LIST OF COMPLETED & ONGOING PROJECT Tasks Description ISO 14001 Implementation Name of assignment: Consultancy Services for the Implementation of an Environment Management System Certifiable to ISO 14001:2015 at Princes Tuna (Mauritius) Ltd Year : 2019 Location : Riche Terre Client: Princes Tuna (Mauritius) Ltd Main Project features : ISO 14001 Implementation Position held: Consultant/ Team Leader Activities performed: Implementation of an Environment Management System Certifiable to ISO 14001:2015 Operation of a 135 Keys Senior Services Residence/Tourist Residence Name of assignment: Consultancy Services for Application and Follow-Up till Licences and Permits are obtained for the Operation of a 135 Keys Senior Services Residence/Tourist Residence at Grand Baie by the AEGIDE Group Year : 2019 Location : Grand Baie Client: AEGIDE Indian Ocean Ltd Main Project features : Application and Follow up till Licences are obtained Position held: Consultant/ Team Leader Activities performed: Application for Tourist Residences Licence , follow up till Licences and permits are obtained . Environmental and Social Impact Assessment Report Name of assignment: Consultancy Services for the Preparation of Environmental and Social Impact Assessment (ESIA) for a Seismic Survey Year : 2019 Location : France Client: CGG Services SAS Main Project features : Preparation of ESIA Report Position held: Consultant Activities performed: Preparation of an ESIA for 2- dimensional offshore seismic research. The seismic study will support potential exploration studies for oil and gas in the future within the territorial waters of Mauritius, being part of the East Africa Regional Survey (EAR). Environmental Impact Assessment Report Name of assignment: Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Construction of the New Jetty at Ile Mangenie Year : 2018 Location : Ile Mangenie ,Mauritius Client: SRL Touessrok Hotel LTS Main Project features : Preparation of EIA Report Position held: Consultant/ Team Leader Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment Environmental Impact Assessment Report Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher Ltd in the South of Mauritius and depot and Block Making Plant in the North of Mauritius and Preparation of Environmental Impact Assessment (EIA) Year : 2018 Location : Laventure Head Office Client: Eastern Stone Crusher Ltd Main Project features : Preparation of EIA Report Position held: Consultant/ Team Leader Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment Environmental Impact Assessment Report Name of assignment: Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready Mix Concrete at Alma Year : 2018 Location : Alma Mauritius Client: Pre-Mixed Concrete Ltd Main Project features : Preparation of PER Position held: Consultant/ Team Leader Activities performed: Preparation of a PER to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

  • Upload
    others

  • View
    9

  • Download
    1

Embed Size (px)

Citation preview

Page 1: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

LIST OF COMPLETED & ONGOING PROJECT

Tasks

Description

ISO 14001 Implementation

Name of assignment:

Consultancy Services for the Implementation of an Environment Management System Certifiable to ISO 14001:2015 at Princes Tuna (Mauritius) Ltd

Year : 2019

Location : Riche Terre

Client: Princes Tuna (Mauritius) Ltd

Main Project features : ISO 14001 Implementation

Position held: Consultant/ Team Leader

Activities performed: Implementation of an Environment Management System Certifiable to ISO 14001:2015

Operation of a 135 Keys Senior Services Residence/Tourist Residence

Name of assignment:

Consultancy Services for Application and Follow-Up till Licences and Permits are obtained for the Operation of a 135 Keys Senior Services Residence/Tourist Residence at Grand Baie by the AEGIDE Group

Year : 2019

Location : Grand Baie

Client: AEGIDE Indian Ocean Ltd

Main Project features : Application and Follow up till Licences are obtained

Position held: Consultant/ Team Leader

Activities performed: Application for Tourist Residences Licence , follow up till Licences and permits are obtained .

Environmental and Social Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of Environmental and Social Impact Assessment (ESIA) for a Seismic Survey

Year : 2019

Location : France

Client: CGG Services SAS

Main Project features : Preparation of ESIA Report

Position held: Consultant

Activities performed: Preparation of an ESIA for 2- dimensional offshore seismic research. The seismic study will support potential exploration studies for oil and gas in the future within the territorial waters of Mauritius, being part of the East Africa Regional Survey (EAR).

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Construction of the New Jetty at Ile Mangenie

Year : 2018

Location : Ile Mangenie ,Mauritius

Client: SRL Touessrok Hotel LTS

Main Project features : Preparation of EIA Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for Locating New Eastern Stone Crusher Ltd in the South of Mauritius and depot and Block Making Plant in the North of Mauritius and Preparation of Environmental Impact Assessment (EIA)

Year : 2018

Location : Laventure Head Office

Client: Eastern Stone Crusher Ltd

Main Project features : Preparation of EIA Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready Mix Concrete at Alma

Year : 2018

Location : Alma Mauritius

Client: Pre-Mixed Concrete Ltd

Main Project features : Preparation of PER

Position held: Consultant/ Team Leader

Activities performed: Preparation of a PER to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Page 2: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

2

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready Mix Concrete at a New Plant in Geoffroy

Year : 2018

Location : Geoffroy Mauritius

Client: Pre-Mixed Concrete Ltd

Main Project features : Preparation of PER

Position held: Consultant/ Team Leader

Activities performed: Preparation of a PER to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of an Environmental Impact Assessment (EIA) for Veolia

Year : 2018

Location : Head Office Ebene

Client: Veolia

Main Project features : Preparation of EIA Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of Environmental and Social Impact Assessment of Two Potential Locations for the Proposed Direct Link LNG Facility for the CEB CCGT Power Station at Fort George Mauritius

Year : 2018

Location : Fort George Mauritius

Client: Gas Natural Fenosa Engineering S.L

Main Project features : Preparation of EIA Report and SIA Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an EIA/SIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Consultancy Services for the Preparation of Environmental Impact Assessment Report for the new Hotel Project of 250 Keys at Petite Riviere Noire Bay

Year : 2018

Location : Petite Riviere Noire Bay

Client: Stella Di Mare Mauritius Ltd

Main Project features : Preparation of a EIA Licence

Position held: Consultant/ Team Leader

Activities performed: Preparation of an EIA. to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Variation to the Environmental Impact Assessment (EIA) Licence

Name of assignment:

Variation to the Environmental Impact Assessment Conditions

Year : March 2018

Location : Grand Baie

Client: Vancances Plus Limited

Main Project features : Preparation of a variation to EIA Licence

Position held: Consultant/ Team Leader

Activities performed: Preparation of a variation to EIA Licence to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Management Plan

Name of assignment:

Environmental Management and Monitoring Plan

Year : March 2018

Location : Deschartres Street Port Louis

Client: Transinvest Construction Ltd

Main Project features : Preparation and Submission of Monthly Environmental Reports (EMR) to Authorities

Position held: Consultant/ Team Leader

Activities performed: Preparation of a monthly Environmental management plan to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment.

Page 3: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

3

Preliminary Environmental Report

Name of assignment:

Preliminary Environment Reports (PER) for Proposed Plant for the Manufacturing of Fibre Optic Cable

Year : February 2018

Location : Industrial Zone, Trianon

Client: AKSH Technologies Mauritius Ltd

Main Project features : Preparation of a PER Reports

Position held: Consultant/ Team Leader

Activities performed: Preparation of an PER reports to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report / Preliminary Environmental Report/Social Impact Assessment Report

Name of assignment:

Environmental Impact Assessment Reports(EIA) / Preliminary Environment Reports (PER) / Social Impact Assessment Reports (SIA) / Environment management Plans for 6 (six) PDS Projects by Two Futures Ltd and /or associated companies of Two Futures Ltd

Year : December 2017

Location : Grand Baie

Client: Two Futures Ltd

Main Project features : Preparation of an EIA / PER/ SIA Reports

Position held: Consultant/ Team Leader

Activities performed: Preparation of an EIA/PER/SIA reports to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Preliminary Environmental Report

Name of assignment:

Preliminary Environmental Report for the Proposed Green Tea Factory at Dubreuil

Year : December 2017

Location : Dubreuil

Client: Mauristea Investment Co Ltd

Main Project features : Preparation of a Preliminary Environmental Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of a Preliminary Environmental Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment Report for the Proposed Waste Recycling Plant at Riche terre by Veolia Recycling & Environmental services (Mauritius) Ltd

Year : November 2017

Location : Riche Terre

Client: Veolia Recycling & Environmental Services (Mauritius) Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment Report for the Proposed Project for Steam production from Treated Used Cooking Oil by Avantime Ltd

Year : October 2017

Location : Beemanique , Nouvelle France

Client: Avantime Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Preparation of a Traffic Impact Assessment Report

Name of assignment:

Traffic Impact Assessment Report to for the Proposed Aquarium of Port Louis Project

Year : September 2017

Location : Port Louis

Client: Oceanarium (Mauritius) Ltd

Main Project features : Preparation of an Traffic Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Traffic Impact Assessment Report, Traffic counts, traffic modelling and reporting.

Page 4: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

4

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment Report for the Proposed 185 Keys Hotel at Baie Du Tombeau by Mauritius Jin Fei Economic Trade and Cooperation Zone Co Ltd

Year : July 2017

Location : Riche Terre , Terre Rouge

Client: Jin Fei Economic Trade and Cooperation Zone Co Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Preparation of Information Paper

Name of assignment:

Artisanal Farming of Crabs at Barachois Anse Bambous

Year : August 2017

Location : Barachois Anse Bambous, Bambous Virieux

Client: Selected Seafood (Mauritius) Ltd

Main Project features : Preparation of an Information Paper

Position held: Consultant/ Team Leader

Activities performed: Preparation of a report to seek clearances for culture of crab from Ministry of Environment and Sustainable Development, Disaster and Beach Management and to various Authorities and Ministry of Ocean Economy, Marine Resources, Fisheries and Shipping

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment Report for the Proposed Photovoltaic Solar Farm project of 4.88 MW Ac at petite riviere

Year : June 2017

Location : Petite Riviere

Client: SPV Petite Riviere Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment Report for the Proposed Solar Farm of 9MW

Year : March 2017

Location : Beau Champ

Client: Helios Beau Champ Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment for the Proposed Photovoltaic Plant of 12.24 MW at Queen Victoria Solar Farm

Year : January 2017

Location : Queen victoria

Client: Voltas Green Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management

Preparation of an Information Paper

Name of assignment:

Environmental Impact Assessment for the Proposed Aquarium of Port Louis Project

Year : December 2016

Location : Port Louis

Client: Oceanarium (Mauritius) Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management

Page 5: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

5

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment for the Setting up of an Oyster Farm at Sud Pointe Grande Passe By Mascareignas Oysters ( Mauritius ) ltd

Year : August 2016

Location : Royal Road , Point D’Esny

Client: Mascareignas Oysters ( Mauritius ) ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management. Supervision of works associated to implementation.

Preliminary Environmental Report

Name of assignment:

Preliminary Environmental Report for a Concrete Batching Plant and Lean Mix Batching Plant

Year : May 2016

Location : Coromandel/ Site Airport of Mauritius

Client: Transinvest Construction

Main Project features : Preparation of an Preliminary Environmental Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Preliminary Environmental Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management

Environmental Management and Monitoring Services

Name of assignment:

Environmental Monitoring Report (monthly - 12 months)

Year : April 2016

Location : Coromandel/Site Airport of Mauritius

Client: Transinvest Construction

Main Project features : Preparation

Position held: Consultant/ Team Leader

Activities performed: Preparation of a monthly report (EMR) to the Ministry of Environment and Sustainable Development, Disaster and Beach Management

Environmental Impact Assessment Report

Name of assignment:

Environmental Audit Report

Year : January 2016

Location : Bambous

Client: Premixed Concrete Ltd

Main Project features : Preparation of an Environmental Audit Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Audit Report for site Inspection and Remedial Measures to contain Rain Water Run – off at the P- C plat of Bambous

Environmental Impact Assessment Report

Name of assignment:

Environmental Impact Assessment for Proposed Project “Paille De Canne de Cogénération” at Terragen Ltd

Year : September 2015

Location : Belle Vue Mapou

Client: Terragen Ltd Preparation of an Environmental Impact Assessment Report related to use of cane trash as fuel for cogeneration

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report related to use of cane trash as fuel for cogeneration

Environmental Management and Monitoring Services

Name of assignment: Environmental Management and Monitoring Services in connection with the replacement of Boilers and Upgrade of Electricity Co- generation

Year : May 2015

Location : Bambous/ Medine/ Mauritius

Client: The Medine Sugar Milling Company Limited

Main Project features : Environmental Management and Monitoring Services during Construction phase

Position held: Team Leader/Consultant

Activities performed: Preparation of a monthly report (EMP) for the Ministry of Environment and Sustainable Development, Disaster and Beach Management

Traffic Impact Assessment Report

Name of assignment: Traffic Impact Assessment Report for the Proposed Project for the Construction of a Mixed Use Building

Year : May 2015

Location : Port Louis /Mauritius

Client: Kwong & Fok Associates Ltd

Main Project features : Preparation of a Traffic Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of a Trafficl Impact Assessment Report, Traffic counts, traffic modelling and reporting.

Page 6: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

6

Environmental Impact Assessment Report

Name of assignment: Environmental Impact Assessment Report for the Proposed Project for the Construction of a Mixed Use Building

Year : May 2015

Location : Port Louis /Mauritius

Client: Kwong & Fok Associates Ltd

Main Project features : Preparation of an Environmental Impact Assessment Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management

Environmental Monitoring and Management Plan

Name of assignment: Environment Monitoring and Management at Mauritius Container Terminal Project Site

Year : January 2015 (ongoing)

Location : Mer Rouge Port Louis

Client: Strabag- Archirodon

Main Project features : Supervision of Environment Monitoring and Management Plan

Position held: Consultant/ Team Leader

Activities performed: Assist in the Preparation of the Construction Environmental Management Plan (CEMP) for the construction phase Environmental Monitoring : Marine (Ecology) Ecosystem Environmental Monitoring: Marine (Sea) Water Quality Environmental Monitoring: Marine Sediment Sieve Analysis Environmental Monitoring: Water Birds Environmental Monitoring: Noise Environmental Monitoring: Air Quality

Social Impact Assessment and Social Need Study

Name of assignment: Social Impact Assessment and Social Need Study

Year : January 2015 (ongoing)

Location : Mont Choisy /Mauritius

Client: Mont Choisy Property Development Ltd ( IRS Project)

Main Project features : Social Consultations and Preparation of Social Programme for Investment

Position held: Consultant/ Team Leader

Activities performed: Preparation of Social Programme for Investment

Environmental Management and Monitoring Services

Name of assignment: Environmental Management and Monitoring Services

Year : August 2014 (ongoing)

Location : Plaine des Roches Ltd /Mauritius

Client: Eole de Plaine des Roches Ltd

Main Project features : Environmental Management and Monitoring Services during Construction of the 17.85 MW Wind Farm by EOLE de Plaine des Roches

Position held: Consultant/ Team Leader

Activities performed: Preparation of a monthly report for the Ministry of Environment and Sustainable Development

Preliminary Environmental Report

Name of assignment: Preliminary Environmental Report (PER)for Proposed Construction of New Island Brush Factory at Saint Antoine Goodlands

Year : May 2014

Location : Goodlands/ Mauritius

Client: Island Brush Company Ltd

Main Project features : Preparation on a Preliminary Environmental Report

Position held: Consultant/ Team Leader

Activities performed: Preparation of Preliminary Environmental Report to the Ministry of Environment and Sustainable Development

Environment Management System (EMS)

Name of assignment: Implementation of Environment Management System (EMS) ISO 14001: 2004

Year : 2014

Location : Beau Climat/ Mauritius

Client: Innodis Ltd

Main Project features : Implementation of Environment Management System (EMS) ISO 14001: 2004

Position held: Team Leader/ Consultant

Activities performed: Identify all procedures, Guide and Coordinate the preparation of the necessary documentation of the EMS to ISO 14001: 2004; provide training on Environment Management to all personnel, and preparation of monthly environment monitoring reports.

Consultancy Services For the Setting Up of a Vehicle Examination Station at Laventure.

Name of assignment: Vehicle Examination Station at Laventure

Year : May 2014 (ongoing)

Location : Laventure, Flacq/Mauritius

Client: Eastern Stone Crusher Ltd

Main Project features : Feasibility and Implementation of the Vehicle Examination Station at Laventure

Position held: Team Leader/ Consultant

Activities performed: Advisory on all aspects consisting of construction regulatory, training, finance and promotion

Page 7: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

7

Compliance to EP and IFC’s Guidelines

Name of assignment: Project Review Compliance to Equator Principles and IFC’s Guidelines

Year : January 2014

Location : Plaine Sophie /Mauritius

Client: Consortium Suzlon – Padgreen Co Ltd

Main Project features : Review Compliance to Equator Principles, IFC’s EHS Guidelines and IFC’s Performance Standards on Environmental and Social Sustainability

Position held: Consultant

Activities performed: Preparation of a Review Compliance to the proposed Wind Farm Project at Plaine Sophie

Environmental Impact Assessment Report

Name of assignment: Preparation of EIA Report and BLUP in connection with the replacement of Boilers and Upgrade of Electricity Co- generation

Year : January 2014 (ongoing)

Location : Bambous/ Medine/ Mauritius

Client: The Medine Sugar Milling Company Limited

Main Project features : Environmental Impact Assessment and Building and Land Use Permit

Position held: Team Leader/Consultant

Activities performed: Preparation of Environmental Impact Assessment report to the Ministry of Environment and Sustainable Development and application for Building and Land Use Permit.

Amendment to EIA License

Name of assignment: Block Making and Concrete Plant

Year : 2013

Location : Beemanique, Nouvelle France/Mauritius

Client: La Rocaille Ltee/ Beemanique Nouvelle France

Main Project features : Environmental Impact Assessment

Position held: Team Leader/ Consultant

Activities performed: Preparation of report to the Ministry of Environment and Sustainable Development

Environmental Monitoring Plan

Name of assignment: Preparation of EMP

Year : 2013 (Ongoing)

Location : Plaine Sophie/Mauritius

Client: Consortium Suzlon - Padgreen Co Ltd

Main Project features : Environmental Monitoring Plan

Position held: Consultant

Activities performed: Environmental Monitoring for the MW14 Wind Turbines at Plaine Sophie

EIA Compliance and Additional Information to Environmental Management Plan

Name of assignment: EIA Compliance and Additional Information for the Environmental Management Plan

Year : 2013

Location : Baie Du Cap/Mauritius

Client: Maconde Lime Co Ltd

Main Project features : Analysis of test results and recommendations for improvement

Position held: Consultant

Activities performed: Preparation of regular reports for the Ministry of Environment and Sustainable Development

Amendment to EIA License

Name of assignment: Proposed Project for the Construction and Operation of a Wind Farm at Plaine des Roches

Year : 2013

Location : Plaine des Roches/ Mauritius

Client: Aerowatt (Mauritius) Ltd

Main Project features : Preparation on an amendment report

Position held: Consultant

Activities performed: Preparation of an EIA report to the Ministry of Environment and Sustainable Development

Application for Water Resources Unit Clearance

Name of assignment: Proposed Real Estate Project

Year : 2013

Location : Black River/ Mauritius

Client: Turnkey Management Ltd

Main Project features : Solving environmental problems associated to the RES project

Position held: Consultant

Activities performed: Consultation with Water Resources Unit, Preparation of a report detailing the acceptable option for evacuating treated waste water from the site and getting the Water Resources Unit’s approval for same.

Preliminary Environmental Report

Name of assignment: Proposed Installation of a Temporary Semi-Mobile Ready-Mix Concrete Batching Plant

Year : 2013

Location : Alma, Moka/ Mauritius

Client: Pre-Mixed Concrete Ltd

Main Project features : Preparation on a PER Report

Position held: Consultant

Activities performed: Preliminary Environmental Report and Public Consultations, and audits.

Page 8: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

8

Environmental Impact Assessment

Name of assignment: Proposed Project for the Setting up of a Pyrolysis Plant for Recycling Scrap Tyre/Rubber and Plastic

Year : 2012 (ongoing)

Location : Beemanique, Nouvelle France/ Mauritius

Client: Sujoy Vishnu Enterprise (Mtius) Ltd

Main Project features : Preparation on an EIA Report

Position held: Team Leader

Activities performed: Environmental Impact Assessment Report

Modelling and Simulating and Compilation of findings

Name of assignment: Preparation of EIA Report

Year : 2012

Location : Plaine Sophie/ Mauritius

Client: Consortium Suzlon - Padgreen Co Ltd

Main Project features : Preparation of EnvironmReport

Position held: Consultant

Activities performed: Preparation of EIA Report

Environmental Impact Assessment

Name of assignment: EIA for Proposed Stone Crushing and Block Making Plant

Year : 2012

Location : Bon Air, Fond du Sac/ Mauritius

Client: Eastern Stone Crusher Ltd

Main Project features : Preparation on an EIA Report

Position held: Team Leader

Activities performed: Environmental impact analysis and monthly reporting during construction

Traffic Impact Assessment Report .

Name of assignment: Traffic Impact Assessment Report for the proposed Vehicle Examination Station at Laventure

Year : 2012

Location : Laventure, Flacq/Mauritius

Client: Eastern Stone Crusher Ltd

Main Project features : Preparation on a Traffic Impact Assessment Report for the Vehicle Examination Station at Laventure

Position held: Team Leader

Activities performed: Preparation of a Trafficl Impact Assessment Report ,traffic counts, traffic modelling and reporting.

Traffic modelling and simulation, impact analysis and reporting.

Name of assignment: EIA Reports for the proposed Vehicle Examination Station at Laventure

Year : 2012 (ongoing)

Location : Laventure, Flacq/Mauritius

Client: Eastern Stone Crusher Ltd

Main Project features : Preparation on an EIA and TIA report s for the Vehicle Examination Station at Laventure

Position held: Team Leader

Activities performed: Traffic counts, traffic modelling, environmental impact analysis and reporting.

Traffic Impact Assessment report.

Name of assignment: Traffic Impact Assessment Report for the proposed Vehicle Examination Station at Forest Side

Year : 2012

Location : Forest Side, Curepipe/ Mauritius

Client: Eastern Stone Crusher Ltd

Main Project features : Preparation on a TIA report s for the Vehicle Examination Station at Forest Side

Position held: Team Leader

Activities performed: Preparation of a Trafficl Impact Assessment Report ,traffic counts, traffic modelling, and reporting.

Environment Impact Assessment

Name of assignment: EIA Report for the proposed Vehicle Examination Station at Forest Side

Year : 2012

Location : Forest Side, Curepipe/ Mauritius

Client: Eastern Stone Crusher Ltd

Main Project features : Preparation on an EIA and TIA report s for the Vehicle Examination Station at Forest Side

Position held: Team Leader

Activities performed:

Pollution load calculation and design of mitigation measures, liaison with Ministry of Environment, assistance in implementation of complete solution.

Name of assignment: Air Pollution Abatement

Year : 2012

Location : Baie Du Cap/ Mauritius

Client: Maconde Lime Co Ltd

Main Project features : Pollution Abatement measures,Calculation of air pollution loads and mitigation measures

Position held: Team Leader

Activities performed: Load calculation, design and liason with Ministry of Environment

Page 9: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

9

Environment Impact Assessment

Name of assignment: Preparation of an EIA and TIA Reports

Year : 2011

Location : Near Bulk Sugar Terminal Les salines/ Mauritius

Client: Neotown Les Salines Development Ltd

Main Project features : Modeling of Environmental impacts and analysis including Traffic Implications of the proposed Scheme

Position held: Team Leader

Activities performed: Impact analysis and mitigation.

Leading a team of Consultants for an FSP GEF project

Name of assignment: Energy Efficiency in Moroccan Manufacturing Sector

Year : 2011

Location : Rabat, Morocco

Client: African Development Bank

Main Project features : GEF FSP Project formulation

Position held: Team Leader

Activities performed: Project Conceptualisation and Formulation

Modelling and Simulation and Compilation of findings

Name of assignment: Preparation of EIA Report

Year : 2011

Location : Mauritius

Client: Aerowatt

Main Project features: Environmental Impact Assessment

Position held: Team Leader

Activities performed: Modelling of Environmental impacts for 18 MW Wind Farm

Environmental Monitoring Services

Name of assignment: Environmental Monitoring and Reporting

Year : 2010

Location : Mauritius

Client: China State Construction Engineering Corporation SSR International Airport Expansion project

Main Project features : Environmental Services

Position held: Environmental Consultant

Activities performed: Environmental Monitoring and Reporting to Ministry of Environment and Sustainable Development

Modelling and Simulation and Compilation of findings

Name of assignment: Preparation of EIA Report

Year : 2010

Location : Mauritius

Client: La Rocaille Ltee/ Beemanique Nouvelle France

Main Project features : Environmental Impact Assessment

Position held: Team Leader

Activities performed: Environmental impacts analysis for the operation of an Existing Stone Crushing Plant and the Setting up of a Block Making Plant, a Bitumen Plant and a Concrete Mixing Plant

Modelling and Simulation and Compilation of findings

Name of assignment: Preparation of EIA Report

Year : 2010

Location : Mauritius

Client: Ministry of Health & Quality of Life

Main Project features: Environmental Impact Assessment

Position held: Team Leader

Activities performed: EIA for the Installation of a medical waste incinerator at J. Nehru Hospital

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Mauritius

Client: Entreprise Mauritius & AHRIM

Main Project features : Energy Audit and Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Pointe aux Sables

Client: Berque Ltee

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Port Louis

Client: Data Communications Ltd

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Page 10: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

10

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : St Pierre

Client: Fit U Garment Ltd

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Forest Side

Client: Prest Plastics Ltd

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Industrial Zone, Phoenix

Client: Ramdenee Edible Oil Products Ltd

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Riche Terre

Client: Filao Limitee

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Energy Auditing

Name of assignment: Energy Management for Efficiency

Year : 2010

Location : Pailles

Client: ABC Motors Co Ltd

Main Project features : Energy Management

Position held: Consultant

Activities performed: Energy Management Consultancy

Modelling and Simulation and Compilation of findings

Name of assignment: Preparation of EIA Report

Year : 2009

Location : Mauritius

Client: Apavou Hotels

Main Project features: Environmental Impact Assessment

Position held: Head of Team of Consultant

Activities performed: Preparation of Environmental Impact Assessment Report for the Extension of Indian Resort & Spa for the Apavou Group.

Electricity Cost Cutting through Energy Efficient Lighting Systems

Name of assignment: Energy Management through better Lighting

Year : 2009

Location : Mauritius

Client: Participants from industry (Mauritius)

Main Project features : Energy Management

Position held: Consultant

Activities performed: Course Design and Delivery

Energy Cost Cutting at 15 branches of the Mauritius Commercial Bank Ltd.

Name of assignment: Energy Efficiency in Buildings

Year : 2009

Location : Mauritius

Client: Mauritius Commercial Bank Ltd (MCB)

Main Project features : Energy Management

Position held: Project Director

Activities performed: Energy Auditing and Project Management

Traffic Impact Assessment (TIA) for the Construction of a Commercial Village at Riviere du Rempart and a business park at Beau Sejour

Name of assignment: Traffic Impact Assessment

Year : 2009

Location : Mauritius

Client: Indian Ocean Real Estate Company (IOREC)

Main Project features : Traffic Impact Assessment

Position held: Consultant

Activities performed: Traffic count and preparation of TIA report

Page 11: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

11

Consultancy services for Energy Cost Cutting at the 5 Apavou Hotels in Mauritius (lighting energy efficiency, air conditioning energy efficiency and solar water heating systems)

Name of assignment: Energy Efficiency in Hotel Sector

Year : 2009

Location : Mauritius

Client: Apavou Hotels

Main Project features : Energy Management

Position held: Project Director

Activities performed: Energy Auditing and Project Management

Consultancy services for Energy Cost Cutting through efficient lighting

Name of assignment: Efficient Lighting for Cost Control

Year : 2009

Location : Mauritius

Client: Tee sun Co Ltd (Palmar Group)

Main Project features : Energy Management

Position held: Technical Consultant

Activities performed: Energy Auditing and Project Manangement

Energy Efficiency

Name of assignment: Solar Water Heaters in Mauritius

Year : 2009

Location : Mauritius

Client: Ministry of Renewable Energy and Public Utilities under the authority of the United Nations Development program

Main Project features : Evaluation of the Grand scheme, application product standards and advice of on how to further increase the usage of SWH in Mauritius

Position held: National Consultant

Activities performed: Baseline data collection, assist in meeting key stakeholders, draft and finalise report.

Modelling and Simulation and Compilation of Findings

Name of assignment: Preparation of EIA Report

Year : 2009

Location : Rodrigues, Mauritius

Client: Var Investment Ltd

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Preparation of Environmental Impact Assessment report for the construction of a beach hotel in Rodrigues, including desalination waste water systems.

Comprehensive Course for Energy Managers

Name of assignment: Course on Energy Energy Management

Year : 2008

Location : Mauritius

Client: Participants from industry

Main Project features : BS EN Standard for Energy Management

Position held: Trainer

Activities performed: Course Design and Delivery

Market study and definition of the terms and conditions of a credit line dedicated to sustainable energy and environmental performance investments in Mauritius

Name of assignment: Setting up of AFDs credit line dedicated to sustainable energy and environmental

Year : 2008

Location : Mauritius

Client: Ernst & Young Ltd

Main Project features : Market Study

Position held: Consultant

Activities performed: Identify all eco-industries acting in Mauritius in the waste, water and energy sectors

EIA for a facility for used oil collection, storage, Re-refining and combustion including post combustion gas cleaning.

Name of assignment: Preparation of EIA Report

Year : 2008

Location : Mauritius

Client: Star Ecoenergy Ltd

Main Project features : Re-refining of Used Oil

Position held: Consultant

Activities performed: Facilitate implementation of used oil re-refining facility, EIA

Implementation of a food safety management system based on HACCP principles

Name of assignment: HACCP Implementation

Year : 2008

Location : Mauritius

Client: SOPHALCO Ltd

Main Project features : HACCP Implementation

Position held: Trainer/ Consultant

Activities performed: Implementation of food safety procedures

Environment review at 3 project sites in the district of Riv du Rempart at Beau Sejour, Mon Loisir and Haute Rive

Name of assignment: Initial Environmental Review

Year : 2008

Location : Mauritius

Client: ACTIS Ltd (UK)

Main Project features : Initial Environment Review of the Azuri project

Position held: Consultant

Activities performed: Preparation of Environmental Audit Report

Page 12: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

12

Social Impact Assessment for the 34 villas IRS project at Bel Ombre

Name of assignment: Preparation of the Social Impact Assessment Report

Year : 2008

Location : Mauritius

Client: Belle Riviere Estate

Main Project features : Social Impact Assessment

Position held: Consultant

Activities performed: Preparation of the Social Impact Assessment Report

Implementation of a food safety management system based on ISO 22000

Name of assignment: ISO 22 000 standard implementation

Year : 2008

Location : Mauritius

Client: Constance Lemuria Resorts (Seychelles)

Main Project features : ISO 22000 Implementation

Position held: Team Leader

Activities performed: Implementation of ISO 22000 Standard

Conduct Market Study For Intertek Ltd for Food and Environment Testing

Name of assignment: Market Study

Year : 2008

Location : Mauritius

Client: Intertek (Mauritius) Limited

Main Project features : Market Study

Position held: Consultant

Activities performed: Market Study for the Implementation of a Food and Environmental Testing Laboratory by Intertek (Mauritius) Ltd

Follow up of ex- employees engaging in small businesses

Name of assignment: Business Plan Formulation

Year : 2008

Location : Mauritius

Client: British American Tobacco PLC

Main Project features : Employee Redeployment Programme Phase II

Position held: Project Director

Activities performed: Follow up of ex-employees engaging in small businesses

Environmental Impact Assessment

Name of assignment: EIA Report Preparation

Year : 2007

Location : Mauritius

Client: Sagar Hotels & Resorts Ltd

Main Project features : Environmental Impact Assessment

Position held: EIA Consultant

Activities performed: Environmental Impact Assessment for the creation of swimming zones and beach reprofiling in front of the Blue Ocean Park Hotel as well as the construction of a jetty, desalination waste water systems

Environmental Impact Assessment

Name of assignment: EIA Report Preparation

Year : 2007

Location : Mauritius

Client: Sagar Hotels & Resorts Ltd

Main Project features : Environmental Impact Assessment

Position held: EIA Consultant

Activities performed: Environmental Impact Assessment for the construction and operation of a beach restaurant attached to the Blue Ocean Park Hotel.

EMS Implementation

Name of assignment: EMS Implementation

Year : 2007

Location : Mauritius

Client: One and Only Le Saint Geran Hotel

Main Project features : Green Globe 21 Implementation

Position held: Consultant

Activities performed: Consultancy Services for the implementation of an Environmental Management System based on Green Globe 21 standard

Environmental Impact Assessment

Name of assignment: EIA Report Preparation

Year : 2007

Location : Mauritius

Client: Chilipoint Ltd

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for the operation of a beach hotel comprising of 39 rooms at Pointe aux Piments

Page 13: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

13

Alternative Fuels

Name of assignment: Assist Total Mauritius Limited in fuel switch- over management on client sites

Year : 2007

Location : Mauritius

Client: Total Mauritius Limited

Main Project features : Consultancy services/ Environment Assessment

Position held: Consultant

Activities performed: Assistance to TOTAL MAURITIUS in connection with environmental implications of fuel switching for industrial client sites

Environment Reporting

Name of assignment: Internal Audit and preparation of the Maurilait Environmental Report

Year : 2007

Location : Mauritius

Client: Maurilait Production Ltee

Main Project features : Environment Reporting

Position held: Team Leader/Consultant

Activities performed: Consultancy services for assistance to participate in the Environmental Reporting Award of the Ministry of Environment

ISO 14001:2004 Implementation

Name of assignment: EMS Implementation

Year : 2007

Location : Mauritius

Client: Alcodis Ltd

Main Project features : ISO 14001:2004 Implementation

Position held: Team Leader/ Consultant

Activities performed: Consultancy services for the implementation of a Environmental Risk Management System

Environment Assessment

Name of assignment: Assessment of the various pollution sources and propose corrective measures

Year : 2007

Location : Mauritius

Client: Alcodis Ltd

Main Project features : Consultancy services/ Environment Assessment

Position held: Consultant

Activities performed: Assist in management of various environmental concerns at the Rose Belle ethanol plant

ISO 9001: 2000 Implementation

Name of assignment: QMS Implementation

Year : 2007

Location : Madagascar

Client: SATIM (Mauritius)

Main Project features : ISO 9001:2000 Implementation

Position held: Team Leader

Activities performed: Consultancy services for the implementation of a Quality Assurance System

Implementation of a Data Collection System

Name of assignment: FAD Fishery Data Collection, Management and Analysis

Year : 2007

Location : Mauritius

Client: FAD / Ministry of Agro-Industry and Fisheries

Main Project features : Data Collection System Implementation

Position held: Head Consultant

Activities performed: A system of data collection, processing, analysis and monitoring for the FAD fishery

Environmental Impact Assessment for a Coal Water Slurry Production Plant

Name of assignment: EIA Report

Year : 2006

Location : Mauritius

Client: Avantime Ltd

Main Project features : Environmental Impact Assessment

Position held: Head Consultant

Activities performed: Pioneer Status Certificate and Environmental Impact Assessment for the Production, Distribution, Combustion of Coal Water Slurry (CWS) including Post-Combustion Gas Cleaning

Preliminary Environmental Report for proposed petrol service station

Name of assignment: Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Caltex

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environmental Report for the proposed petroleum retail outlet at La Vigie on the Motorway

Page 14: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

14

Preliminary Environmental Report

Name of assignment: Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Rocki Mtius Ltd

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environmental Report for proposed project for the setting up of an Art Glassmaking Factory & Shop at Trou aux Biches

Preliminary Environmental Report

Name of assignment: Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Paris Belle Epoque (Gleeds Ltd)

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environmental Report for the proposed construction of 24 Housing Unit at Curepipe

Preliminary Environmental Report

Name of assignment: Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Admiral Court Ltd (Gleeds Ltd)

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environment Report for the construction of a residential complex at Bain Boeuf

Preliminary Environmental Report

Name of assignment: PER Preparation

Year : 2006

Location : Mauritius

Client: Solid Waste Recycling Co Ltd

Main Project features : Preliminary Environmental Report

Position held: Head Consultant

Activities performed: Consultancy Services for the proposed investment project for large scale composting of organic waste including un-segregated municipal solid waste in Mauritius including Preliminary Environment Report and Marketing Plan

Preliminary Environmental Report

Name of assignment: Complete Study and Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Caltex

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environment Report for the complete renovation of the petroleum retail outlet at Curepipe

Preliminary Environmental Report

Name of assignment: Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Peche Mignon Ltee

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environment Report for a proposed bakery project at Tamarin

Preliminary Environmental Report

Name of assignment: Complete Study and Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Bonne Terre Home for the Elderly

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environment Report for the renovation of a home for the elderly

Preliminary Environmental Report

Name of assignment: Complete Study and Preliminary Environment Report

Year : 2006

Location : Mauritius

Client: Texpull Ltd

Main Project features : Preliminary Environmental Report

Position held: Consultant

Activities performed: Preliminary Environment Report for a textile knitting unit with 50 machines

Page 15: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

15

Feasibility Study

Name of assignment: Business Planning

Year : 2005

Location : Mauritius

Client: Pharmacy Seegobin

Main Project features : Feasibility Study

Position held: Team Leader

Activities performed: Feasibility and opportunity study of a new Pharmacy including survey of potential customers

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2005

Location : Mauritius

Client: Caltex (Mauritius) Ltd, Mare D’Australia

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for the proposed petroleum retail outlet at Mare D’Australia

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2005

Location : Mauritius

Client: Caltex (Mauritius) Ltd, St Julien

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for the proposed petroleum retail outlet at St Julien

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2005

Location : Mauritius

Client: Les Entreprise Phi Ltee

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for the construction of a residential complex of 82 Housing Units at Belle Rose

Preliminary Environmental Report

Name of assignment: PER

Year : 2005

Location : Mauritius

Client: Soeur de Charite of Belle Rose

Main Project features : Preliminary Environment Report

Position held: Consultant

Activities performed: Preliminary Environment Report for the extension and renovation of a residential home for the elderly

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2005

Location : Mauritius

Client: Super Construction Co. Ltd

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for a luxury housing project at Grand Bay

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2005

Location : Mauritius

Client: Challeng’hair Ltd

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for the construction and operation of a clinic for hair grafting at Trou aux Biches

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2005

Location : Mauritius

Client: Societe de l’Horizon

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for the construction of 83 housing units

Page 16: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

16

ISO 14001: 2004 Gap Analysis

Name of assignment: EMS Implementation

Year : 2005

Location : Madagascar

Client: SACIMEM (Antsirabe)

Main Project features : ISO 14001:2004 Gap Analysis

Position held: Team Leader

Activities performed: System Audit with respect to ISO 14001:2004

ISO 14001: 2004 Gap Analysis

Name of assignment: EMS Implementation

Year : 2005

Location : Mauritius

Client: SITAM (Majunga)

Main Project features : ISO 14001:2004 Gap Analysis

Position held: Team Leader

Activities performed: System Audit with respect to ISO 14001:2004

ISO9001:2000 Implementation

Name of assignment: QMS Implementation

Year : 2005

Location : Mauriitus

Client: State Insurance Corporation of Mauritius

Main Project features : ISO 9001:2000

Position held: Team Leader

Activities performed: Maintenance and upgrading of the Quality Management System

Energy Efficiency

Name of assignment: Energy Efficiency in Building in Mauritius

Year : 2005

Location : Mauritius

Client: UNDP

Main Project features : Determination of the status of Energy Efficiency and Energy Conservation in Buildings in the Republic of Mauritius

Position held: National Consultant

Activities performed: The identification of a baseline; Identified barriers and their root causes and their classification in order of severity; Identified project activities, outputs and costs for all components identified under a work plan; presented matrix of baseline and incremental costs; presented project budget as per UNDP-GEF format, including identification of sources of funding; designed project institutional framework/implementation mechanism and the work plan; finalise MSP project brief in GEF format

ISO 9001:2000 And ISO 14001:2004

Name of assignment: Joint EMS and QMS Implementation

Year : 2004-2005

Location : Mauritius

Client: British American Tobacco

Main Project features : ISO 9001:2000 and ISO 14001:2004

Position held: Team Leader

Activities performed: Maintenance and Monitoring of Management System (Quality and Environment)

Environmental Impact Assessment

Name of assignment: Environmental Impact Assessment Report

Year : 2004-2005

Location : Mauritius

Client: MMC International Ltd

Main Project features : Environmental Impact Assessment

Position held: Consultant

Activities performed: Environmental Impact Assessment for proposed plant for the manufacture of Tile Adhesives

Green Globe 21

Name of assignment: EMS Implementation

Year : 2004

Location : Mauritius

Client: Le Prince Maurice

Main Project features : Green Globe 21

Position held: Trainer/Team Leader

Activities performed: Benchmarking for Green Globe Certification

HACCP Implementation

Name of assignment: HACCP

Year : 2004

Location : Mauritius

Client: Le Prince Maurice

Main Project features : HACCP implementation

Position held: Team Leader

Activities performed: Gap Analysis and identification of Hazard Analysis Critical Control Points

Page 17: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

17

Strategic Environmental Impact for Agricultural Diversification Study

Name of assignment: Strategic Environment Assessment

Year : 2004

Location : Mauritius

Client: Mauritius Chamber of Agriculture

Main Project features : Agricultural Diversification Study

Position held: Team Leader

Activities performed: Strategic Environmental Assessment (SEA) of 3 production systems (potato, deer and palm)

Project Concept Development

Name of assignment: Concept Development

Year : 2004

Location : Rodrigues

Client: CEB Staff Association

Main Project features : Project concept development

Position held: Consultant

Activities performed: Project concept development and environmental planning for proposed Camp de Vacances in Rodrigues Island

ISO 9001:2000 Implementation

Name of assignment: QMS Implementation

Year : 2004

Location : Mauriitus

Client: State Insurance Corporation Of Mauritius

Main Project features : ISO 9001:2000 Implementation

Position held: Consultant

Activities performed: Consultancy services for the implementation of a Quality Assurance System

Preliminary Environmental Report

Name of assignment: PER

Year : 2004

Location : Mauritius

Client: Indian Oil (Mauritius) Ltd

Main Project features : Preliminary Environment Reports for 7 petroleum retail outlets

Position held: Consultant

Activities performed: Mini-Environmental Impact Assessment together with traffic impact studies carried out at 7 locations namely at: Chemin Grenier, Bonne Terre, Quatre Bornes, L’Amitie, Centre de Flacq, Terre Rouge, Petite Riviere

Environment Information System

Name of assignment: Local Coordination for EIS project

Year : 2003-2004

Location : Mauritius

Client: Ministry of Environment

Main Project features : Environment Information System

Position held: Team Leader

Activities performed: Development of an Environment Information System for the Ministry of Environment in association with SMEC

Training and Capacity Building

Name of assignment: Capacity Building

Year : 2003

Location : Mauritius

Client: Pad & Co. Ltd

Main Project features : Training and Capacity Building

Position held: Trainer

Activities performed: Employee Skills Enhancement Project

ISO 9001:2000 Implementation at Mauritius Telecom

Name of assignment: QMS Implementation

Year : 2003

Location : Mauritius/Rodrigues

Client: Mauritius Telecom Group

Main Project features : ISO 9001:2000 Implementation

Position held: Consultant

Activities performed: Consultancy services for the implementation of a Quality Assurance System in the following branches: Mauritius Telecom Ltd, Cellplus Ltd, Telecom Plus Ltd, Teleservices Ltd, Mauritius Telecom (Rodrigues) Ltd

Biomass Assessment

Name of assignment: Biomass Resource Assessment

Year : 2003

Location : Mauriitus

Client: SOPAC (South Pacific Applied Geosciences Commission)

Main Project features : Biomass Assessment

Position held: Team Leader

Activities performed: Regional Biomass Assessment for six pacific islands and preparation of a strategy for biomass resource management

Page 18: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

18

Assessment of Fish Aggregation Devices

Name of assignment: Assessment of Technology

Year : 2003

Location : Rodrigues

Client: FAD / Ministry of Fisheries

Main Project features : Assessment of Fish Aggregation Devices in Mauritius and Rodrigues

Position held: Consultant

Activities performed: Survey of fishers and Economic/Environmental Impact Assessment of FAD technology

Cogeneration Assessment

Name of assignment: Improved Bagasse Cogeneration in Mauritius for Enhanced Carbon Savings

Year : 2002

Location : Mauritius

Client: NEDO, Japan

Main Project features : Feasibility Report

Position held: Consultant

Activities performed: Assess Bagasse Cogeneration in Mauritius

PDF A application for funding

Name of assignment: Application for Funding

Year : 2002

Location : Mauriitus

Client: United Nations Development Programme

Main Project features : PDF A application for funding

Position held: Team Leader

Activities performed: Electrification of Agalega Island using Biofuels from Coconut

Survey on Domestic Electricity Consumption

Name of assignment: Domestic Energy Savings

Year : 2002

Location : Rodrigues

Client: Rodrigues Council of Social Services

Main Project features : Survey on Domestic Electricity Consumption

Position held: Team Leader

Activities performed: Opportunities for domestic energy savings in Rodrigues – Impact of the introduction of CFLs

Flash Diagnosis

Name of assignment: Enterprise Diagnosis

Year : 2002

Location : Mauritius

Client: Fast Fit / Quad Printers / Island Sports/Cover Craft

Main Project features : Flash Diagnosis

Position held: Head of Team

Activities performed: Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance

ISO 14001:2004 Implementation

Name of assignment: EMS Implementation

Year : 2002

Location : Mauriitus

Client: Southern Textile Ltd

Main Project features : ISO 14001:2004 Implementation

Position held: Consultant

Activities performed: Consultancy services for the implementation of an Environment Management System

ISO 9001:2000 Implementation

Name of assignment: QMS Implementation

Year : 2002

Location : Mauritius

Client: Prosimex Ltd / Unicorn Ltd / Alpha Cleaning Ltd

Main Project features : ISO 9001:2000 Implementation

Position held: Consultant

Activities performed: Consultancy services for the implementation of a Quality Assurance System

Seaweed Farming in Rodrigues

Name of assignment: New Farming Systems

Year : 2002

Location : Rodrigues

Client: Ministry of Fisheries

Main Project features : Seaweed Farming in Rodrigues

Position held: Consultant

Activities performed: Feasibility and site identification together with Environmental Impact Identification

Feasibility report on Bagasse cogeneration

Name of assignment: Cogeneration with Sugarcane Biomass

Year : 2001

Location : Mauriitus

Client: National Renewables Energy Laboratory, USA

Main Project features : Feasibility report

Position held: Consultant

Activities performed: Feasibility for Bagasse utilisation in Cogeneration

Page 19: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

19

ISO 14001:2004 Implementation

Name of assignment: EMS Implementation

Year : 2001

Location : Mauritius

Client: Queenswear Ltd

Main Project features : ISO 14001:2004 Implementation

Position held: Team Leader

Activities performed: Consultancy services for the implementation of an Environment Management System

ISO 9001:2000 Implementation

Name of assignment: QMS Implementation

Year : 2001

Location : Mauriitus

Client: Data Communications Limited / Il Moro Di Venezia Ltee / PAD & Co Ltd / Bonny Air Travel and Tours Ltd

Main Project features : ISO 9001:2000 Implementation

Position held: Team Leader

Activities performed: Consultancy services for the implementation of a Quality Assurance System

Economic Impact Assessment

Name of assignment: Modeling and Calculation of Economic Rate of Return

Year : 2001

Location : Mauriitus

Client: Montgomery Watson (UK)

Main Project features : Economic Impact Assessment for Plaines Wilhems Sewerage

Position held: Team leader

Activities performed: Performed an Economic Impact Assessment of the Plaines Wilhems Sewerage Project

Environment Planning

Name of assignment: EMP

Year : 2001

Location : Rodrigues

Client: Pleasure Bay Ltd

Main Project features : Environmental planning of proposed hotel in Rodrigues

Position held: Consultant

Activities performed: Environmental planning and facilitation of licenses of a proposed 44 room hotel project in Rodrigues Island

EIA

Name of assignment: EIA

Year : 2001

Location : Mauritius

Client: Italpro Ltd

Main Project features : Environmental Impact Assessment for Wine Factory

Position held: Consultant

Activities performed: Complete EIA report preparation to granting of EIA licence for a proposed wine factory

EMS Implementation

Name of assignment: EMS Implementation

Year : 2001

Location : Mauritius

Client: Esquel Group (Textile Industries Ltd)

Main Project features : ISO 14001:2004 Implementation

Position held: Consultant

Activities performed: Consultancy services for implementation of an Environment Management System

QMS Implementation

Name of assignment: QMS

Year : 2000

Location : Mauritius

Client: Green Cross Medical Laboratory

Main Project features : ISO 9002:1994 Implementation

Position held: Consultant

Activities performed: Consultancy services for implementation of a Quality Assurance System

Workshop

Name of assignment: Workshop

Year : 2000

Location : Mauritius

Client: Association Hôteliers et Restaurateurs de L'île Maurice

Main Project features : Solid Waste Management System

Position held: Trainer

Activities performed: Seminar on Solid Waste Management System for personnel & maintenance managers of over 20 beach resort hotels in Mauritius

Page 20: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

20

QMS Implementation

Name of assignment: QMS Implementation

Year : 2000

Location : Mauritius

Client: Universal Fabrics Ltd

Main Project features : ISO 9001:2000 Implementation

Position held: Consultant

Activities performed: Consultancy services for implementation of Quality Assurance System

EMS Implementation

Name of assignment: Implementation of EMS

Year : 2000

Location : Mauritius

Client: Esquel Group (Leisure Garments)

Main Project features : ISO 14001:2004 Implementation

Position held:

Activities performed: Consultancy services for implementation of Environment Management System

Industrial Energy Efficiency

Name of assignment: Energy Management in Industry

Year : 2000

Location : Mauritius

Client: Mauritius Research Council / Private Sector Collaborative Research Scheme

Main Project features : Energy cost Cutting

Position held: Consultant

Activities performed: Energy Management Framework at the Ferney Spinning Mills.

Industrial Energy Efficiency

Name of assignment: Energy Management in Industry

Year : 2000

Location : Mauritius

Client: Mauritius Research Council / Private Sector Collaborative Research Scheme

Main Project features : Energy cost Cutting

Position held: Consultant

Activities performed: Energy Management Framework at the Ferney Spinning Mills.

Biomass Assessment and Cogeneration

Name of assignment: Sugar Factory Co-generation Potential Assessment for Eastern Africa

Year : 1999

Location : Harare, Zimbabwe

Client: UNCTAD (Common Fund for Commodities)

Main Project features : Model to assess cogeneration potential of sugar factories in Southern and Eastern Africa

Position held: Consultant

Activities performed: Sugar Factory Co-generation Potential Assessment for Eastern Africa

PV for Irrigation

Name of assignment: Solar Photovoltaic Irrigation System

Year : 1999

Location : Rodrigues

Client: UNDP GEF/SGP

Main Project features : Small scale PV for micro irrigation

Position held: Consultant

Activities performed: Sustainable Agricultural Technologies for Rodrigues: Solar Photovoltaic Irrigation System,

Solar Desalination

Name of assignment: Solar Seawater Desalination in Pre-selected Coastal Villages in Rodrigues

Year : 1998

Location : Rodrigues

Client: UNDP / GEF-SGP

Main Project features : Design and construction of solar stills

Position held: Consultant

Activities performed: Design, construction, installation and performance monitoring

Renewable Energy Technologies for Mauritius

Name of assignment: The State of Renewable Energy Resources Development in Mauritius, consultancy service for UNICO International Corporation (Japan), Industrial Management Consultants, under contact for Japan International Cooperation Agency (JICA).

Year : 1996

Location : Mauritius

Client: UNICO / JICA

Main Project features : Desk Study of all possible options

Position held: Consultant

Activities performed: Assessment and reporting

Page 21: LIST OF COMPLETED & ONGOING PROJECT - srm-consulting.comsrm-consulting.com/pdf/TrackRecords2019.pdf · Name of assignment: Consultancy Services for Locating New Eastern Stone Crusher

21

EIA for power generation plant

Name of assignment: EIA

Year : 1996

Location : Rodrigues

Client: CEB

Main Project features : Noise modeling and simulation

Position held: Consultant

Activities performed: Environment Impact Assessment of the Port Mathurin Power Generation Plant

GHG Implications of various energy strategies for the USA

Name of assignment: Greenhouse Gas implications of various energy strategies for the US economy

Year : 1991

Location : Arligton, Virginia, USA

Client: Applied Energy Services (AES), USA

Main Project features : Modelling and simulation using FOSSIL2

Position held: Consultant

Activities performed: Responsible for a study on the Greenhouse Gas implications of various energy strategies for the US economy