List of Punch Point Site

Embed Size (px)

Citation preview

  • 8/22/2019 List of Punch Point Site

    1/4

    LIST OF PUNCH POINT AT BTS SITE

    S.N. VEIW LOCATION CHECKING POINTS

    1 AT TOWER 1.Pole mount on the tower.

    2 AT TOWER 2.Antenna is properly installed on the pole mount.

    3 AT TOWER 3.Antenna height as per RF plan.

    4 AT TOWER 4.Antenna azimuth angle as per RF plan.

    5 AT TOWER 5.Antenna electrical tilt as per RF plan.

    6 AT TOWER 6.Antenne mechnical tilt as per RF plan.

    7 AT TOWER 7.Antenna labeling.

    8 AT TOWER 8.Antenna and O/D jumper is properly connected.

    9 AT TOWER

    9.Antenna and O/D jumper connection is properly cover by weather

    proofing kit.

    10 AT TOWER 10.O/D jumper labeling.

    11 AT TOWER 11.O/D jumper properly looping.

    12 AT TOWER 12.O/D jumper and feeder cable is properly connected.

    13 AT TOWER

    13.O/D jumper and feeder cable connection is properly cover by weather

    proofing kit.

    14 AT TOWER 14.Feeder cable labeling.15 AT TOWER 15. No zig-zag routeing in feeder cable.

    16 AT TOWER 16.No cross routeing in feeder cable.

    17 AT TOWER 17.RF clamp is used on feeder cable.

    18 AT TOWER 18.Bending radius r>300mm in feeder cable.

    19 AT TOWER

    19.Earthing kit below the O/D jumper and feeder cable connection at specified

    length.

    20 AT TOWER 20.Earthing kit is properly connected on the feeder cable.

    21 AT TOWER 21.Earthing kit is each and every feeder cable.

    22 AT TOWER 22.Earthing kit is properly terminated with C clamp.

    23 AT TOWER 23.C clamp is properly terminated with tower body.

    24 AT TOWER 24.Earthing kit cable is properly route.

    25 AT TOWER 25.No zig-zag routeing in earthing kit cable.

    26 AT TOWER 26.No cross routeing in earthing kit cable.

    27 AT TOWER 27.Black cable tie is used to route earthing kit cable.

    28 AT TOWER 28.Black cable tie is used on each and every earthing kit cable.

    29 AT TOWER 29.Earthing kit cable is connected on each feeder cable in line.

    30 AT TOWER 30.C clamp is terminated on the tower body where paint is remove.

    31 AT TOWER 31.Earthing kit cable is properly terminated with c clamp.

    32 AT SHALTER WALL 32.EGB is installed on shelter wall below the cable tray.

    33 AT SHALTER WALL 33.EGB is installad properly on shelter wall.

    34 AT SHALTER WALL 34.Roxtec is proprely installed on shelter wall.

    35 AT SHALTER WALL 35.Roxtec is properly attached with shelter wall.

    36 AT SHALTER WALL 36.Roxtec sector labeling.37 AT SHALTER WALL 37.Roxtec and feeder cable entrence with s band.

    38 AT SHALTER WALL 38.In roxtec the empty holes filled by rubber boots.

    39 AT SHALTER WALL

    39.Roxtec is iran sheet type than we used gelly filled gap between shelter wall

    or roxtec.

    40 IN SIDE SHELTER 40.BTS install as per floor layout.

    41 IN SIDE SHELTER 41.TRSM RACK install as per floor layout.

    42 IN SIDE SHELTER 42.Battary Bank install as per floor layout.

    43 IN SIDE SHELTER 43.Power plant install as per flooe layout.

  • 8/22/2019 List of Punch Point Site

    2/4

    44 IN SIDE SHELTER 44.PIU install as per floor layout.

    45 IN SIDE SHELTER 45.BTS properly install on the ancer fostner.

    46 IN SIDE SHELTER 46.BTS leveling .

    47 IN SIDE SHELTER 47.TRSM RACK properly install on the ancer fostner.

    48 IN SIDE SHELTER 48.TRSM RACK leveling .

    49 IN SIDE SHELTER 49.Battary bank is properly install on the rubber padding.

    50 IN SIDE SHELTER 50.Battary bank leveling.

    51 IN SIDE SHELTER 51.CELL is properly inserted in rack.52 IN SIDE SHELTER 52.Numbering on the cell.

    53 IN SIDE SHELTER 53.Strip is properly tight.

    54 IN SIDE SHELTER 54.Gelly is used on each and every strip& cell connection.

    55 IN SIDE SHELTER 55.Battary bank is properly covered.

    56 IN SIDE SHELTER 56.Battary bank power cable is connected with power plant.

    57 IN SIDE SHELTER 57.Battary bank power cable is proprely routed.

    58 IN SIDE SHELTER 58.Power plant is properly install on the battary bank.

    59 IN SIDE SHELTER 59.Power plant leveling.

    60 IN SIDE SHELTER 60.Power plant power cable is properly connected with BTS.

    61 IN SIDE SHELTER 61.Power cable is properly route from POWER PLANT to BTS.

    62 IN SIDE SHELTER 62.Power cable is properly route from POWER PLANT to TRSM RACK.63 IN SIDE SHELTER 63.Power cable is properly route from PIU to POWER PLANT.

    64 IN SIDE SHELTER 64.Power cable routeing is done dy pvc channel.

    65 AT O/D OF SITE 65.Site cleanness.

    66 AT O/D OF SITE 66.Distance between two eart pits not

  • 8/22/2019 List of Punch Point Site

    3/4

    I/D GROUNDING

    91 AT BTS 91.BTS grounding cable is properly terminted with IGB.

    92 AT BTS 92.Grounding cable is proper tight at IGB.

    93 AT BTS 93.Grounding cable is proper tight at BTS.

    94 AT BTS 94.Grounding cable is properly routed from BTS to IGB.

    95 AT BTS 95.No zig-zag routeing in grounding cable from BTS to IGB.

    96 AT BTS 96.No cross routeing in grounding cable from BTS to IGB.

    97 AT BTS 97.Cable tie is on grounding cable.98 AT BTS 98.Cable tie connected to grounding cable with cross knot.

    99 AT BTS 99.Cable tie knot on grounding cable is same way.

    100 AT BTS 100.White cable tie is used on grounding cable.

    101 AT BTS 101.Labeling on grounding cable.

    102 AT BTS 102.Labeling of grounding cable connection at BTS.

    103 AT BTS 103.Labeling of grounding cable connection at IGB.

    104 AT BTS 104.Cable tie is proprely cutted.

    105 AT TRSM RACK 105.TRSM RACK grounding cable is properly terminted with IGB.

    106 AT TRSM RACK 107.Grounding cable is proper tight at TRSM RACK.

    107 AT TRSM RACK 108.Grounding cable is proper tight at IGB.

    109 AT TRSM RACK 109.Grounding cable is properly routed from TRSM RACK to IGB.110 AT TRSM RACK 110.No zig-zag routeing in grounding cable from TRSM RACK to IGB.

    111 AT TRSM RACK 111.No cross routeing in grounding cable from TRSM RACK to IGB.

    112 AT TRSM RACK 112.Cable tie is on grounding cable.

    113 AT TRSM RACK 113.Cable tie connected to grounding cable with cross knot.

    114 AT TRSM RACK 114.Cable tie knot on grounding cable is same way.

    115 AT TRSM RACK 115.White cable tie is used on grounding cable.

    116 AT TRSM RACK 116.Labeling on grounding cable.

    117 AT TRSM RACK 117.Labeling of grounding cable connection at TRSM RACK.

    118 AT TRSM RACK 118.Labeling of grounding cable connection at IGB.

    119 AT TRSM RACK 119.Cable tie is proprely cutted.

    120 AT BATTARY BANK 120.Battary Bank grounding cable is properly terminted with IGB.

    121 AT BATTARY BANK 121.Grounding cable is proper tight at IGB.

    122 AT BATTARY BANK 122.Grounding cable is proper tight at Battary Bank.

    123 AT BATTARY BANK 123.Grounding cable is properly routed from Battary Bank to IGB.

    124 AT BATTARY BANK 124.No zig-zag routeing in grounding cable from Battary Bank to IGB.

    125 AT BATTARY BANK 125.No cross routeing in grounding cable from Battary Bank to IGB.

    126 AT BATTARY BANK 126.Cable tie is on grounding cable.

    127 AT BATTARY BANK 127.Cable tie connected to grounding cable with cross knot.

    128 AT BATTARY BANK 128.Cable tie knot on grounding cable is same way.

    129 AT BATTARY BANK 129.White cable tie is used on grounding cable.

    130 AT BATTARY BANK 130.Labeling on grounding cable.

    131 AT BATTARY BANK 131.Labeling of grounding cable connection at Battary Bank.

    132 AT BATTARY BANK 132.Labeling of grounding cable connection at IGB.133 AT BATTARY BANK 133.Cable tie is proprely cutted.

    134 AT POWER PLANT 134.Power Plant grounding cable is properly terminted with IGB.

    135 AT POWER PLANT 135.Grounding cable is proper tight at IGB.

    136 AT POWER PLANT 136.Grounding cable is proper tight at Power Plant.

    137 AT POWER PLANT 137.Grounding cable is properly routed from Power Plant to IGB.

    138 AT POWER PLANT 138.No zig-zag routeing in grounding cable from Power Plant to IGB.

    139 AT POWER PLANT 139.No cross routeing in grounding cable from Power Plant to IGB.

    140 AT POWER PLANT 140.Cable tie is on grounding cable.

  • 8/22/2019 List of Punch Point Site

    4/4

    141 AT POWER PLANT 141.Cable tie connected to grounding cable with cross knot.

    142 AT POWER PLANT 142.Cable tie knot on grounding cable is same way.

    143 AT POWER PLANT 143.White cable tie is used on grounding cable.

    144 AT POWER PLANT 144.Labeling on grounding cable.

    145 AT POWER PLANT 145.Labeling of grounding cable connection at Power Plant.

    146 AT POWER PLANT 146.Labeling of grounding cable connection at Power IGB.

    147 AT POWER PLANT 147.Cable tie is proprely cutted.

    148 AT PIU 148.PIU grounding cable is properly terminted with IGB.149 AT PIU 149.Grounding cable is proper tight at IGB.

    150 AT PIU 150.Grounding cable is proper tight at PIU.

    151 AT PIU 151.Grounding cable is properly routed from PIU to IGB.

    152 AT PIU 152.No zig-zag routeing in grounding cable from PIU to IGB.

    153 AT PIU 153.No cross routeing in grounding cable from PIU to IGB.

    154 AT PIU 154.Cable tie is on grounding cable.

    155 AT PIU 155.Cable tie connected to grounding cable with cross knot.

    156 AT PIU 156.Cable tie knot on grounding cable is same way.

    157 AT PIU 157.White cable tie is used on grounding cable.

    158 AT PIU 158.Labeling on grounding cable.

    159 AT PIU 159.Labeling of grounding cable connection at PIU.160 AT PIU 160.Labeling of grounding cable connection at IGB.

    161 AT PIU 161.Cable tie is proprely cutted.

    162 AT DDF 162.DDF grounding cable is properly terminted with IGB.

    163 AT DDF 163.Grounding cable is proper tight at IGB.

    164 AT DDF 164.Grounding cable is proper tight at DDF.

    165 AT DDF 165.Grounding cable is properly routed from DDF to IGB.

    166 AT DDF 166.No zig-zag routeing in grounding cable from DDF to IGB.

    167 AT DDF 167.No cross routeing in grounding cable from DDF to IGB.

    168 AT DDF 168.Cable tie is on grounding cable.

    169 AT DDF 169.Cable tie connected to grounding cable with cross knot.

    170 AT DDF 170.Cable tie knot on grounding cable is same way.

    171 AT DDF 171.White cable tie is used on grounding cable.

    172 AT DDF 172.Labeling on grounding cable.

    173 AT DDF 173.Labeling of grounding cable connection at DDF.

    174 AT DDF 174.Labeling of grounding cable connection at IGB.

    175 AT DDF 175.Cable tie is proprely cutted.

    176 SURGE ARRESTER 176.Surge Arrester grounding cable is properly terminted with IGB.

    177 SURGE ARRESTER 177.Grounding cable is proper tight at IGB.

    178 SURGE ARRESTER 178.Grounding cable is proper tight at Surge Arrester.

    179 SURGE ARRESTER 179.Grounding cable is properly routed from Surge Arrester to IGB.

    180 SURGE ARRESTER 180.No zig-zag routeing in grounding cable from Surge Arrester to IGB.

    181 SURGE ARRESTER 181.No cross routeing in grounding cable from Surge Arrester to IGB.

    182 SURGE ARRESTER 182.Cable tie is on grounding cable.183 SURGE ARRESTER 183.Cable tie connected to grounding cable with cross knot.

    184 SURGE ARRESTER 184.Cable tie knot on grounding cable is same way.

    185 SURGE ARRESTER 185.White cable tie is used on grounding cable.

    186 SURGE ARRESTER 186.Labeling on grounding cable.

    187 SURGE ARRESTER 187.Labeling of grounding cable connection at Surge arrester.

    188 SURGE ARRESTER 188.Labeling of grounding cable connection at IGB.

    189 SURGE ARRESTER 189.Cable tie is proprely cutted.