7/30/2019 Ljubljana Cluster1 Optimization Report http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 1/26  All rights reserved © 2007, Alcatel-Lucent Si.Mobil UMTS, October 2007 Alcatel-Lucent Team Page 1 Cluster Optimisation Report Ljubljana Cluster1 Introduction Overview Drive test routes  Status Before Optimisation Scrambling Codes from Scanner  RSCP from Scanner  EcIo from Scanner  EcNo from UE Optimisation Performed Main Issues Explanation  Antenna Modifications Summary Status After Optimisation Scrambling Codes from Scanner  RSCP from Scanner  EcIo from Scanner  EcNo from UE Main Indicators Short Call AMR Statistics Main Indicators Summary

Ljubljana Cluster1 Optimization Report

Embed Size (px)

Citation preview

Page 1: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 1/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 1

Cluster Optimisation ReportLjubljana Cluster1

Introduction Overview

Drive test routes 

Status Before Optimisation

Scrambling Codes from Scanner  RSCP from Scanner 

EcIo from Scanner 

EcNo from UE

Optimisation Performed

Main Issues

Explanation

 Antenna Modifications Summary

Status After Optimisation Scrambling Codes from Scanner 

RSCP from Scanner 

EcIo from Scanner 

EcNo from UE

Main Indicators Short Call AMR Statistics

Main Indicators Summary

Page 2: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 2/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 2

Introduction

This study consisted of:

Performing measurements on selected routes.

 Analysing these measurements and process some statistics.

Measurement description:

The following equipment was used:

Couei X-CAL v3.1.2

Qualcomm T6275 mobile in car configuration

 Anritsu ML8720B UMTS Scanner in outdoor configuration (external antenna)

The mobile configuration used for this report is:

AMR short call (2’ call + 1’ pauses) in car with UE in automatic mode.

The scanner has been connected in outdoor configuration for each drive.

All the sites were in commercial traffic during the optimisation.

Page 3: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 3/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 3

Overview

This cluster is composed of 17 macro sites.

CLUSTER 1

Page 4: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 4/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 4

Drive Test Route

Comments :

The drive goes through each main road of the cluster and through each cell’s area of service.

Page 5: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 5/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 5

Results

Network StatusBefore the Optimisation

Page 6: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 6/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 6

Results:Scrambling Codes from Scanner 

Comments :

- no problem of cross feeders was found on cluster 1

- some zones have problems of best-servers

- some cells have large coverage and may interfere

Page 7: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 7/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 7

Results:RSCP from Scanner 

Comments :

There are zones with low coverage. Specific investigations need to be done in order to

avoid as much as possible having “exclusion zones”. 

Page 8: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 8/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 8

Results:EcIo from Scanner Outdoor 

Comments :

 Areas with low quality are revealed with this map.

Page 9: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 9/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 9

Results:EcNo from the mobile

Page 10: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 10/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 10

Remarks

Scrambling code analysis :

All sites were on air during the first drive.

Due to very low values of the initial antenna tilts, there are areas covered by a high number of 

sectors. This produces a best server problem in this areas.

RSCP analysis :

The RSCP level is good in most of the areas. But, all the sectors had a very low initial tilt. A slight

decrease in the RSCP level is expected, as these sectors have to be down-tilted to reduce the

overshooting. A gain in the RSCP level can only be obtain by adding new sites.

EcIo analysis :

There are some cases of areas with bad EcIo. These areas must be investigated to see whether 

he quality problems come from overshooting or lack of coverage.

Page 11: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 11/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 11

Network StatusOptimisation Performed

Page 12: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 12/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 12

Optimisation performed:Main issues

Red circles represent examples of areas with bad quality that need to be optimised.

Area1

Area2

Page 13: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 13/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 13

Optimisation performed: Area 1 

The following optimisations were performed:

- down-tilt Mestni_Log_2: from 2o to 5o

- down-tilt Cerkev_Trnovo_2: from 0o to 2o

- down-tilt Semenarna_3: from 0o to 3o

- down-tilt Iskra_2: from 0o to 6o , azimuth from 120o to 140o

EcIo in area 1 before optimization EcIo in area 1 after optimization

Page 14: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 14/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 14

Optimisation performed: Area 2

EcIo in area 2 before optimization EcIo in area 2 after optimization

The following optimisations were performed:

- up-tilt Kozarje_1: from 3o to 1o, azimuth from 20o to 0o 

- down-tilt Iskra_3: from 0o to 6o 

- down-tilt Posta_Trzaska  _2: from 3o to 6o

Page 15: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 15/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 15

Optimisation performed: Area 2

RSCP (SC 162) in area 1 before optimization RSCP (SC 162) in area 1 after optimization

RSCP (SC 163) in area 2 before optimization RSCP (SC 163) in area 2 after optimization

Page 16: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 16/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 16

Optimisation Performed: Antenna Modifications Summary

 AZIMUTH TILT AZIMUTH TILT

"Podpec Sv. Ana" 48 70 8 70 8 0 0

"Podpec Sv. Ana" 49 260 8 260 8 0 0

"Podpec Sv. Ana" 50 350 8 350 8 0 0

"KPL Vic" 96 0 0 0 2 0 -2

"KPL Vic" 97 120 3 120 3 0 0"KPL Vic" 98 265 4 265 4 0 0

"Iskra PRINS" 155 60 3 60 3 0 0

"Iskra PRINS" 156 240 3 240 3 0 0

"Iskra PRINS" 157 335 3 335 3 0 0

"Kozarje" 158 20 3 0 1 20 2

"Kozarje" 159 100 3 100 4 0 -1

"Kozarje" 160 210 3 200 2 10 1

"Mladinska knjiga" 66 130 3 130 6 0 -3

"Mladinska knjiga" 67 200 3 200 4 0 -1

"Mladinska knjiga" 68 280 3 280 3 0 0

"Nama" 167 105 3 105 5 0 -2

"Nama" 168 240 3 240 6 0 -3

"Nama" 169 350 3 350 4 0 -1

"Stolnica" 84 20 3 20 3 0 0

"Stolnica" 85 120 3 120 3 0 0

"Stolnica" 86 210 3 210 3 0 0

"Iskra" 161 30 0 30 0 0 0

"Iskra" 162 120 0 140 6 -20 -6

"Iskra" 163 240 0 240 6 0 -6

"Cerkev Trnovo" 21 10 0 10 0 0 0

"Cerkev Trnovo" 22 180 0 180 2 0 -2

"Cerkev Trnovo" 23 285 0 285 1 0 -1

"GD Murgle" 24 190 3 180 4 10 -1

"GD Murgle" 25 270 3 270 3 0 0

"GD Murgle" 26 350 3 350 4 0 -1

NameDELTA

 AZIMUTH

DELTA

TILTPSC

BEFORE AFTER

Page 17: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 17/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 17

Optimisation Performed: Antenna Modifications Summary

Comments :

 Average electrical tilt:

- Before the optimisation: 2.68°

- After the optimisation: 3.80°

 AZIMUTH TILT AZIMUTH TILT

"Omega Air" 87 60 3 60 3 0 0

"Omega Air" 88 180 3 180 5 0 -2

"Omega Air" 89 300 3 300 3 0 0

"Posta Trzaska" 42 130 3 130 6 0 -3

"Posta Trzaska" 43 250 3 230 6 20 -3"Posta Trzaska" 44 310 3 310 4 0 -1

"Dolgi Most" 114 0 3 0 4 0 -1

"Dolgi Most" 115 140 3 160 5 -20 -2

"Dolgi Most" 116 220 3 220 4 0 -1

"TVD Partizan" 69 30 3 30 4 0 -1

"TVD Partizan" 70 100 3 100 5 0 -2

"TVD Partizan" 71 180 3 180 2 0 1

"Srednja Elektro Vegova" 90 120 3 100 5 20 -2

"Srednja Elektro Vegova" 91 200 3 200 6 0 -3

"Srednja Elektro Vegova" 92 280 3 280 5 0 -2

"Semenarna" 184 60 0 60 0 0 0

"Semenarna" 185 150 0 150 0 0 0

"Semenarna" 186 300 0 300 3 0 -3

"Mestni log" 170 0 2 0 3 0 -1

"Mestni log" 171 110 2 110 5 0 -3

"Mestni log" 172 270 3 270 4 0 -1

DELTA

 AZIMUTH

DELTA

TILTName PSC

BEFORE AFTER

Page 18: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 18/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 18

Results

Network Status After the Optimisation

Page 19: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 19/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 19

Results:Scrambling Codes from Scanner Outdoor 

Comments :

Zones with multi-servers reduced compared to the first drive test.

Page 20: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 20/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 20

Results:RSCP from Scanner Outdoor 

Page 21: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 21/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 21

Results:EcIo from Scanner Outdoor 

Comments :

EcIo improved in all the cases considered for optimisation. 

Page 22: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 22/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 22

Results:EcNo from the UE

Comments :

The EcNo improved after the optimisation. We can see on the map the zones whereproblems might happen (red points).

Page 23: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 23/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 23

Remarks

Scrambling Code Analysis :

 All sites were on air during the final drive.

Most of the best server problems have been solved.

RSCP Analysis :

There are some areas with low RSCP level, especially the one west to Semenarna site, but this

is mainly due to lack of sites in these areas.

EcIo and EcNo Analysis :

The EcIo improved in the areas considered for optimisation. Very few zones remain with low

quality level; these zones are to be optimized further in the acceptance phase.

Page 24: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 24/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 24

Results

Network StatusMain Indicators

Page 25: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 25/26

 All rights reserved © 2007, Alcatel-LucentSi.Mobil UMTS, October 2007

Alcatel-Lucent Team

Page 25

Results:Short Call AMR

Statistics before optimisation :

Statistics after optimisation :

Nb of Setup Fail  Nb of Drops  CSSR  CDR Nb of HHO Nb Attempts

4  7  94.20%  10.77% 2  69 

Nb of Setup Fail  Nb of Drops  CSSR  CDR Nb of HHO Nb Attempts

0  1  100%  1.41% 1  71 

Page 26: Ljubljana Cluster1 Optimization Report

7/30/2019 Ljubljana Cluster1 Optimization Report

http://slidepdf.com/reader/full/ljubljana-cluster1-optimization-report 26/26

Results:Main Indicators Summary

Call Setup Success Rate analysis:

For the first drive:

-4 failures were found:

3 due to CM SERVICE REJECT sent by CN to the mobile 1 radio problem

For the last drive:

- No fail occurred due to radio problems in the last drive.

Call Drop Analysis after Investigation:

For the first drive:

- 7 radio drops were found in the first drive.

For the last drive:

- 1 call drop occurred in the last drive.

HHO Analysis:

For the first drive:

- 2 handovers to GSM occurred, triggered on bad RSCP criteria.

For the last drive: 

- 1 handover to GSM occurred, triggered on bad RSCP criteria.