List of Operation Issues Adani PL. (i) Sh. Nirmal Sharma, VP (O&M), Fax- 0141-2292065 (ii) Sh. Sameer Ganju, Head-Northern Region, Fax No. 011-24115560 APCPL (i) AGM (O&M)-I, IGSTPP, Fax No. 01251-266326 (ii) AGM (EEMG), 01251-266326 BBMB (i) Director (PR) Fax- 0172-2652820 (ii) Power Controller, Fax- 0172-2653297. HVPNL Chief Engineer (Comm.); SE (SO & SLDC): 0181-2664440 Fax-0172-2560622 NHPC (i) Sh. Janardan Choudhary, E.D., Faridabad – Fax-0129-2272413 (ii) Sh. S P.Singh, Chief Engineer (O&M), Faridabad – Fax-0129-2272413 POWERGRID (i) Sh. Prabhakar singh, ED (NR-I), Fax No. 011-26853488 (ii) Sh. A.K. Arora, General Manager (O&M), NR-I, (iii) Sh. R.V.S Kushwaha, General Manager (O&M), Jammu; Fax- 0191-2471187 (iv) Sh.Rajeev Sudan Dy, General Manager (OS), Fax- 0191-2471187 RRVUNL Sh. P.S Arya, Chief Engineer (PPMC & IT), ) Fax- 0141-2740006 NTPC (i) Head of OS/ Head of RCC, Fax No. 0120-2410082 (ii) Sh. Praveen Chaturvedi, GM (OS), NRHQ Lucknow; Fax-0522-2305849. HPSEBL (i) Sh Suneel Grover, Chief Engineer (SO &P), Fax No. 0177-2653656 (ii) Sh. Deepak Uppal, SE (PR& ALDC): Fax-0177-2837143 (iii) Sh. Joginder Singh. Power Controller, Fax No. 0177-2837143. NRLDC General Manager - 26854861, 4051, 26569504 Fax- 26852747 NLDC General Manager, NLDC, Fax: 011-26853488/26601079 Lanco APTL Sh. Raj Kumar Roy, Director, Fax: 0124-2341627/4741024 SJVNL/NJHPS General Manager (C&SO), Fax- 0177-2673283 PTCUL/UPCL (i) Sh. Anupam Sharma, SE (SLDC), Fax- 0135-2451160, 0135-2763570 UPPTCL (i) Director (Op), Fax- 0522-2286476 (ii) Chief Engineer (SLDC), Fax- 0522-2287880, 2288736 HPLDS (i) Sh. N.P.sharma, SE, SLDC, Fax: 0177-2837649 (ii) Sh. Lokesh Thakur, Executive engineer, Fax: 0177-2837649 DTL General Manager (SLDC)/ General Manager (Protection) Fax-23236462, 23221069 THDCIL Sh. U.C Kannaujia, AGM (EMD), Tehri, Fax- 0135-2438682 PSTCL (i) Sh. S.S.Mal, Chief Engineer (SLDC) Fax – 0175-2365340 (ii) Sh D.P.Sethi, Dy.Chief Engineer (SLDC) Fax – 0175-2365340 CHANDIGARH Sh. M.P.Singh, SE (Elect. Op.Circle) – Fax-0172-2740505 IPGCL/PPCL (i) Sh. Y.P.Arora,GM (T), IPGCL, New Delhi, Fax- 23370884 (ii) Sh. R.K.Yadav, DGM (T), IPGCL, New Delhi, Fax- 23370884 BRPL Sh. Satinder Sondhi, VP & Head System Operations, Fax No. 011-39996549 Everest PPL Sh. Yogendra Kumar, Chief Operating Officer, Fax No. 011-45823862/ 43852507 RPSCL Sh. Niranjan Jena, Addl.VP/ Sh. Suvendu Dey, Asst. VP-O&M, Fax: 05842-300003 HPGCL Sh. S.K. Wadhwa SE/Technical(HQ), Fax: 0172-5022436
From organizations which are yet to submit revised nominations
Uttar Haryana Bijli Vitaran Nigam Ltd. Jodhpur Vidyut Vitran Nigam Ltd. Dakshinanchal Vidyut Vitaran Nigam Ltd.
HPPTCL Director (Planning & Contracts), Fax: 0177-2626284 J&K (PDD) Chief Engineer (Survey & Commercial) Fax-0191-2476213 J&K SPDCL GM, Fax: 0194-2500145 PSPCL Engineer-in- Chief (PPRR), Fax- 0175-2308698. RRVPNL Chief Engineer (LD); SE (SO&LD) – Fax- 0141-2740920 UPRVUNL DGM (TOM), 0522-2287861 UJVNL General Manager Engineering: 0135-2761485, fax- 0135-2761549 CEA Director, (GM-I), Fax- 26170385, 26108834 Chief Engineer, NPC NPCIL (i) Station Director, NAPS; Fax. 05734-222177.(ii) Sr. Manager (Transmission),
NPCILFax.-022-25563350 JPPVL Sh. Suresh Chandra, Director, Fax- 0120-4516201/4609464/4609496 Jhajjar PL Sh. Goutam Biswas, GM (Production), 01251-270155.
New Members for the year 2016-17 (Nominations not received)
PROPOSED OUTAGE OF GENERATIONG STATIONS FOR THE 137th OCC MEETING ANNEXURE 1
NTPC –NCR
Station Unit Capacity
(MW)
Period Days Remarks
From To
DADRI COAL 1 4 210 17-8-17 10-9-17 25 BOILER OVERHAUL ANTA 2 88.71 15-8-17 18-8-17 4 MAJOR INSPECTION
1
PROPOSED OUTAGE OF NLDC TRANSMISSION LINES FOR THE MONTH OF AUGUST FOR THE 137th OCC MEETING ANNEXURE 2A
Request By Element Name Owner Name Mode Reasons
From Date
From Time To Date To Time
Remarks Request Detail
1 POWERGRID
[ DELHI ] Agra-VNC HVDC
Pole-I(800 kV) Power grid Daily
Sealing work to prevent entry of rain water at Pole-3 DC
Hall , Agra HVDC 01-08-17 08:00 01-08-17 18:00 -
2 POWERGRID
[ DELHI ] Barh Gorakhpur Ckt-
I(400 kV) Power grid Daily
Replacement of terminal connector of line Isolator as per head office instructions. ,
at Gorakhpur 03-08-17 09:00 03-08-17 17:30 -
3 POWERGRID
[ DELHI ] Barh Gorakhpur Ckt-
II(400 kV) Power grid Daily
Replacement of terminal connector of line Isolator as per head office instructions. ,
at Gorakhpur 04-08-17 09:00 04-08-17 17:30 -
4 SLDC_RAJASTHAN
[ RAJASTHAN ] ANTA-PHAGI-1
(765 kV) Rajasthan Daily stability test for spare reactor 12-08-17 09:00 12-08-17 20:00 -
5 SLDC_RAJASTHAN
[ RAJASTHAN ] ANTA-PHAGI-2
(765 kV) Rajasthan Daily stability test for spare reactor 18-08-17 09:00 18-08-17 20:00 -
6 SLDC_RAJASTHAN
[ RAJASTHAN ]
Badod(MP)-Modak(RVPNL)
(220 kV) Rajasthan Continuous Annual Maintenance 08-08-17 09:00 08-08-17 17:00 -
7 POWERGRID
[ DELHI ]
765 kV S/C Bhiwani-Jaipur-I (PG) Line
(765 kV) Power grid Daily
Commissioning of CSD for Line Reactor & NGR Bypass scheme at Bhiwani. Radiator
oil leakage at Phagi end. Reapplied as per last OCC
discussion. 04-08-17 08:00 04-08-17 18:00 - 2
8 POWERGRID
[ DELHI ]
765 kV S/C Bhiwani-Jaipur-I (PG) Line
(765 kV) Power grid Daily
Commissioning of CSD for Line Reactor & NGR Bypass
scheme at Bhiwani. Reapplied as per last OCC
discussion. 07-08-17 08:00 07-08-17 18:00 -
9 PGCIL 500 BALIA BHIWADI I PGCIL Cont
Diversion work by Bhiwadi due to Railway DFCC project. Resubmitted
11-8-17 08:00 25-8-17 18:00
10 PGCIL 500 BALIA BHIWADI II PGCIL Cont
Diversion work by Bhiwadi due to Railway DFCC project. Resubmitted
11-8-17 08:00 25-8-17 18:00
11 PGCIL 765kV BHIWANI PHAGI I PGCIL Daily
Commissioning of CSD for Line Reactor & NGR Bypass scheme at Bhiwani. Radiator oil leakage at Phagi end. Reapplied as per last OCC discussion.
4-08-17 08:00 4-08-17 13:00
12 PGCIL 765kV BHIWANI PHAGI II PGCIL Cont
Commissioning of CSD for Line Reactor & NGR Bypass scheme at Bhiwani
7-08-17 08:00 7-08-17 13:00
13 PGCIL 765kV KANPUR JHATIKRA I PGCIL Daily
Jumper tightening and other line maintenance work.
1-08-17 08:00 4-08-17 18:00
14 PGCIL 765kV JHATIKRA BHIWANI I PGCIL Daily
Line AMP, Tightening of Jumper, Spacers & other equipment AMP at Bhiwani
10-8-17 8:00 10-8-17 18:00
15 PGCIL 765KV Fatehpur Agra Line-II S/C PGCIL Daily
Stringing for Crossing of 765kV D/C Orai-Aligarh TL, TE07, at
Orai ( AP 59- AP 60)
17-8-17 7:00 18-8-17 18:00
3
16 PGCIL 765KV Agra Fatehpur Line2 S/C PGCIL Cont
. For Diversion work due to DFCC work., at Agra 20-8-17 09:00 25-8-17 18:00
17 PGCIL 765KV Fatehpur Agra Line -I S/C PGCIL Daily
Stringing for Crossing of 765kV D/C Orai-
Aligarh TL, TE07 , at Orai (AP 61 - AP 62)
29-8-17 07:00 30-8-17 18:00
18 PGCIL 765kv Varanasi Ballia S/C PGCIL Daily Bushing Oil sampling for DGA , at Varanasi 2-08-17 10:00 2-08-17 13:00
19 PGCIL 6.6 KV NTPC Vindhyachal
HVDC BTB
Vindhyachal
Feeder-1
(3 BA 28)
PGCIL Cont
Bus Overhauling at NTPC , Vindhyachal as
requested by NTPC Vindhyachal STPS
22-7-17 14:00 29-7-17 20:00
20 PGCIL 765KV Varanasi Gaya Line-II (S/C) PGCIL Daily Bushing Oil sampling
for DGA , at Varanasi 2-08-17 14:00 2-08-17 17:00
21 PGCIL 800 KV Champa Kurekshetra Pole I PGCIL Daily
For Bi pole software up gradation and
necessary integration works of POLE II under
commissioning
2-8-17 9:00 3-8-17 17:00
22 UPPTCL 765KV Unnao Anpara C UP Daily For routine protection testing of Anpara C 9-8-17 8:00 9-8-17 18:00
4
PROPOSED OUTAGE OF TRANSMISSION LINES FOR THE MONTH OF AUGUST FOR THE 137th OCC MEETING ANNEXURE 2B
SNO Request By Element Name Owner Name Mode Reasons
From Date
From Time To Date To
Time Remarks Request Detail
1 SLDC_HARYANA
[ HARYANA ] Daultabad-Dhanonda ckt-
1(400 kV) Haryana Daily
General Maintenance and alignment of 400KV Line & Bay Isolator with Tie
Bay at Daultabad/Dhanonda 08-08-17 10:00 08-08-17 16:00
2 SLDC_HARYANA
[ HARYANA ] Daultabad-Dhanonda ckt-
2(400 kV) Haryana Daily
General Maintenance and alignment of 400KV Line & Bay Isolator with Tie
Bay at Daultabad/Dhanonda 10-08-17 10:00 10-08-17 16:00
3 SLDC_HARYANA
[ HARYANA ] Daultabad(HVPNL)-
Jhajjar(APCPL) 1(400 kV) Haryana Daily For isolator alignment,
Nut & Bolt Tightening, for attending Red hot point
and tree cutting
17-08-17 08:00 17-08-17 17:00
4 SLDC_HARYANA
[ HARYANA ] Daultabad(HVPNL)-
Jhajjar(APCPL) 2(400 kV) Haryana Daily 18-08-17 08:00 18-08-17 17:00
5 SLDC_HARYANA
[ HARYANA ] Daultabad(HVPNL)-
Gurgaon(PG) -1(400 kV) Haryana Daily
For isolator alignment, Nut & Bolt Tightening, for attending Red hot point
and tree cutting 09-08-17 08:00 09-08-17 17:00
6 SLDC_HARYANA
[ HARYANA ] Daultabad(HVPNL)-
Gurgaon(PG) -2(400 kV) Haryana Daily
For isolator alignment, Nut & Bolt Tightening, for attending Red hot point
and tree cutting 11-08-17 08:00 11-08-17 17:00
7 NHPC [ DELHI ] Salal(NHPC)-Jammu(JK)
2(220 kV) Power grid Daily To replace
faulty/damaged isolator 30-07-17 10:00 30-07-17 15:00
8A SLDC_UP [ UTTAR PRADESH ]
Dadri-Nawada (400KV)
Uttar Pradesh Daily
For commissioning of AR and general maintenance of bay 19-8-17 10:00 19-8-17 16:00
8b SLDC_UP [ UTTAR PRADESH ]
Obra –Rewa Road (400KV)
Uttar Pradesh Continuous
For Diversion work of 400 KV Obra- Rewa Road line at Bhadraumarganj Loc. Due to DFCC & Jumpering work of 220KV Sarangapur - Phulpur line and Diversion work at Jarar Meja for Meja Urja Nigam Ltd .
2-8-17 8:00 14-8-17 18:00
5
9
SLDC_UP [ UTTAR PRADESH ] 132 KV Pilibhit –Sitarganj
Line Uttar
Pradesh Daily Maintenance of complete
bay 3-8-17 9:00 3-8-17 14:00
10 SLDC_UP [ UTTAR PRADESH ]
400 KV Fatehbad -Muradnagar
Uttar Pradesh Daily
1. For replacement of damage jumper & fixing
of pilot string copper bond, bull dog clamp
and other line maintenance work. 2. Tightening of Bay
11-8-17 8:00 11-8-17 18:00
Deferred in 136th OCC
meeting due to high loading conditions
11 SLDC_UP [ UTTAR PRADESH ] Panki -Aligarh
Uttar Pradesh Continuous
For diversion of line due to construction of NTPC
plant in Bilhaur between 1 no. 92 to 104 & general
maintenance. 22-8-17 8:00 22-8-17 18:00
Deferred in 136th OCC
meeting due to high loading conditions.
12 SLDC_UP
[ UTTAR PRADESH ] Aligarh –Muradnagar
(400KV) Uttar
Pradesh Daily
1. Maintenance of line & replacement of damage
disc extra. 2. Line maintenance
and lopping and chopping of tree
branches. 26-8-17 8:00 26-8-17 18:00
Deferred in 136th OCC
meeting due to high loading conditions.
6
13 SLDC_UP
[ UTTAR PRADESH ] Lucknow(PG)-
Lucknow(UP)(400 kV)I Powergrid Daily
RETROFITTING OF LINE ISOLATOR (SHUTDOWN IS
REQUIRED FOR DISCONNECTION OF PIPE
BUS BETWEEN LINE ISOLATOR & TRANSFER BUS ISOLATOR). AFTER
DISCONNECTION OF PIPE BUS, LINE WILL BE CHARGED FROM TRANSFER BUS. 01-08-17 09:00 01-08-17 16:00
14 SLDC_UP
[ UTTAR PRADESH ] Lucknow(PG)-
Lucknow(UP) II(400 kV) Powergrid Daily
RECONNECTION OF PIPE BUS BETWEEN
LINE ISOLATOR & TRANSFER BUS
ISOLATOR AFTER RETROFITTING OF LINE
ISOLATOR. Jumper tightening etc. 10-08-17 09:00 10-08-17 16:00
15 SLDC_UP [ UTTAR
PRADESH ] Agra-Unnao(400 kV) Uttar
Pradesh Continuous
Erection of towers & stringing for diversion
near Tundala Bypass due to DFCC between 1 no.
661 to 664 02-08-17 08:00 12-08-17 18:00
16 SLDC_UP
[ UTTAR PRADESH ] Muradnagar-
Muzaffarnagar(400 kV) Uttar
Pradesh Continuous
Replacement of CT, CVT and B Bus pantograph
isolator. 08-08-17 08:00 10-08-17 18:00
17 SLDC_UP
[ UTTAR PRADESH ]
Khodri(UPCL)-Saharnpur(UPPCL)-2
(220 kV) Uttar
Pradesh Daily
For tree cutting, repairing of conductor, Inspection
of Insulators & other maintenance of line 10-08-17 08:00 12-08-17 18:00
18 SLDC_UP [ UTTAR
PRADESH ] Kanpur(PG)-Panki(UP)
1(400 kV) Power grid Daily Replacement of jumper & tightening of clamps etc. 11-08-17 08:00 11-08-17 18:00
19 SLDC_UP [ UTTAR
PRADESH ] Khurja(UP)-Napp(NPC)
1(220 kV) Uttar
Pradesh Daily Replacement of Protection Panel 15-08-17 08:00 16-08-17 16:00
20 SLDC_UP [ UTTAR Lucknow-Unnao(400 kV) Uttar Daily General Maintenance of 16-08-17 08:00 16-08-17 18:00
7
PRADESH ] Pradesh complete bay, & jumper tightening
21 SLDC_UP [ UTTAR
PRADESH ] Khodri-Saharnpur
ckt2(400 kV) Uttar
Pradesh Daily
For Tree cutting, repairing of conductor, Inspection
of Insulators & other maintenance of line 16-08-17 08:00 18-08-17 18:00
22 SLDC_UP [ UTTAR
PRADESH ] Nara(UP)-
Roorkee(UTT)(220 kV) Uttar
Pradesh Daily
For Tree cutting, repairing of conductor, Inspection
of Insulators & other maintenance of line 17-08-17 09:00 18-08-17 18:00
23 SLDC_UP [ UTTAR
PRADESH ] Lucknow(PG)-
Sultanpur(UP)(400 kV) Uttar
Pradesh Daily
(a) For routine protection testing. (b) Maintenance of Sultanpur-LKO (PGCIL) line.
20-08-17 08:00 20-08-17 18:00
Deferred in 136th OCC meeting due to high load in Grid
24 SLDC_UP [ UTTAR
PRADESH ] Bareilly-Unnao 1(400 kV) Uttar
Pradesh Daily
For Routine Maintenance and Testing of Equipments. 22-08-17 08:00 22-08-17 18:00
25 SLDC_UP [ UTTAR
PRADESH ] Napp(NPC)-
Sambhal(UP)(220 kV) Uttar
Pradesh Continuous
1. Raising of height of line at SH/NH road crossing. 2. Various type work i.e. checking & tightening of
jumpers of line, lopping/chopping & cutting of trees & maintenance of
equipments in 220KV Bay at 220KV S/S Sambhal. 22-08-17 08:00 25-08-17 18:00
26 SLDC_UP [ UTTAR
PRADESH ] Bareilly-Unnao 2(400 kV) Uttar
Pradesh Daily
For Routine Maintenance and Testing of Equipments. 23-08-17 08:00 23-08-17 18:00
27 SLDC_UP [ UTTAR
PRADESH ] Panki-Unnao(400 kV) Uttar
Pradesh Daily General Maintenance of
complete bay 25-08-17 08:00 25-08-17 18:00
28 SLDC_UP [ UTTAR
PRADESH ] Dadri(NTPC)-
G.Noida(UP)(400 kV) Power grid Daily For General maintenance
& its bay 27-08-17 07:00 28-08-17 11:00
8
29 SLDC_UP [ UTTAR
PRADESH ] Obra-Sultanpur(400 kV) Uttar
Pradesh Continuous
I. From 15.08.17 to 18.08.17 (a) Dismantling
of HV bushing, tuuret, IPS pipe etc for complete
gasket replacement and oil centrifuging of
50MVAR Obra line reactor (b)Replacement
of disc insulators by Polymers and lopping &
Chopping of tree branches in the corridor..
2 .From 15.08.17 to 01.09.17. For complete gasket replacement and
oil centrifuging of line reactor. 3 From 29.08.17 to 01.09.17. For erection of HV bushing, Turret etc.
after complete gasket replacement of 50MVAR
Obra line reactor. 15-08-17 08:00 01-09-17 18:00
Deferred in 136th OCC
meeting due to high load in
Grid
30 SLDC_UP [ UTTAR
PRADESH ] Khatima(UPCL)-
Pilibhit(UPPCL)(220 kV) Uttrakhand Daily Maintenance of Complete
Bay 02-08-17 09:00 02-08-17 14:00
31 SLDC_UP [ UTTAR
PRADESH ] Gazipur(DTL)-Noida sec
62(UP)(220 kV) Uttar
Pradesh Continuous
For height raising of Transmission line at NH-
24 Crossing. 01-08-17 09:00 07-08-17 18:00
32 BBMB [ CHANDIGARGH ]
Narela(DTL)-Rohtakroad(BBMB) 2(220
kV) BBMB Daily
For replacement of conventional C-Wedge
clamps. 09-08-17 08:00 09-08-17 17:00
9
33 BBMB [ CHANDIGARGH ]
Narela(DTL)-Rohtakroad(BBMB) 1
(220 kV) BBMB Daily
For replacement of conventional C-Wedge
clamps. 02-08-17 08:00 02-08-17 17:00
34 BBMB [ CHANDIGARGH ] Panipat-Kurukshetra
(220 kV) BBMB Daily
For replacement of conventional disc
insulators with polymer insulators. 16-08-17 08:00 26-08-17 17:00
35 BBMB [ CHANDIGARGH ]
Charkhi Dadri(BBMB)-Mohindergarh(HVPNL)
2(220 kV) BBMB Daily
Replacement of Static Electromechanical
scheme with Numerical DP scheme. 07-08-17 08:00 07-08-17 17:00
36 BBMB [ CHANDIGARGH ] Hissar –SANGRUR Ckt
I& II(220KV) BBMB Conti.
Shifting/Raising of height between TL 230-231 due to
electrification of Rohtak-Bhatinda Section of Railway. (Deposit work of Rail Vikas
Nigam) 1.8.17 8:00 20-8-17 17:00
37 NTPC [ DELHI ] Sultanpur(UP)-
Tanda(NTPC) 2(220 kV) Uttar
Pradesh Daily Maintenance and testing
of circuit breakers 22-08-17 08:00 22-08-17 18:00
38 NTPC [ DELHI ] Lucknow(UP)-
Singrauli(NTPC)(400 kV) Power grid Daily
Maintenance and testing of circuit breakers and Protection Equipments 02-08-17 08:00 02-08-17 18:00
39 NTPC [ DELHI ]
Allahabad(PG)-Singrauli(NTPC) 2
(400 kV) Power grid Daily
Maintenance and testing of circuit breakers and Protection Equipments 04-08-17 08:00 04-08-17 18:00
40 NTPC [ DELHI ] Anpara(UP)-
Singrauli(NTPC)(400 kV) Power grid Daily CVT Replacement. 08-08-17 08:00 10-08-17 18:00
41 NTPC [ DELHI ]
Allahabad(PG)-Singrauli(NTPC) 1
(400 kV) Power grid Daily CVT Replacement. 11-08-17 08:00 13-08-17 18:00
10
42 NTPC [ DELHI ]
Allahabad(PG)-Singrauli(NTPC) 1
(400 kV) Power grid Daily
CVT Replacement of 400 KV Bus-2 (During Unit shutdown for overhaul) 18-08-17 08:00 20-08-17 18:00
43 SLDC_DELHI [ DELHI ] Jhajjar(APCPL)-
Mundka(DTL) 1(400 kV) APCPL Jhajjar Daily
ATTENDING HOT SPOTS ON BUS ISOLATOR 89B, B
PHASE LINE ISOLATOR AND BAY TIGHTENING
WORKS. 03-08-17 06:00 03-08-17 11:00
44 SLDC_DELHI [ DELHI ] Jhajjar(APCPL)-
Mundka(DTL) 2(400 kV) APCPL Jhajjar Daily
ATTENDING HOT SPOTS ON B & Y
PHASE LINE ISOLATOR AND BAY TIGHTENING
WORKS. 04-08-17 06:00 04-08-17 11:00
45 SLDC_UTTARAKHAND [
UTTARAKHAND ] Kashipur-Rishikesh(400
kV) Uttrakhand Daily For testing PLCC
protection. 21-08-17 10:00 21-08-17 17:00
46 SLDC_RAJASTHAN
[ RAJASTHAN ] Chabbra –Anta CKT I
( 400 KV) Rajasthan Daily
Maintenance work of Bay equipments, tightening of clamps and connectors
and tan delta measurement of CTs at
Anta end 22-8-17 9:00 22-8-17 18:00
During Shut down other
circuit of line will be available
47 SLDC_RAJASTHAN
[ RAJASTHAN ] Chabbra –Anta CKT II
( 400 KV) Rajasthan Daily
Maintenance work of Bay equipments, tightening of clamps and connectors
and tan delta measurement of CTs at
Anta end 23-8-17 9:00 23-8-17 18:00
During Shut down other
circuit of line will be available
48 SLDC_RAJASTHAN
[ RAJASTHAN ]
Badod(MP)-Sakatpura(RVPNL)
(400 kV) Rajasthan Continuous
Annual Maintenance and for replacement of
Isolator clamp & C.T 10-08-17 07:00 11-08-17 18:00
49 SLDC_RAJASTHAN
[ RAJASTHAN ] Bikaner-Merta (400KV) Rajasthan Daily
Stringing of 400KV D/C Bikaner-Sikar line by M/S
Kec AT Bikaner and Quarterly maintenance at
Merta end 3-8-17 9:00 3-8-17 17:00
11
50 SLDC_RAJASTHAN
[ RAJASTHAN ] Phagi –HPR CKT-I Rajasthan Daily
For checking /tightening /rectification of jumpers
on all angle towers observed hot spots at
some locations 1-8-17 7:00 5-8-17 19:00
400 KV HPR GSS fed by other circuit
51 SLDC_RAJASTHAN
[ RAJASTHAN ] Agra-Bharatpur(220 kV) Rajasthan Daily Quarterly maintenance at
Bharatpur 04-08-17 09:00 04-08-17 17:00
52 SLDC_RAJASTHAN
[ RAJASTHAN ] Akal-Jodhpur II(400 kV) Rajasthan Continuous
Shifting of 400 KV Jodhpur line from old bay to new bay by m/s TATA projects at Jaisalmer end. 01-08-17 10:00 12-08-17 18:00
53 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II-Merta 1
(400 kV) Rajasthan Continuous
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS at Merta 09-08-17 09:00 09-08-17 17:00
54 SLDC_RAJASTHAN
[ RAJASTHAN ] Jodhpur II-Merta 2
(400 kV) Rajasthan Continuous
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS at Merta 11-08-17 09:00 11-08-17 17:00
55 SLDC_RAJASTHAN
[ RAJASTHAN ] Merta-Ratangarh(220 kV) Rajasthan Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS at Merta 22-08-17 09:00 22-08-17 17:00
56 SLDC_RAJASTHAN
[ RAJASTHAN ] Ratangarh-Suratgarh
1(400 kV) Rajasthan Continuous
maintenance work of line and bay equipments at
Ratangarh 18-08-17 09:00 19-08-17 20:00
57 SLDC_RAJASTHAN
[ RAJASTHAN ] Charkhi Dadri-Khetri
1(220 kV) Rajasthan Daily For Tree trimming work
under Line 10-08-17 09:30 10-08-17 18:00
58 SLDC_RAJASTHAN
[ RAJASTHAN ] Charkhi Dadri-Khetri
2(220 kV) Rajasthan Daily For Tree trimming work
under Line 09-08-17 09:30 09-08-17 18:00
59 SLDC_RAJASTHAN
[ RAJASTHAN ] Debari(RVPNL)-RAPS
A(NPC)(220 kV) Rajasthan Daily For Line Maintenance 18-08-17 09:00 18-08-17 18:00
12
60 SLDC_RAJASTHAN
[ RAJASTHAN ] RAPP (A )-KOTA-1
D/C(220 kV) Rajasthan Daily
Annual Maintenance and to replace detioriated Line Isolator Jumpers & Clamp Connectors and testing of
CVT at Kota end. 17-08-17 07:00 17-08-17 18:00
61 SLDC_RAJASTHAN
[ RAJASTHAN ] Chabra-Hindaun II
(400 kV) Rajasthan Daily Half Yearly Maintenance
Work 17-08-17 10:00 17-08-17 17:00
62 SLDC_RAJASTHAN [
RAJASTHAN ] Kota(PG)-Merta(RVPNL)
1(400 kV) Power grid Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS at Merta 25-08-17 09:00 25-08-17 17:00
63 SLDC_RAJASTHAN [
RAJASTHAN ] Shree Cement(CSL)-
Merta(RRVPNL)(400 kV) Power grid Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS at Merta 26-08-17 09:00 26-08-17 17:00
64 SLDC_RAJASTHAN [
RAJASTHAN ] Jodhpur II(RVPNL)-
Kankroli(PG) 1(400 kV) Power grid Daily
2nd Quarterly maintenance work at
Jodhpur 02-08-17 10:00 02-08-17 18:00
65 POWERGRID [ DELHI ] Bhiwani(BBMB)-
Mahendergarh(400 kV) Powergrid Daily
AMP and bay equipment jumper tightening at
Bhiwani end. 03-08-2017 08:00
03-08-2017 18:00
Deferred by 136OCC
66 POWERGRID [ DELHI ] Bhiwani(BBMB)-
Mahendergarh(400 kV) Powergrid Daily
AMP and bay equipment jumper tightening at
Bhiwani end. 04-08-2017 08:00
04-08-2017 18:00
Deferred by 136OCC
67 POWERGRID [ DELHI ] Ballabgarh-Mainpuri
1(400 kV) Powergrid Daily
For Line diversion work under DFCC. During S/D,
02 Nos tower to be erected out of 04 Nos
tower after stringing of the new section shall be
taken up. 08-08-2017 08:00
18-08-2017 18:00
Deferred by 136OCC
13
68 POWERGRID [ DELHI ] Ballabgarh-Mainpuri
2(400 kV) Powergrid Continuous
For Line diversion work under DFCC. During S/D,
02 Nos tower to be erected out of 04 Nos
tower after stringing of the new section shall be
taken up 08-08-2017 08:00
18-08-2017 18:00
Deferred by 136OCC
69 POWERGRID [ DELHI ] Agra-Ballabgarh(400 kV) Power grid Continuous
For Line diversion work under DFCC. During S/D,
02 Nos tower to be erected out of 03 Nos
tower after that stringing of the new section shall
be taken up. 01-08-17 08:00 07-08-17 18:00 Deferred by
136OCC
70 POWERGRID [ DELHI ]
Koteshwar Pool(PG)-Koteshwar(THDC) 1
(400 kV) Power grid Daily
S/D along with both Bus for modification in Bus Bar Protn Scheme at Koteshwar THDC for
charging of new 125MVAR B/R. 20-07-17 08:00 20-07-17 18:00
71 POWERGRID [ DELHI ]
Koteshwar Pool(PG)-Koteshwar(THDC) 2
(400 kV) Power grid Daily
S/D along with both Bus for modification in Bus Bar Protn Scheme at Koteshwar THDC for
charging of new 125MVAR B/R. 20-07-17 08:00 20-07-17 18:00
73 POWERGRID [ DELHI ] Bahadurgarh(PG)-
Bawana(DTL)(400 kV) Power grid Continuous
Diversion due to KMP express way/ fixing CC
Ring/ Arcing Horn, check nut in jumpers etc. 08-08-17 08:00 13-08-17 18:00
Deferred by 136OCC.
74 POWERGRID [ DELHI ] Bahadurgarh(PG)-
Bhiwani(BBMB)(400 kV) Power grid Continuous
Diversion due to KMP express way/ fixing CC
Ring/ Arcing Horn, check nut in jumpers etc. 08-08-17 08:00 13-08-17 18:00
Deferred by 136OCC.
14
75 POWERGRID [ DELHI ] Bahadurgarh -
Kabulpur(400 kV) Power grid Daily
S/D for fixing CC Ring Grading Ring/ Arcing
Horn,check nut in jumpers & other AMP.. 16-08-17 08:00 16-08-17 18:00
Deferred by 136OCC.
76 POWERGRID [ DELHI ] Ratangarh(RVPNL)-
Sikar(PG) 1 Rajasthan Daily
Erection of Structure/Equipment/Al.
Bus pipe under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at
Sikar 01-08-17 08:00 03-08-17 18:00
77 POWERGRID [ DELHI ] Sikar(PG)-Sikar(RVPNL)
1 Rajasthan Daily
Erection of Structure/Equipment/Al.
Bus pipe under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at
Sikar 05-08-17 08:00 07-08-17 18:00
78 POWERGRID [ DELHI ] RAPP (B )-DEBARI
(220 kV) Rajasthan Daily
Stringing of crossing span of U/C400 KV D/C (Quad)
Chittorgarh (New) - Chittorgarh (RRVPNL)
T/L 25-07-17 08:00 26-07-17 18:00
79 POWERGRID [ DELHI ] Abdullapur - Kurukshetra-
2(400 kV) Power grid Daily
Shutdown for HV test of GIB and IPS tube
erection at Kurukshetra for 400 kV Jind Line. 21-08-7 09:00 26-08-17 18:30
80 POWERGRID [ DELHI ]
Abdullapur-Karchamwangtoo 1
(400 kV)
Jaiparkash Power
Venture Limited Continuous
For carrying out balance stringing work for Loop in and Loop out of 400 kV
Karcham Wangtoo- Abdullapur ckt I at
upcoming Kala Amb Sub Station. 17-08-17 07:00 19-08-17 18:00
15
81 POWERGRID [ DELHI ]
Abdullapur-Karchamwangtoo 1
(400 kV)
Jaiparkash Power
Venture Limited Continuous
For carrying out modifications of cross
arms & balance stringing work for Loop in and Loop
out of 400 kV Karcham Wangtoo- Abdullapur ckt-II at upcoming Kala Amb
Sub Station. 20-08-17 07:00 22-08-17 18:00
82 POWERGRID [ DELHI ]
Abdullapur-Karchamwangtoo 2
(400 kV)
Jaiparkash Power
Venture Limited Continuous
For carrying out modifications of cross
arms & balance stringing work for Loop in and Loop
out of 400 kV Karcham Wangtoo- Abdullapur ckt-II at upcoming Kala Amb
Sub Station. 20-08-17 07:00 22-08-17 18:00
83 POWERGRID [ DELHI ] Abdullapur(PG)-
Bawana(DTL) 1(400 kV) Power grid Daily
For replacement of Porcelain Insulators with
Polymer Insulators on towers nos. 285 (TP), 406
& 407 02-08-17 09:00 02-08-17 15:00
84 POWERGRID [ DELHI ] Dipalpur(HVPNL)-
Bawana(DTL)(400 kV) Power grid Daily
For replacement of Porcelain Insulators with
Polymer Insulators on tower no. 406 & 407 03-08-17 09:00 03-08-17 14:00
85 POWERGRID [ DELHI ] Kurukshetra-Sonepat -
1(400 kV) Power grid Daily
For replacement of Porcelain Insulators with
Polymer Insulators on tower No. 265 (TP), 319
& 322 04-08-17 09:00 04-08-17 15:00
86 POWERGRID [ DELHI ] Kurukshetra-Sonepat -
2(400 kV) Power grid Daily
For replacement of Porcelain Insulators with
Polymer Insulators on tower nos. 319 & 322 05-08-17 09:00 05-08-17 15:00
16
87 POWERGRID [ DELHI ] Salal(NHPC)-Jammu(JK)
2(220 kV) Power grid Daily
FOR AMP WORKS INCLUDING
REPLACEMENT OF BROKEN INSULATORS
AND JUMPER TIGHTENING. 11-08-17 09:00 11-08-17 18:00
88 POWERGRID [ DELHI ]
Hamirpur ( PG) - Hamirpur ( HPSEB) Ckt-
I (220 kV) Power grid Daily For AMP works. 08-08-17 09:00 08-08-17 17:00
89 POWERGRID [ DELHI ]
Hamirpur ( PG) - Hamirpur ( HPSEB) Ckt-
II (220 kV) Power grid Daily For AMP works. 10-08-17 09:00 10-08-17 17:00
90 POWERGRID [ DELHI ] Allahabad-Fatehpur
3(220 kV) Power grid Continuous
For installation of ERS for diversion work of
Transmission Line due to DFCCIL Railway track
(Between Loc. No. - 604 to 608) , at Allahabad 25-07-17 08:00 27-07-17 18:00
91 POWERGRID [ DELHI ] Allahabad-Fatehpur
3(220 kV) Power grid Continuous
For dismantling of ERS for diversion work of
Transmission Line due to DFCCIL Railway track
(Between Loc. No. - 604 to 608) ,at Allahabad 04-08-17 08:00 06-08-17 18:00
92 POWERGRID [ DELHI ] Allahabad(PG)-
Jhusi(UP)(220 kV) Power grid Continuous
For installation of ERS for diversion work of
Transmission Line due to DFCCIL Railway track
(Between Loc. No. - 11 to 13) ,at Allahabad 08-08-17 08:00 09-08-17 18:00
93 POWERGRID [ DELHI ] Allahabad(PG)-
Jhusi(UP)(220 kV) Power grid Continuous
For dismantling of ERS for diversion work of
Transmission Line due to DFCCIL Railway track
(Between Loc. No. - 11 to 13) ,at Allahabad 15-08-17 08:00 16-08-17 18:00
94 POWERGRID [ DELHI ] Agra-Kanpur(400 kV) Power grid Daily
Stringing for Crossing of 765 KV D/C Orai-Aligarh TL, TE07 , at Orai (AP
65-AP 66) 02-08-17 07:00 03-08-17 18:00
17
95 POWERGRID [ DELHI ] Gorakhpur-Lucknow
3(220 kV) Power grid Daily
Replacement of terminal connector of line insulator
as per head office instructions. , at
Gorakhpur 10-08-17 09:00 10-08-17 17:30
96 POWERGRID [ DELHI ] Gorakhpur-Lucknow
4(400 kV) Power grid Daily
Replacement of terminal connector of line insulator
as per head office instructions. , at
Gorakhpur 12-08-17 09:00 12-08-17 17:30
97 PGCIL 400 KV Agra (PG) Fatehabad (UP) PGCIL Line-1 Daily
Rectification of pending
construction defects left due to court cases during
diversion work.
Presently line stringing is
done on rollers and required permanent clipping. ,at
Agra
10-08-17 09:00 10-08-17 18:00
98 PGCIL 400 KV Unnao Agra UPPCL S/C Daily
Stringing for Crossing of 765kV D/C Orai-Aligarh
TL, TE07 ( AP 95- AP 96 ) ,at
Orai
10-08-17 07:00 11-08-17 18:00
18
99 PGCIL 400 KV Fatehabad (UP)
Agra Pilipokhar
(UP) PGCIL Line-1 Daily
Rectification of pending
construction defects left due to court cases during
diversion work.
Presently line stringing is
done on rollers and required permanent clipping. ,at
Agra
11-08-17 09:00 11-08-17 18:00
100 PGCIL 400 KV Agra (PG) Agra
Pilipokhar (UP)
PGCIL Line-1 Daily
Rectification of pending
construction defects left due to court cases
during diversion work. Presently line
stringing is done on rollers and required permanent clipping. ,at
Agra
12-08-17 09:00 12-08-17 18:00
101 PGCIL 400 kV Gorakhpur Lucknow Power Link Line-1 Daily
Replacement of terminal
connector of line insulator as per head
office instructions. , at Gorakhpur
05-08-17 09:00 05-08-17 17:30
19
102 PGCIL 400 kV Gorakhpur Lucknow Power Link Line-2 Daily
Replacement of terminal
connector of line insulator as per head
office instructions. , at Gorakhpur
08-08-17 09:00 08-08-17 17:30
103 PGCIL 400 kV Bareilly Kashipur PGCIL CKT-I (D/C) Daily
For OPGW replacement work in tower sections (269-
270) for creation of joint box to
provide Telecom
services , at IIM
Kashipur(Uttra Khand)
21-07-17 09:00 21-07-17 14:00
104 PGCIL 220 KV FATEHPUR FATEHPUR (UPPCL) UPPCL Line-1 Daily
AMP OF LINE EQUIPMENTS , at Fatehpur
29-08-17 10:00 29-08-17 18:00
105 PGCIL 220 KV FATEHPUR FATEHPUR (UPPCL) UPPCL Line-2 Daily
AMP OF LINE EQUIPMENTS
,at Fatehpur 31-08-17 10:00 31-08-17 18:00
106 PGCIL 220 KV Lucknow Bakshi ka
Talab (Lucknow)
UPPCL S/C Daily
For CT Oil sampling and Testing of CT
on variable frequency at
Lucknow
02-08-17 10:00 02-08-17 14:00
20
107 PGCIL 132 KV Pithoragarh (PGCIL)
Pithoragarh (PTCUL) PTCUL S/C Daily
AMP of line equipments (for AMP of
CT,CVT etc.),at
Pithoragarh
25-07-17 09:00 25-07-17 17:00
108 PGCIL 132 KV Pithoragarh (PGCIL)
Almora (PTCUL) PTCUL S/C Daily
AMP of line equipmets (for
AMP of CT,CVT etc.)
,at Pithoragarh
27-07-17 09:00 27-07-17 17:00
109 Bhiwani-Mahendergarh Ckt-I HVPN-Adani Daily 03-08-17 08:00 03-08-17 18:00
AMP and bay equipment jumper tightening at Bhiwani end. Deferred by 136OCC
110 Bhiwani-Mahendergarh Ckt-II HVPN-Adani Daily 04-08-17 08:00 04-08-17 18:00
AMP and bay equipment jumper tightening at Bhiwani end. Deferred by 136OCC
111 400KV BLBGRH-MAINPURI-I PGCIL Cont. 08-08-17 08:00 18-08-17 18:00
For Line diversion work under DFCC. During S/D, 02 Nos tower to be erected out of 04 Nos tower after stringing of the new section shall be taken up. Deferred by 135/136OCC
112 400KV BLBGRH-MAINPURI-II PGCIL Cont. 08-08-17 08:00 18-08-17 18:00
For Line diversion work under DFCC. During S/D, 02 Nos tower to be erected out of 04 Nos tower after stringing of the new section shall be taken up. Deferred by 135/136OCC
113 400KV AGRA-BLBGARH PGCIL Cont. 01-08-17 08:00 07-08-17 18:00
For Line diversion work under DFCC. During S/D, 02 Nos tower to be erected out of 03 Nos tower after that stringing of the new section shall be taken up. Deferred by 136OCC
114 400KV KOTESHWR-KHEP-I PGCIL Daily 20-07-17 09:00 20-07-17 17:00
S/D along with both Bus for modification in Bus Bar Protection Scheme at Koteshwar THDC for charging of new 125MVAR B/R.
21
115 400KV KOTESHWR-KHEP-II PGCIL Daily 20-07-17 09:00 20-07-17 17:00
S/D along with both Bus for modification in Bus Bar Protection Scheme at Koteshwar THDC for charging of new 125MVAR B/R.
116 400KV BHIWANI-BAWANA PGCIL Daily 08-08-17 08:00 13-08-17 18:00
Diversion due to KMP express way/ fixing CC Ring/ Arcing Horn, check nut in jumpers etc. Deferred by 136OCC.
117 400KV BAHADURGRH-BAWANA PGCIL Daily 08-08-17 08:00 13-08-17 18:00
Diversion due to KMP expresses way/ fixing CC Ring/ Arcing Horn, check nut in jumpers etc. Deferred by 136OCC.
118 400KV BAHADURGRH-KABULPR PGCIL Daily 16-08-17 08:00 16-08-17 18:00
S/D for fixing CC Ring Grading Ring/ Arcing Horn, check nut in jumpers & other AMP. Deferred by 136OCC.
119 220KV SIKAR-RATANGARH-I PGCIL Daily 01-08-17 09:00 03-08-17 17:00
Erection of Structure/Equipment/Al. Bus pipe under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
120 220KV SIKAR-SIKAR(RJ)-I PGCIL Daily 05-08-17 09:00 07-08-17 17:00
Erection of Structure/Equipment/Al. Bus pipe under augmentation scheme of 500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
121
220 KV S/C RAPP (B) - UDAIPUR
PGCIL Daily 25-07-17 07:00 26-07-17 18:00
Stringing of crossing span of U/C400 KV D/C (Quad) Chittorgarh (New) - Chittorgarh (RRVPNL) T/L
122 POWERGRID 400KV Moga(PG)-Hisar(PG) Line-3 POWERGRID Daily For AMP Works. 17.08.2017 09:00 17.08.2017 17:30
123 POWERGRID 400KV Kishenpur(PG)-Sambar(PG) Line-1 POWERGRID Daily
Tightening of Jumper Nut -bolts of selected locations to attend hot spots
01.08.2017 08:00 01.08.2017 17:00
124 POWERGRID 400KV Kishenpur(PG)-Sambar(PG) Line-2 POWERGRID Daily
Tightening of Jumper Nut -bolts of selected locations to attend hot spots
02.08.2017 08:00 02.08.2017 17:00
22
125 POWERGRID 400KV Malerkotla(PG)-Kurukshetra(PG) Line-2 ESSEL INFRA Daily
Shutdown for HV test of GIB at Kurukshetra for 400 kV Jind Line.
21.08.2017 09:00 22.08.2017 18:30
126 POWERGRID 400KV Malerkotla(PG)-Kurukshetra(PG) Line-2 ESSEL INFRA Daily
Shutdown for IPS tube erection at Kurukshetra for 400 kV Jind Line.
25.08.2017 09:00 25.08.2017 18:30
127 POWERGRID 400KV Malerkotla(PG)-Kurukshetra(PG) Line-1 ESSEL INFRA Daily
Shutdown for HV test of GIB at Kurukshetra for 400 kV Jind Line.
23.08.2017 09:00 24.08.2017 18:30
128 POWERGRID 400KV Malerkotla(PG)-Kurukshetra(PG) Line-1 ESSEL INFRA Daily
Shutdown for IPS tube erection at Kurukshetra for 400 kV Jind Line.
26.08.2017 09:00 26.08.2017 18:30
23
PROPOSED OUTAGE OF THE NLDC TRANSMISSION ELEMNTS FOR THE MONTH OF AUGUST FOR THE 137th OCC MEETING ANNEXURE 3 A
INDENTING AGENCY POWER GRID (NR-III),
LUCKNOW
Remark S.N
NAME OF REQUESTI
NG AGENCY
EQUIPMENT DETAILS
DAILY/ CONTINUO
US Reason
PROPOSED DATE AND TIME
VOLT LEVEL
(KV) NAME OF ELEMENTS (ICT,
B/R, SVC, Bays, etc) OWNER INTER/ INTRA
REGION
FROM TO
DATE TIME DATE TIME
1 PGCIL 765 KV ICT-I Main Bay(703) ,at Agra PGCIL Intra Daily
AMP work.
10-08-17 09:30 10-08-17 18:00
2 PGCIL 765 KV ICT-II Main Bay(706) ,at Agra PGCIL Intra Daily 11-08-17 09:30 11-08-17 18:00
3 PGCIL 765 KV Agra-Fatehpur-II Tie Bay(711) ,at Agra PGCIL Intra Daily 17-08-17 09:30 17-08-17 18:00
4 PGCIL 765 KV 765/400kV ICT-I , at Agra PGCIL Intra Daily
Bushing Oil
sampling for DGA by M/s ABB
service Engineer.
25-08-17 09:30 25-08-17 18:00
5 PGCIL 765 KV Bus Reactor-II , at Agra PGCIL Intra Daily
Bushing Oil
sampling for DGA by M/s ABB
service Engineer.
26-08-17 09:30 26-08-17 18:00
24
6 PGCIL 765 KV Agra-Fatehpur-II Line reactor , at Agra PGCIL Intra Daily
Bushing Oil
sampling for DGA by M/s ABB
service Engineer.
26-08-17 09:30 26-08-17 18:00
7 PGCIL 765 KV 701 main bay ,at Agra HVDC PGCIL Intra Daily
Integration work and point to point
testing with
HVDC Control Room
05-08-17 08:00 06-08-17 18:00
8 PGCIL 765 KV 702 tie bay ,at Agra HVDC PGCIL Intra Daily 07-08-17 08:00 07-08-17 18:00
9 PGCIL 765 KV 703 ICT Bay , at Agra HVDC PGCIL Intra Daily
Integration work and point to point
testing with
HVDC Control Room
08-08-17 08:00 09-08-17 18:00
10 PGCIL 765 KV 704 main bay , at Agra HVDC PGCIL Intra Daily
Integration work and point to point
testing with
HVDC Control Room
10-08-17 08:00 11-08-17 18:00
25
11 PGCIL 765 KV 705 tie bay , at Agra HVDC PGCIL Intra Daily
Integration work and point to point
testing with
HVDC Control Room
12-08-17 08:00 12-08-17 18:00
12 PGCIL 765 KV 706 ICT Bay , at Agra HVDC PGCIL Intra Daily 13-08-17 08:00 14-08-17 18:00
13 PGCIL 765 KV ICT-1 , at Bareilly PGCIL Intra Daily AMP of ICT - 1 units
04-08-17 10:00 04-08-17 17:30
14 PGCIL 765 KV ICT-2 , at Bareilly PGCIL Intra Daily AMP of ICT - 2 units
11-08-17 10:00 11-08-17 17:30
15 PGCIL 765 KV 702 Bay (Tie bay of 765 KV ICT-1) at Fatehpur PGCIL Intra Daily AMP work 22-08-17 09:30 22-08-17 18:00
16 PGCIL 765 KV 711 Bay (Tie bay of 765 KV Fatehpur-Agra-1 Line) , at
Fatehpur PGCIL Intra Daily AMP work 24-08-17 09:30 24-08-17 18:00
Name of Transmission Utility/licensee : Uttar Pradesh Power Transmission Corporation Limited
Sl. No.
Detail of Transmission element Date Timings
Reason Remark Voltage level
Name of Transmission Elements From To From To
1 2 3 6 7 8 9 10 11
1 765 KV 765KV MAIN BUS-I Unnao 03.08.17 04.08.17 08:00 18:00
Daily basis for erection & commissioning of CT/CB/Isolator for new 765KV Mainpuri bay with 3X50 MVAR line reactor. Power Flow remain intact through 765 KV Main Bus-II
DAILY BASIS
26
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
S.No. Details of Transmission
element/line Date Timings Type of Shutdown Purpose Remark
Voltage Level Name From To From To
Daily/ Continuous
1 765 KV
400/765 KV ,3X500 MVA ICT Bank -III at 765kV GSS Anta
01.08. 17 03.08. 17 09.00 Hrs. 20.00 Hrs. Continuous
Synchronisation of 400/765 KV ICT Bank-III with spare
ICT
During Shut down 400/ 765 KV ICT Bank I & II will be available in circuit.
2 765 KV
400/765 KV ,3X500 MVA ICT Bank -II at 765kV GSS Anta
07.08.17 09.08.17 09.00 Hrs. 20.00 Hrs. Continuous Synchronisation of 400/765 KV ICT Bank-II with spare
ICT
Note: - During Shut down 400/ 765 KV ICT Bank I & III will be available in circuit.
3 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - I at 765kV GSS Anta
10.08.17 12.08.17 09.00 Hrs. 20.00 Hrs. Continuous
For synchronisation and commissioning of 765 KV
Anta-Phagi ckt-I Line Reactor Bank with spare
Reactor
Note: - During Shut down of 765 KV Anta-Phagi Ckt-I &II and Reactor Bank-II will be available in circuit.
4 765 KV
765 KV ,3X80 MVAr Line Reactor Bank of 765 KV Anta -Phagi Ckt - II at 765kV GSS Anta
16.08.17 18.08.17 09.00 Hrs. 20.00 Hrs. Continuous
For synchronisation and commissioning of 765 KV
Anta-Phagi ckt-I I Line Reactor Bank with spare
Reactor
Note: - During Shut down of 765 KV Anta-Phagi Ckt-I &II and Reactor Bank-I will be available in circuit.
27
5 765 KV
400/765 KV ,3X500 MVA ICT Bank -I at 765kV GSS Anta
21.08.17 21.08.17 09.00 Hrs. 20.00 Hrs. daily RPH 2 relay, 02 no commissioning
Note: - During Shut down 400/ 765 KV ICT Bank II & III will be available in circuit.
6 765 KV
800 KV CB (701-52A) of Phagi- Bhiwani-2 line at 765kV GSS Phagi
10.08.17 11.08.17 9.00Hrs. 18.00Hrs Daily
1. Measurement of tan-delta of CTs 2. Maintenance of CB
& CTs. 3. Tightening of clamps & connectors.
There will be no power interruption during shut-down period as the 765KV Phagi-Bhiwani line-2 will be remained connected to 765KV-B through 800 KV Tie CB (701-52T), & 800 KV CB (701-52B).
7 765 KV
800 KV CB (705-52A) of 3X80 MVAr Bus-Reactor Bank at 765kV GSS Phagi.
17.08.17 18.08.17 9.00 Hrs. 18.00Hrs. Daily
1. Measurement of tan-delta of CTs 2. Maintenance of CB
& CTs. 3. Tightening of clamps & connectors.
There will be no interruption during shut-down period as the 3X80 MVAr Bus-Reactor bank will be remained connected to 765 Bus-B through 800 KV Tie CB (705-52T).
28
8 765 KV
800 KV CB( 706-52A) of 765 KV Phagi-Gwalior-1 line at 765kV GSS Phagi.
21.08 2017
22.08. 2017 9.00Hrs. 18.00Hr. Daily
1. Measurement of tan-delta of CTs
2. Maintenance of CB & CTs. 3. Tightening of clamps
& connectors.
There will be no power interruption during shut-down period as the 765 KV Gwalior-1 line will be remained connected to 765KV Bus-B through 800 KV Tie CB (706-52T), & 800 KV CB (706-52B).
9 765 KV
3 X 500 MVA ICT-2 at 765kV GSS Phagi 24.08.17 25.08.17 9.00Hrs. 18.00Hr. Daily
1. To check the air leakage from air cell
of R-Phase Tr. as the air has been
observed in the conservator tank. 2. To check the tripping of CBs through Main & auxiliary protection.
3. Measurement of Tan-delta of Bushings.
There will be no power interruption during shut-down period as the 3X 500 MVA ICT-1 will be remained energized to evacuate the power.
10 765 KV
800 KV CB (707-52A) of 765KV Phagi-Gwalior-2 line at 765kV GSS Phagi.
29.08.17 30.08.17 9.00Hrs. 18.00Hrs Daily
1.For the measurement of Tan-delta of Current
transformers. 2. Tightening of clamps & connectors.3.
maintenance of CB.
There will be no power interruption during shut-down period as the 765 KV Gwalior-2 line will be remained connected to 765KV Bus-B through 800 KV Tie CB (707-52T), & 800 KV CB (707-52B).
29
POWER GRID (NR-I)
REMARKS NAME OF REQUESTING
AGENCY
EQUIPEMENT DETAILS DAILY/
CONTINUOUS REASON
PROPOSED DATE AND TIME
VOLT LEVEL (KV)
NAME OF THE ELEMENT OWNER INTER/ INTRA
REGIONAL
FROM TO
DATE TIME DATE TIME
PGCIL 765kV ICT-I at Bhiwani PGCIL INTRA DAILY
Commissioning of CSD relay on 400kV side and AMP of Transformer
21-8-17 08:00 21-8-
17 18:00 Deferred by 136OCC
PGCIL 765kV ICT-II at Bhiwani PGCIL INTRA DAILY
Commissioning of CSD relay on 400kV side and AMP of Transformer
22-8-17 08:00 22-8-
17 18:00 Deferred by 136OCC
PGCIL 765kV Bus-I at Bhiwani PGCIL INTRA DAILY Replacement of porcelain DISC with polymer String
28-08-17 08:00 29-08-
17 18:00 Deferred by 136OCC
PGCIL 765kV Bus-II at Bhiwani PGCIL INTRA DAILY Replacement of porcelain DISC with polymer String
30-08-17 08:00 31-08-
17 18:00 Deferred by 136OCC
PGCIL 765kV Bus-I at Meerut PGCIL INTRA DAILY
BUS - 1 AMP Maintenance Work & 713 R Phase Isolator Jumper Modification Work
24-08-17 08:00 25-08-
17 18:00
PGCIL 765kV 715R - Gr. Noida Line Reactor Bay at Meerut PGCIL INTRA Cont AMP works. 10-08-
17 08:00 10-08-17 18:00
PGCIL 765kV 765 KV BUS Reactor at Meerut PGCIL INTRA Cont AMP works. 03-08-
17 08:00 03-08-17 18:00
PGCIL 765kV 711-Tie Bay of 765KV Moga/Bhiwani at Meerut PGCIL INTRA Cont AMP works. Deferred
by RLDC 21-07-
17 08:00 21-07-17 18:00
PGCIL 765kV 710-765 kV Moga Main Bay at Meerut PGCIL INTRA Cont AMP works. Deferred
by RLDC 27-07-
17 08:00 27-07-17 18:00
30
PROPOSED OUTAGE OF TRANSMISSION ELEMNTS FOR THE MONTH OF AUGUST IN THE 137th OCC MEETING ANENEXURE 3 B UPPTCL
Sl. No.
Detail of Transmission element Date Timings
Reason Remark Voltage level
Name of Transmission Elements From To From To
1 400 KV
400KV 63MVAR Reactor installed at 400KV Mainpuri-PGCIL-Orai line at 400KV Mainpuri PGCIL end
01.08.17 06.08.17 08:00 18:00
Dismantling of 63MVAR reactor for installation of reactor at 400KV S/S Aligarh.
Continuous basis
2 400KV 50MVAR Obra Line Reactor Sultanpur 02.08.17 19.08.17 08:00 18:00
For complete gasket replacement and oil centrifuging
continuous basis
3 400 KV
400KV 50MVAR Reactor installed at 400KV Aligarh-Panki line at 400KV Aligarh end
07.08.17 22.08.17 08:00 18:00 Dismantling of 50MVAR reactor & installation of 63MVAR reactor.
Continuous basis
4 400KV 315MVA ICT-I at 400KV S/S Moradabad 09.08.17 09.08.17 09:00 17:00 General maintenance of
Transformer. Daily basis
5 400KV 400/220KV 240MVA ICT-II at Sultanpur 13.08.17 13.08.17 08:00 18:00 For Bay maintenance Daily basis
6 400KV 315MVA ICT-II at 400KV S/S Moradabad 17.08.17 17.08.17 09:00 17:00 General maintenance of
Transformer. Daily basis
7 400 KV 400 KV Main Bus-II along with 400 KV Bus Coupler Sarojani nagar
17.08.17 28.08.17 09:00 16:00
FOR RETROFITTING WORK OF BUS-II PANTOGRAPH ISOLATOR OF FOLLOWING BAYS: - 1. 400 KV SAROJININAGAR-KURSI ROAD LINE. 2. 315 MVA 400/220 KV ICT-I.
CONTINUOUS BASIS
31
8 220 KV
220 KV Main Bus Bar at 220 KV S/S Sohawal
19.08.17 20.08.17 07:00 11:00
For jumper tightening of 220 KV Main Bus Bar & Setting of Main Bus isolator at 220 KV S/S Sohawal.
Daily basis
9 400KV 400/220 KV 500 MVA ICT –I at 400KV S/S Greater Noida.
20.08.17 20.08.17 07:00 11:00 For General maintenance of T/F & its bay
Daily basis
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
S.No. Details of Transmission element/line Date Timings Type of Shutdown Purpose Remark
Voltage Level Name From To From To
Daily/ Continuous
1 400 KV 400 KV Main Bus-I at 765 GSS Anta 24.08.2017 25.08.17 09.00
Hrs. 18.00 Hrs. daily
For the tightening of clamps & connectors of dropper from main Bus to isolators of different 400 KV Bays connected to 400 KV Main Bus -I
During Shut down 400 KV Main Bus-II will be available in circuit.
2 400 KV 400/220/33 KV 315 MVA
ICT-I & bays at 400kV GSS Bikaner
10.08.2017 10.08.2017 10.00 Hrs. 17.00 Hrs daily Routine Bay
Maintenance Work
3 400 KV 400/220/33 KV 315 MVA
ICT-II & bays at 400kV GSS Bikaner
11.08.2017 11.08.2017 10.00 Hrs. 17.00 Hrs daily Routine Bay
Maintenance Work
4 400 KV 400 KV 50 MVAR
Reactor& Bay at 400kV GSS Bikaner
18.08.2017 18.08.2017 10.00 Hrs. 17.00 Hrs daily Routine Bay
Maintenance Work
5 400 KV 400 KV 50MVAR LINE REACTOR at 400kV GSS Jaisalmer
08.08.2017 11.08.2017 10.00 Hrs. 18.00 Hrs daily
Sifting of 400 KV Jodhpur line from old bay to new bay by m/s TATA projects
6 400 KV Tie CB of 400KV ICT-I & Jodhpur line at 400kV GSS Jaisalmer
22.08.2017 22.08.2017 10.00 Hrs. 18.00 Hrs daily Quarterly Maintenance
7 400 KV Tie CB of 400KV ICT-II & ICT-III at 400kV GSS Jaisalmer
17.08.2017 17.08.2017 10.00 Hrs. 18.00 Hrs daily Quarterly Maintenance
32
8 400 KV 400KV ICT-III 315 MVA at 400kV GSS Jaisalmer 17.08.2017 17.08.2017 10.00
Hrs. 18.00 Hrs daily Quarterly Maintenance
9 400 KV 400KV ICT-IV 500 MVA at 400kV GSS Jaisalmer 28.08.2017 28.08.2017 10.00
Hrs. 18.00 Hrs daily Quarterly Maintenance
10 400 KV 400KV Main Bus-I at 400kV GSS Jaisalmer 08.08.2017 11.08.2017 08.00
Hrs. 18.00 Hrs daily Argumentation work by M/s Techno
11 400 KV 400KV Main Bus-II at 400kV GSS Jaisalmer 21.08.2017 26.08.2017 08.00
Hrs. 18.00 Hrs daily Argumentation work by M/s Techno
12 400 KV Tie CB of 400KV Barmer line at 400kV GSS Jaisalmer
21.08.2017 23.08.2017 08.00 Hrs. 18.00 Hrs daily Argumentation work by
M/s Techno
13 400 KV 400 KV 50MVAR BUS REACTOR at 400kV GSS Jaisalmer
24.08.2017 24.08.2017 10.00 Hrs. 18.00 Hrs daily Quarterly Maintenance
14 400 KV
400KV 50MVAR REACTOR-III of MERTA-BIKANER LINE at 400kV GSS Merta
03.08.17 03.08.17 09.00 Hrs. 17.00 Hrs Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
15 400 KV 400 KV MAIN BUS-B at 400kV GSS Merta 10.08.17 10.08.17 09.00
Hrs. 17.00 Hrs Daily II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply maintained through 400 KV MAIN BUS-A. Hence No supply disturbance (except 400 KV Merta -Heerapura line remain off)
16 400 KV
400KV 752A C.B. Of 400KV MERTA-KOTA (PGCIL) LINE at 400kV GSS Merta
12.08.17 12.08.17 09.00 Hrs. 17.00 Hrs Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply maintained through 752 B C.B. Hence No supply disturbance
17 400 KV
400KV 752B C.B. Of 400KV MERTA-KOTA (PGCIL) LINE at 400kV GSS Merta
16.08.17 16.08.17 09.00 Hrs. 17.00 Hrs Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply maintained through 752 A C.B. Hence No supply disturbance
33
18 400 KV 400/220/33 KV ,315 MVA ILT-I at 400kV GSS Merta 17.08.17 17.08.17 09.00
Hrs. 17.00 Hrs Daily II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply of 400/220/33 KV, 315 MVA ILT-II. Hence No supply disturbance
19 400 KV 400 KV MAIN BUS-A at 400kV GSS Merta 18.08.17 18.08.17 09.00
Hrs. 17.00 Hrs Daily II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply maintained through 400 KV MAIN BUS-B AND ALSO 400 MERTA-JODHPUR-II LINE AND 400 KV MERTA-RATANGARH LINE SHOULD BE IN CLOSED CONDITION TO AVOID 315 MVA ILT-I AND ILT-II. Hence No supply disturbance
20 400 KV
400KV 852A C.B. Of 400KV MERTA- SCL,BEAWAR LINE at 400kV GSS Merta
19.08.17 19.08.17 09.00 Hrs. 17.00 Hrs Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply maintained through 852 B C.B. Hence No supply disturbance
21 400 KV
400KV 852B C.B. Of 400KV MERTA- SCL,BEAWAR LINE at 400kV GSS Merta
21.08.17 21.08.17 09.00 Hrs. 17.00 Hrs Daily
Supply maintained through 852 A C.B. Hence No supply disturbance
22 400 KV 400/220/33 KV ,315 MVA ILT-II at 400kV GSS Merta 24.08.17 24.08.17 09.00
Hrs. 17.00 Hrs Daily II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
Supply of 400/220/33 KV,315 MVA ILT-I. Hence No supply disturbance
34
23 400 KV
400KV 50MVAR REACTOR-II of MERTA-KOTA (PGCIL)LINE at 400kV GSS Merta
25.08.17 25.08.17 09.00 Hrs. 17.00 Hrs Daily
II nd QUARTERLY MAINT.WORK OF BAY & EQUIPMENTS
24 400 KV
315 MVA,400/220/33KV ILT-2nd BHEL make Transformer at 400kV GSS Jodhpur
03.08.2017 03.08.2017 10:00 Hrs 18:00 Hrs Daily 2nd Quarterly
maintenance work
25 400 KV MAIN BUS A at 400kV GSS Jodhpur 09.08.2017 09.08.2017 10:00
Hrs 18:00 Hrs Daily 2nd Quarterly maintenance work
26 400 KV MAIN BUS B at 400kV GSS Jodhpur 10.08.2017 10.08.2017 10:00
Hrs 18:00 Hrs Daily 2nd Quarterly maintenance work
27 400KV
400KV Side Circuit Breaker of 400/220/33 KV , 315 MVA ILT- 1st ( Code- 352A) at 400kV GSS Ratangarh
02.08.2017 04.08.2017 09:00 Hrs. 20:00Hrs Continuous
basis
Overhauling of the circuit breaker ( Code-352A)
Load of 400/220/33 KV, 315 MVA ILT- 1st will be supplied through Tie circuit breaker CB (Code -352T ) . Hence there will be no supply disturbance
28 400 KV 400/220KV,315 MVA ILT -1st at 400kV GSS Ratangarh
10.08.2017 13.08.2017 09:00 Hrs. 20:00Hrs Continuous
Basis
for painting of ILT and maintenance work of bay equipments
During the shutdown period he Load will be supplied through 400/220/33 KV, 315 MVA ILT- 2nd & 3rd. Hence there will be no supply disturbance
35
29 400 KV 400/220KV,315 MVA ILT -2nd at 400kV GSS Ratangarh
16.08.2017 19.08.2017 09:00 Hrs. 20:00Hrs Continuous
Basis
for painting of ILT & attending the OIL Leakage of OLTC and maintenance work of bay equipments
During the shutdown period the Load will be supplied through 400/220/33 KV, 315 MVA ILT- 1st & 3rd. Hence there will be no supply disturbance
30 400 KV 400/220KV,315 MVA ILT -3rd at 400kV GSS Ratangarh
21.08.2017 25.08.2017 09:00 Hrs. 20:00Hrs Continuous
Basis
for painting of ILT & attending the OIL Leakage of OLTC and maintenance work of bay equipments
During the shutdown period the Load will be supplied through 400/220/33 KV , 315 MVA ILT- 1st & 2nd. Hence there will be no supply disturbance
31 400 KV
400/220/33 KV ,315 MVA TRANSFORMER-I (MAKE TELK) at 400kV GSS Hindaun
10.08.2017 10.08.2017 10:00 Hrs 17:00 Hrs Daily Half Yearly
Maintenance Work
32 400 KV 400 KV Main Bus-I at 400kV GSS Hindaun 17.08.2017 17.08.2017 10:00
Hrs 17:00 Hrs Daily Half Yearly Maintenance Work
33 400 KV
400/220/33 KV ,315 MVA TRANSFORMER-II (MAKE CGL) at 400kV GSS Hindaun
24.08.2017 24.08.2017 10:00 Hrs 17:00 Hrs Daily Half Yearly
Maintenance Work
34 400 KV
400 KV Rajwest & 400 KV Transformer-II Tie Breaker at 400kV GSS Barmer
03.08.2017 03.08.2017 10:00 Hrs 18:00 Hrs Daily Roof Repairing work of
Kiosk
36
35 400 KV 400/220 KV 315 MVA TELK TRF-I at 400kV GSS Barmer
23.08.2017 23.08.2017 10:00 Hrs 18:00 Hrs Daily Maintenance work
POWER GRID (NR 11)
S.N. Details of Transmission Element DURATION
Daily/ Continuous
Reason
Voltage level (KV)
NAME OF THE ELEMENT AND SUBSTATION
FROM TO
DATE TIME DATE TIME
X-2 For construction activity
1 400 315 MVA ICT-III at Samba 10.08.2017 09:00 10.08.2017 12:00 Daily For Commissioning of CSD device for Main and Tie bays of ICT-III.
2 400 400 kV Bus-I at Samba 16.08.2017 09:00 16.08.2017 18:00 Daily Extension of Bus-I for bays of 400 kV Samba - Amargarh line.
3 400 400 kV Bus-II at Samba 17.08.2017 09:00 17.08.2017 18:00 Daily Extension of Bus-II for bays of 400 kV Samba - Amargarh line.
4 400 400 kV Bus-II at Kaithal 21.08.2017 09:00 22.08.2017 17:00 Daily
For connection of jumpers to 400 KV Bus-2 and stability test for Bay extension works of ICT-III Bay.
5 220 220 kV Bus-I at Kaithal 23.08.2017 09:00 24.08.2017 17:00 Daily For connection of jumpers and stability test for charging ICT-III.
6 220 220 kV Bus-II at Kaithal 25.08.2017 09:00 26.08.2017 18:00 Daily For connection of jumpers and stability test for charging ICT-III.
X-3 For O&M activity 1 400 315 MVA ICT-III at Fatehabad 29.08.2017 10:00 29.08.2017 18:00 Daily For AMP works.
2 400 Dadri Line 50 MVAR Reactor at Kaithal 04.08.2017 10:00 04.08.2017 16:00 Daily
For attending oil leakage from PRV. Line will be opened for 10 min. while taking in & out the reactor.
37
NDENTING AGENCY POWER GRID (NR-III), LUCKNOW
Remark S.N
NAME OF REQUESTING
AGENCY
EQUIPMENT DETAILS
DAILY/ CONTINUOUS Reason
PROPOSED DATE AND TIME
VOLT LEVEL
(KV)
NAME OF ELEMENTS (ICT, B/R, SVC, Bays,
etc) OWNER
FROM TO
DATE TIME DATE TIME
1 PGCIL 400 KV 500 MVA ICT-2 , at Lucknow PGCIL Daily
AMP of ICT,AMP of 400 KV ICT-2 Bay ,
AMP of 220 KV ICT-2 Bay
01-08-17 10:00 01-08-17 16:00
2 PGCIL 400 KV Agra-Auriya-1 Main Bay(406) , at Agra PGCIL Daily AMP work. 18-08-17 09:30 18-08-17 18:00
3 PGCIL 400 KV Agra-Auriya-II Main Bay(409) , at Agra PGCIL Daily AMP work. 24-08-17 09:30 24-08-17 18:00
4 PGCIL 400 KV Bus Reactor-1 , at Agra PGCIL Daily AMP work. 23-08-17 09:30 23-08-17 18:00
5 PGCIL 400 KV Bus-II , at Ballia PGCIL Daily For replacement of damaged BPI
Connector 02-08-17 10:00 02-08-17 15:00
6 PGCIL 400 KV (401 Bay) ,Bareilly-
Bareilly (UPPTCL)-2 at 400 kv Bareilly S/S
PGCIL Daily Bay AMP Work 02-8-17 09:00 02-08-17 17:00
7 PGCIL 400 KV 408 Bay (Tie bay of 400 KV Allahabad 2 Line) ,at
Fatehpur PGCIL Daily AMP work 01-08-17 09:30 01-08-17 18:00
8 PGCIL 400 KV 409 Bay (Main bay of 400 KV Allahabad 2 Line) ,at
Fatehpur PGCIL Daily AMP work 03-08-17 09:30 03-08-17 18:00
9 PGCIL 400 KV 411 Bay (Tie bay of 400 KV Allahabad 1 Line) ,at
Fatehpur PGCIL Daily AMP work 08-08-17 09:30 08-08-17 18:00
38
10 PGCIL 400 KV 412 Bay (Main bay of 400 KV Allahabad 1 Line) ,at Fatehpur
PGCIL Daily AMP work 10-08-17 09:30 10-08-17 18:00
11 PGCIL 400 KV 431 Bay (Main bay of 765 KV ICT-2 400 KV
Side) ,at Fatehpur PGCIL Daily AMP work 17-08-17 09:30 17-08-17 18:00
12 PGCIL 400 KV 400 KV Lucknow (PG)-
1 Bay at Unnao (UPPTCL)
PGCIL Daily
Overhauling of Pneumatic drive in 400 KV ABB CB at Unnao substation.
Line will be charged through TBC bay (Lucknow(PG)-1 bay at Unnao)
,UPPTCL
07-08-17 10:00 09-08-17 18:00
13 PGCIL 400 KV 400 KV Lucknow (PG)-
2 Bay at Unnao (UPPTCL)
PGCIL Daily
Overhauling of Pneumatic drive in 400 KV ABB CB at Unnao
substation. Line will be charged
through TBC bay (Lucknow(PG)-2 bay at Unnao),
UPPTCL
10-08-17 10:00 12-08-17 18:00
14 PGCIL 400 KV 400 KV Bareilly (PG) Bay, Sarojani Nagar
(UPPTCL), at Lucknow PGCIL Daily
Overhauling of Pneumatic drive in 400 KV ABB
CB at Sarojininagar
(Lucknow) substation. Line will be charged
through TBC bay (Bareilly (PG) bay at Sarojani Nagar
(UPPTCL)
14-08-17 10:00 16-08-17 18:00
39
15 PGCIL 400 KV 400 KV Singrauli Bay
,Sarojani Nagar (UPPTCL) , at Lucknow
PGCIL Daily
Overhauling of Pneumatic drive in 400 KV ABB
CB at Sarojininagar
(Lucknow) substation. Line will be charged through TBC bay,Sarojani
Nagar (UPPCL)
17-08-17 10:00 19-08-17 18:00
16 PGCIL 400 KV 400 KV Gorakhpur ckt-
3 Line Reactor , at Lucknow
PGCIL Daily
Bushing Replacement
work (Switchable Line Reactor)
19-08-17 10:00 23-08-17 18:00
17 PGCIL 400 KV 400 KV Gorakhpur ckt-
4 Line Reactor , at Lucknow
PGCIL Daily
Bushing Replacement
work (Switchable Line Reactor)
24-08-17 10:00 28-08-17 18:00
18 PGCIL 400 KV TCSC FSC System of 400 kV GKP MZP line I
,at Gorakhpur PGCIL Daily For AMP work 17-08-17 08:00 19-08-17 17:30
19 PGCIL 400 KV TCSC FSC System of
400 kV GKP MZP line II , at Gorakhpur
PGCIL Daily For AMP work 23-08-17 08:00 25-08-17 17:30
20 PGCIL 400 KV 405 GKP MZP Line II Tie Bay , at Gorakhpur PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
40552 CB
23-07-17 09:00 26-07-17 17:30
21 PGCIL 400 KV 407 GKP LKO Line 2
Main Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
40752 CB
27-07-17 09:00 30-07-17 17:30
22 PGCIL 400 KV 408 GKP LKO Line 2 &
ICT 1 Tie Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
31-07-17 09:00 03-08-17 17:30
40
40852 CB
23 PGCIL 400 KV 409 ICT1 Main Bay , at Gorakhpur PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
40952 CB
04-08-17 09:00 07-08-17 17:30
24 PGCIL 400 KV 409 GKP LKO Line 1
Main Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
41052 CB
08-08-17 09:00 11-08-17 17:30
25 PGCIL 400 KV 409 GKP LKO Line 1 &
ICT2 Tie Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
41152 CB
12-08-17 09:00 15-08-17 17:30
26 PGCIL 400 KV 409 ICT2 Main Bay , at Gorakhpur PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
41252 CB
16-08-17 09:00 19-08-17 17:30
27 PGCIL 400 KV 409 GKP UPPTCL Line
2 Main Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
41352 CB
20-08-17 09:00 23-08-17 17:30
28 PGCIL 400 KV 409 GKP UPPTCL Line
2 Tie Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
41452 CB
24-08-17 09:00 27-08-17 17:30
29 PGCIL 400 KV 409 GKP UPPTCL Line
1 Main Bay , at Gorakhpur
PGCIL Conti.
For Overhauling of Pneumatic
operating Mechanism of
41652 CB
28-08-17 09:00 31-08-17 17:30
41
30 PGCIL 220 KV 220 KV BUS-1 , at Lucknow PGCIL Daily AMP of Bus 22-08-17 10:00 22-08-17 18:00
31 PGCIL 220 KV 220 KV BUS-2 ,at Lucknow PGCIL Daily AMP of Bus 23-08-17 10:00 23-08-17 18:00
DTL
S.No
Shutdown
Type From To Work to be Carried Remarks Name Date Time Date Time
1 315MVA ICT-1 at Bawana
Daily Basis 21.07.2017 07:00 21.07.2017 13:00 For final completion of Errection & testing
of HVW system on 315MVA ICT-I
During shutdown of transformer No-1 the load will be met through 315 MVA ICTs 2,3,4,5&6
2 315MVA ICT-1 at Bawana
Daily Basis 23.07.2017 07:00 23.07.2017 13:00 For final completion of Errection & testing
of HVW system on 315MVA ICT-I
During shutdown of transformer No-1 the load will be met through 315 MVA ICTs 2,3,4,5&6
42
3 315MVA ICT-1 at Bawana
Daily Basis 25.07.2017 07:00 25.07.2017 13:00 For final completion of Errection & testing
of HVW system on 315MVA ICT-I
During shutdown of transformer No-1 the load will be met through 315 MVA ICTs 2,3,4,5&6
4 315 MVA Tr-III at Tikri Kalan
Daily basis 02.08.2017 06:00 02.08.2017 12:00
Attending Hot spots & Replacement of jumper near jack bus, Carrying out the Winding Resistance test.
Load shall be met by ICT-II & IV
5 315MVA ICT-04 at Bamnauli
Daily Basis 06.08.2017 05:00 06.08.2017 11:00
Shutdown of ICT IV is required during dismantling of 220kv incomer CB poles for overhauling (due to less clearance from jack bus for crane movement). PTW on incomer 4 main CB will be continued from 5th to 10 th of august 2017. During this period Load will share by TBC.
Load of Bamnauli Stn (part load ) will be met through 500MVA ICT -II & 315MVA ICT-I (from Ballabgarh side)
6 400kV BUS-II at PPCL Bawana
Daily Basis 06.08.2017 07:00 06.08.2017 15:00
1. Alignment of bus isolator of new 400 kV bay no. 412 by BHEL TBG. 2. Stability test for bay no. 411 by BHEL TBG. 3. Attending a hot spot (111°C, Ambient temp.-40°C, Load-388A) at Y-Phase of Bus isolator clamp (bus side) of bay 413).
Load will be met through 400kV Bus-I.
7 315MVA ICT-4 at Bamnauli
Daily Basis 10.08.2017 05:00 10.08.2017 11:00
Shutdown of I CT I V i s r equired dur ing erection of 220kv incomer CB poles after overhauling ( due to less clearance from jack bus for crane movement ).
Load of Bamnauli Stn (part load ) will be met through 500MVA ICT -II & 315MVA ICT-I (from Ballabgarh side)
8
315MVA ICT-4 at Bawana Daily
Basis 18.08.2017 07:30 17.08.2017 13:00 To carryout Tan del ta t esting and ot her maintenance o f the t ransformer as per OS manual
Load will be meet through ICT 1,2,3, 5&6
43
9
315MVA ICT-6 at Bawana
Daily Basis 21.08.2017 07:30 21.08.2017 13:00
To carryout Tan del ta t esting and ot her maintenance o f the t ransformer as per OS manual
Load will be meet through ICT 1,2,3,4 , &5
BBMB
Sr. No.
Element Name Owner Name
Mode (Daily/Conti.)
Reasons From To
Date Time Date Time 1 220 kV Interlinking feeder at Barnala. PSTCL Daily Replacement of LA. 02.08.2017 8.00 02.08.2017 17.00
3 220/132 kV 100 MVA Transformer T-1 at Ch. Dadri HVPNL
Continue basis
Replacement of Isolators. 02.08.2017 8.00 04.08.2017 17.00
4 220/66 kV 100 MVA Transformer T-3 at Delhi HVPNL
Daily For replacement of conventional clamps with C-Wedge clamps
16.08.2017 8.00 16.08.2017 17.00
POWER GRID (NR I)
ICT , B/R, SVC
1 500MVA ICT-I at MANDOLA Daily 04-08-17 10:00 04-08-17 17:00 AMP of ICT ( 1st AMP after commissioning). Defered by 136th OCC
2 500MVA ICT-III at MANDOLA Daily 07-08-17 10:00 07-08-17 17:00 AMP of ICT ( 1st AMP after commissioning). Defered by 136th OCC
3 500MVA ICT-IV at MANDOLA Daily 11-08-17 09:00 11-08-17 18:00 AMP of ICT ( 1st AMP after commissioning). Defered by 136th OCC
4 500MVA ICT-II at MANDOLA Daily 12-08-17 09:00 12-08-17 18:00 AMP of ICT ( 1st AMP after commissioning). Defered by 136th OCC
5 400KV 500MVA ICT-III at MAHRANIBAG Cont. 01-08-17 09:00 05-08-17 18:00 Attending Oil leakage and Bushing
replacement etc.
6 400KV 500MVA ICT-II at Bahadurgarh Daily 22-08-17 10:00 22-08-17 18:00 AMP WORK
7 500 MAV ICT-I at Jaipur(S) Daily 01-08-17 10:00 01-08-17 17:00 AMP WORK
44
8 500 MAV ICT-II at Jaipur(S)
Daily 02-08-17 10:00 02-08-17 17:00 AMP WORK
9 315 MVA, 400/220 kV ICT-2 at Sikar
Daily 19-08-17 09:00 21-08-17 17:00 Erection of Equipment/Bus pipe stringing for500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
10 400KV Bus-I at Bhiwani Daily 03-08-17 08:00 04-08-17 18:00 AMP Work 11 400KV Bus-II at Bhiwani Daily 09-08-17 08:00 10-08-17 18:00 AMP Work
12 400KV BUS- I at Jaipur(S) Daily 08-08-17 09:00 09-08-17 17:00
Jumpering of Main Bus-1 & Extention for RAPP and KOTA bay extension work at Jaipur South SS under S2 package
13 400KV BUS- II at Jaipur(S) Daily 10-08-17 08:00 11-08-17 16:00
Jumpering of Main Bus-II & Extention RAPP and KOTA bay extension work at Jaipur South SS under S2 package
14 400 kV BUS-1 at Sikar Daily 01-08-17 09:00 03-08-17 17:00 Jack Bus stringing under Construction of 400 kV Bikaner-1&2 Line bays at Sikar
15 400 kV BUS-2 at Sikar Daily 04-08-17 09:00 06-08-17 17:00 Jack Bus stringing under Construction of 400 kV Bikaner-1&2 Line bays at Sikar
16 220 kV BUS-1 at Sikar Daily 08-08-17 09:00 11-08-17 17:00
Erection of Structure/Equipment/Al. Bus pipe/Bus stringing for500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
17 220 kV BUS-2 at Sikar Daily 12-08-17 09:00 15-08-17 17:00
Erection of Structure/Equipment/Al. Bus pipe/Bus stringing for500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
18 220 kV BUS-1 at Meerut Daily 04-08-17 09:00 04-08-17 18:00 To attend Hot Spots 19 220 kV BUS-2 at Meerut Daily 05-08-17 09:00 05-08-17 18:00 To attend Hot Spots 20 400 kV BUS-1 at Bhinmal Daily 03-08-17 09:00 03-08-17 18:00 AMP Work 21 400 kV BUS-2 at Bhinmal Daily 04-08-17 09:00 04-08-17 18:00 AMP Work
22 400KV, Mandola-II Main Bay 403 at Meerut Daily 25-08-17 09:00 25-08-17 18:00 AMP and other Maintenance work
23 400KV ICT-III Main Bay 404 at Meerut Daily 26-08-17 09:00 26-08-17 18:00 AMP and other Maintenance work
24 400KV, Mandola-II ,ICT-III Tie Bay at Meerut Daily 21-08-17 09:00 21-08-17 18:00 AMP and other Maintenance work
45
25 500MVA ICT-I ,M/ Bay 401 & 205 at Manesar Daily 01-08-17 09:30 01-08-17 18:00 AMP Work
26 500MVA ICT-II, M/ Bay 408 & 207 at Manesar Daily 03-08-17 09:30 03-08-17 18:00 AMP Work
27 400/220kV ICT-1 bay 208 at Bhinmal Daily 01-08-17 09:30 01-08-17 18:00 AMP Work
28 400/220kV ICT-II bay 210 at Bhinmal Daily 02-08-17 09:30 02-08-17 18:00 AMP Work
29 400 KV Gurgaon-1 M/Bay 406 at Manesar Daily 09-08-17 09:30 09-08-17 18:00 AMP Work
30 400 KV Gurgaon-2 M/Bay 407 at Manesar Daily 11-08-17 09:30 11-08-17 18:00 AMP Work
31 400 KV Agra-I Tie Bay 411 at Sikar Cont. 01-08-17 09:00 30-08-17 18:00
Erection of Structure/Equipment/Al. Bus pipe for 500 MVA ICT-3 & 02 no. of 220 kV Line bays at Sikar
32 220 kV Chaksu Line (206 Bay) at Jaipur(S) Daily 11-08-17 09:00 11-08-17 18:00 AMP Work
33 220 kV SEZ Line (209 Bay) at jaipur(S) Daily 17-08-17 09:00 17-08-17 18:00 AMP Work
34 300/+400 MVAR SVC (BAY 417 AND 418) Daily 01-08-17 09:00 05-08-17 18:00 AVR BAY INSTALLATION AND
COMMISSIONING
46