I Certification Date:C 0 P ~llJnited States of America" ..Department of Homeland Security
United States Coast Guard
I Expiration Date: 18 Apr 2004 IIIMO Number: 7320095
Vessel Name
COLUMBIAOfficial Number
557340Call Sign
WYR2092Service
Passenger (More Than 6)
Hailing PortJUNEAU AK
Hull Material
SteelHo~epower
10800Propulsion
Diesel Reduction
:Place Built
SEATTLE WA, UNITED STATESDelivery Date Date Keel Laid
31 Dec1974 01Jan1974Gross Tons
R-3946
1-13009
Net Tons
R-26831-4932
DWT LengthR-376.81-376.8
Operator
STATE OF ALASKA, DEPT. OF TRANSP. & PUBLICFACILITIESA.M.H.S. PORT CAPTAIN 3132 CHANNEL DRIVEJUNEAU, AK 99801-7898UNITED STATES
UwnerAMHS
PORT CAPTAIN3132 CHANNEL DRIVEJUNEAU,
AK 99801-7898
This vessel must be manned with the following licensed and unlicensed personnel. Included in which there must be26 certified lifeboatmen. 0 certified tankermen. 0 HSC type rating. and 0 GMDSS Operators.
0 Master 1 Master & 1st Class pilot 0 Radio Officer(s) 1 Chief Engineer 0 QMED/Rating
0 Chief Mate 0 Mate & 1 st Class Pilot 4 Able Seamen/ROANW 0 1 st Asst. Engr/2nd Engr. 2 Oilers
0 2nd Mate/OICNW 0 Lic. Mate/OICNW 2 Ordinary Seamen 0 2nd Asst. Engr/3rd Engr. 1 PATROLMAN
0 3rd Mate/OICNW 31st Class Pilot 0 Deckhands 0 3rd Asst. Engr. 1 WIPER
2 'Lic. Engr.
In addition, this vessel may carry 750 passengers, 69 other persons in crew, 0 persons in addition to crew, and no others.Total persons allowed: 836
Route Permitted and Conditions of Operation:
---Lakes, Bays, and Sounds---
THE SHELTERED WATERS OF THE WEST COAST OF NORTH AMERICA AS DEFINED IN 46 CFR 42.03-35, NOTON AN INTERNATIONAL VOYAGE DEFINED BY SOLAS. THIS VESSEL IS EXEMPTED FROM THE CONSTRUCTIONREQUIREMENTS FOR VESSELS ON AN INTERNATIONAL VOYAGE AS DEFINED BY 46 CFR 70.05-10 (A) (2) (iii) PER 46 CFR 70.05-10 (d) .
AN HOURLY PATROL OF THE VEHICLE DECK SHALL BE CONDUCTED IN ADDITION TO THE EVENING PATROLS
REQUIRED BY 46 CFR 78.30-10.
THE VESSEL MAY TRANSPORT MOTOR VEHICLES, GASOLINE (INCLUDING CAMP STOVE OR LANTERN FUEL) ,AND LIQUEFIED PETROLEUM GAS IN COMMERCE SUBJECT TO THE LIMITATIONS AND SPECIAL
***SEE
NEXT PAGE FOR ADDITIONAL CERTIFICATE INFORMATION***
r in Charge, Marine Inspection, MSOinspection laws and the rules and
With this InspectionIJUNEAU certified the vessel, in all respects,
IThisA/P/Q SiqnatureDate Zone
USCGJ. prSIF;lING
,"lit'I¥pection Zone
OMBNo.2115-O517Dept of Home Sec., USCG, CG-841 (Rev4-2000XY2)
Department of Homeland Sa:urityUnited States Coast Guard
co[:;rificate of InspectionPage 2 of 4 Certification Date:
18Apr2003COLUMBIA
REQUIREMENTS SPECIFIED IN DEPARTMENT OF TRANSPORTATION EXEMPTION DOT-E 7465 DATED 20AUGUST 2002, A COpy OF WHICH SHALL BE CARRIED ABOARD THE VESSEL.
THE VESSEL MAY ALSO TRANSPORT HAZARDOUS MATERIAL AUTHORIZED TO BE STOWED "ON DECK" AND
"UNDER DECK" ON CARGO VESSELS (INDICATED BY THE NUMBERS "1,2" IN COLUMN (7) (A) OF 49 CFR172.101) AND "ON DECK" ON PASSENGER VESSELS (INDICATED BY THE NUMBER "I" IN COLUMN (7) (B)OF 49 CFR 172.101) IN COMMERCE SUBJECT TO THE LIMITATIONS AND SPECIAL REQUIREMENTSI SPECIFIED IN DEPARTMENT OF TRANSPORTATION EXEMPTION DOT-E 7928 DATED 15 MARCH 1984, A! COpy OF WHICH SHALL BE CARRIED ABOARD THE VESSEL.
Next Exam20Sep200420Sep2004
Last Exam20Mar200320Mar2003
Prior Exam30May200230May2002
---Hull Exams---Exam TypeDrydockInternal structure
---Stability---Letter Approval Date / 16May2002 Office/ Marine Safety Center
---Inspection Status---* Fuel Tanks*
Tank ID4 PORT4 STBD5 PORT5 CENTER5 STBD6 PORT6 CENTER6 STBD
7 PORT7 CENTER7 STBD
Next02Feb200402Feb200418Mar200802Feb200418Mar200818Mar200802Feb200402Feb200802Feb200402Feb200402Feb2004
Internal ExaminationsPrevious Last-02Feb1999-02Feb199916Apr1998 18Mar2003-02Feb199904Mar1997 18Mar200316Apr1998 18Mar2003-02Feb199902Feb1999 18Mar2003-02Feb1999-02Feb1999-02Feb1999
*Boilers/Steam Piping*Maximum Steam Pressure Allowed/150
MountsOpened20Mar2003llMar200320Mar2003
MountsRemoved20Mar2003llMar200320Mar2003
Hydro/PreviouslOJu12001lOJu12001lOJu12001
Boiler/Piping IDSEA 73-22473208SEA 73-225
Hydro/Last02Apr200320Mar200302Apr2003
Hydro/Next020ct200S20Sep200S020ct200S
WatersidePrevious30May200230May200230May2002
FiresidePrevious30May200230May200230May2002
Boiler/Piping IDSEA 73-22473208SEA 73-225
LastOlApr200320Mar2003OlApr2003
Last NextOlApr2003 OlOct200S20Mar200320Sep200SOlApr2003 OlOct200S
NextOlOct200S20Sep200SOlOct200S
Previous NextLastlOJu12001
*Pressure Vessels*TypeAir Receiver
LocationGenerator Room
~~' OMB No-rl15'()517DqJt. of Home Stt., USCG. CG-841 (_4-2000)(v2)
Certificate
of InspectionPage 3 of 4 Certification Date:
18Apr2003COLUMBIA
Shaft AlleyGenerator RoomGenerator RoomGenerator Room
lOMay1999lOJu12001lOJu12001lOJu12001
lOMay2004lOJu12006lOJu12006lOJu12006
-OtherAir ReceiverAir ReceiverAir Receiver
*Tailshafts*Tailshaft IDPORTSTBD
Date
Drawn Next Due DatelONov2004lONov2004
*Lifesaving*Number of Davits/4Lifeboat/Raft ID21RESCUE 2RESCUE 1
Full
Wgt Test Light Wgt Test17Apr2003 -18Apr2003 -18Apr2003 -17Apr2003 -
Falls Rnwd17Apr200317Apr200317Apr200317Apr2003
Falls End/End
---Lifesaving Equipment---Number Persons
Total Equipment for 836Lifeboats (Total) 2 96Lifeboats (Port) * 1 48Lifeboats (Starbd) * 1 48Motor Lifeboats* 2 96Lifeboats W/Radio* 0 0
Rescue Boats/Platforms 2 18Inflatable Rafts 18 900Life Floats/Buoyant App 0 0
Required878751262400Yes
Life Preservers(Adult)Life Preservers(Child)Ring Buoys (Total)
With Lights*With Line Attached*Other*
InU1\ersion SuitsPortable Lifeboat RadiosEquipped with EPIRB?(* included in totals)
---Fire Fighting Equipment---Nwnber of Fireman Outfits/ :2 Number of Fire Pumps/ 2
*Hose information*Qty Diameter1 2.510 2.560 1.56 1.5
Length75505075
Space ProtectedMAIN ENGINE ROOMAUXILIARY MACHINERY SPACEEMERGENCY GENERATORPAINT LOCKERCAR DECKGAYLORD -CAFETERIA SIDEGAYLORD -DINING SIDE
BOWTHRUSTER
*Fixed Extinguishing Systems*Capacity Agent3500 Carbon Dioxide2000 Carbon Dioxide100 Carbon Dioxide150 Carbon Dioxide
Water Spray25 Other25 Other450 Carbon Dioxide
~"'".
Department of Homeland Security0 p y United States Coast Guard
COLUMBIA
Shaft Alley -Generator Room -Generator Room -Generator Room -~ -~ ~T
Date Drawn Next Due Date-10Nov2004-10Nov2004
Full Wgt Test Light Wgt Test17Apr2003 -18Apr2003 -18Apr2003 -17Apr2003 -
~
OMBNo.2115-0517DqIt. of Home Sa:.. USCG. CG-841 (Rev 4-2000)(v2)
~