Page 1: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Load Rating of Post-Tensioned

Cast-in-place Concrete Segmental

Bridge

Ken Lee and Nyssa Beach

Page 2: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

H-09-U: SH 82 over Maroon Creek, Aspen CO

Buttermilk Ski ResortH-09-U

Page 3: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Project Overview – CDOT Load Rating

• First of two task orders to rate Colorado structures

that are either missing load ratings or in need of

updated load ratings.

• 20 structures rated in the first task order

• Load ratings included:– Cast-in-place post tensioned segmental structure (Maroon Creek – Midas)

– 10-span curved welded plate steel girder (AASHTOWare BrR)

– Multi-cell cast-in-place post tensioned box girder (AASHTOWare BrR)

– 8-span spliced post-tensioned concrete U-girder (Bentley Consplice)

– 3-span welded plate girder steel slant leg (Midas)

– Concrete Arch Culvert (SAP2000)

Page 4: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Bridge Overview – Maroon Creek Bridge

Page 5: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Bridge Overview – Maroon Creek Bridge

Completed in 2005

3 Spans (170ft. – 270ft. – 170ft.)

Bridge width = 73’-0”

Typical Box Depth = 13’-6” along

Bridge Width = 73’-0”

Fully Integral at Piers

Page 6: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Bridge Overview – Maroon Creek Bridge

Page 7: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Bridge Overview – Maroon Creek Bridge

Page 8: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Bridge Overview – Maroon Creek Bridge

Page 9: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Bridge Overview – Maroon Creek Bridge

Page 10: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Challenging aspects of Bridge Design

• Transverse and Longitudinal Analyses

• Construction Stages

• Time-dependent Behavior

• Interaction of Transverse Bending and Longitudinal

Shear in Webs

• Geometry

• Prevention of Substructure Flexural Crack

• Load Ratings

Page 11: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Main Topics

• Longitudinal Analysis and Design

• Construction Stages

• Time-dependent Behaviors

• Load Ratings

Page 12: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Modeling of Maroon Creek Bridge

Connectivity and BCs

Page 13: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Modeling of Maroon Creek Bridge

Creep/Shrinkage: CEB-FIP (1978)

Page 14: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Time-dependent Material and Behavior

Creep Coefficient

Page 15: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Modeling of Maroon Creek Bridge

Tendon Profiles

Page 16: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Modeling of Maroon Creek Bridge

Tendon Properties (low relaxation)

Page 17: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Modeling of Maroon Creek Bridge

Jacking Force

Page 18: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Modeling of Maroon Creek Bridge

17- Load Cases

Page 19: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Load Combination

20 Load combinations

Page 20: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Temperature and Structural Behavior

TG [AASHTO 3.12.3]

Page 21: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Why Construction Stage Analysis is crucial?

M under Selfweight wo/ CS – 3 span continuous

M under Top PT w/ CS– Cantilevers and closure pour

Page 22: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Why Construction Stage Analysis is crucial?

M under Top PT wo/ CS – Secondary PT included!!

M under Top PT w/ CS – No Secondary PT Effect

Page 23: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Construction Stage Analysis- Total 11 CSs.

360days for Bridge Completion

Page 24: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Construction Stage Analysis

Assign Groups to Each Construction Stage

Page 25: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Construction Stage Analysis

Page 26: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Construction Stage Analysis

360 days at Bridge Completion and 10 years for CR/SH

Page 27: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Construction Stage Analysis

Page 28: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Summation of CS

Summation of CS

Reaction

DL+ER+Secondary PT+Secondary CR+Secondary SH

Deformation

DL+ER+Primary PT+Primary CR+Primary SH

Force

DL+ER+Primary PT+Secondary PT+Secondary CR+

. Secondary CR

Page 29: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Evaluation of Post-Analysis: Const. Stages

Page 30: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Evaluation of Post-Analysis: After Completion

Page 31: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Tendon Stress Limits

Page 32: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Evaluation of Post-Analysis: Tendon Loss

Page 33: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Midas Design Feature

Longitudinal Reinforcing

Page 34: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Midas Design Feature

Shear and Torsional reinforcing

Page 35: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Load Rating

Design Vehicles – HL93 / 9 Legal / CDOT Permit

Define Rating Cases

Page 36: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Load Rating

Summary of Ratings in Strength

Page 37: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Summary

• Load Rating = 1.3

• Construction Stage Analysis is crucial

• Verification of Behavior of Time-dependent material

• Evaluation of Post-Analysis

• Midas Design Features for Seg. PT Concrete Bridge

• Capability of Midas Load Rating for Seg. PT Concrete

Bridge

Page 38: Load Rating of Post-Tensioned Cast-in-place Concrete Segmental …northamerica.midasuser.com/web/upload/sample/KenLee... · 2016. 3. 23. · Project Overview –CDOT Load Rating •

Acknowledgement