Ver.22.05.2015 LNG Projects

LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

  • Upload
    trannhi

  • View
    226

  • Download
    2

Embed Size (px)

Citation preview

Page 1: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Ver.22.05.2015

LNG Projects

Page 2: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Çimtaş Precision Machining

Cimtas Group Company Locations

Page 3: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Cimtas Fabrication Shop Locations, Gemlik/Turkey

Cimtas Gemlik Works

Cimtas Pipe

Cimtas Precision Machining

Page 4: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Cimtas Pipe Fabrication and Trading Ltd. Co.

• Power, Process and OEM Piping Systems• Integrated Design & Engineering, Material Procurement

Fabrication, Surface Treatment, Packing, Framing• Induction Bending (2 machines, 40 and 108 mm thk. P92)• ASME NPT, NS, NA, KTA1401 Nuclear Certificates• 22 Bays, 49 Overhead Cranes• Fenced Area: 93,000 sqm • Covered Shop Area: 38,000 sqm• 3,500 tons/month Fabrication Capacity

Page 5: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

LNG Projects

Project Name Location Tonnage *Plant Capacity Year

ELNG Egypt 5,350 7.2 2003-2004

EGLNG Equatorial Guinea 2,500 3.4 2005-2006

Angola LNG Angola 7,250 5.2 2009-2010

Queensland LNG Australia 10,100 8.5 2012-2013

Gladstone LNG Australia 12,500 7 2012-2013

AP LNG Australia 6,900 4.5 2012-2013

Sabine Pass LNG Train 1-2 U.S.A. 14,250 9 2013-2014

Sabine Pass LNG Train 3-4 U.S.A. 13,700 9 2014-2015

Angola LNG (Additional) Angola 1,300 5.2 2014-2015

Corpus Christi LNG Train 1-2 U.S.A. 14,250 4.5 2015TOTAL 88,100 63.5

*Total of 16 trains with 63.5 million tons per annum capacity

Page 6: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

LNG Projects Size and Metallurgy Breakdown

Metalurgy Dia Inch Range Tonnage Material

CS2" and below 1,850 CS1

3" - 24" 29,200 CS2

>24" 37,900 CS3

Sub Total 68,950

SS2" and below 980 SS1

3" - 24" 7,700 SS2

>24" 10,470 SS3

Sub Total 19,150

Grand Total 88,100

Page 7: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

PMP® certified project managers and coordinators support the objectives to implement solutions with the lowest overall risk and highest customer satisfaction.

Project Management

• Integrated change control to centrally manage and document change orders

• Communication Plan to clearly define how to communicate the right information to the

right stakeholder at the right time

• Integrating, communicating and managing technical changes

• Managing suppliers and sub-contractors through cost, schedule and quality baselines

Page 8: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Logistics

• Procurement, material handling, storage, packing

• Crating, Bundling, Containerizing, Framing

• 21 Portal & Semi-Portal cranes up to 30 tons capacity

• 49 Overhead cranes up to 25 tons capacity

• 100 logistics staff

• 2 hrs/ 200 kms from Istanbul

• 2 kms from 4 International Deep Sea Ports

• 50,000 sqm stock area

Page 9: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Procurement

• Pipes• Pipe Supports• Fittings• Flanges• Valves• Instruments• Process Equipment Packages

• Cost-efficient supply chain management

• Global sourcing

• Knowledge of local and int.’l markets and customs

• Wide range of approved well known suppliers

• Multi location central managed sourcing

• Experienced sourcing and procurement engineers

• Supplier qualification and evaluation

Butterfly steam control valveVendor Inspection

Scope

Page 10: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Packing Types

• Regular weekly 500 tons of bulk spool shipments

on priority basis worldwide.

Crating, Bundling, Containerizing

Page 11: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

2008- 2014 Total : $ 270 MGlobal Sourcing

Page 12: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

Worldwide Deliveries Over 40 countries

Page 13: LNG Projects - cimtas.com LNG proje… · LNG Projects Project Name ... • Process Equipment Packages • Cost-efficient supply chain management • Global sourcing ... PowerPoint

www.cimtaspipe.com