University of New South Wales 

Loading Dock Traffic Management Plan 

Upper Campus Store 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Shauna Simon 

09/11/2017   

Page 2: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

2  

Contents 

Purpose ......................................................................................................................................... 3 

General Operations ........................................................................................................................ 3 

Upper Campus Store Operating Hours ............................................................................................... 3 

Access and Route for Waste Management and Shared Gas Store ..................................................... 3 

Collection of Store Orders and Deliveries ........................................................................................... 3 

Multiplex – Shared Access .................................................................................................................. 4 

Loading and Unloading ....................................................................................................................... 4 

Security‐ Store Areas ........................................................................................................................... 4 

Traffic Control ................................................................................................................................ 5 

Access Routes ...................................................................................................................................... 5 

Forklift Usage ...................................................................................................................................... 5 

General Waste Removal ..................................................................................................................... 5 

Liquid Nitrogen Fills and Dry Ice ......................................................................................................... 5 

Removal of Chemical Waste ............................................................................................................... 6 

Delivery of Dangerous Goods ............................................................................................................. 6 

Biological Waste Removal ................................................................................................................... 6 

Cardboard/Waste Paper removal ....................................................................................................... 6 

Skip Bin ................................................................................................................................................ 6 

Multiplex ............................................................................................................................................. 6 

Health and Safety .......................................................................................................................... 6 

Forklift, Pedestrians, Couriers ............................................................................................................. 6 

Noise ................................................................................................................................................... 7 

Multiplex ............................................................................................................................................. 7 

Dangerous Goods ................................................................................................................................ 7 

Equipment and Machinery .................................................................................................................. 7 

External Companies ............................................................................................................................ 8 

Communication ............................................................................................................................. 8 

Loading Dock Activities ....................................................................................................................... 8 

Store Activities .................................................................................................................................... 8 

Multiplex ............................................................................................................................................. 8 

 

 

Page 3: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

3  

PurposeThe purpose of this document is to provide information on the traffic management associated with 

the daily operations of the Upper Campus Store and E26 Loading Dock.  

 

Information contained in this document is relevant to all regularly accessing the loading dock. It is 

the responsibility of the Upper Campus Store Manager, Multiplex and other relevant UNSW 

operational staff to ensure that the policies and procedures referred to in this document are 

observed and performed by all which includes contractors, couriers and all UNSW staff carrying out 

regular daily operations within the area. 

 

 

 

GeneralOperations 

UpperCampusStoreOperatingHoursAll Upper Campus Store operations will be conducted between the following times: 

 

7:30am – 4pm Monday to Friday 

CLOSED Saturday and Sunday 

 

Location  

E26, Bioscience South  

LG018 Loading Dock, Via Gate 11 Botany Street,  

UNSW, Kensington, SYDNEY, NSW, 2052 

 

Map – Attachment 1 

D26 LG Hoarding and UNSW Shared Access Routes – Attachment 2 

AccessandRouteforWasteManagementandSharedGasStoreClear pathways have been marked for all buildings within the upper campus precinct to access waste 

rooms.  

Inductions are to be completed for the following areas before access can be given: 

General Waste Store 

Chemical Waste Store 

Biological Waste Store 

Gas Cylinder Store 

 

Inductions for all stores are to be conducted by area or laboratory manager. 

 

D26 LG Hoarding and UNSW Shared Access Routes – Attachment 2 

 

CollectionofStoreOrdersandDeliveriesClear pathways have been marked for all to access the Store.  

 

D26 LG Hoarding and UNSW Shared Access Routes – Attachment 2 

Page 4: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

4  

Multiplex–SharedAccessShared accessed with MPX will continue into 2019 for Multiplex to continue to carry out works on 

E26 Bioscience South and D26 Bioscience Building. 

 

Rubbish removal for D26 demolishment and refurbishment will continue to be 6am to 7am daily and 

7am to 5pm Saturdays.  

 

Any access required outside the above mentioned must be discussed and coordinated between the 

Upper Campus Store and Multiplex. 

 

MPX D26 LG Demolition Hoardings and Access Routes – Attachment 2 

MPX D26 LG Demolition Dust Control – Attachment 3 

MPX D26 LG Demolition HAZMAT and Dust Control – Attachment 4 

LoadingandUnloadingThe loading dock will only be used for vehicles and trucks to unload deliveries, equipment and any 

items that are to be delivered to the precinct (Bioscience, Samuels, Wallace Wurth, Lowy and 

occasionally Matthews). Each bay is a restricted 15‐minute loading and unloading zone only, strict 

fines will apply.  

 

Parking vehicles are not permitted in the area as this is used for deliveries only. No courier or parking 

vehicle is to park outside the spaces indicated to allow continuous movement of traffic as the area is 

also used as an emergency egress. 

 

Use of the area after hours is permitted to those with access to buildings within the precinct 

(Bioscience, Samuels, Wallace Wurth, Lowy and Matthews). It is the responsibility of the 

user/operator to coordinate with UNSW security and ensure work is conducted in line with UNSW’s 

Health and Safety’s Working After Hours Guideline. It is courtesy to make The Upper Campus Store 

aware of any after‐hours movements within the loading dock, approval from Store Manager is not 

required unless there are possibly disruptions during Store operating hours. 

 

Security‐StoreAreasStrict access to main store areas during operational hours apply unless accompanied by store staff. 

Access is limited outside of regular operational hours to those who have been granted access by 

Store Manager, this includes stores staff and contractors who have been inducted into the area/s. 

Anyone requiring access to the holding area to load/unload will need to arrange prior with Store and 

be accompanied by Stores staff.   

 

Any after‐hours work to be conducted will need to be approved by the Store Manager and will need 

to be coordinated with UNSW security and conducted in line with UNSW’s Health and Safety’s 

Working After Hours Guideline. Any person found inside a building after hours without authorisation 

or an access card (with their name and photo on it) will be asked to leave the building immediately. 

 

 

Page 5: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

5  

All store areas are locked by either swipe or key. Strict access to chemical, liquid nitrogen and gas 

cylinder holding areas applies always, only stores staff and those who have been inducted have 

access to these areas. Access will only be given to gas cylinder holding area once an induction has 

been completed as this is a shared zone. Access will only be given to liquid nitrogen holding area by 

Store Manager or Cold Storage Systems Manager. There will be no access given to stores chemical 

holding area unless in certain circumstances where the Store Manager sees necessary. 

 

 

 

TrafficControl 

AccessRoutesAccess routes for forklift and pedestrians have been clearly marked and communicated to all 

regularly accessing the area. There is to be no pedestrian access through the loading bays, 

pedestrians must stick to the routes marked on the map and marked pathways within the loading 

dock. Store have barricades for those crossing from Samuels into the loading dock area. 

 

D26 LG Hoarding and UNSW Shared Access Routes – Attachment 2 

 

ForkliftUsageForklift is operated daily within the loading dock and main store areas (holding and main store 

warehouse). Forklift route is shared with pedestrians, pathways have been marked however high 

traffic is expected during D26 demolition from Monday 13th November 2017 until advised by MPX. 

 

D26 LG Hoarding and UNSW Shared Access Routes – Attachment 2 

 

GeneralWasteRemovalThe removal of general waste occurs before midday each day and will impact on the pathway to the 

general waste store. It is advised that all general waste operations happen after this time to 

minimise congestion and any possible hazard. There are clearly marked pathways within the loading 

dock for general waste access. Forklift is also operated along this route, pathways have been marked 

however high traffic is expected during D26 demolition from Monday 13th November 2017 until 

advised by MPX. 

 

D26 LG Hoarding and UNSW Shared Access Routes – Attachment 2 

 

LiquidNitrogenFillsandDryIceLiquid Nitrogen is filled by Air Liquide trucks as required. The tank is parked as close as possible to 

the fill point/cage still allowing traffic flow to the loading dock. The average delivery time is 45 

minutes. Anyone requiring use of the loading dock during this time will need to be aware of the 

operation and plan accordingly. 

 

Access for suppliers will be directly in front of LG071within the yellow line marking (no parking area). 

This has been marked as a reserved spot for these deliveries.   

 

Page 6: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

6  

RemovalofChemicalWasteThe removal of chemical waste is scheduled weekly (Thursday), access is required mostly during the 

morning and most likely at points during the day depending. The waste truck has been allocated to 

loading bay 8 & 6, travel path is front of the loading docks holding area into the chemical waste 

room. Part of this path is shared access, pedestrians using this path must be aware of the operation 

and plan accordingly to avoid any possible hazard. 

 

DeliveryofDangerousGoodsGas cylinder deliveries can occur between the times of 6am to 4pm. The truck will be parked within 

the loading dock in a space appropriate still allowing access for pedestrians and traffic flow. The 

average delivery time is approximately 30 minutes. Part of the travel path is shared access with 

pedestrians, pedestrians using this path must be aware of the operation and plan accordingly to 

avoid any possible hazard.  

 

BiologicalWasteRemovalThe removal of biological waste is scheduled between 5pm and 7am falling outside regular operating 

hours. Anyone requiring the use of the loading dock during this time will need to be aware of the 

operation and plan accordingly. 

 

Cardboard/WastePaperremovalRemoval of cardboard/waste paper is twice a week. Driver will use loading bay 8. Anyone requiring 

the use of the loading dock during this time will need to be aware of the operation and plan 

accordingly. 

 

SkipBinThere is a designated area for the skip bin within the loading dock. Access will be Monday to Friday 

during usual business hours and closed weekends. Removal is as required. Anyone requiring the use 

of the loading dock will need to be aware of the operation and plan accordingly when necessary.  

 

MultiplexWork carried out by Multiplex should be scheduled outside usual Store operating hours. Work 

scheduled during Store operating hours is to be coordinated with UNSW Store, additional to that 

already mentioned on page 4 of this document.  

 

 

 

HealthandSafetyForklift,Pedestrians,CouriersThe following traffic control measures have been put into place: 

Signage  

Barriers 

Mirrors 

Page 7: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

7  

People Management (Store Staff) 

Designated forklift parking 

Clearly marked pathways for pedestrians and forklift 

High traffic areas have been separated where possible from forklift, cars and trucks 

Safe Work Procedures 

Loading Dock Traffic Management Plan 

 

NoiseRequired work is regularly carried out within the loading dock between the hours 6am and 5pm, 

noise is mostly generated by trucks, cars and forklift. Noise levels produced within the area are low 

risk to staff and are isolated by distance to the wider UNSW community and residences within the 

area.  

 

UNSW must consult, coordinate and communicate with the Upper Campus Store and other relevant 

parties on any activities whereby noise within the loading dock may be hazardous so that all risks are 

eliminated or minimised where possible. 

 

MultiplexD26 demolition works commencing Monday 13th will generate noise. Noise levels will be monitored 

throughout the works. These works could last up to 4 weeks of the major noisy works (demo works). 

 

Multiplex are to coordinate and communicate with the Upper Campus Store and UNSW on any 

additional work to that already mentioned on page 4 of this document, and are responsible for 

ensuring any noise is compliant with NSW WHS Act. 

 

DangerousGoodsGoods delivered directly to the Upper Campus Store are loaded/unloaded by Stores staff only, all 

staff are trained to handle dangerous goods and are compliant as per safe work procedures. 

 

Any dangerous goods to be unloaded directly by the end user are the responsibility of the end user, 

the paths marked out for pedestrians must be used. 

 

Gas cylinder companies delivering directly to the shared cylinder store and liquid nitrogen store have 

been inducted into the area and must use loading zones and pathways as directed. It is the 

responsibility of the company to ensure they are compliant as per their own safe work procedures.  

 

EquipmentandMachineryEquipment can be loaded/unloaded with forklift or gantry crane, only to be operated by the Upper 

Campus Store staff. Stores staff are trained on forklift and gantry crane and compliant as per safe 

work procedures. Any equipment or machinery unloaded by courier or supplier is not the 

responsibility of UNSW, it is the responsibility of the company to ensure they are compliant as per 

their own safe work procedures. 

 

 

Page 8: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

LoadingDockTrafficManagementPlan

 

8  

ExternalCompaniesIt is the responsibility of all external companies delivering goods to the Store or the precinct to 

ensure they are carrying out the correct handling and safety procedures as per their own safe work 

procedures as well as working in line with the Upper Campus Store Loading Dock Traffic 

Management procedures. This includes: 

Delivery of liquid nitrogen 

Delivery of gas cylinders 

Removal of general, biological and chemical waste 

All couriers 

Removal of skip bins 

Multiplex activities 

 

 

 

Communication 

LoadingDockActivitiesAny changes with the following procedures should be communicated to the Upper Campus Store to 

ensure best management of the loading dock and the procedures within this document are kept up 

to date. 

Liquid nitrogen delivery  

Delivery of gas cylinders 

Removal of general, biological and chemical waste 

General usage of dock 

Removal of skip bins 

Special deliveries – animals, equipment etc.  

Multiplex works 

 

StoreActivitiesThe Upper Campus Store will communicate all Store and loading dock activities to the precinct, 

couriers and suppliers where required and relay all relevant information from within the precinct 

where general operations may be impacted. 

 

MultiplexMultiplex and The Upper Campus Store will communicate on all activities when required where 

operations may be impacted, this also includes work after hours. 

 

 

Page 9: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),
z3115490
Oval
Page 10: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

abov

e

abov

e

abov

eab

ove

FHR

FH

FHR

FH

BLBL

LG1 LG3

LGQ9LG2

LG4 LGQ2

LGQ10

LIFT11

LG25

LG24

LGQ4

LGQ3

LGQ1

LG20

LG26

LG21

LG23

LG22D

LG22A LG22B

LG22CLGQ7

LGQ8

HYD

ELE

COM

HYD

LG05

LG06 LG07

LG09 LG11B LG10D

LG11LG11A

LG10LG10C

LG10B

LG10A

LG08

LGQ5

LGQ3

LG02

LGQ4

LG30

LIFT5LIFT6

LG03LG04

LG04

A

LG05

A

LG05

BLG06

LG05

LG09

LG10

LGQ5

LGQ6

LG11LG11A

LG11BLG29

LIFTPIT

LGQ7

LG12LG13

LGQ9

LGQ8

LG16

LG07

LG09B

LG08 LG09A

LGQ4A

FHR

LG04B

LG03A

LG01LGQ5A

LGQ7A

LGQ23A

12m2

26m2

17m2

234m2

6m26m2

9m225m2

15m2

9m2

9m220m2

10m2

25m2

45m2

172m2

55m2

14m28m2

24m227m2

11m2

51m2

46m213m2

6m2

11m2

9m2

65m2

9m2

15m2 21m2

2m2

2m2

306m24m2

3m2

eB eD eF eH eK eL eM eN eO eP eQ eR eS

e1

e2

e3

SPRINKLER/PUMPLGQ79

FIELD GEAR PREPLG030

GAS METER ROOMLGQ76

STORELG008

RADIOACTIVE WASTELG002

HERBARIUM PREPLG006

MAIN STORESLG016

WORKPLACELG015

RECEIPTLG018

HOLDINGLG017

MAIN SWITCHROOMLGQ74

COMPACTUS STORELG021

SHELL SPACELG009

CHILLERSLGQ78

CHEMICAL STORESLG020

LOADING AREALG033

CIRCULATIONLGQ16

STAIR 01LGQ01

MALE WCLGQ52

LIFTLGLS01

COMMLG060

COLD 4cLG016A

PALEO PREP-SAMPLELG001

FIELD GEAR STORELG029

LEAD INLG061

STAIR 02LGQ03

DIESEL TANK ROOMLGQ75

HYDRAULIC PUMPLGQ77

PALAEO PREP- ACID BATHSLG010

HERB FRZLG004

HERBARIUM COMPACTUSLG003

STAIRLGQ06

4c STORELG019

ROCK CRUSHLG014

PETRO PREPLG012

ROCK CUTLG011

BIO. WASTELG024

GEN. WASTELG025

VEHICLE BAYSLG032

COMPUTATIONLG007

STORELG005

BULK GASESLGQ71

GAS CYLLG023

CHEM WASTELG026

ROCK POLLG013

STORELG036

RISERMLGQ01

FHRFLGQ01

USATLGQ51

ELECELGQ01

??

CLEANERSLG034

DIVE GEARLG031

FEMALE WCLGQ53

LIFTLGLS02 LIFT

LGLS02LIFT

LGLS02

CRYO STORELG028

TEALG037

CIRCULATIONLGQ13

CIRCULATIONLGQ18

UPS/ BATTERY RACK ROOMLGQ27

CIRCULATIONLGQ20

CIRCULATIONLGQ19

CIRCULATIONLGQ24

CIRC

ULAT

ION

LGQ2

1

CIRCULATIONLGQ23

CIRCULATIONLGQ22

FHRFLGQ07

FHRFLGQ06

FHRFLGQ04

CIRC

ULAT

ION

LGQ1

1CI

RCUL

ATIO

NLG

Q12

CIRC

ULAT

ION

LGQ1

5

CIRC

ULAT

ION

LGQ2

6

FHRFLGQ05

FHRFLGQ03

BOOSTER VALVE SETHLGQ01

PFCLGQ73

GLASS WASHLG022

8128

8128

8128 8128 8128 8128 8128 8128 8128 8128 8128 8128 8128 8128

111000

211000

111001

211001

eA

DOCUMENT REVIEWBrookfield Multiplex Constructions Pty Ltd

A - Acceptable for ConstructionB - Acceptable for Construction subject to comments. Correct and ResubmitC - Unacceptable for Construction. Correct and Resubmit for ReviewD - Drawing on Hold

These documents have been reviewed for conformity with design intent. Acceptance does notmean approval of dimensions, sizes or weights nor does it relieve the Subcontractor and/or theConsultant from responsibility for errors, omissions or compliance with his obligations and/orrequirements of the Contract and/or Subconract.

Reviewed ............................................................. Date ...............................

Contractor must verify all dimensions on site before commencing workor preparing shop drawings. Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Size check

Project

Client

Notes & Legend

© Woods Bagot

# Description DateStatusRecent revision history

TM

Architect

Builder

Project Manager

Mechanical / Gases / VT

Electrical / ICT / AV

Hydraulic / Fire

Structure / Civil

Landscape

BS2-WB-AR- 4

1 : 200

10000

PRELIMINARY

120922

AP CS

UNSW Australia

BIOLOGICAL SCIENCES PROJECTSTAGE 2Botany StreetKensington CampusNSW 2052

EXISTING FLOOR PLANS - LOWERGROUND FLOOR

1 SD ISSUED FOR INFORMATION 20/07/162 DD DD ISSUE 14/12/163 DD DD ISSUE 05/01/174 PRELIMINARY E26 ROOM NUMBERS ADDED 05/10/17

mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
PolyLine
mwatson
Line
mwatson
Line
mwatson
PolyLine
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
PolyLine
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
PolyLine
mwatson
PolyLine
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Text Box
2.4m high painted timber hoarding
mwatson
Text Box
Existing doors bolted closed
mwatson
Text Box
Walls extended up to prevent dust movement
mwatson
Text Box
UNSW PLANT ROOM
mwatson
Text Box
UNSW ACCESS PATHS
mwatson
Text Box
MPX CONSTRUCTION SITE
mwatson
Line
mwatson
Line
mwatson
Callout
New Hoarding with signage indicating access changes
mwatson
Callout
New Hoarding with signage indicating access changes
mwatson
Callout
No further access between buildings
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Callout
New Hoarding
mwatson
PolyLine
mwatson
Text Box
Page 1 - Hoardings
mwatson
Callout
UNSW access doors
mwatson
Callout
UNSW access doors
mwatson
Callout
UNSW access doors
z3115490
Polygonal Line
z3115490
Polygonal Line
z3115490
Callout
New Access Route
Page 11: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

abov

e

abov

e

abov

eab

ove

FHR

FH

FHR

FH

BLBL

LG1 LG3

LGQ9LG2

LG4 LGQ2

LGQ10

LIFT11

LG25

LG24

LGQ4

LGQ3

LGQ1

LG20

LG26

LG21

LG23

LG22D

LG22A LG22B

LG22CLGQ7

LGQ8

HYD

ELE

COM

HYD

LG05

LG06 LG07

LG09 LG11B LG10D

LG11LG11A

LG10LG10C

LG10B

LG10A

LG08

LGQ5

LGQ3

LG02

LGQ4

LG30

LIFT5LIFT6

LG03LG04

LG04

A

LG05

A

LG05

BLG06

LG05

LG09

LG10

LGQ5

LGQ6

LG11LG11A

LG11BLG29

LIFTPIT

LGQ7

LG12LG13

LGQ9

LGQ8

LG16

LG07

LG09B

LG08 LG09A

LGQ4A

FHR

LG04B

LG03A

LG01LGQ5A

LGQ7A

LGQ23A

12m2

26m2

17m2

234m2

6m26m2

9m225m2

15m2

9m2

9m220m2

10m2

25m2

45m2

172m2

55m2

14m28m2

24m227m2

11m2

51m2

46m213m2

6m2

11m2

9m2

65m2

9m2

15m2 21m2

2m2

2m2

306m24m2

3m2

eB eD eF eH eK eL eM eN eO eP eQ eR eS

e1

e2

e3

SPRINKLER/PUMPLGQ79

FIELD GEAR PREPLG030

GAS METER ROOMLGQ76

STORELG008

RADIOACTIVE WASTELG002

HERBARIUM PREPLG006

MAIN STORESLG016

WORKPLACELG015

RECEIPTLG018

HOLDINGLG017

MAIN SWITCHROOMLGQ74

COMPACTUS STORELG021

SHELL SPACELG009

CHILLERSLGQ78

CHEMICAL STORESLG020

LOADING AREALG033

CIRCULATIONLGQ16

STAIR 01LGQ01

MALE WCLGQ52

LIFTLGLS01

COMMLG060

COLD 4cLG016A

PALEO PREP-SAMPLELG001

FIELD GEAR STORELG029

LEAD INLG061

STAIR 02LGQ03

DIESEL TANK ROOMLGQ75

HYDRAULIC PUMPLGQ77

PALAEO PREP- ACID BATHSLG010

HERB FRZLG004

HERBARIUM COMPACTUSLG003

STAIRLGQ06

4c STORELG019

ROCK CRUSHLG014

PETRO PREPLG012

ROCK CUTLG011

BIO. WASTELG024

GEN. WASTELG025

VEHICLE BAYSLG032

COMPUTATIONLG007

STORELG005

BULK GASESLGQ71

GAS CYLLG023

CHEM WASTELG026

ROCK POLLG013

STORELG036

RISERMLGQ01

FHRFLGQ01

USATLGQ51

ELECELGQ01

??

CLEANERSLG034

DIVE GEARLG031

FEMALE WCLGQ53

LIFTLGLS02 LIFT

LGLS02LIFT

LGLS02

CRYO STORELG028

TEALG037

CIRCULATIONLGQ13

CIRCULATIONLGQ18

UPS/ BATTERY RACK ROOMLGQ27

CIRCULATIONLGQ20

CIRCULATIONLGQ19

CIRCULATIONLGQ24

CIRC

ULAT

ION

LGQ2

1

CIRCULATIONLGQ23

CIRCULATIONLGQ22

FHRFLGQ07

FHRFLGQ06

FHRFLGQ04

CIRC

ULAT

ION

LGQ1

1CI

RCUL

ATIO

NLG

Q12

CIRC

ULAT

ION

LGQ1

5

CIRC

ULAT

ION

LGQ2

6

FHRFLGQ05

FHRFLGQ03

BOOSTER VALVE SETHLGQ01

PFCLGQ73

GLASS WASHLG022

8128

8128

8128 8128 8128 8128 8128 8128 8128 8128 8128 8128 8128 8128

111000

211000

111001

211001

eA

DOCUMENT REVIEWBrookfield Multiplex Constructions Pty Ltd

A - Acceptable for ConstructionB - Acceptable for Construction subject to comments. Correct and ResubmitC - Unacceptable for Construction. Correct and Resubmit for ReviewD - Drawing on Hold

These documents have been reviewed for conformity with design intent. Acceptance does notmean approval of dimensions, sizes or weights nor does it relieve the Subcontractor and/or theConsultant from responsibility for errors, omissions or compliance with his obligations and/orrequirements of the Contract and/or Subconract.

Reviewed ............................................................. Date ...............................

Contractor must verify all dimensions on site before commencing workor preparing shop drawings. Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Size check

Project

Client

Notes & Legend

© Woods Bagot

# Description DateStatusRecent revision history

TM

Architect

Builder

Project Manager

Mechanical / Gases / VT

Electrical / ICT / AV

Hydraulic / Fire

Structure / Civil

Landscape

BS2-WB-AR- 4

1 : 200

10000

PRELIMINARY

120922

AP CS

UNSW Australia

BIOLOGICAL SCIENCES PROJECTSTAGE 2Botany StreetKensington CampusNSW 2052

EXISTING FLOOR PLANS - LOWERGROUND FLOOR

1 SD ISSUED FOR INFORMATION 20/07/162 DD DD ISSUE 14/12/163 DD DD ISSUE 05/01/174 PRELIMINARY E26 ROOM NUMBERS ADDED 05/10/17

mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Cloud+
mwatson
Cloud+
Wall - 1200mm clear opening to soffit
mwatson
Cloud+
mwatson
Cloud+
Metal cage - bottom 1200 = full panel - middle section = mesh panel - top 1200mm = open to soffit
mwatson
Cloud+
mwatson
Cloud+
Cool room panel - 1200 gap to ceiling
mwatson
Cloud+
mwatson
Cloud+
Metal cage - bottom 1200 = full panel - middle section = mesh panel - top 1500mm = open to soffit
mwatson
Cloud+
mwatson
Cloud+
Metal cage - bottom 1200 = full panel - middle section = mesh panel - top 1200mm = open to soffit
mwatson
PolyLine
mwatson
PolyLine
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Arrow
mwatson
Text Box
= natural air flow across plant
mwatson
Text Box
= MPX site
mwatson
Text Box
= UNSW plant
mwatson
Text Box
= UNSW acess
mwatson
Text Box
= core flute full height up to services and around where practicable
mwatson
Line
mwatson
Line
mwatson
Text Box
Air extraction from MPX work faces
mwatson
Callout
LG air intake fans
mwatson
Callout
LG air exhaust fans
mwatson
Rectangle
mwatson
Rectangle
mwatson
Rectangle
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Rectangle
mwatson
Rectangle
mwatson
Polygon
mwatson
Rectangle
mwatson
Text Box
= Air extraction fans & socks
mwatson
Callout
air extraction fans vented into eastern lift shaft
mwatson
Text Box
MPX site
mwatson
Text Box
= Areas marked in green will be wet misted when required
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Text Box
= Existing full height walls remain to act as barriers
mwatson
Callout
air extraction fans vented out to northern loading dock
mwatson
PolyLine
mwatson
PolyLine
mwatson
PolyLine
mwatson
Rectangle
mwatson
PolyLine
mwatson
Callout
Existing rock crush duct - venting past Biolink roof
mwatson
Callout
MPX site water feed
mwatson
Callout
NEW WATER FEED INSTALL to work faces
mwatson
PolyLine
mwatson
Text Box
Page 2 - Dust controll
mwatson
Text Box
Zone 1
mwatson
Text Box
Zone 2
Page 12: Loading Dock Traffic Management Plan - Stores...Loading Dock Traffic Management Plan ` ^ _ e 6 Removal of Chemical Waste The removal of chemical waste is scheduled weekly (Thursday),

abov

e

abov

e

abov

eab

ove

FHR

FH

FHR

FH

BLBL

LG1 LG3

LGQ9LG2

LG4 LGQ2

LGQ10

LIFT11

LG25

LG24

LGQ4

LGQ3

LGQ1

LG20

LG26

LG21

LG23

LG22D

LG22A LG22B

LG22CLGQ7

LGQ8

HYD

ELE

COM

HYD

LG05

LG06 LG07

LG09 LG11B LG10D

LG11LG11A

LG10LG10C

LG10B

LG10A

LG08

LGQ5

LGQ3

LG02

LGQ4

LG30

LIFT5LIFT6

LG03LG04

LG04

A

LG05

A

LG05

BLG06

LG05

LG09

LG10

LGQ5

LGQ6

LG11LG11A

LG11BLG29

LIFTPIT

LGQ7

LG12LG13

LGQ9

LGQ8

LG16

LG07

LG09B

LG08 LG09A

LGQ4A

FHR

LG04B

LG03A

LG01LGQ5A

LGQ7A

LGQ23A

12m2

26m2

17m2

234m2

6m26m2

9m225m2

15m2

9m2

9m220m2

10m2

25m2

45m2

172m2

55m2

14m28m2

24m227m2

11m2

51m2

46m213m2

6m2

11m2

9m2

65m2

9m2

15m2 21m2

2m2

2m2

306m24m2

3m2

eB eD eF eH eK eL eM eN eO eP eQ eR eS

e1

e2

e3

SPRINKLER/PUMPLGQ79

FIELD GEAR PREPLG030

GAS METER ROOMLGQ76

STORELG008

RADIOACTIVE WASTELG002

HERBARIUM PREPLG006

MAIN STORESLG016

WORKPLACELG015

RECEIPTLG018

HOLDINGLG017

MAIN SWITCHROOMLGQ74

COMPACTUS STORELG021

SHELL SPACELG009

CHILLERSLGQ78

CHEMICAL STORESLG020

LOADING AREALG033

CIRCULATIONLGQ16

STAIR 01LGQ01

MALE WCLGQ52

LIFTLGLS01

COMMLG060

COLD 4cLG016A

PALEO PREP-SAMPLELG001

FIELD GEAR STORELG029

LEAD INLG061

STAIR 02LGQ03

DIESEL TANK ROOMLGQ75

HYDRAULIC PUMPLGQ77

PALAEO PREP- ACID BATHSLG010

HERB FRZLG004

HERBARIUM COMPACTUSLG003

STAIRLGQ06

4c STORELG019

ROCK CRUSHLG014

PETRO PREPLG012

ROCK CUTLG011

BIO. WASTELG024

GEN. WASTELG025

VEHICLE BAYSLG032

COMPUTATIONLG007

STORELG005

BULK GASESLGQ71

GAS CYLLG023

CHEM WASTELG026

ROCK POLLG013

STORELG036

RISERMLGQ01

FHRFLGQ01

USATLGQ51

ELECELGQ01

??

CLEANERSLG034

DIVE GEARLG031

FEMALE WCLGQ53

LIFTLGLS02 LIFT

LGLS02LIFT

LGLS02

CRYO STORELG028

TEALG037

CIRCULATIONLGQ13

CIRCULATIONLGQ18

UPS/ BATTERY RACK ROOMLGQ27

CIRCULATIONLGQ20

CIRCULATIONLGQ19

CIRCULATIONLGQ24

CIRC

ULAT

ION

LGQ2

1

CIRCULATIONLGQ23

CIRCULATIONLGQ22

FHRFLGQ07

FHRFLGQ06

FHRFLGQ04

CIRC

ULAT

ION

LGQ1

1CI

RCUL

ATIO

NLG

Q12

CIRC

ULAT

ION

LGQ1

5

CIRC

ULAT

ION

LGQ2

6

FHRFLGQ05

FHRFLGQ03

BOOSTER VALVE SETHLGQ01

PFCLGQ73

GLASS WASHLG022

8128

8128

8128 8128 8128 8128 8128 8128 8128 8128 8128 8128 8128 8128

111000

211000

111001

211001

eA

DOCUMENT REVIEWBrookfield Multiplex Constructions Pty Ltd

A - Acceptable for ConstructionB - Acceptable for Construction subject to comments. Correct and ResubmitC - Unacceptable for Construction. Correct and Resubmit for ReviewD - Drawing on Hold

These documents have been reviewed for conformity with design intent. Acceptance does notmean approval of dimensions, sizes or weights nor does it relieve the Subcontractor and/or theConsultant from responsibility for errors, omissions or compliance with his obligations and/orrequirements of the Contract and/or Subconract.

Reviewed ............................................................. Date ...............................

Contractor must verify all dimensions on site before commencing workor preparing shop drawings. Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Size check

Project

Client

Notes & Legend

© Woods Bagot

# Description DateStatusRecent revision history

TM

Architect

Builder

Project Manager

Mechanical / Gases / VT

Electrical / ICT / AV

Hydraulic / Fire

Structure / Civil

Landscape

BS2-WB-AR- 4

1 : 200

10000

PRELIMINARY

120922

AP CS

UNSW Australia

BIOLOGICAL SCIENCES PROJECTSTAGE 2Botany StreetKensington CampusNSW 2052

EXISTING FLOOR PLANS - LOWERGROUND FLOOR

1 SD ISSUED FOR INFORMATION 20/07/162 DD DD ISSUE 14/12/163 DD DD ISSUE 05/01/174 PRELIMINARY E26 ROOM NUMBERS ADDED 05/10/17

mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
PolyLine
mwatson
Line
mwatson
Line
mwatson
PolyLine
mwatson
Polygon
mwatson
Polygon
mwatson
Polygon
mwatson
PolyLine
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
PolyLine
mwatson
PolyLine
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Text Box
2.4m high painted timber hoarding
mwatson
Text Box
Existing doors bolted closed
mwatson
Text Box
Walls extended up to prevent dust movement
mwatson
Text Box
UNSW PLANT ROOM
mwatson
Text Box
UNSW ACCESS PATHS
mwatson
Text Box
MPX CONSTRUCTION SITE
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
Line
mwatson
PolyLine
mwatson
Rectangle
mwatson
Callout
Remove lead dust in ceiling
mwatson
Rectangle
mwatson
Rectangle
mwatson
Rectangle
mwatson
Callout
Remove lead dust in ceiling
mwatson
Callout
Remove lead dust in ceiling
mwatson
Polygon
mwatson
Callout
Remove asbestos dust in ceiling
mwatson
Text Box
Page 3 - HAZMAT and DEMO