LNG Infrastructure & Development

K.K. Sinha

Director– Essar Ports Ltd.

Page 2: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

2

Chabahar Port

HaziraPort

Gas in Global Energy Basket (2016)

4418, 33%

3204, 24%

3732, 28%

592, 5%910, 7%

420, 3%

Million tonnes oil Equ.

Oil Natural GasCoal Nuclear EnergyHydro Electric Renewables

▪ Natural gas contributes 24% in

world Energy basket

▪ Natural gas contribution is third

behind oil (33%) and coal (28%)

▪ Being cleanest among top three,

natural gas is expected to further

enhance its share

2460, 69%

1083, 31%

Gas Consumption (Domestic v/s Trade)

Gas Domestic Consumption Gas Trade

▪ More than two third of gas is

consumed domestically.

▪ Approx. one third is traded in

the form of gas through

pipelines and in the form of

LNG through ships

▪ Approx. two third of gas is

traded through pipeline primarily

within Europe and North

America

▪ Approx. one third of gas is

traded in the form of LNG

primarily to Japan, Korea, China,

India, Taiwan etc.

737, 68%

346, 32%

Trade Distribution (Pipeline V/s LNG)

Gas Pipeline Trade LNG Trade

Source: BP Statistical Review of World energy

Total: 13.3 Billion TOE

Total: 3,543 BCM Total: 1,083 BCM

Page 3: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

Global - Liquefaction and Regasification Infrastructure

340

258

0

50

100

150

200

250

300

350

400

Capacity Demand

Liquefaction Quantity in MMT

795

258

0

100

200

300

400

500

600

700

800

900

Capacity Demand

Regasification Quantity in MMT

340

452

0

50

100

150

200

250

300

350

400

450

500

2016 2022

Proposed Liquefaction Quantity in MMT

▪ Capacity utilization of liquefaction plant is 75%

▪ Additional 112 MMT (35% increase) is expected to

be added by 2022

▪ Regasification capacity utilization is approx. 35%

▪ USA has regasification capacity of 129 MMTPA

and utilization is 1%

▪ 90 MMT of new Regasification capacity is under

construction

Source: IGU 2017 World LNG Report

Page 4: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

Gas in India – Overview

213, 30%

412, 57%

45, 6%

9, 1% 29, 4%17, 2%

2016 - MillionTonnes Oil Equivalent in India

Oil Coal Gas Nuclear Hydro Renewable

▪ Natural gas contributes 6% in India

Energy basket while coal and oil

contributes 57% and 30% respectively.

▪ With focus on clean energy, gas share is

expected to increase substantially

▪ Fertilizer, power, refinery, city gas and

petrochemicals are the major user of gas

in India

▪ Gas demand has increased by 8.5% in

FY 17 and 4% in first nine months of FY

18.

▪ Although latent demand is huge, India is

yet to reach the inflexion point of the

faster growth.

Source: BP Statistical Review of World energy June 2017 Source: Crisil

44 42 45 45 40

31 2832 32

30

2019

20 2123

77

7 7 10

1413

14 15 1910

1110

1719

0

20

40

60

80

100

120

140

160

FY14 FY15 FY16 FY 17 FY 18

M

M

S

C

M

D

Sector Wise Natural Gas Demand

Others (Others/LPG/PLconsumption)

Refinery

Petrochemicals

CGD

Power

Fertilisers

126121

127

136 142

Total: 725 Million TOE

Page 5: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

Demand and Supply of Natural Gas in India

5

▪ During last 3 years Natural gas demand has

increased from 121 MMSCMD in FY 15 to

142 MMSCMD in FY 18

▪ Domestic production has been stagnant

around 70 MMSCMD

▪ Natural gas import has increased from 48

MMSCMD in FY 15 to 71 MMSCMD in FY

18

73 69 70 71

48 58 6871

0

20

40

60

80

100

120

140

160

FY15 FY16 FY17 FY 18

M

M

S

C

M

D

LNG Consumption

LNG

Domestic

121 127138

142

Source: Crisil

Page 6: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

6

Chabahar Port

HaziraPort

▪ LNG prices have declined during FY 16 and FY17 with increase in the liquefaction capacity

and decrease in price of crude oil

▪ However, during last few months, price has strengthened due to rise in crude prices

▪ Currently LNG price is at approx. USD 10/MMBTU which is quite high

▪ Currently LNG and Fuel oil are trading at similar prices and only benefit for LNG are benefits

associated with the cleaner fuel

Price sensitivity of LNG

Page 7: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

7

Chabahar Port

HaziraPort

Traditional LNG Termimal – Huge investment and long term

commitment from full value chain

▪ Land based terminal with huge investment of ~ USD 700 – 800 Million

▪ Tie up of full value chain – Liquefaction capacity, ships and end user

▪ Beneficial for large scale operations to cater to market size 5 MTPA or more

▪ Important for sectors with fixed demands and capability of long term commitments

▪ Worldwide, 106 land based LNG terminals are operational

Page 8: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

New Concept – FSRU and FSU + Land based Regas

▪ LNG ship is used as storage unit instead of development of large tanks on land

▪ Regasification unit is on ship in FSRU and on land in case of FSU

▪ Capex is lower than land based terminal ( ~ USD 400 – 600 Million) for FSRU and USD 200-300 million

for FSU + land based regas

▪ Better option compared to land based terminal if demand is not very high up to 3-4 MMTPA

▪ Breakeven at lower traffic of 1.0 to 2.0 MMTPA

▪ Long term commitment for full value chain is not required beyond the anchor customer

▪ Worldwide, 26 FSRU and one FSU based LNG terminals are operational at present

Floating Storage and Regasification (FSRU) Floating Storage Unit (FSU) and Land based Regasification

Page 9: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

9

Chabahar Port

HaziraPort

LNG Regasification infrastructure in India

Location Ownership Stake

Existing

Capacity

(MTPA)

Incremen

tal

Capacity

(MTPA)

Utilisat

ion

Dahej Petronet LNG 100% 15 2.5 97%

HaziraShell Gas B.V. 74%

5 76%Total 26%

Dabhol

GAIL 25.5%

5 (1.6 due to

lack of

breakwater

56.3%

NTPC 25.5%

MSEB and

Financial

institutions

49.0%

Kochi Petronet LNG 100% 5 ~ 5 %

Total 26.6 2.5

▪ Currently, India has approx. 27 MTPA of

regasification capacity from Petronet

Dahej, Petronet Kochi, RGPPL Dabhol &

Shell – Total Hazira import terminals

Location Ownership Capacity in

Phases I

Expected

Commissioning

Mundra GSPC and Adani Port 5 2018

Ennore IOCL 5 2018

ChharaHPCL and Shapoorji

Pallonji Group5 2021

DhamraAdani Port, GAIL and

IOCL5 2021

Jafrabad Swan Energy 5 2020

HaziraUltra LNG Limited and

Essar Bulk Terminal4 2020

Total 29

Existing Regasification Terminals

Upcoming Regasification Terminals

▪ Approximately 30 MMT LNG

regasification terminal is under

development in India

▪ 4 terminals are on land based – Ennore,

Mundra, Dhamra and Chhara

▪ One FSRU – Jafrabad

▪ One FSU + Land based at Hazira

Page 10: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

Hub Spoke Model and Small Scale LNG

▪ Pipeline connectivity to all the demand centers is going to be a challenge

▪ Several small capacity LNG terminals might be a better solution compared to few large terminals

▪ Hub and Spoke model can be implemented where one large terminal will cater to a large demand

center and also provide transshipment facility for few smaller terminals.

▪ Bangladesh and Sri Lanka market can also be captured through hub and spoke model

▪ Road movement of LNG for smaller distance will be another source of transportation of LNG

Page 11: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

LNG as auto fuel and bunker – potential demand centre

▪ With tighter emission rules for the maritime sector from 1st January 2020, potential to use LNG as

bunker fuel is increasing.

▪ Antwerp, Amsterdam, Rotterdam, Zeebrugge and Stockholm ports already have LNG bunkering

infrastructure. LNG can be bunkered at several Norwegian ports.

▪ LNG prices are almost same as that of fuel oil hence shifting into LNG will not lead to additional fuel

cost, however, ship engines need to be modified

▪ LNG is better than CNG due to its higher density hence larger quantity can be stored in the

automobile fuel tanks

▪ LNG and solar powered vehicles are solution for the future transportation as they are cleaner

compared to other fossil fuels

▪ India consumed 76 MMT of diesel during 2016-17

▪ Demand of diesel has increased at CAGR of 3.3% during last 5 years

▪ Assuming similar trend in future diesel demand is expected to be 90 MMT by FY 2022

▪ If 25% of diesel in FY 2022 is replaced by LNG, LNG demand will increase by 22 MMT which is

higher than the current import of LNG in the country.

Page 12: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

LNG as Auto Fuel Infrastructure Required

▪ Due to cryogenic state, LNG cannot be moved through pipelines for longer distance

▪ LNG movement will require separate infrastructure in terms of LNG depot and LNG

filling stations

▪ For economical movement of LNG to the depots, LNG can be moved by railway through

pressurized double walled tanks

▪ LNG can also be moved by LNG semi trailer and LNG iso-containers

Page 13: LNG Infrastructure & Development€¦ · Regasification unit is on ship in FSRU and on land in case of ... terminals might be a better solution compared to few ... financial viability

13

Chabahar Port

HaziraPort

LNG Financing

Important factors for financing of LNG Infrastructure:

▪ Long term take or pay contracts with customers providing revenue visibility and

stable cash flows resulting in financial viability of the project

▪ Lower LNG prices are critical for financing of LNG projects

▪ Indian market is highly price sensitive

▪ Many industries like power cannot afford high LNG prices as they have to

compete with alternate sources of energy like coal, solar etc.

▪ Lower cost and longer duration loan are critical for sustenance of LNG infrastructure

projects

▪ Procurement of equipment from established vendors with past track record to ensure

quality and reliability of the LNG infrastructure