Listing Constructional Data Report (CDR) Report Number 101005952LAX-001 Original Issued: 28-Jun-2013 Revised: None Standard(s) Applicant Manufacturer Address Address Country Country Contact Contact Phone Phone FAX FAX Email Email [email protected] [email protected] 1159 route 22 East Mountainside, NJ 07092 (908) 393 7523 (908) 393 7523 1159 route 22 East Mountainside, NJ 07092 USA AK Stamping Company Inc 1.0 Reference and Address AK Stamping Company Inc (908) 232 5202 Mr. Ken Eisenberg Mr. Ken Eisenberg USA (908) 232 5202 UL 467 - Issue:2007/09/21 Ed:9 UL Standard for Safety Grounding and Bonding Equipment Page 1 of 19

Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Embed Size (px)

Citation preview

Page 1: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Listing Constructional Data Report (CDR)

Report Number 101005952LAX-001 Original Issued: 28-Jun-2013 Revised: None

Standard(s)

Applicant Manufacturer

Address Address

Country CountryContact ContactPhone PhoneFAX FAXEmail Email [email protected]@akstamping.com

1159 route 22 EastMountainside, NJ 07092

(908) 393 7523 (908) 393 7523

1159 route 22 EastMountainside, NJ 07092

USA

AK Stamping Company Inc

1.0 Reference and Address

AK Stamping Company Inc

(908) 232 5202

Mr. Ken Eisenberg Mr. Ken EisenbergUSA

(908) 232 5202

UL 467 - Issue:2007/09/21 Ed:9 UL Standard for Safety Grounding and Bonding Equipment

Page 1 of 19

Page 2: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 2 of 19 Issued: 28-Jun-2013Revised: None

Product Brand name

Models

Model Similarity

RatingsOther Ratings To be used with 10 AWG conductor only

Mid clamp and Ground clamp are intended to be used together with PV frames only. Spacer is intended to be used as bonding point between rail and PV frames.

Description

Products covered in this report are grounding clamp and spacers.Grounding clamps and spacers are used to bond PV panels to the racking system that they are mounted on. Grounding clamps are used between one module frame to another module frame.

Bonding clips are used between rail of racking system and frame of PV module.

Grounding clamps achieve bonding through side teeth that penetrate anodized coating of aluminum frame.Grounding clips achieve bonding between the PV panel frame and the mounting rack by using multiple serrated metal punch outs that pierce that anodized coating on the panel frame. The serrated punch outs are on both sides of the product which comes into contact with the panel frame and rail to ensure continuity. Bonding straps achieve bonding through usage of hardware (including washers, nuts, and bolts).

Final installation must be in accordance to NFPA NEC 70 and applicable local jurisdictionBonding straps are used between separate rails to ensure continuity of bonding connection. Mid clamp, Ground clamp, Spacer

NA

2.0 Product Description

Bonding and Grounding EquipmentNA

ED 16.3.15 (1-Jan-13) Mandatory

Page 3: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 3 of 19 Issued: 28-Jun-2013Revised: None

Photo 1 - Ground Clamp

Photo 2 - Spacer

3.0 Product Photographs

1

4

20

0

ED 16.3.15 (1-Jan-13) Mandatory

Page 4: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 4 of 19 Issued: 28-Jun-2013Revised: None

Photo #

Item

no.1 NameManufacturer/

trademark2 Type / model2Technical data and securement means

Mark(s) of

conformity3

1 1 Ground Clamp AK Stamping Mid Clamp

Material is 0.06" Zinc-plated, hardened 1075 carbon steel. To be used with cable clamp housing and 10-32 hex head slotted SS zinc-plated screw. Refer to illustration 1 for details.

NR

1 2Ground Clamp Terminal

Various VariousTin Coated copper terminal as shown in illustration 1. Suitable for connection of 10 AWG

UL

1 3Mid Clamp (Not Shown)

AK Stamping Ground Clamp

Material is 420 Stainless Steel, Annealed. Heat treated to 50 RC min. Refer to illustration 2 for details.

NR

2 4 Spacer AK Stamping Spacer

Material is 0.012” 301 Stainless Steel, ½ hard. Outer diameter option of 0.75", 1.0", or 1.25". Refer to illustration 3, 4, and 5 for details.

NR

3) Indicates specific marks to be verified, which assures the agreed level of surveillance for the component. "NR" - indicates Unlisted and only visual examination is necessary. "See 5.0" indicates Unlisted components or assemblies to be evaluated periodically refer to section 5.0 for details.

4.0 Critical Components

NOTES:

1) Not all item numbers are indicated (called out) in the photos, as their location is obvious.

2) “Various“ means any type, from any manufacturer that complies with the "Technical data and securement means" and meets the "Mark(s) of conformity" can be used.

ED 16.3.15 (1-Jan-13) Mandatory

Page 5: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 5 of 19 Issued: 28-Jun-2013Revised: None

No Unlisted CEC components

5.0 Critical Unlisted CEC Components

ED 16.3.15 (1-Jan-13) Mandatory

Page 6: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 6 of 19 Issued: 28-Jun-2013Revised: None

1. Corrosion Protection - Only stainless steel is used in the product, no corrosion protection is required.2. Grounding - The grounding conductor to be used with the system is 10 AWG.3. Markings -

Markings to be verified as stamped into the product are:

a) Manufacturer nameb) Model or catalog numberc) ETL mark.

4. Installation, Operating and Safety Instructions - Instructions for installation and use of this product are provided by the manufacturer. Mid clamp and Ground clamp are to be torque down to 12-15 ft.lbs. Refer to illustration 6, 7, and 8 for details.

6.0 Critical Features

Unlisted Component - A part that has not been previously evaluated to the appropriate designated component standard. It may also be a Listed or Recognized component that is being used outside of its evaluated Listing or component recognition.

Listed Component - A component part, which has been previously Listed or Certified by an accredited Certification Organization with no restrictions and is used in the intended application within its ratings.

Critical Features/Components - An essential part, material, subassembly, system, software, or accessory of a product that has a direct bearing on the product’s conformance to applicable requirements of the product standard.Construction Details - For specific construction details, reference should be made to the photographs and descriptions. All dimensions are approximate unless specified as exact or within a tolerance. In addition to the specific construction details described in this Report, the following general requirements also apply.

Recognized Component - A component part, which has been previously evaluated by an accredited certification body with restrictions and must be evaluated as part of the basic product considering the restrictions as specified by the Conditions of Acceptability.

ED 16.3.15 (1-Jan-13) Mandatory

Page 7: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 7 of 19 Issued: 28-Jun-2013Revised: None

Illustration 1 - Mid Clamp7.0 Illustrations

ED 16.3.15 (1-Jan-13) Mandatory

Page 8: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 8 of 19 Issued: 28-Jun-2013Revised: None

7.0 IllustrationsIllustration 2 - Ground Clamp

ED 16.3.15 (1-Jan-13) Mandatory

Page 9: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 9 of 19 Issued: 28-Jun-2013Revised: None

7.0 IllustrationsIllustration 3 - Spacers

ED 16.3.15 (1-Jan-13) Mandatory

Page 10: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 10 of 19 Issued: 28-Jun-2013Revised: None

7.0 IllustrationsIllustration 4 - Spacers

ED 16.3.15 (1-Jan-13) Mandatory

Page 11: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 11 of 19 Issued: 28-Jun-2013Revised: None

7.0 IllustrationsIllustration 5 - Spacers

ED 16.3.15 (1-Jan-13) Mandatory

Page 12: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 12 of 19 Issued: 28-Jun-2013Revised: None

7.0 IllustrationsIllustration 6 - Installation Manual for Mid Clamp

ED 16.3.15 (1-Jan-13) Mandatory

Page 13: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 13 of 19 Issued: 28-Jun-2013Revised: None

7.0 IllustrationsIllustration 7 - Installation Manual for Grounding Spacer

ED 16.3.15 (1-Jan-13) Mandatory

Page 14: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 14 of 19 Issued: 28-Jun-2013Revised: None

Evaluation Period Project No. G101005952Sample Rec. Date 7-Jun-2013 Condition Production Sample ID. LAN1306071045Test LocationTest Procedure

Completed by: Reviewed by:Title: Title:

Signature: Signature:

The following tests were performed by Intertek Lake Forest, CA facility to bonding clip, bonding straps, and mid clamps:

8.1 Signatures

Engineering Team Leader

A representative sample of the product covered by this report has been evaluated and found to comply with the applicable requirements of the standards indicated in Section 1.0.

Reviewer

7.5

Matt PavloffCharles Tumengko

Short time current test

8.0 Test Summary

25791 Commercentre Drive, Lake Forest, CA 92630Testing Lab

Test Description

June 21, 2013 to June 27, 2013

UL 467

Determination of the result includes consideration of measurement uncertainty from the test equipment and methods. The product was tested as indicated below with results in conformance to the relevant test criteria.

ED 16.3.15 (1-Jan-13) Mandatory

Page 15: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 15 of 19 Issued: 28-Jun-2013Revised: None

BASIC LISTEE

Address

CountryProduct

MULTIPLE LISTEE 1AddressCountry

Brand Name

ASSOCIATED MANUFACTURER

AddressCountry

BASIC LISTEE MODELS

MULTIPLE LISTEE 2AddressCountry

Brand Name

ASSOCIATED MANUFACTURER

AddressCountry

BASIC LISTEE MODELS

MULTIPLE LISTEE 3AddressCountry

Brand Name

ASSOCIATED MANUFACTURER

AddressCountry

BASIC LISTEE MODELS

None

None

None

MULTIPLE LISTEE 1 MODELS

MULTIPLE LISTEE 3 MODELS

MULTIPLE LISTEE 2 MODELS

Bonding and Grounding EquipmentUSA

9.0 Correlation Page For Multiple ListingsThe following products, which are identical to those identified in this report except for model number and Listee name, are authorized to bear the ETL label under provisions of the Intertek Multiple Listing Program.

AK Stamping Company Inc1159 route 22 EastMountainside, NJ 07092

ED 16.3.15 (1-Jan-13) Mandatory

Page 16: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 16 of 19 Issued: 28-Jun-2013Revised: None

10.0 General InformationThe Applicant and Manufacturer have agreed to produce, test and label ETL Listed products in accordance with the requirements of this Report. The Manufacturer has also agreed to notify Intertek and to request authorization prior to using alternate parts, components or materials.

COMPONENTSComponents used shall be those itemized in this Intertek report covering the product, including any amendments and/or revisions.

LISTING MARKThe ETL Listing mark applied to the products shall either be separable in form, such as labels purchased from Intertek, or on a product nameplate or other media only as specifically authorized by Intertek. Use of the mark is subject to the control of Intertek.

The mark must include the following four items:

1) applicable country identifiers "US" and/or "C" or "US", "C" and "EU" 2) the word "Listed" or "Classified" or "Recognized Component" (whichever is appropriate)3) a control number issued by Intertek 4) a product descriptor that identifies the standards used for certification. Example:

For US standards, the words, “Conforms to” shall appear with the standard number along with the word, “Standard” or “Std.” Example: “Conforms to ANSI/UL Std. XX.”

For Canadian standards, the words “Certified to CAN/CSA Standard CXX No. XX.” shall be used, or abbreviated, “Cert. to CAN/CSA Std. CXX No. XX.”

Can be used together when both standards are used.

Note: A facsimile must be submitted to Intertek, Attn: Follow-up Services for approval prior to use. The facsimile need not have a control number. A control number will be issued after signed Certification Agreements have been received by the Follow-up Services office, approval of the facsimile of your proposed Listing Mark, satisfactory completion of the Listing Report, and scheduling of a factory assessment in your facility.

MANUFACTURING AND PRODUCTION TESTSManufacturing and Production Tests shall be performed as required in this Report.

FOLLOW-UP SERVICEPeriodic unannounced audits of the manufacturing facility (and any locations authorized to apply the mark) shall be scheduled by Intertek. An audit report shall be issued after each visit. Special attention will be given to the following:

1. Conformance of the manufactured product to the descriptions in this Report.2. Conformance of the use of the ETL mark with the requirements of this Report and the Certification Agreement.3. Manufacturing changes.4. Performance of specified Manufacturing and Production Tests.

In the event that the Intertek representative identifies non-conformance(s) to any provision of this Report, the Applicant shall take one or more of the following actions:

1. Correct the non-conformance.2. Remove the ETL Mark from non-conforming product.3. Contact the issuing product safety evaluation center for instructions.

ED 16.3.15 (1-Jan-13) Mandatory

Page 17: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 17 of 19 Issued: 28-Jun-2013Revised: None

10.1 Evaluation of Unlisted Components

Note to Intertek Follow Up Inspector: The Component Evaluation Center, CEC, will notify you in writing when these components must be selected and sent to the CEC for re-evaluation

Ship the samples to:Intertek Testing Services NA Inc.ETL Component Evaluation Center45000 Helm Street, Suite 150Plymouth Twp., MI 48170 USAAttn: Component Evaluation CenterSample Disposition: Due to the destructive nature of the testing, all samples will be discarded at the conclusion of testing unless, the manufacturer specifically requests the return of the samples. The request for return must accompany the initial component shipment.�

Because Unlisted Components are uncontrolled, and they do not fall under a third party follow up program, Intertek may require these components to be tested and/or evaluated at least once annually, more often for certain components, as part of the independent certification process. The Unlisted Components in Section 5.0 require testing and/or evaluation as indicated.

ED 16.3.15 (1-Jan-13) Mandatory

Page 18: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 18 of 19 Issued: 28-Jun-2013Revised: None

11.0 Manufacturing and Production Tests

No manufacturing or production tests are required.

ED 16.3.15 (1-Jan-13) Mandatory

Page 19: Listing Constructional Data Report (CDR) - Sollegasollega.com/wp-content/uploads/2013/12/ETLGroundingReport.pdfListing Constructional Data Report (CDR) ... The ETL Listing mark applied

Report No. 101005952LAX-001AK Stamping Company Inc

Page 19 of 19 Issued: 28-Jun-2013Revised: None

Date/ Project Handler/Proj # Site ID Reviewer

None

12.0 Revision SummaryThe following changes are in compliance with the declaration of Section 8.1:

Section Item Description of Change

ED 16.3.15 (1-Jan-13) Mandatory