal, ERCOT will need to meet following market rules timeline:– May 28 Concept doc distributed to TAC/WMS/DSWG– May 31 DSWG discussion– June 6 TAC introduction to concept– June 10 Loads in SCED Workshop– June 12 WMS discussion– June 27 NPRR draft posted– June 28 DSWG review of draft NPRR– July 2 TAC discussion– July 3 NPRR filed (ERCOT sponsored) with preliminary IA– July 10 WMS NPRR discussion (vote)– July 18 PRS NPRR discussion (possible vote)– Aug. 22 PRS NPRR discussion (vote)– Sept. 5 TAC NPRR discussion (vote)– Sept. 17 BOD NPRR discussion (vote)

Loads in SCED 1.0June 10, 2013

Page 4: Loads in SCED 1.0

4 DSWGJune 28, 2013

High-level summary

• Eligibility to participate: LSE QSEs representing Load Resources capable of following 5-minute SCED base point instructions– Existing or new single-site Controllable Load Resources (CLRs)

• SCED qualification will be a new attribute for redefined CLR (more on this later)

– Aggregate Load Resources (ALRs) composed of multiple sites within single ERCOT Load Zone (may be subset of CLR)

• Will not support direct participation by third-party DR QSEs• Will not support DR with temporal constraints or block energy

bids• New interface will allow QSEs to maintain ALR populations

Page 5: Loads in SCED 1.0

5 DSWGJune 28, 2013

High-level summary (cont.)

• QSEs with LRs in SCED will submit Bids to buy (not Offers to sell)• Bids will reflect LR’s willingness to consume “up to” a specified

five-minute Load Zone LMP– Use of Load Zone LMPs ensures consistency with PUC Rules

• May be a curve or a MW bid at single strike price– Bid curve option could allow the QSE to submit bids with different

strike prices for separate loads within the LR• Bid will modify the SCED demand curve and have ability to set

price– SCED Generation to be Dispatched (GTBD) will be adjusted to

accommodate LR participation – This will ensure proper price formation and reduce the likelihood of

oscillating dispatch instructions• This creates settlement outcomes equivalent to the “volumetric

flow” LMP minus G methodology endorsed by TAC, while avoiding need for ERCOT to “send back” the DR value to the LSE

Page 6: Loads in SCED 1.0

6 DSWGJune 28, 2013

High-level summary (cont.)

• Block bids not allowed – inconsistent with SCED requirements to follow base points– If LR’s bid is on the margin, base point instructions could require

LR to move up or down in increments as small as 100 kW– SCED will honor LR ramp rates (in MW per minute) as

telemetered from the LR• LR will benefit from avoided cost of consumption and from

price certainty due to ERCOT dispatch• No make-whole payments• No load ratio share uplifts to market for DR value• SCED will dispatch LRs for power balance and congestion

management using the applicable Load Zone Shift Factor

Page 7: Loads in SCED 1.0

7

High-level summary (cont.)

• Eligible LRs may also participate in Non-spin Reserves– To provide Non-spin, QSE would submit an offer to provide the

service in the Day-Ahead Market– If LR offer clears in DAM, QSE will be paid MCPC for awarded

hours in following Operating Day, regardless of whether Non-spin is deployed

– For Offline Non-Spin, energy Bids ≥$180 will need to be released to SCED within 20 minutes following dispatch, similar to Generation Resources providing Offline Non-spin

– For Online Non-Spin, energy Bids ≥$120 will need to be active in SCED for all intervals that the LR is obligated in Non-Spin

– Bids from LRs providing Non-Spin capped at the System Wide Offer Cap

DSWGJune 28, 2013

Page 8: Loads in SCED 1.0

8

High-level summary (cont.)

• Implementation of Loads in SCED 1.0 is related to and dependent on adoption of NPRR 532 – CPS Energy: LR Participation in Non-spin

• For ALRs, participation in SCED and Non-spin are both contingent on validation by ERCOT of the QSE’s telemetry at time of LR qualification, and spot-validation thereafter– Other Binding Document associated with NPRR 532 describes this

process• Telemetry from LRs providing Non-Spin and dispatched by SCED

must include Scheduled Power Consumption and SPC+2 to allow baseline-style M&V– M&V for LR in SCED for energy only does not require use of SPC

and SPC+2 • All members of ALR must have revenue-grade premise level 15-

minute interval metering– Via ESI ID or NOIE meter data submission process similar to ERS

DSWGJune 28, 2013

Page 9: Loads in SCED 1.0

9

Changes to Load Resource definitions

• Loads in SCED NPRR redefines Controllable Load Resource (CLR)

• CLRs will provide Regulation, RRS (as non-UFR type resource) & Non-Spin

• RRS and Non-Spin from CLR will be deployed via economic dispatch of DR capacity via SCED – CLR will have RTM Energy Bid that covers the RRS and/or Non-

Spin capacity released to SCED – Also can optionally bid additional DR capacity for SCED dispatch

• SCED will only consider CLR for dispatch if its telemetered Resource status indicates it is On-Line– If Resource Status is OUTL, then SCED ignores CLR

DSWGJune 28, 2013

Page 10: Loads in SCED 1.0

10

CLR (cont.)

• CLR qualifications:– To qualify for providing Regulation and RRS, tested for ability to

provide Primary Frequency Response (no change from today)– To provide RRS, Non-Spin or Real-Time energy only, tested for

ability to follow SCED Base Point Instructions– To provide Non-Spin or Real-Time energy only, not required to

provide Primary Frequency Response

•  Non-Controllable Load Resource (NCLR)– NCLR participation going forward limited to UFR-type Load

Resources providing RRS– In other words, all LRs providing Non-spin must be CLRs

DSWGJune 28, 2013

Page 11: Loads in SCED 1.0

11

Compliance

• Base point deviations calculated for under- and over-performance and added to LSE QSE charges in real-time – As drafted, these charges would apply regardless of whether LR was

carrying an AS responsibility• CLREDP scores (sum of base point deviations) calculated

monthly similar to GREDP

DSWGJune 28, 2013

Page 12: Loads in SCED 1.0

12

Impact on existing DR services

• No change to existing participation in RRS by UFR-type Load Resources

• No change to existing ERS

DSWGJune 28, 2013

Page 13: Loads in SCED 1.0

Loads in SCED 1.0Participation Scenarios

Page 14: Loads in SCED 1.0

14

Scenario 1

• For any SCED intervals that the LR’s bid to buy is greater than the five-minute Load Zone LMP, SCED Base Point will instruct the LR to consume at its telemetered Maximum Power Consumption, subject to ramp rate limitations from its current consumption level (NPF)

DSWGJune 28, 2013

ALR CLR(No Non-spin responsibility)

10 MW Firm

5 MW DR-capable

MPC →

LPC →

► $1,000

RTM Bid to Buy

(up to):Load Zone

LMP

$50

SCED Base Point

MPC► ►

Page 15: Loads in SCED 1.0

15

Scenario 2

• For any SCED intervals that the LR’s bid to buy is less than the five-minute Load Zone LMP, SCED Base Point will instruct the LR to consume at its telemetered Low Power Consumption, subject to ramp rate limitations from its current consumption level (NPF)

DSWGJune 28, 2013

ALR CLR(No Non-spin responsibility)

10 MW Firm

5 MW DR-capable

MPC →

LPC →

► $1,000

RTM Bid to Buy

(up to):Load Zone

LMP

$1,500

SCED Base Point

LPC► ►

Page 16: Loads in SCED 1.0

16

Scenario 3

• For any SCED intervals that the LR’s bid to buy is equal to the five-minute Load Zone LMP, SCED may dispatch the LR in either direction (up or down) in increments as small as 0.1 MW, within the bounds of the LR’s telemetered Maximum Power Consumption and Low Power Consumption, subject to its telemetered ramp rate limitations from its current consumption level (NPF)

• In this scenario, the LR sets the Load Zone LMP

DSWGJune 28, 2013

ALR CLR(No Non-spin responsibility)

10 MW Firm

5 MW DR-capable

MPC →

LPC →

► $1,000

RTM Bid to Buy

(up to):Load Zone

LMP

$1,000

SCED Base Point

LPC≤ BasePoint ≤ MPC► ►

Page 17: Loads in SCED 1.0

17

Scenario 4a

DSWGJune 28, 2013

ALR CLR(5 MW Online Non-spin responsibility; 5 MW additional DR

capability)

5 MW Firm

MPC →

LPC →

► $5,000

RTM Bid to Buy

(up to):Load Zone

LMP SCED

Base Point

LPC+5MWsubject to ramp rate limitations from its current

consumption level (NPF)

5 MW Non-spin

► $1,000

$1,500►5 MW add’lDR-capable

Page 18: Loads in SCED 1.0

18

Scenario 4b

DSWGJune 28, 2013

ALR CLR(5 MW Online Non-spin responsibility; 5 MW additional DR

capability)

5 MW Firm

MPC →

LPC →

► $5,000

RTM Bid to Buy

(up to):Load Zone

LMP SCED

Base Point

5 MW Non-spin

► $1,000

$5,000►

LPC+5≤ BasePoint ≤ MPCsubject to ramp rate limitations from its

current consumption level (NPF)5 MW add’l

DR-capable

Page 19: Loads in SCED 1.0

19

Scenario 5

• LR is cleared in Non-Spin in the DAM for six hours, 2-8 PM – BUT….maximum run time is 3 hours

• Real-time energy bid is 5 MW at $1,000 for all six hours• In real time, Non-Spin is deployed and at 4 PM the LZ LMP goes to

$1,500 and LR is dispatched• Prices stay above $1,000 for 4 hours.  • In that fourth hour, LR can’t deploy any longer (sets status to

OUTL)– QSE should continue to send accurate telemetry signals even when

LR status is OUTL• QSE must replace the capacity, either with a different Resource or

through a trade – If can’t replace, subject to compliance violation and potential other

penalties• If QSE notified ERCOT earlier of inability to run more than 3 hours,

ERCOT may run a SASM, and QSE replaces capacity at the MCPC cleared in the SASM

DSWGJune 28, 2013

Page 20: Loads in SCED 1.0

20

Scenario 6

• Same LR, same energy bid, same scenario as previous• Difference: this time LR does not have Non-Spin responsibility

(did not offer into DAM)• After LR deployed for the three hours LR hits maximum run

time, QSE changes telemetry to OUTL status• SCED can no longer dispatch• QSE should continue to send accurate telemetry signals even

when LR status is OUTL

DSWGJune 28, 2013

Page 21: Loads in SCED 1.0

21 Loads in SCED 1.0June 10, 2013

ON

OFF

Questions?