2
CASE STUDY H2O INC. 841 VINCENT RD. LAFAYETTE, LA 70508 (P) 337.857.7203 www.h2oinc.com DIVISION POTABLE WATER TREATMENT PROJECT NAME DELTA HOUSE OWNER LLOG EXPLORATION ABOUT THIS PROJECT: POTABLE WATER SYSTEM LOCATION: GULF OF MEXICO PROJECT FACTS The Delta House semi-submersible Floating Production System achieved first oil production in 2015. It is installed in Mississippi Canyon 254 and sits in water depth of 4,500 feet. H2O was awarded the complete potable water system including the watermaker, storage tank and pressure set packages. CHALLENGE Initially, the scope was intended as three separate packages installed in various locations throughout the platform: a 5,000 gallon per day reverse osmosis desalination plant to supply enough water for 50 people, a 2,500 gallon day tank and a 2 X 50 gallons per minute pressure set skid. The customer was interested in ways to save space and reduce costs for the project. SOLUTION H2O offered to package the entire potable water system for the platform on a single skid. The single skid resulted in smaller footprint and easier installation as it was now a single lift item. Additionally, the customer saved considerable costs in three primary areas: 1) Engineering: with the same engineering team reviewing the specifications and submitting documentation for all three packages, H2O was able to reduce 30% of engineering hours required 2) Control system: with a single supplier, only one PLC was required to control all three packages as opposed to having a separate PLC per package 3) Field installation: all of the interconnecting plumbing and wiring between the three packages was conducted prior to delivery. Hence, having three packages on a single skid minimized field plumbing and cabling.

LLOG Delta House Water Package Case Study - H2O Inc.€¦ · CASE STUDY H2O INC. 841 VINCENT RD. LAFAYETTE, LA 70508 (P) 337.857.7203 DIVISION POTABLE WATER TREATMENT PROJECT NAME

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LLOG Delta House Water Package Case Study - H2O Inc.€¦ · CASE STUDY H2O INC. 841 VINCENT RD. LAFAYETTE, LA 70508 (P) 337.857.7203 DIVISION POTABLE WATER TREATMENT PROJECT NAME

CASESTUDY

H2OINC.841VINCENTRD.LAFAYETTE,LA70508(P)337.857.7203www.h2oinc.com

DIVISION

POTABLEWATERTREATMENT

PROJECTNAME

DELTAHOUSE

OWNER

LLOGEXPLORATION

ABOUTTHISPROJECT:POTABLEWATERSYSTEM LOCATION:GULFOFMEXICO

PROJECTFACTS

TheDeltaHousesemi-submersibleFloatingProductionSystemachievedfirstoilproductionin2015.ItisinstalledinMississippiCanyon254andsitsinwaterdepthof4,500feet.H2Owasawardedthecompletepotablewatersystemincludingthewatermaker,storagetankandpressuresetpackages.

CHALLENGE

Initially,thescopewasintendedasthreeseparatepackagesinstalledinvariouslocationsthroughouttheplatform:a5,000gallonperdayreverseosmosisdesalinationplanttosupplyenoughwaterfor50people,a2,500gallondaytankanda2X50gallonsperminutepressuresetskid.Thecustomerwasinterestedinwaystosavespaceandreducecostsfortheproject.

SOLUTION

H2Oofferedtopackagetheentirepotablewatersystemfortheplatformonasingleskid.Thesingleskidresultedinsmallerfootprintandeasierinstallationasitwasnowasingleliftitem.Additionally,thecustomersavedconsiderablecostsinthreeprimaryareas:

1) Engineering:• withthesameengineeringteamreviewingthespecificationsandsubmittingdocumentationforall

threepackages,H2Owasabletoreduce30%ofengineeringhoursrequired2) Controlsystem:

• withasinglesupplier,onlyonePLCwasrequiredtocontrolallthreepackagesasopposedtohavingaseparatePLCperpackage

3) Fieldinstallation:• alloftheinterconnectingplumbingandwiringbetweenthethreepackageswasconductedpriorto

delivery.Hence,havingthreepackagesonasingleskidminimizedfieldplumbingandcabling.

Page 2: LLOG Delta House Water Package Case Study - H2O Inc.€¦ · CASE STUDY H2O INC. 841 VINCENT RD. LAFAYETTE, LA 70508 (P) 337.857.7203 DIVISION POTABLE WATER TREATMENT PROJECT NAME

2

H2OINC.841VINCENTRD.LAFAYETTE,LA70508(P)337.857.7203www.h2oinc.com

RESULT

LLOGwasabletoachievedesiredcostreduction,whilesavingspaceandminimizingtheamountoffieldworktypicallyrequiredtointerconnectthesepackages.H2Owasabletodesign,test,documentanddeliverthisentirecustompotablewatersysteminlessthan20weeks.