Cluster Optimisation ReportLjubljana Cluster1
Introduction Overview
Drive test routes
Status Before Optimisation
Scrambling Codes from Scanner RSCP from Scanner
EcIo from Scanner
EcNo from UE
Optimisation Performed
Main Issues
Explanation
Antenna Modifications Summary
Status After Optimisation Scrambling Codes from Scanner
RSCP from Scanner
EcIo from Scanner
EcNo from UE
Main Indicators Short Call AMR Statistics
Main Indicators Summary
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 2/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 2
Introduction
This study consisted of:
Performing measurements on selected routes.
Analysing these measurements and process some statistics.
Measurement description:
The following equipment was used:
Couei X-CAL v3.1.2
Qualcomm T6275 mobile in car configuration
Anritsu ML8720B UMTS Scanner in outdoor configuration (external antenna)
The mobile configuration used for this report is:
AMR short call (2’ call + 1’ pauses) in car with UE in automatic mode.
The scanner has been connected in outdoor configuration for each drive.
All the sites were in commercial traffic during the optimisation.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 3/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 3
Overview
This cluster is composed of 17 macro sites.
CLUSTER 1
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 4/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 4
Drive Test Route
Comments :
The drive goes through each main road of the cluster and through each cell’s area of service.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 5/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 5
Results
Network StatusBefore the Optimisation
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 6/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 6
Results:Scrambling Codes from Scanner
Comments :
- no problem of cross feeders was found on cluster 1
- some zones have problems of best-servers
- some cells have large coverage and may interfere
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 7/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 7
Results:RSCP from Scanner
Comments :
There are zones with low coverage. Specific investigations need to be done in order to
avoid as much as possible having “exclusion zones”.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 8/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 8
Results:EcIo from Scanner Outdoor
Comments :
Areas with low quality are revealed with this map.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 9/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 9
Results:EcNo from the mobile
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 10/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 10
Remarks
Scrambling code analysis :
All sites were on air during the first drive.
Due to very low values of the initial antenna tilts, there are areas covered by a high number of
sectors. This produces a best server problem in this areas.
RSCP analysis :
The RSCP level is good in most of the areas. But, all the sectors had a very low initial tilt. A slight
decrease in the RSCP level is expected, as these sectors have to be down-tilted to reduce the
overshooting. A gain in the RSCP level can only be obtain by adding new sites.
EcIo analysis :
There are some cases of areas with bad EcIo. These areas must be investigated to see whether
he quality problems come from overshooting or lack of coverage.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 11/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 11
Network StatusOptimisation Performed
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 12/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 12
Optimisation performed:Main issues
Red circles represent examples of areas with bad quality that need to be optimised.
Area1
Area2
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 13/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 13
Optimisation performed: Area 1
The following optimisations were performed:
- down-tilt Mestni_Log_2: from 2o to 5o
- down-tilt Cerkev_Trnovo_2: from 0o to 2o
- down-tilt Semenarna_3: from 0o to 3o
- down-tilt Iskra_2: from 0o to 6o , azimuth from 120o to 140o
EcIo in area 1 before optimization EcIo in area 1 after optimization
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 14/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 14
Optimisation performed: Area 2
EcIo in area 2 before optimization EcIo in area 2 after optimization
The following optimisations were performed:
- up-tilt Kozarje_1: from 3o to 1o, azimuth from 20o to 0o
- down-tilt Iskra_3: from 0o to 6o
- down-tilt Posta_Trzaska _2: from 3o to 6o
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 15/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 15
Optimisation performed: Area 2
RSCP (SC 162) in area 1 before optimization RSCP (SC 162) in area 1 after optimization
RSCP (SC 163) in area 2 before optimization RSCP (SC 163) in area 2 after optimization
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 16/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 16
Optimisation Performed: Antenna Modifications Summary
AZIMUTH TILT AZIMUTH TILT
"Podpec Sv. Ana" 48 70 8 70 8 0 0
"Podpec Sv. Ana" 49 260 8 260 8 0 0
"Podpec Sv. Ana" 50 350 8 350 8 0 0
"KPL Vic" 96 0 0 0 2 0 -2
"KPL Vic" 97 120 3 120 3 0 0"KPL Vic" 98 265 4 265 4 0 0
"Iskra PRINS" 155 60 3 60 3 0 0
"Iskra PRINS" 156 240 3 240 3 0 0
"Iskra PRINS" 157 335 3 335 3 0 0
"Kozarje" 158 20 3 0 1 20 2
"Kozarje" 159 100 3 100 4 0 -1
"Kozarje" 160 210 3 200 2 10 1
"Mladinska knjiga" 66 130 3 130 6 0 -3
"Mladinska knjiga" 67 200 3 200 4 0 -1
"Mladinska knjiga" 68 280 3 280 3 0 0
"Nama" 167 105 3 105 5 0 -2
"Nama" 168 240 3 240 6 0 -3
"Nama" 169 350 3 350 4 0 -1
"Stolnica" 84 20 3 20 3 0 0
"Stolnica" 85 120 3 120 3 0 0
"Stolnica" 86 210 3 210 3 0 0
"Iskra" 161 30 0 30 0 0 0
"Iskra" 162 120 0 140 6 -20 -6
"Iskra" 163 240 0 240 6 0 -6
"Cerkev Trnovo" 21 10 0 10 0 0 0
"Cerkev Trnovo" 22 180 0 180 2 0 -2
"Cerkev Trnovo" 23 285 0 285 1 0 -1
"GD Murgle" 24 190 3 180 4 10 -1
"GD Murgle" 25 270 3 270 3 0 0
"GD Murgle" 26 350 3 350 4 0 -1
NameDELTA
AZIMUTH
DELTA
TILTPSC
BEFORE AFTER
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 17/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 17
Optimisation Performed: Antenna Modifications Summary
Comments :
Average electrical tilt:
- Before the optimisation: 2.68°
- After the optimisation: 3.80°
AZIMUTH TILT AZIMUTH TILT
"Omega Air" 87 60 3 60 3 0 0
"Omega Air" 88 180 3 180 5 0 -2
"Omega Air" 89 300 3 300 3 0 0
"Posta Trzaska" 42 130 3 130 6 0 -3
"Posta Trzaska" 43 250 3 230 6 20 -3"Posta Trzaska" 44 310 3 310 4 0 -1
"Dolgi Most" 114 0 3 0 4 0 -1
"Dolgi Most" 115 140 3 160 5 -20 -2
"Dolgi Most" 116 220 3 220 4 0 -1
"TVD Partizan" 69 30 3 30 4 0 -1
"TVD Partizan" 70 100 3 100 5 0 -2
"TVD Partizan" 71 180 3 180 2 0 1
"Srednja Elektro Vegova" 90 120 3 100 5 20 -2
"Srednja Elektro Vegova" 91 200 3 200 6 0 -3
"Srednja Elektro Vegova" 92 280 3 280 5 0 -2
"Semenarna" 184 60 0 60 0 0 0
"Semenarna" 185 150 0 150 0 0 0
"Semenarna" 186 300 0 300 3 0 -3
"Mestni log" 170 0 2 0 3 0 -1
"Mestni log" 171 110 2 110 5 0 -3
"Mestni log" 172 270 3 270 4 0 -1
DELTA
AZIMUTH
DELTA
TILTName PSC
BEFORE AFTER
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 18/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 18
Results
Network Status After the Optimisation
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 19/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 19
Results:Scrambling Codes from Scanner Outdoor
Comments :
Zones with multi-servers reduced compared to the first drive test.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 20/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 20
Results:RSCP from Scanner Outdoor
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 21/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 21
Results:EcIo from Scanner Outdoor
Comments :
EcIo improved in all the cases considered for optimisation.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 22/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 22
Results:EcNo from the UE
Comments :
The EcNo improved after the optimisation. We can see on the map the zones whereproblems might happen (red points).
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 23/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 23
Remarks
Scrambling Code Analysis :
All sites were on air during the final drive.
Most of the best server problems have been solved.
RSCP Analysis :
There are some areas with low RSCP level, especially the one west to Semenarna site, but this
is mainly due to lack of sites in these areas.
EcIo and EcNo Analysis :
The EcIo improved in the areas considered for optimisation. Very few zones remain with low
quality level; these zones are to be optimized further in the acceptance phase.
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 24/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 24
Results
Network StatusMain Indicators
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 25/26
All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007
Alcatel-Lucent Team
Page 25
Results:Short Call AMR
Statistics before optimisation :
Statistics after optimisation :
Nb of Setup Fail Nb of Drops CSSR CDR Nb of HHO Nb Attempts
4 7 94.20% 10.77% 2 69
Nb of Setup Fail Nb of Drops CSSR CDR Nb of HHO Nb Attempts
0 1 100% 1.41% 1 71
7/30/2019 Ljubljana Cluster1 Optimization Report
http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 26/26
Results:Main Indicators Summary
Call Setup Success Rate analysis:
For the first drive:
-4 failures were found:
3 due to CM SERVICE REJECT sent by CN to the mobile 1 radio problem
For the last drive:
- No fail occurred due to radio problems in the last drive.
Call Drop Analysis after Investigation:
For the first drive:
- 7 radio drops were found in the first drive.
For the last drive:
- 1 call drop occurred in the last drive.
HHO Analysis:
For the first drive:
- 2 handovers to GSM occurred, triggered on bad RSCP criteria.
For the last drive:
- 1 handover to GSM occurred, triggered on bad RSCP criteria.