16
1 MINISTRY OF RESEARCH, TECHNOLOGY, AND HIGHER EDUCATION COORDINATING TEAM OF FOREIGN RESEARCH PERMIT A. POSTPONED APPLICATION No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE STATUS REMARKS 1 a. Mr. Pedro Aparicio Llorente b. Colombia c. Harvard University- Graduate School of Design d. Harvard University Asia Center e. Graduate Student a. 2 months (25 June - 25 August 2015) b. Jakarta c. Rujak Center for Urban Studies (Dian Tri Irawaty) d. Spatial and Regional Planning e. Scales and Format for Risk Identification and Resilience Dissemination POSTPONED 27/5/2015 : Researcher is requested to add counterpart from UI 2.A a. Ms. Sophie Jane Hedges b. UK c. University of Exeter d. University of Exeter e. Student a. 26 July 2015- 15 September 2015 b. Kalteng (Palangkaraya, Hutan Sabangau) c. CIMTROP, Universitas Palangkaraya (Suwido Limin) d. Ecology e. Survey of Herpetological Diversity in Bawan Forest, Kalimantan Tengah POSTPONED 29/7/2015: Researchers were requested to provide copy of MoU and MTA that were signed by CIMTROP and University of Exeter 2.B a. Ms. Alice Miranda Rosen b. UK c. University of Exeter d. University of Exeter e. Undergraduate Student as above POSTPONED as above 2.C a. Mr. Daniel Kit Maskrey as above POSTPONED as above LIST OF RESEARCH APPLICATION Date : September 22, 2015 Nomor: 9B/TKPIPA/E5/Dit.KI/IX/2015

LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

  • Upload
    lekhanh

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

1

MINISTRY OF RESEARCH, TECHNOLOGY, AND HIGHER EDUCATION

COORDINATING TEAM OF FOREIGN RESEARCH PERMIT

A. POSTPONED APPLICATION

No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION

a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE

STATUS REMARKS

1 a. Mr. Pedro Aparicio Llorente b. Colombia c. Harvard University- Graduate

School of Design d. Harvard University Asia Center e. Graduate Student

a. 2 months (25 June - 25 August 2015)

b. Jakarta c. Rujak Center for Urban Studies

(Dian Tri Irawaty) d. Spatial and Regional Planning e. Scales and Format for Risk

Identification and Resilience Dissemination

POSTPONED

27/5/2015 : Researcher is requested to add counterpart from UI

2.A a. Ms. Sophie Jane Hedges b. UK c. University of Exeter d. University of Exeter e. Student

a. 26 July 2015- 15 September 2015 b. Kalteng (Palangkaraya, Hutan

Sabangau) c. CIMTROP, Universitas Palangkaraya

(Suwido Limin) d. Ecology e. Survey of Herpetological Diversity in

Bawan Forest, Kalimantan Tengah

POSTPONED

29/7/2015: Researchers were requested to provide copy of MoU and MTA that were signed by CIMTROP and University of Exeter

2.B a. Ms. Alice Miranda Rosen b. UK c. University of Exeter d. University of Exeter e. Undergraduate Student

as above

POSTPONED

as above

2.C a. Mr. Daniel Kit Maskrey as above POSTPONED as above

LIST OF RESEARCH APPLICATION

Date : September 22, 2015

Nomor: 9B/TKPIPA/E5/Dit.KI/IX/2015

Page 2: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

2

b. UK c. University of Exeter d. University of Exeter e. Undergraduate Student

2.D a. Mr. Rhodri Huw Gruffydd b. UK c. University of Exeter d. University of Exeter e. Student

as above

POSTPONED

as above

2.E a. Ms. Louise Jeanne Bienfait b. Netherland c. University of Exeter d. University of Exeter e. Student

as above

POSTPONED

as above

2.F a. Mr. Zoe Eleri Hughes b. UK c. University of Exeter d. University of Exeter e. Student

as above

POSTPONED

as above

3. a. Ms. Imke Anna Podbielski b. German c. ZMT Bremen d. ZMT Bremen e. Doctoral Student

a. 12 months (1 August 2015-31 July 2016)

b. NTB (Lombok Utara, Pantai Krakas), DIY (Gunung Kidul, Ngobaran, Drini, Kukup, Sundak), Maluku (Waai, Itapori, Ambon, Maluku Tengah), Bali

c. Pusat Penelitian Oseanografi LIPI (Wawan Kiswara)

d. Marine Ecophysiology e. Effects of submarine Groundwater

Discharge (SGD) on benthic ecosystem around tropical island

POSTPONED

29/7/2015: Researcher is requested to clarify regarding methodology and scope object’s of the research proposal

4.A a. Ms. Katharine Elisabeth Currier b. USA c. Biosphere Foundation d. Biosphere Foundation

a. 12 month (1 July 2015 - 31 August 2016)

b. Bali (Buleleng, Pulau Menjangan, TN Bali Barat, Pemuteran, Sumber Kima,

POSTPONED

Research is planned for 14 month 6/5/2015 : Reseacher is

Page 3: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

3

e. Research Associate Pejarakan, dan Sumber Klampok) c. Pusat Penelitian Lingkungan Hidup –

Universitas Udayana (Mr. Abd. Rahman As-syakur)

d. Marine Ecology

e. The Menjangan Island Coral Reef Project: Addressing Threats to Reefs

requested to deliver presentation and explain the reason of adding member 13/05/2015 : Researcher/counterpart didn’t attend to deliver presentation 27/05/2015 : Researcher is requested to provide a copy of MoU, MTA, and IPR Agreement 02/09/2015 : FRP Secretariat received MoU 09/09/2015 :FRP Secretariat is waiting for copy of MTA & IPR Agreement 22/09/2015 : FRP Secretariat is waiting for MTA

4.B a. Ms. Abigail Kingsley Alling b. USA c. Biosphere Foundation d. Biosphere Foundation e. Founder and President of

Biosphere

As above POSTPONED

4.C a. Mr. Mark Van Thillo b. Belgia c. Belgia, 18-03-1961 d. EJ445192 e. s.d 17 September 2017 f. Biosphere Foundation

As above POSTPONED

Page 4: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

4

g. Biosphere Foundation h. Chief Operation Officer of

Biosphere 5. a. Mrs. Sophia Van Zyle Warshall

b. USA c. University of California,

Berkeley d. University of California,

Berkeley- Fulbright Hays e. PhD Candidate

a. 15 July 2015 – 31 March 2016 b. Sumsel (Palembang), Jakarta

(Jaksel), D.I Yogyakarta, Jatim (Surabaya)

c. Universitas Surabaya (Ismail Lutfi) d. Socio-cultural e. Translating the Buddha: Indonesian

reliquaries and the vimala usnisa dharani

APPROVED

10/6/2015: Counterpart is deliver presentation 10/9/2015: FRP Secretariat is received a copy of MoU

6. a. Mr. Philipp Wilhelm Heinrich Vogt

b. German c. Museum Fuer Naturkunde Berlin d. Lab Resources of Supervisor,

Dr.Thomas Von Rintelen e. Phd Candidate

a. 28 June 2015 – 20 December 2015 b. Sumatera (Batam, Padang), Jawa

(Pangandaran, Madura), Kalimantan (Pontianak, Derawan), Sulawesi (Spermonde, Selayar, Donggala), Maluku (Ternate), Papua (Raja Ampat, Teluk Cendrawasih)

c. Fakultas Biologi, Unsoed (Dr.Romanus E.Prabowo)

d. Marine Biology e. Comparative phylogeography of the

hyperdiverse gastropod conus in Indonesia

APPROVED

29/7/2015: Researcher is requested to provie a copy of MoU & MTA between Unsoed & Museum fuer Naturkunde Berlin 15/9/2015: FRP Secretariat is received a copy of MoU 22/9/2015: Papua is not allow to be location of research

7. a. Dr. Khin Saw Myint b. Myanmar c. United States Center for

Diseases Control d. U.S. Center of Diseases Control e. Virologist

a. 12 month (start from September 2015)

b. DKI Jakarta, Kalimantan (Banjarmasin: Universitas Lambung Mangkurat), Bali (Denpasar: Universitas Warmadewa), Sulawesi, NTB, dan Sumatera

c. Lembaga Biologi Molekular Eijkman (Ir. I Made Artika, M.App.Sc, Ph.D)

d. Virology

APPROVED

Research is planned for 5 years 6/5/2015: Researcher is requested to provide a copy of time table activity and detail location 17/9/2015:

Page 5: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

5

e. Study of Epidemic and Emerging Viruses in Indonesia Archipelago

FRP Secretariat is received a copy of time table activity and detail location. Location of NTB and Sumatera will be determined by LBM Eijkman

Page 6: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

6

B. PRESENTATION

1 a. Mr. Thomas Daniel Wright b. Australia c. University of Queensland d. University of Queensland e. PhD Candidate

a. 12 months (start from August 2015) b. Bali (Kuta Utara dan Badung) c. Fakultas Sastra dan Budaya –

Universitas Udayana (Prof. Dr. I Nyoman Dama Putra, M.Litt)

d. Environmental anthropology e. Water, tourism and surfing: an

ethnography of marine environments in Bali

POSTPONED

9/9/2015: Researcher is requested to deliver a presentation 22/9/2015: Researcher or Indonesian Counterpart didn’t attend to deliver a presentation

2 a. Ms. Ruby Stocklin Weinberg b. USA c. University of British Columbia d. Canadian International

Resources and Development Institute

e. PhD Student

a. 12 months (start from November 2015)

b. Bangka-Belitung (Belitung Timur, Bangka Barat, Bangka, Bangka Tengah, Bangka Selatan, dan Bangka Induk) dan Jawa Tengah (Lebak dan Banyumas)

c. Pusat Teknologi Sumberdaya Mineral – BPPT (Yudi Prabangkara)

d. Natural Resources Management f. Feasibility of Training Centres in

Artisanal Mining

POSTPONED

9/9/2015: Researcher is requested to add additional counterpart from PSDR –LIPI (Dr. Erwiza Herman) 22/9/2015: 1) Researcher is requested to

revise methodology how to obtain the data

2) Researcher is requested not to have interview with illegal miners

3) Partner was delivered a presentation of research projects

3 a. Ms. Lotte Suzanne Woittiez b. Netherland c. Wageningan University d. Wageningan University e. PhD Student

a. 12 month (start from September 2015)

b. Riau (Perkebunan Ds. Dosan di Siak), Sumut (Simalungun), Jambi, Kalbar

c. Pusat Penelitian Kelapa Sawit (Winarna)

d. Agriculture e. Improving oil palm yield on

APPROVED

Research is planned for4 years 9/9/2015: Researcher is requested to deliver progress report 22/9/2015: Researcher is requested to add local counterpart from

Page 7: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

7

smallholder peatland plots in Indonesia

Tanjung Pura University and provide a copy of MoU with Wageningan University

4.A. a. Dr. Maureen Miller b. USA c. EcoHealth Alliance d. United States Agency for

International Development (USAID)

e. Senior Research Scientist

a. 12 month (start from September 2015)

b. Sulawesi Utara (Manado dan Tomohon) serta Gorontalo (Boalemo)

c. Primatology d. Pusat Studi Satwa Primata – IPB

(Joko Pamungkas) e. PREDICT 2: Qualitative Research

for Behavioral Risk Surveillance and Characterization

APPROVED

Research is planned for2 years 9/9/2015: Researcher is requested to deliver a presentation and add local counterpart from Balitbangkes and Eijkman

4.B. a. Dr. Kevin James Olivial b. USA c. EcoHealth Alliance d. United States Agency for

International Development (USAID)

e. Senior Research Scientist

As above

APPROVED

Page 8: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

8

C. NEW APPLICATION

No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION

a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE

STATUS REMARKS

1 a. Ms. Pia Louise Harkness b. Australia c. Charles Darwin University d. Endeavour Postgraduate

Scholarship e. PhD Candidate

a. 10 month (start from September 2015)

b. NTT (Sabu-Raijua) c. Fakultas Ilmu Kelautan dan

Perikanan – Universitas Nusa Cendana (Prof. Ricky Gimin)

d. Fishery e. Coastal Livelihoods, small-scale

fishery dependence and the impacts of fisheries management and marine conservation, Sabu-Raijua district, NTT

APPROVED

22/9/2015: Researcher is requested to check a copy of MoU Research permit given only for 6 month

2 a. Dr. Jeffrey Mark Neilson b. Australia c. University of Sydney d. Australian Centre for

International Research (ACIAR) e. Senior Lecturer

a. 12 month (start fromOctober 2015) b. Sumatera Utara (Simalungun),

Sumatera Selatan (Muara Enim), Lampung (Lampung Barat), Sulawesi Selatan (Toraja Utara dan Polewali) serta Jawa Barat (Bandung)

c. Badan Penelitian dan Pengembangan Pertanian – Kementan (Dr. Muhammad Syakir, MS)

d. Economy e. Evaluating smallholder livelihoods

and sustainability in the Indonesian coffee and cocoa value chains

APPROVED

Research is planned for 3 years

Page 9: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

9

3 a. Mr. Craig Hutton Proctor b. Australia c. CSIRO Marine and Atmosphere

Research d. Australian Centre for

International Agricultural Research (ACIAR)

e. Scientist

a. 12 month (start fromOctober 2015) b. Sumatera Barat (Padang), Jawa

Barat (Pelabuhan Ratu dan Sukabumi), Jawa Tengah (Cilacap), Jawa Timur (Prigi dan Trenggalek), Sulawesi Tenggara (Kendari), Sulawesi Utara (Bitung), Maluku (Ambon), Papua Barat (Sorong), serta Papua (Sorong)

c. Badan Penelitian dan Pengembangan Kelautan dan Perikanan – KKP (Dr. Achmad Poernomo)

d. Fishery e. Developing research capacity for

management of Indonesia’s pelagic fisheries resources

APPROVED

22/9/2015: Research location in Papua is not allowed For data retrival in Papua, only allow to carried out by local counterpart

4 a. Mr. Christopher Ryan Rumple b. USA c. University of Wyoming d. William J. Fulbright scholarship

program e. Ph.D. Candidate

a. 12 month (start fromJanuary 2016) b. Jawa Barat (Taman Nasional

Gunung Halimun, Lebak Banten) dan Sulawesi Barat (Kab. Mamasa)

c. Pusat Penelitian Lingkungan Hidup LPPM – IPB (Dr. Y. Aris Purwanto)

d. Development studies e. Renewable Energy Solutions for

Developing Communities

APPROVED

5 a. Mr. James Arthur Askew b. Inggris c. University of Southern

California d. University of Southern

California e. Ph.D Candidate

a. 12 month (start fromFebruary 2015 b. Previous location: Sumut

(Sikundur,TN Gunung Leuser), Kalteng (Sebangau), Kaltim (Prevab Camp, TN Kutai). New location: Sumbar (Batang Taro)

c. Fakultas Kehutanan Universitas Mulawarman (Dr. Yaya Rayadin)

d. Primatology

APPROVED

Research is planned for 18 month SIP: 06/EXT/SIP/FRP/SM/II/2015 valid until 5 February 2016 Location exchange from TN Kutai to Batang Taro

Page 10: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

10

e. The function of the orangutan long call: What is its role in mediating social relationshis and reproductive strategies?

6 a. Ms. Mareike Huhn b. German c. Helmholtz Centre for Ocean

Research Kiel – GEOMAR d. Australian National University

Indonesia project grant e. PhD Student

a. 12 month (start from September 2015)

b. Jawa Barat (Bogor) dan Maluku (Banda Naira)

c. Fakultas Ilmu Perikanan dan Kelautan – IPB (Dr. Hawis Madduppa)

d. Ecology e. Trial of an early warning system for

marine pests in the Banda Islands, Moluccas, Indonesia

APPROVED

22/9/2015: Researcher is requested to add local counterpart from Pusat Penelitian Laut Dalam- LIPI

7 a. Ms. Nadya Rose Mamoozadeh b. USA c. Virginia Institute of Marine

Science d. National Marine Fisheries

Service (USA) e. PhD Student

a. 12 month (start from September 2015)

b. Bali (Benoa) c. Loka Penelitian Ikan Tuna (Budi

Nugraha, S.Pi, M.Si) d. Fishery e. Evaluation of Genetic Population

Structure in Istiophorid Billfishes Based on High-Throughput Genotyping Methodologies

APPROVED

Research is planned for 2 years

8 a. Ms. Elitza Stanislavova Germanov

b. Canada c. Murdoch University d. Murdoch University e. PhD student

a. 12 month (start from November 2015)

b. Jawa Timur (Probolinggo, Banyuwangi), Bali (Kab. Klungkung: Nusa Penida, Nusa Lembongan, dan Nusa Ceningan), NTB (Lombok Barat dan Lombok Timur), NTT (TN. Pulau Komodo, Manggarai Barat, Solor, dan Lembata), Papua Barat (Raja Ampat), serta Kalimantan

APPROVED

22/9/2015: Research location in Papua is not alloweds

Page 11: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

11

Timur (Berau) c. Fakultas Perikanan dan Kelautan –

Udayana (I Gede Hendrawan, Ph.D) d. Fishery e. Microplastics and Megafauna:

Implications of microplastic ingestion on large filter feeders

9 a. Dr. Michael Albert Rimmer b. Australia c. Sydney University d. ACIAR e. Project Manager

a. 12 month (start from October 2015) b. DI Yogyakarta, Bali, NTB

(Sumbawa), Sulsel (Makassar) c. Balitbang KP – KKP (Dr. Achmad

Poernomo) d. Fishery e. Improving fish health management

and production protocols in marine finfish aquaculture in Indonesia and Australia

APPROVED

SIP: 301/SIP/FRP/SM/IX/2014 valid until 24 September 2015

10 a. Mr. Alessandro Albani b. Italy c. Science Department, Roma Tre

University d. The Rome University e. PhD Student

a. 12 month (start from September 2015)

b. Sulsel (Cagar Alam Karaenta, TN. Bantimurung – Bulusaraung, Kab. Maros)

c. Fakultas Kehutanan – Unhas (Dr. Ngakan Putu Oka)

d. Primatology e. The ecology of endangered

endemic primate Macaca maura (H.R. Schinz, 1825) in karst forests of peninsular Sulawesi Selatan (Indonesia) at the intra- and inter- group level

APPROVED

Research is planned for2 years 5 month SIP: 195/SIP/FRP/SM/VII/2014 valid until 20 July 2015

11 a. Ms. Christine Sur b. USA c. University of California, Davis d. Fulbright – AMINEF

a. 12 month (start fromFebruary 2016) b. Sulawesi Selatan (Makassar dan

Kepulauan Spermonde: Pulau Barrang Lompo serta Pulau Badi)

APPROVED

Page 12: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

12

e. Graduate student c. Fakultas Ilmu Kelautan dan Perikanan – Unhas (Prof. Dr. Ir. Rohani Ambo Rappe, M.Si)

d. Marine Biology e. Food security and sustainability in

the Spermonde Islands, Indonesia

12 a. Mr. Andy Scott Chang b. USA c. Department of Sociology,

University of California, Berkeley

d. The American Institute for Indonesian Studies (AIFIS)

e. Ph.D. Candidate

a. 12 month (start fromFebruary 2016) b. Jakarta; Jawa Timur (Surabaya,

Malang, Ponorogo, Blitar, dan Madiun); serta Jawa Tengah (Semarang, Surakarta, Temanggung, Karanganyar, Sukoharjo, dan Wonosobo)

c. Program Pascasarjana Multidisiplin – UI (Prof. Sulistyowati Irianto, Ph.D)

d. Sociology e. A New Model for Rural

Development: Contract Migration and Gender Relations in Indonesia

APPROVED

13 a. Ms. Paula Sophie Margarethe Senff

b. German c. Centre for Tropical Marine

Ecology (ZMT), University of Bremen

d. Self Funding e. Student

a. 8 month (start from September 2015)

b. NTB(Lombok) c. Fakultas Ilmu Kelautan dan

Perikanan (Prof. Ir. Jamaluddin Jompa, M.Sc, Ph.D)

d. Marine Biology e. Sea Cucumber Integrated

Multitrophic Aquaculture on Lombok, Indonesia - Ecological, Social and Institutional Settings

APPROVED

14 a. Dr. Richard Kazimierz Frank Unsworth

b. UK c. Swansea University

a. 12 month (start from September 2015)

b. Sulawesi Selatan (Kepulauan Selayar dan Wakatobi)

APPROVED

Research is planned for 2 years

Page 13: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

13

d. Waterloo Foundation (UK) e. Research Officer

c. Fakultas Ilmu Kelautan dan Perikanan – Unhas (Prof. Dr. Ir. Rohani Ambo Rappe, M.Si)

d. Marine Biology e. Empowering Community Action for

Seagrass Conservation in Southeast Asia: Seagrass Meadows Support Food Security

15 a. Prof. John Kevin Baird b. USA c. Eijkman-Oxford Clinical

Research Unit d. University of Oxford e. Director

a. 12 month (start from September 2015)

b. DKI Jakarta, NTT (Sumba Barat), Lampung (Lampung Selatan), dan Jawa Tengah (Sragen)

c. LBM Eijkman (Prof. Herawati Sudoyo, Dr. Rintis Noviyanti, Dr. Farah N. Coutrier, dan Dr. Ari W. Satyagraha)

d. Healthy e. Improving the Prevention and

Treatment of Vivax Malaria in Indonesia

APPROVED

Research is planned for 5 years Memorandum of Scientific Collaboration between LBM Eijkman and University of Oxford MoU between LBM Eijkman and Direktorat Kesehatan Angkatan Darat MoU between University of Oxford and Universitas Indonesia

Page 14: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

14

D. RESEARCH PERMIT EXTENSION

No a. NAME b. CITIZENSHIP c. INSTITUTION d. FUNDING GUARANTOR e. POSITION

a. RESEARCH PERIOD b. LOCATION c. INDONESIAN COUNTERPART d. FIELD OF RESEARCH e. RESEARCH TITLE f. REASON FOR EXTENTION

STATUS REMARKS

1 a. Mr. Adam Eric Miller b. USA c. Planet Indonesia d. Princeton University, American

Institute for Indonesian Studies (AIFIS)

e. Director and Founder

a. 3 month (start from October 2015) b. Kalimantan Barat (Ketapang,

Kayong Utara, TN Gunung Palung) c. Fakultas Kehutanan – Universitas

Tanjungpura (Dr. Siti Masitoh Karikawati, M.Si dan Mufilihati, S.Hut, M.Si)

d. Natural Resources Management e. Understanding the impacts of The

Wild Bird trade in Gunung Palung National Park, West Kalimantan

f. Researcher need to collect data for analizing

APPROVED

SIP: 83/SIP/FRP/SM/III/2015 valid until 30 September 2015

2 a. Dr. Estelle Pascale Raymonde Masseret

b. French c. Universite Montpellier 2 & IRD d. Institut de Recherche pour le

Développement (IRD) e. Associate Professor

a. 4 month (start from September 2015)

b. DKI Jakarta (Teluk Jakarta) c. Puslit Oseanografi LIPI (Dr. Hikmah

Thoha) d. Marine Biology e. Diversity of the phytoplanktonic

species responsible for Harmful Algal Blooms (HABs) in Indonesia with a special focus on the Alexandrium tamarense complex

f. To continue analizing data

APPROVED Research is planned fo r2 years SIP: 50/EXT/SIP/FRP/SM/IX/2014 valid until 24 September 2015 Second Extension

3 a. Dr. Hans Stefan Danerek a. 12 month (start fromOctober 2015) SIP:

Page 15: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

15

b. Sweden c. Lund University d. Axson Johnson Foundation e. Independent Researcher

b. NTT (P. Palu'e, Maumere, Kab. Sikka, Ende, Flores Timur, Manggarai, Manggarai Barat), DKI Jakarta (Arsip Nasional)

c. Asosiasi Tradisi Lisan (Dr. Pudentia MPSS, MA.)

d. Etno Linguistic e. Language and narratives of the past

in the Flores Sea region f. Need extra time to documentating

and archiving research result

APPROVED 49/EXT/SIP/FRP/SM/IX/2014 valid until 29 October 2015

4 a. Ms. Erin Elizabeth Poor b. USA c. Virginia Tech d. Fulbright e. PhD Candidate

a. 12 month (start from October 2015) b. Riau (Indragiri Hilir, Indragiri Hulu,

Kampar, Kuantan Singingi Pelalawan, Pekanbaru dan Hutan Lindung Bukit Batabuh, Suaka Margasatwa Kerumutan, Suaka Margasatwa Bukit Rimbang Baling); DKI Jakarta (LBM Eijkman); Jawa Barat (Taman Safari)

c. Fakultas Kehutanan – UGM (Muhammad Ali Imron)

d. Ecology e. Identifying fine scale habitat use and

landscape connectivity of tigers in a central Sumatran landscape

f. Need extra time to collect sampel and analizing the data

APPROVED

SIP: 39/SIP/FRP/SM/II/2015 valid until 19 October 2015 Second Extension

5 a. Mr. Bram Martinus Adrianus Dortmans

b. Netherland c. Uppsala University d. SECO, State Secretariat for

Economic Affairs & Eawag - Switzerland

a. 12 month (start from September 2015)

b. Jawa Tengah (Pekalongan), Jawa Timur (Sidoarjo)

c. Insitut Teknology Sepuluh Nopember (Prof. Dr. Ing Ir Herman Sasongko)

APPROVED

SIP: 58/SIP/FRP/SM/III/2015 berlaku sampai 9 October 2015

Page 16: LIST OF RESEARCH APPLICATION Date : …Joko Pamungkas) e. PREDICT 2: Qualitative Research for Behavioral Risk Surveillance and Characterization APPROVED Research is planned for2 years

16

e. Student d. Enviroment Engineering e. From Organic Waste to Recycling

for Development – FORWARD f. To continue implementation of

organic solid waste treatment technology in Sidoarjo

6 a. Mr. Sǿren Brofeldt b. Denmark c. University of Copenhagen d. Danish International

Development Assistance (DANIDA)

e. Ph.D Student

a. 9 month (start from September 2015)

b. Jambi (TN. Berbak, Kab. Muaro Jambi), Kalimantan Timur (Kab. Berau) dan Sumatera Barat (Kab. Sijunjung)

c. Fakultas Kehutanan - IPB (Prof. Dr. Ir. Iskandar Z. Siregar)

d. Forestry e. REDD+: The Forest grab of all

times? f. Melanjutkan proses pengambilan

dan analisis sample

APPROVED

SIP: 285/SIP/FRP/SM/IX/2014 valid until 16 September 2015