Longitudinal instability thresholds on the SPS flat top LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies, CERN April 21, 2016 LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 1 / 27

LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Longitudinal instability thresholds on the SPS flat topLIU-SPS Beam Dynamics Working Group

J. Repond, A. Lasheen, E. Shaposhnikova

Beams Department - Radio-Frequency Group - Beams & RF Studies, CERN

April 21, 2016

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 1 / 27

Page 2: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Outline

1 Motivations

2 Impedance model

3 Instability thresholds

4 Missing impedance

5 How to reach HL-LHC goals ?

6 Conclusion

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 2 / 27

Page 3: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Motivations

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 3 / 27

Page 4: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Motivations

• The HL-LHC goals achieved with tight margins by impedance reduction ofvacuum flanges .

• Is there any other way to obtain the desired stability threshold ?

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 4 / 27

Page 5: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Impedance model

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 5 / 27

Page 6: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Impedance model

Current configuration• TWC200

- 2◊ 4 sections + 2◊ 5 sections.- 20dB reduction on main

harmonic to modelize feedback.- 7 MV assumed, independent of

beam current.

• - BPM - QD and BPM - QF.- QD type flanges.

• - QF type flanges.

• - 42 remaining unshieldedpumping ports.

Future configuration• TWC200

- 4◊ 3 sections + 2◊ 4 sections.- 20dB reduction on main

harmonic to modelize feedback.- 10 MV assumed, independent of

beam current.+ 3 sections

- Main harmonic estimated usingG. Dôme (CERN-SPS/ARF/ 77-11,1977).

- HOMs reduced by 40% bycomparing 4 and 5 sections.

• - 0 impedance for the BPM - QF.• - QF reduced by a factor 20

assumed (J.Varela).• - 25 remaining unshielded

pumping ports.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 6 / 27

Page 7: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Impedance model

• Currentconfiguration

• Futureconfiguration

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 7 / 27

Page 8: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability thresholds at450GeV for 72 bunches

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 8 / 27

Page 9: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability thresholds at 450 GeV for 72 b, 2 RF

• Comparaison nowand after upgrade.

• TWC800 at 10%.

• HL-LHC intensitygoal included.

• Referencemeasurement.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 9 / 27

Page 10: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability threshold - Currentsituation

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 10 / 27

Page 11: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability threshold - Current situation - FT, 72 b, 2 RF

• Simulations based on the latest impedance model agree with measurementstaking into account possible sources of errors.

- The step in intensity used in simulations adds a ±7% error in threshold.

- The voltage seen by the beam decreases with intensity due to beam loading.Not taken into account in simulations.

- Bunch length variation in measurements due to beam loading and controlledemittance blow-up during ramp.

- Measurements done with feedback, feed-forward and longitudinal damper onthe TWC200.

- In simulations TW800 kept at 10% in bunch shortening mode.

• Another source of impedance? æ synchrotron frequency shift measurements.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 11 / 27

Page 12: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Missing impedance

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 12 / 27

Page 13: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Missing impedance

• Simulations/measurements disagreement in synchrotron frequency.- Transfer function of measurement system lengthen the profile (up to 100 ps

possible for short bunches).- Some inductive impedance seems to be missing.- Tough measurement due to control of the BL, need to be cross-checked.

• Adding 1 ⌦ pure inductive impedance improves agreement withmeasurements.

• Multiplying the kickers by 1.5 improves agreement too.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 13 / 27

Page 14: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Missing impedance

• Simulations with 72 b at FT, 2 RF.

• The frequency dependence of themissing impedance is unknown.

• Adding 1 ⌦ lowers the stabilitythreshold by 10% at 1.65 ns.

• Pessimistic result compared to theactual measurement.

• Missing impedance could comefrom loop in insulated VF(measurements needed).

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 14 / 27

Page 15: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability thresholds - futuresituation

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 15 / 27

Page 16: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability thresholds - future situation - FT, 72 b, 2 RF

• To achieve safely the HL-LHC goals, impedance reduction of vacuum flangesis probably not su�cient. How can we gain some margins?

- Reduce the 630 MHz HOM in TWC200. Di�cult to have more than a factor 2for the moment.

- Act on the kickers (MKP, factor 2).

- Act on all flanges?

- The TWC800 stabilizes the beam, we can try to optimize its parameters.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 16 / 27

Page 17: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Instability thresholds - future situation - FT, 72 b, 2 RF

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 17 / 27

Page 18: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

How to reach HL-LHC goals ?

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 18 / 27

Page 19: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

How to reach HL-LHC goals ?

• Fourth harmonic cavity needed to stabilize the high intensity LHC beam.

• Used in bunch shortening mode.

• Ratio between TWC200 and TWC800 voltage set to 10% in operation.

• A second TWC800 is now operational, more voltage available (also functionof beam current, up to 3 MV).

• We explored larger values of this ratio in simulations.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 19 / 27

Page 20: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

How to reach HL-LHC goal ?

• What happenthrough ramp?

• Voltage availablechanges with beamcurrent.

• 10MV at≥ 2.2◊ 1011 ppb.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 20 / 27

Page 21: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

How to reach HL-LHC goals ?

• Increased ratio allows to reach easily LIU requirement.

• Huge margins to play with.

• Uncertainties in low level RF must be taken into account (phase shift frombeam loading compensation).

• Ramp has to be simulated. Need speed up in simulation time, ongoing work(K. Iliakis).

• To compare with measurement, simulations with present model performed.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 21 / 27

Page 22: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

• Ramp still needinvestigations.

• Voltage availablechanges with beamcurrent.

• 7MV at≥ 1.4◊ 1011 ppb.

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 22 / 27

Page 23: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

800 MHz - current situation

• The increase in stability threshold important in this case too.

• 25% gain at 1.65ns for TWC800 at 15%.

• Di�cult to reproduce in operation, 7MV not available for more than1.4◊ 1011 ppb.

• MDs can be done to investigate for short bunches only.

• The uncertainties on the TWC800 phase introduces new question.- Synchrotron frequency distribution modified, new instabilities (possible loss of

Landau damping).

• Simulations done to have an idea of changes with phase shift „2

(V800

(t) = V2

sin(4ÊRF t + „2

)).

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 23 / 27

Page 24: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

800MHz - current situation

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 24 / 27

Page 25: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

800 MHz - current situation

• Non monotonic dependence on phase shift due to intensity e�ects.

• „2

= ±30¶ w.r.t. the TWC800 moves instability threshold by ±15 % at 1.65ns.

• For very large values (±120¶), beam unstable in this range of BL andintensity.

• Positive phase shift should be kept in operation to increase stability.

• MDs should be done to assess real phase in multibunch batches.

• Simulations required to explore behavior during ramp. Need speed up insimulation time, ongoing work (K. Iliakis)

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 25 / 27

Page 26: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Conclusion

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 26 / 27

Page 27: LIU-SPS Beam Dynamics Working Group€¦ · LIU-SPS Beam Dynamics Working Group J. Repond, A. Lasheen, E. Shaposhnikova Beams Department - Radio-Frequency Group - Beams & RF Studies,

Conclusion

• Simulations in current situation close to measurements. But a source ofimpedance is missing.

- +1 ⌦ of pure inductive impedance gives too pessimistic instability thresholdfor 72b at FT.

- A source could be loop in insulated VF.

• We use now a model of impedance reduction after LS2 based on shieldingfrom J. Varela assuming a factor 20 in the QF type flanges.

• Due to uncertainties in measurements and simulations, safety margins areneeded to reach the HL-LHC parameters.

- Increase in voltage of TWC800 gives large margin at 450 GeV.- Uncertainties in low level RF can change this threshold but we observe that≠60¶ < „

2

< +60¶, the gain is still important.- What happen through the ramp?

LIU-SPS BDWG Longitudinal instability thresholds on the SPS flat top April 21, 2016 27 / 27