LIST OF STAFFS.No.
Name of Employee
Designation
Work Load
Name of Work
Sanction Cost (in Lacs)
Work Executed up to date
Remaining work
1. Sh. A.B. Pandey
Resident Engineer
Const. of ROB at Tijara Phatak
1875.00 115.44 1759.56
2. Sh. R.K. Mali Asstt. Resident Engineer
Const. CFC Building Gola ka bas
88.65 63.53 25.12
3. Sh. N.K. Bhatnagar
Accountant
Total = 1963.65 178.97 1784.68
PROJECT AT A GLANCE• Name of Work :- Construction of RoB at L.C. No. 111 ( Tizara
Phatak) on Alwar – Bhiwadi Road ( T.P. No. 71/3-4 B.G.)• Name of Client :- UIT, Alwar• A & F Sanction :- Vide No. P.8(1) UDH/1/2006 Dated 17th Sept.
2008 for Rs. 20.55 Crores.• Technical Sanction :- Rs. 20.55 Crores on dated 06.01.2009• St date of start :- 01-09.2008• St. date of completion :- 08.01.2010• Expected dated of completion: 31.12.2011• Funds received from client upto 4th Dec. 2009 :- Rs. 150.00
Lacs• Expenditure as on 4th Dec. 2009 :- Rs. 115.44Lacs.
( including liabilities)
Land marks :-• GAD approved by Railway :-
01.05.08• Pile foundation work is in progress• Funds Received from client :- • (a) Rs. 25.00 Lacs on 29.05.07 for
preparation of DPR• (b) Rs. 75.00 Lacs on 02.07.09• (c) Rs. 50.00 Lacs on 20.11.09
Hindrances :- • Encroachment removed by UIT on 19.06.09 but matter
is pending in the Rajasthan High Court, Jaipur for Payment of Compensation for land & Buildings.
• Shifting of utilities such as:- • (a) Water supply lines shifting are still in process• (b) Electric poles are still in process• (c) Removing of trees- Application for permission
submitted by UIT, Alwar• (d) The traffic is not diverted till date from LC No. 111• Agitation by local citizens for land and building
compensation since 16.07.09 to 22.10.09.
PROJECT AT A GLANCE• 1.Name of Work :- Construction of Common Facility Center for Murtikala
Cluster Gola ka Bas, Tehsil-Rajgarh District- Alwar (Raj.)• 2. Name of Client :- DIC, Alwar• 3. A & F Sanction :- Rs. 88.65 Lacs• 4. Technical Sanction (Revised) :- Rs. 88.65Lacs• 5. St. date of start :- 02-11-07• 6. St. date of completion :- 22-01-10 • 7. Funds received from client as on 31th Oct. 2009 :- Rs. 88.65 Lacs• 8. Expenditure as on 04TH Dec. 2009 :- Rs. 63.53 Lacs.• 9. Bottlenecks:-Revised funds received late as on 09-03-09.
– Plate form Drawing received as on 09-06-09.– Encroachment on land for Culvert and approach road has not yet been
cleared till today as on 04.12.09.
WIDENING OF ALWAR WIDENING OF ALWAR ––BHIWADI BHIWADI ROAD (SH-25)KM 146/0 TO 225/0 ROAD (SH-25)KM 146/0 TO 225/0 FROM 2 LANE TO 4LANE DEVIDED FROM 2 LANE TO 4LANE DEVIDED
HIGHWAYHIGHWAYLENGTH : 79.00KM
PROJECT COST : 222.26 CroresPERIOD OF CONSTRUCTION : 18 Months PERIOD OF CONCESSION : 19 YEARS
Total Period : 20 Years 6 Mths
Toll Booth : 2 Nos. Booth
1. on KM 160
2. on KM 211