LIST OF COMPLETED & ONGOING PROJECT
Tasks
Description
ISO 14001 Implementation
Name of assignment:
Consultancy Services for the Implementation of an Environment Management System Certifiable to ISO 14001:2015 at Princes Tuna (Mauritius) Ltd
Year : 2019
Location : Riche Terre
Client: Princes Tuna (Mauritius) Ltd
Main Project features : ISO 14001 Implementation
Position held: Consultant/ Team Leader
Activities performed: Implementation of an Environment Management System Certifiable to ISO 14001:2015
Operation of a 135 Keys Senior Services Residence/Tourist Residence
Name of assignment:
Consultancy Services for Application and Follow-Up till Licences and Permits are obtained for the Operation of a 135 Keys Senior Services Residence/Tourist Residence at Grand Baie by the AEGIDE Group
Year : 2019
Location : Grand Baie
Client: AEGIDE Indian Ocean Ltd
Main Project features : Application and Follow up till Licences are obtained
Position held: Consultant/ Team Leader
Activities performed: Application for Tourist Residences Licence , follow up till Licences and permits are obtained .
Environmental and Social Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of Environmental and Social Impact Assessment (ESIA) for a Seismic Survey
Year : 2019
Location : France
Client: CGG Services SAS
Main Project features : Preparation of ESIA Report
Position held: Consultant
Activities performed: Preparation of an ESIA for 2- dimensional offshore seismic research. The seismic study will support potential exploration studies for oil and gas in the future within the territorial waters of Mauritius, being part of the East Africa Regional Survey (EAR).
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Construction of the New Jetty at Ile Mangenie
Year : 2018
Location : Ile Mangenie ,Mauritius
Client: SRL Touessrok Hotel LTS
Main Project features : Preparation of EIA Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for Locating New Eastern Stone Crusher Ltd in the South of Mauritius and depot and Block Making Plant in the North of Mauritius and Preparation of Environmental Impact Assessment (EIA)
Year : 2018
Location : Laventure Head Office
Client: Eastern Stone Crusher Ltd
Main Project features : Preparation of EIA Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready Mix Concrete at Alma
Year : 2018
Location : Alma Mauritius
Client: Pre-Mixed Concrete Ltd
Main Project features : Preparation of PER
Position held: Consultant/ Team Leader
Activities performed: Preparation of a PER to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
2
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of a Preliminary Environmental Report (PER) for the Manufacture of Ready Mix Concrete at a New Plant in Geoffroy
Year : 2018
Location : Geoffroy Mauritius
Client: Pre-Mixed Concrete Ltd
Main Project features : Preparation of PER
Position held: Consultant/ Team Leader
Activities performed: Preparation of a PER to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of an Environmental Impact Assessment (EIA) for Veolia
Year : 2018
Location : Head Office Ebene
Client: Veolia
Main Project features : Preparation of EIA Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an EIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of Environmental and Social Impact Assessment of Two Potential Locations for the Proposed Direct Link LNG Facility for the CEB CCGT Power Station at Fort George Mauritius
Year : 2018
Location : Fort George Mauritius
Client: Gas Natural Fenosa Engineering S.L
Main Project features : Preparation of EIA Report and SIA Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an EIA/SIA to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Consultancy Services for the Preparation of Environmental Impact Assessment Report for the new Hotel Project of 250 Keys at Petite Riviere Noire Bay
Year : 2018
Location : Petite Riviere Noire Bay
Client: Stella Di Mare Mauritius Ltd
Main Project features : Preparation of a EIA Licence
Position held: Consultant/ Team Leader
Activities performed: Preparation of an EIA. to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Variation to the Environmental Impact Assessment (EIA) Licence
Name of assignment:
Variation to the Environmental Impact Assessment Conditions
Year : March 2018
Location : Grand Baie
Client: Vancances Plus Limited
Main Project features : Preparation of a variation to EIA Licence
Position held: Consultant/ Team Leader
Activities performed: Preparation of a variation to EIA Licence to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Management Plan
Name of assignment:
Environmental Management and Monitoring Plan
Year : March 2018
Location : Deschartres Street Port Louis
Client: Transinvest Construction Ltd
Main Project features : Preparation and Submission of Monthly Environmental Reports (EMR) to Authorities
Position held: Consultant/ Team Leader
Activities performed: Preparation of a monthly Environmental management plan to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment.
3
Preliminary Environmental Report
Name of assignment:
Preliminary Environment Reports (PER) for Proposed Plant for the Manufacturing of Fibre Optic Cable
Year : February 2018
Location : Industrial Zone, Trianon
Client: AKSH Technologies Mauritius Ltd
Main Project features : Preparation of a PER Reports
Position held: Consultant/ Team Leader
Activities performed: Preparation of an PER reports to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report / Preliminary Environmental Report/Social Impact Assessment Report
Name of assignment:
Environmental Impact Assessment Reports(EIA) / Preliminary Environment Reports (PER) / Social Impact Assessment Reports (SIA) / Environment management Plans for 6 (six) PDS Projects by Two Futures Ltd and /or associated companies of Two Futures Ltd
Year : December 2017
Location : Grand Baie
Client: Two Futures Ltd
Main Project features : Preparation of an EIA / PER/ SIA Reports
Position held: Consultant/ Team Leader
Activities performed: Preparation of an EIA/PER/SIA reports to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Preliminary Environmental Report
Name of assignment:
Preliminary Environmental Report for the Proposed Green Tea Factory at Dubreuil
Year : December 2017
Location : Dubreuil
Client: Mauristea Investment Co Ltd
Main Project features : Preparation of a Preliminary Environmental Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of a Preliminary Environmental Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment Report for the Proposed Waste Recycling Plant at Riche terre by Veolia Recycling & Environmental services (Mauritius) Ltd
Year : November 2017
Location : Riche Terre
Client: Veolia Recycling & Environmental Services (Mauritius) Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment Report for the Proposed Project for Steam production from Treated Used Cooking Oil by Avantime Ltd
Year : October 2017
Location : Beemanique , Nouvelle France
Client: Avantime Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Preparation of a Traffic Impact Assessment Report
Name of assignment:
Traffic Impact Assessment Report to for the Proposed Aquarium of Port Louis Project
Year : September 2017
Location : Port Louis
Client: Oceanarium (Mauritius) Ltd
Main Project features : Preparation of an Traffic Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Traffic Impact Assessment Report, Traffic counts, traffic modelling and reporting.
4
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment Report for the Proposed 185 Keys Hotel at Baie Du Tombeau by Mauritius Jin Fei Economic Trade and Cooperation Zone Co Ltd
Year : July 2017
Location : Riche Terre , Terre Rouge
Client: Jin Fei Economic Trade and Cooperation Zone Co Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Preparation of Information Paper
Name of assignment:
Artisanal Farming of Crabs at Barachois Anse Bambous
Year : August 2017
Location : Barachois Anse Bambous, Bambous Virieux
Client: Selected Seafood (Mauritius) Ltd
Main Project features : Preparation of an Information Paper
Position held: Consultant/ Team Leader
Activities performed: Preparation of a report to seek clearances for culture of crab from Ministry of Environment and Sustainable Development, Disaster and Beach Management and to various Authorities and Ministry of Ocean Economy, Marine Resources, Fisheries and Shipping
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment Report for the Proposed Photovoltaic Solar Farm project of 4.88 MW Ac at petite riviere
Year : June 2017
Location : Petite Riviere
Client: SPV Petite Riviere Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment Report for the Proposed Solar Farm of 9MW
Year : March 2017
Location : Beau Champ
Client: Helios Beau Champ Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Social Security, National Solidarity, and (Environment and Sustainable Development Division) Department of Environment
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment for the Proposed Photovoltaic Plant of 12.24 MW at Queen Victoria Solar Farm
Year : January 2017
Location : Queen victoria
Client: Voltas Green Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management
Preparation of an Information Paper
Name of assignment:
Environmental Impact Assessment for the Proposed Aquarium of Port Louis Project
Year : December 2016
Location : Port Louis
Client: Oceanarium (Mauritius) Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management
5
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment for the Setting up of an Oyster Farm at Sud Pointe Grande Passe By Mascareignas Oysters ( Mauritius ) ltd
Year : August 2016
Location : Royal Road , Point D’Esny
Client: Mascareignas Oysters ( Mauritius ) ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management. Supervision of works associated to implementation.
Preliminary Environmental Report
Name of assignment:
Preliminary Environmental Report for a Concrete Batching Plant and Lean Mix Batching Plant
Year : May 2016
Location : Coromandel/ Site Airport of Mauritius
Client: Transinvest Construction
Main Project features : Preparation of an Preliminary Environmental Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Preliminary Environmental Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management
Environmental Management and Monitoring Services
Name of assignment:
Environmental Monitoring Report (monthly - 12 months)
Year : April 2016
Location : Coromandel/Site Airport of Mauritius
Client: Transinvest Construction
Main Project features : Preparation
Position held: Consultant/ Team Leader
Activities performed: Preparation of a monthly report (EMR) to the Ministry of Environment and Sustainable Development, Disaster and Beach Management
Environmental Impact Assessment Report
Name of assignment:
Environmental Audit Report
Year : January 2016
Location : Bambous
Client: Premixed Concrete Ltd
Main Project features : Preparation of an Environmental Audit Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Audit Report for site Inspection and Remedial Measures to contain Rain Water Run – off at the P- C plat of Bambous
Environmental Impact Assessment Report
Name of assignment:
Environmental Impact Assessment for Proposed Project “Paille De Canne de Cogénération” at Terragen Ltd
Year : September 2015
Location : Belle Vue Mapou
Client: Terragen Ltd Preparation of an Environmental Impact Assessment Report related to use of cane trash as fuel for cogeneration
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report related to use of cane trash as fuel for cogeneration
Environmental Management and Monitoring Services
Name of assignment: Environmental Management and Monitoring Services in connection with the replacement of Boilers and Upgrade of Electricity Co- generation
Year : May 2015
Location : Bambous/ Medine/ Mauritius
Client: The Medine Sugar Milling Company Limited
Main Project features : Environmental Management and Monitoring Services during Construction phase
Position held: Team Leader/Consultant
Activities performed: Preparation of a monthly report (EMP) for the Ministry of Environment and Sustainable Development, Disaster and Beach Management
Traffic Impact Assessment Report
Name of assignment: Traffic Impact Assessment Report for the Proposed Project for the Construction of a Mixed Use Building
Year : May 2015
Location : Port Louis /Mauritius
Client: Kwong & Fok Associates Ltd
Main Project features : Preparation of a Traffic Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of a Trafficl Impact Assessment Report, Traffic counts, traffic modelling and reporting.
6
Environmental Impact Assessment Report
Name of assignment: Environmental Impact Assessment Report for the Proposed Project for the Construction of a Mixed Use Building
Year : May 2015
Location : Port Louis /Mauritius
Client: Kwong & Fok Associates Ltd
Main Project features : Preparation of an Environmental Impact Assessment Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of an Environmental Impact Assessment Report to the Ministry of Environment and Sustainable Development, Disaster and Beach Management
Environmental Monitoring and Management Plan
Name of assignment: Environment Monitoring and Management at Mauritius Container Terminal Project Site
Year : January 2015 (ongoing)
Location : Mer Rouge Port Louis
Client: Strabag- Archirodon
Main Project features : Supervision of Environment Monitoring and Management Plan
Position held: Consultant/ Team Leader
Activities performed: Assist in the Preparation of the Construction Environmental Management Plan (CEMP) for the construction phase Environmental Monitoring : Marine (Ecology) Ecosystem Environmental Monitoring: Marine (Sea) Water Quality Environmental Monitoring: Marine Sediment Sieve Analysis Environmental Monitoring: Water Birds Environmental Monitoring: Noise Environmental Monitoring: Air Quality
Social Impact Assessment and Social Need Study
Name of assignment: Social Impact Assessment and Social Need Study
Year : January 2015 (ongoing)
Location : Mont Choisy /Mauritius
Client: Mont Choisy Property Development Ltd ( IRS Project)
Main Project features : Social Consultations and Preparation of Social Programme for Investment
Position held: Consultant/ Team Leader
Activities performed: Preparation of Social Programme for Investment
Environmental Management and Monitoring Services
Name of assignment: Environmental Management and Monitoring Services
Year : August 2014 (ongoing)
Location : Plaine des Roches Ltd /Mauritius
Client: Eole de Plaine des Roches Ltd
Main Project features : Environmental Management and Monitoring Services during Construction of the 17.85 MW Wind Farm by EOLE de Plaine des Roches
Position held: Consultant/ Team Leader
Activities performed: Preparation of a monthly report for the Ministry of Environment and Sustainable Development
Preliminary Environmental Report
Name of assignment: Preliminary Environmental Report (PER)for Proposed Construction of New Island Brush Factory at Saint Antoine Goodlands
Year : May 2014
Location : Goodlands/ Mauritius
Client: Island Brush Company Ltd
Main Project features : Preparation on a Preliminary Environmental Report
Position held: Consultant/ Team Leader
Activities performed: Preparation of Preliminary Environmental Report to the Ministry of Environment and Sustainable Development
Environment Management System (EMS)
Name of assignment: Implementation of Environment Management System (EMS) ISO 14001: 2004
Year : 2014
Location : Beau Climat/ Mauritius
Client: Innodis Ltd
Main Project features : Implementation of Environment Management System (EMS) ISO 14001: 2004
Position held: Team Leader/ Consultant
Activities performed: Identify all procedures, Guide and Coordinate the preparation of the necessary documentation of the EMS to ISO 14001: 2004; provide training on Environment Management to all personnel, and preparation of monthly environment monitoring reports.
Consultancy Services For the Setting Up of a Vehicle Examination Station at Laventure.
Name of assignment: Vehicle Examination Station at Laventure
Year : May 2014 (ongoing)
Location : Laventure, Flacq/Mauritius
Client: Eastern Stone Crusher Ltd
Main Project features : Feasibility and Implementation of the Vehicle Examination Station at Laventure
Position held: Team Leader/ Consultant
Activities performed: Advisory on all aspects consisting of construction regulatory, training, finance and promotion
7
Compliance to EP and IFC’s Guidelines
Name of assignment: Project Review Compliance to Equator Principles and IFC’s Guidelines
Year : January 2014
Location : Plaine Sophie /Mauritius
Client: Consortium Suzlon – Padgreen Co Ltd
Main Project features : Review Compliance to Equator Principles, IFC’s EHS Guidelines and IFC’s Performance Standards on Environmental and Social Sustainability
Position held: Consultant
Activities performed: Preparation of a Review Compliance to the proposed Wind Farm Project at Plaine Sophie
Environmental Impact Assessment Report
Name of assignment: Preparation of EIA Report and BLUP in connection with the replacement of Boilers and Upgrade of Electricity Co- generation
Year : January 2014 (ongoing)
Location : Bambous/ Medine/ Mauritius
Client: The Medine Sugar Milling Company Limited
Main Project features : Environmental Impact Assessment and Building and Land Use Permit
Position held: Team Leader/Consultant
Activities performed: Preparation of Environmental Impact Assessment report to the Ministry of Environment and Sustainable Development and application for Building and Land Use Permit.
Amendment to EIA License
Name of assignment: Block Making and Concrete Plant
Year : 2013
Location : Beemanique, Nouvelle France/Mauritius
Client: La Rocaille Ltee/ Beemanique Nouvelle France
Main Project features : Environmental Impact Assessment
Position held: Team Leader/ Consultant
Activities performed: Preparation of report to the Ministry of Environment and Sustainable Development
Environmental Monitoring Plan
Name of assignment: Preparation of EMP
Year : 2013 (Ongoing)
Location : Plaine Sophie/Mauritius
Client: Consortium Suzlon - Padgreen Co Ltd
Main Project features : Environmental Monitoring Plan
Position held: Consultant
Activities performed: Environmental Monitoring for the MW14 Wind Turbines at Plaine Sophie
EIA Compliance and Additional Information to Environmental Management Plan
Name of assignment: EIA Compliance and Additional Information for the Environmental Management Plan
Year : 2013
Location : Baie Du Cap/Mauritius
Client: Maconde Lime Co Ltd
Main Project features : Analysis of test results and recommendations for improvement
Position held: Consultant
Activities performed: Preparation of regular reports for the Ministry of Environment and Sustainable Development
Amendment to EIA License
Name of assignment: Proposed Project for the Construction and Operation of a Wind Farm at Plaine des Roches
Year : 2013
Location : Plaine des Roches/ Mauritius
Client: Aerowatt (Mauritius) Ltd
Main Project features : Preparation on an amendment report
Position held: Consultant
Activities performed: Preparation of an EIA report to the Ministry of Environment and Sustainable Development
Application for Water Resources Unit Clearance
Name of assignment: Proposed Real Estate Project
Year : 2013
Location : Black River/ Mauritius
Client: Turnkey Management Ltd
Main Project features : Solving environmental problems associated to the RES project
Position held: Consultant
Activities performed: Consultation with Water Resources Unit, Preparation of a report detailing the acceptable option for evacuating treated waste water from the site and getting the Water Resources Unit’s approval for same.
Preliminary Environmental Report
Name of assignment: Proposed Installation of a Temporary Semi-Mobile Ready-Mix Concrete Batching Plant
Year : 2013
Location : Alma, Moka/ Mauritius
Client: Pre-Mixed Concrete Ltd
Main Project features : Preparation on a PER Report
Position held: Consultant
Activities performed: Preliminary Environmental Report and Public Consultations, and audits.
8
Environmental Impact Assessment
Name of assignment: Proposed Project for the Setting up of a Pyrolysis Plant for Recycling Scrap Tyre/Rubber and Plastic
Year : 2012 (ongoing)
Location : Beemanique, Nouvelle France/ Mauritius
Client: Sujoy Vishnu Enterprise (Mtius) Ltd
Main Project features : Preparation on an EIA Report
Position held: Team Leader
Activities performed: Environmental Impact Assessment Report
Modelling and Simulating and Compilation of findings
Name of assignment: Preparation of EIA Report
Year : 2012
Location : Plaine Sophie/ Mauritius
Client: Consortium Suzlon - Padgreen Co Ltd
Main Project features : Preparation of EnvironmReport
Position held: Consultant
Activities performed: Preparation of EIA Report
Environmental Impact Assessment
Name of assignment: EIA for Proposed Stone Crushing and Block Making Plant
Year : 2012
Location : Bon Air, Fond du Sac/ Mauritius
Client: Eastern Stone Crusher Ltd
Main Project features : Preparation on an EIA Report
Position held: Team Leader
Activities performed: Environmental impact analysis and monthly reporting during construction
Traffic Impact Assessment Report .
Name of assignment: Traffic Impact Assessment Report for the proposed Vehicle Examination Station at Laventure
Year : 2012
Location : Laventure, Flacq/Mauritius
Client: Eastern Stone Crusher Ltd
Main Project features : Preparation on a Traffic Impact Assessment Report for the Vehicle Examination Station at Laventure
Position held: Team Leader
Activities performed: Preparation of a Trafficl Impact Assessment Report ,traffic counts, traffic modelling and reporting.
Traffic modelling and simulation, impact analysis and reporting.
Name of assignment: EIA Reports for the proposed Vehicle Examination Station at Laventure
Year : 2012 (ongoing)
Location : Laventure, Flacq/Mauritius
Client: Eastern Stone Crusher Ltd
Main Project features : Preparation on an EIA and TIA report s for the Vehicle Examination Station at Laventure
Position held: Team Leader
Activities performed: Traffic counts, traffic modelling, environmental impact analysis and reporting.
Traffic Impact Assessment report.
Name of assignment: Traffic Impact Assessment Report for the proposed Vehicle Examination Station at Forest Side
Year : 2012
Location : Forest Side, Curepipe/ Mauritius
Client: Eastern Stone Crusher Ltd
Main Project features : Preparation on a TIA report s for the Vehicle Examination Station at Forest Side
Position held: Team Leader
Activities performed: Preparation of a Trafficl Impact Assessment Report ,traffic counts, traffic modelling, and reporting.
Environment Impact Assessment
Name of assignment: EIA Report for the proposed Vehicle Examination Station at Forest Side
Year : 2012
Location : Forest Side, Curepipe/ Mauritius
Client: Eastern Stone Crusher Ltd
Main Project features : Preparation on an EIA and TIA report s for the Vehicle Examination Station at Forest Side
Position held: Team Leader
Activities performed:
Pollution load calculation and design of mitigation measures, liaison with Ministry of Environment, assistance in implementation of complete solution.
Name of assignment: Air Pollution Abatement
Year : 2012
Location : Baie Du Cap/ Mauritius
Client: Maconde Lime Co Ltd
Main Project features : Pollution Abatement measures,Calculation of air pollution loads and mitigation measures
Position held: Team Leader
Activities performed: Load calculation, design and liason with Ministry of Environment
9
Environment Impact Assessment
Name of assignment: Preparation of an EIA and TIA Reports
Year : 2011
Location : Near Bulk Sugar Terminal Les salines/ Mauritius
Client: Neotown Les Salines Development Ltd
Main Project features : Modeling of Environmental impacts and analysis including Traffic Implications of the proposed Scheme
Position held: Team Leader
Activities performed: Impact analysis and mitigation.
Leading a team of Consultants for an FSP GEF project
Name of assignment: Energy Efficiency in Moroccan Manufacturing Sector
Year : 2011
Location : Rabat, Morocco
Client: African Development Bank
Main Project features : GEF FSP Project formulation
Position held: Team Leader
Activities performed: Project Conceptualisation and Formulation
Modelling and Simulation and Compilation of findings
Name of assignment: Preparation of EIA Report
Year : 2011
Location : Mauritius
Client: Aerowatt
Main Project features: Environmental Impact Assessment
Position held: Team Leader
Activities performed: Modelling of Environmental impacts for 18 MW Wind Farm
Environmental Monitoring Services
Name of assignment: Environmental Monitoring and Reporting
Year : 2010
Location : Mauritius
Client: China State Construction Engineering Corporation SSR International Airport Expansion project
Main Project features : Environmental Services
Position held: Environmental Consultant
Activities performed: Environmental Monitoring and Reporting to Ministry of Environment and Sustainable Development
Modelling and Simulation and Compilation of findings
Name of assignment: Preparation of EIA Report
Year : 2010
Location : Mauritius
Client: La Rocaille Ltee/ Beemanique Nouvelle France
Main Project features : Environmental Impact Assessment
Position held: Team Leader
Activities performed: Environmental impacts analysis for the operation of an Existing Stone Crushing Plant and the Setting up of a Block Making Plant, a Bitumen Plant and a Concrete Mixing Plant
Modelling and Simulation and Compilation of findings
Name of assignment: Preparation of EIA Report
Year : 2010
Location : Mauritius
Client: Ministry of Health & Quality of Life
Main Project features: Environmental Impact Assessment
Position held: Team Leader
Activities performed: EIA for the Installation of a medical waste incinerator at J. Nehru Hospital
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Mauritius
Client: Entreprise Mauritius & AHRIM
Main Project features : Energy Audit and Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Pointe aux Sables
Client: Berque Ltee
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Port Louis
Client: Data Communications Ltd
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
10
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : St Pierre
Client: Fit U Garment Ltd
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Forest Side
Client: Prest Plastics Ltd
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Industrial Zone, Phoenix
Client: Ramdenee Edible Oil Products Ltd
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Riche Terre
Client: Filao Limitee
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Energy Auditing
Name of assignment: Energy Management for Efficiency
Year : 2010
Location : Pailles
Client: ABC Motors Co Ltd
Main Project features : Energy Management
Position held: Consultant
Activities performed: Energy Management Consultancy
Modelling and Simulation and Compilation of findings
Name of assignment: Preparation of EIA Report
Year : 2009
Location : Mauritius
Client: Apavou Hotels
Main Project features: Environmental Impact Assessment
Position held: Head of Team of Consultant
Activities performed: Preparation of Environmental Impact Assessment Report for the Extension of Indian Resort & Spa for the Apavou Group.
Electricity Cost Cutting through Energy Efficient Lighting Systems
Name of assignment: Energy Management through better Lighting
Year : 2009
Location : Mauritius
Client: Participants from industry (Mauritius)
Main Project features : Energy Management
Position held: Consultant
Activities performed: Course Design and Delivery
Energy Cost Cutting at 15 branches of the Mauritius Commercial Bank Ltd.
Name of assignment: Energy Efficiency in Buildings
Year : 2009
Location : Mauritius
Client: Mauritius Commercial Bank Ltd (MCB)
Main Project features : Energy Management
Position held: Project Director
Activities performed: Energy Auditing and Project Management
Traffic Impact Assessment (TIA) for the Construction of a Commercial Village at Riviere du Rempart and a business park at Beau Sejour
Name of assignment: Traffic Impact Assessment
Year : 2009
Location : Mauritius
Client: Indian Ocean Real Estate Company (IOREC)
Main Project features : Traffic Impact Assessment
Position held: Consultant
Activities performed: Traffic count and preparation of TIA report
11
Consultancy services for Energy Cost Cutting at the 5 Apavou Hotels in Mauritius (lighting energy efficiency, air conditioning energy efficiency and solar water heating systems)
Name of assignment: Energy Efficiency in Hotel Sector
Year : 2009
Location : Mauritius
Client: Apavou Hotels
Main Project features : Energy Management
Position held: Project Director
Activities performed: Energy Auditing and Project Management
Consultancy services for Energy Cost Cutting through efficient lighting
Name of assignment: Efficient Lighting for Cost Control
Year : 2009
Location : Mauritius
Client: Tee sun Co Ltd (Palmar Group)
Main Project features : Energy Management
Position held: Technical Consultant
Activities performed: Energy Auditing and Project Manangement
Energy Efficiency
Name of assignment: Solar Water Heaters in Mauritius
Year : 2009
Location : Mauritius
Client: Ministry of Renewable Energy and Public Utilities under the authority of the United Nations Development program
Main Project features : Evaluation of the Grand scheme, application product standards and advice of on how to further increase the usage of SWH in Mauritius
Position held: National Consultant
Activities performed: Baseline data collection, assist in meeting key stakeholders, draft and finalise report.
Modelling and Simulation and Compilation of Findings
Name of assignment: Preparation of EIA Report
Year : 2009
Location : Rodrigues, Mauritius
Client: Var Investment Ltd
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Preparation of Environmental Impact Assessment report for the construction of a beach hotel in Rodrigues, including desalination waste water systems.
Comprehensive Course for Energy Managers
Name of assignment: Course on Energy Energy Management
Year : 2008
Location : Mauritius
Client: Participants from industry
Main Project features : BS EN Standard for Energy Management
Position held: Trainer
Activities performed: Course Design and Delivery
Market study and definition of the terms and conditions of a credit line dedicated to sustainable energy and environmental performance investments in Mauritius
Name of assignment: Setting up of AFDs credit line dedicated to sustainable energy and environmental
Year : 2008
Location : Mauritius
Client: Ernst & Young Ltd
Main Project features : Market Study
Position held: Consultant
Activities performed: Identify all eco-industries acting in Mauritius in the waste, water and energy sectors
EIA for a facility for used oil collection, storage, Re-refining and combustion including post combustion gas cleaning.
Name of assignment: Preparation of EIA Report
Year : 2008
Location : Mauritius
Client: Star Ecoenergy Ltd
Main Project features : Re-refining of Used Oil
Position held: Consultant
Activities performed: Facilitate implementation of used oil re-refining facility, EIA
Implementation of a food safety management system based on HACCP principles
Name of assignment: HACCP Implementation
Year : 2008
Location : Mauritius
Client: SOPHALCO Ltd
Main Project features : HACCP Implementation
Position held: Trainer/ Consultant
Activities performed: Implementation of food safety procedures
Environment review at 3 project sites in the district of Riv du Rempart at Beau Sejour, Mon Loisir and Haute Rive
Name of assignment: Initial Environmental Review
Year : 2008
Location : Mauritius
Client: ACTIS Ltd (UK)
Main Project features : Initial Environment Review of the Azuri project
Position held: Consultant
Activities performed: Preparation of Environmental Audit Report
12
Social Impact Assessment for the 34 villas IRS project at Bel Ombre
Name of assignment: Preparation of the Social Impact Assessment Report
Year : 2008
Location : Mauritius
Client: Belle Riviere Estate
Main Project features : Social Impact Assessment
Position held: Consultant
Activities performed: Preparation of the Social Impact Assessment Report
Implementation of a food safety management system based on ISO 22000
Name of assignment: ISO 22 000 standard implementation
Year : 2008
Location : Mauritius
Client: Constance Lemuria Resorts (Seychelles)
Main Project features : ISO 22000 Implementation
Position held: Team Leader
Activities performed: Implementation of ISO 22000 Standard
Conduct Market Study For Intertek Ltd for Food and Environment Testing
Name of assignment: Market Study
Year : 2008
Location : Mauritius
Client: Intertek (Mauritius) Limited
Main Project features : Market Study
Position held: Consultant
Activities performed: Market Study for the Implementation of a Food and Environmental Testing Laboratory by Intertek (Mauritius) Ltd
Follow up of ex- employees engaging in small businesses
Name of assignment: Business Plan Formulation
Year : 2008
Location : Mauritius
Client: British American Tobacco PLC
Main Project features : Employee Redeployment Programme Phase II
Position held: Project Director
Activities performed: Follow up of ex-employees engaging in small businesses
Environmental Impact Assessment
Name of assignment: EIA Report Preparation
Year : 2007
Location : Mauritius
Client: Sagar Hotels & Resorts Ltd
Main Project features : Environmental Impact Assessment
Position held: EIA Consultant
Activities performed: Environmental Impact Assessment for the creation of swimming zones and beach reprofiling in front of the Blue Ocean Park Hotel as well as the construction of a jetty, desalination waste water systems
Environmental Impact Assessment
Name of assignment: EIA Report Preparation
Year : 2007
Location : Mauritius
Client: Sagar Hotels & Resorts Ltd
Main Project features : Environmental Impact Assessment
Position held: EIA Consultant
Activities performed: Environmental Impact Assessment for the construction and operation of a beach restaurant attached to the Blue Ocean Park Hotel.
EMS Implementation
Name of assignment: EMS Implementation
Year : 2007
Location : Mauritius
Client: One and Only Le Saint Geran Hotel
Main Project features : Green Globe 21 Implementation
Position held: Consultant
Activities performed: Consultancy Services for the implementation of an Environmental Management System based on Green Globe 21 standard
Environmental Impact Assessment
Name of assignment: EIA Report Preparation
Year : 2007
Location : Mauritius
Client: Chilipoint Ltd
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for the operation of a beach hotel comprising of 39 rooms at Pointe aux Piments
13
Alternative Fuels
Name of assignment: Assist Total Mauritius Limited in fuel switch- over management on client sites
Year : 2007
Location : Mauritius
Client: Total Mauritius Limited
Main Project features : Consultancy services/ Environment Assessment
Position held: Consultant
Activities performed: Assistance to TOTAL MAURITIUS in connection with environmental implications of fuel switching for industrial client sites
Environment Reporting
Name of assignment: Internal Audit and preparation of the Maurilait Environmental Report
Year : 2007
Location : Mauritius
Client: Maurilait Production Ltee
Main Project features : Environment Reporting
Position held: Team Leader/Consultant
Activities performed: Consultancy services for assistance to participate in the Environmental Reporting Award of the Ministry of Environment
ISO 14001:2004 Implementation
Name of assignment: EMS Implementation
Year : 2007
Location : Mauritius
Client: Alcodis Ltd
Main Project features : ISO 14001:2004 Implementation
Position held: Team Leader/ Consultant
Activities performed: Consultancy services for the implementation of a Environmental Risk Management System
Environment Assessment
Name of assignment: Assessment of the various pollution sources and propose corrective measures
Year : 2007
Location : Mauritius
Client: Alcodis Ltd
Main Project features : Consultancy services/ Environment Assessment
Position held: Consultant
Activities performed: Assist in management of various environmental concerns at the Rose Belle ethanol plant
ISO 9001: 2000 Implementation
Name of assignment: QMS Implementation
Year : 2007
Location : Madagascar
Client: SATIM (Mauritius)
Main Project features : ISO 9001:2000 Implementation
Position held: Team Leader
Activities performed: Consultancy services for the implementation of a Quality Assurance System
Implementation of a Data Collection System
Name of assignment: FAD Fishery Data Collection, Management and Analysis
Year : 2007
Location : Mauritius
Client: FAD / Ministry of Agro-Industry and Fisheries
Main Project features : Data Collection System Implementation
Position held: Head Consultant
Activities performed: A system of data collection, processing, analysis and monitoring for the FAD fishery
Environmental Impact Assessment for a Coal Water Slurry Production Plant
Name of assignment: EIA Report
Year : 2006
Location : Mauritius
Client: Avantime Ltd
Main Project features : Environmental Impact Assessment
Position held: Head Consultant
Activities performed: Pioneer Status Certificate and Environmental Impact Assessment for the Production, Distribution, Combustion of Coal Water Slurry (CWS) including Post-Combustion Gas Cleaning
Preliminary Environmental Report for proposed petrol service station
Name of assignment: Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Caltex
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environmental Report for the proposed petroleum retail outlet at La Vigie on the Motorway
14
Preliminary Environmental Report
Name of assignment: Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Rocki Mtius Ltd
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environmental Report for proposed project for the setting up of an Art Glassmaking Factory & Shop at Trou aux Biches
Preliminary Environmental Report
Name of assignment: Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Paris Belle Epoque (Gleeds Ltd)
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environmental Report for the proposed construction of 24 Housing Unit at Curepipe
Preliminary Environmental Report
Name of assignment: Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Admiral Court Ltd (Gleeds Ltd)
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environment Report for the construction of a residential complex at Bain Boeuf
Preliminary Environmental Report
Name of assignment: PER Preparation
Year : 2006
Location : Mauritius
Client: Solid Waste Recycling Co Ltd
Main Project features : Preliminary Environmental Report
Position held: Head Consultant
Activities performed: Consultancy Services for the proposed investment project for large scale composting of organic waste including un-segregated municipal solid waste in Mauritius including Preliminary Environment Report and Marketing Plan
Preliminary Environmental Report
Name of assignment: Complete Study and Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Caltex
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environment Report for the complete renovation of the petroleum retail outlet at Curepipe
Preliminary Environmental Report
Name of assignment: Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Peche Mignon Ltee
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environment Report for a proposed bakery project at Tamarin
Preliminary Environmental Report
Name of assignment: Complete Study and Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Bonne Terre Home for the Elderly
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environment Report for the renovation of a home for the elderly
Preliminary Environmental Report
Name of assignment: Complete Study and Preliminary Environment Report
Year : 2006
Location : Mauritius
Client: Texpull Ltd
Main Project features : Preliminary Environmental Report
Position held: Consultant
Activities performed: Preliminary Environment Report for a textile knitting unit with 50 machines
15
Feasibility Study
Name of assignment: Business Planning
Year : 2005
Location : Mauritius
Client: Pharmacy Seegobin
Main Project features : Feasibility Study
Position held: Team Leader
Activities performed: Feasibility and opportunity study of a new Pharmacy including survey of potential customers
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2005
Location : Mauritius
Client: Caltex (Mauritius) Ltd, Mare D’Australia
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for the proposed petroleum retail outlet at Mare D’Australia
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2005
Location : Mauritius
Client: Caltex (Mauritius) Ltd, St Julien
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for the proposed petroleum retail outlet at St Julien
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2005
Location : Mauritius
Client: Les Entreprise Phi Ltee
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for the construction of a residential complex of 82 Housing Units at Belle Rose
Preliminary Environmental Report
Name of assignment: PER
Year : 2005
Location : Mauritius
Client: Soeur de Charite of Belle Rose
Main Project features : Preliminary Environment Report
Position held: Consultant
Activities performed: Preliminary Environment Report for the extension and renovation of a residential home for the elderly
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2005
Location : Mauritius
Client: Super Construction Co. Ltd
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for a luxury housing project at Grand Bay
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2005
Location : Mauritius
Client: Challeng’hair Ltd
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for the construction and operation of a clinic for hair grafting at Trou aux Biches
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2005
Location : Mauritius
Client: Societe de l’Horizon
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for the construction of 83 housing units
16
ISO 14001: 2004 Gap Analysis
Name of assignment: EMS Implementation
Year : 2005
Location : Madagascar
Client: SACIMEM (Antsirabe)
Main Project features : ISO 14001:2004 Gap Analysis
Position held: Team Leader
Activities performed: System Audit with respect to ISO 14001:2004
ISO 14001: 2004 Gap Analysis
Name of assignment: EMS Implementation
Year : 2005
Location : Mauritius
Client: SITAM (Majunga)
Main Project features : ISO 14001:2004 Gap Analysis
Position held: Team Leader
Activities performed: System Audit with respect to ISO 14001:2004
ISO9001:2000 Implementation
Name of assignment: QMS Implementation
Year : 2005
Location : Mauriitus
Client: State Insurance Corporation of Mauritius
Main Project features : ISO 9001:2000
Position held: Team Leader
Activities performed: Maintenance and upgrading of the Quality Management System
Energy Efficiency
Name of assignment: Energy Efficiency in Building in Mauritius
Year : 2005
Location : Mauritius
Client: UNDP
Main Project features : Determination of the status of Energy Efficiency and Energy Conservation in Buildings in the Republic of Mauritius
Position held: National Consultant
Activities performed: The identification of a baseline; Identified barriers and their root causes and their classification in order of severity; Identified project activities, outputs and costs for all components identified under a work plan; presented matrix of baseline and incremental costs; presented project budget as per UNDP-GEF format, including identification of sources of funding; designed project institutional framework/implementation mechanism and the work plan; finalise MSP project brief in GEF format
ISO 9001:2000 And ISO 14001:2004
Name of assignment: Joint EMS and QMS Implementation
Year : 2004-2005
Location : Mauritius
Client: British American Tobacco
Main Project features : ISO 9001:2000 and ISO 14001:2004
Position held: Team Leader
Activities performed: Maintenance and Monitoring of Management System (Quality and Environment)
Environmental Impact Assessment
Name of assignment: Environmental Impact Assessment Report
Year : 2004-2005
Location : Mauritius
Client: MMC International Ltd
Main Project features : Environmental Impact Assessment
Position held: Consultant
Activities performed: Environmental Impact Assessment for proposed plant for the manufacture of Tile Adhesives
Green Globe 21
Name of assignment: EMS Implementation
Year : 2004
Location : Mauritius
Client: Le Prince Maurice
Main Project features : Green Globe 21
Position held: Trainer/Team Leader
Activities performed: Benchmarking for Green Globe Certification
HACCP Implementation
Name of assignment: HACCP
Year : 2004
Location : Mauritius
Client: Le Prince Maurice
Main Project features : HACCP implementation
Position held: Team Leader
Activities performed: Gap Analysis and identification of Hazard Analysis Critical Control Points
17
Strategic Environmental Impact for Agricultural Diversification Study
Name of assignment: Strategic Environment Assessment
Year : 2004
Location : Mauritius
Client: Mauritius Chamber of Agriculture
Main Project features : Agricultural Diversification Study
Position held: Team Leader
Activities performed: Strategic Environmental Assessment (SEA) of 3 production systems (potato, deer and palm)
Project Concept Development
Name of assignment: Concept Development
Year : 2004
Location : Rodrigues
Client: CEB Staff Association
Main Project features : Project concept development
Position held: Consultant
Activities performed: Project concept development and environmental planning for proposed Camp de Vacances in Rodrigues Island
ISO 9001:2000 Implementation
Name of assignment: QMS Implementation
Year : 2004
Location : Mauriitus
Client: State Insurance Corporation Of Mauritius
Main Project features : ISO 9001:2000 Implementation
Position held: Consultant
Activities performed: Consultancy services for the implementation of a Quality Assurance System
Preliminary Environmental Report
Name of assignment: PER
Year : 2004
Location : Mauritius
Client: Indian Oil (Mauritius) Ltd
Main Project features : Preliminary Environment Reports for 7 petroleum retail outlets
Position held: Consultant
Activities performed: Mini-Environmental Impact Assessment together with traffic impact studies carried out at 7 locations namely at: Chemin Grenier, Bonne Terre, Quatre Bornes, L’Amitie, Centre de Flacq, Terre Rouge, Petite Riviere
Environment Information System
Name of assignment: Local Coordination for EIS project
Year : 2003-2004
Location : Mauritius
Client: Ministry of Environment
Main Project features : Environment Information System
Position held: Team Leader
Activities performed: Development of an Environment Information System for the Ministry of Environment in association with SMEC
Training and Capacity Building
Name of assignment: Capacity Building
Year : 2003
Location : Mauritius
Client: Pad & Co. Ltd
Main Project features : Training and Capacity Building
Position held: Trainer
Activities performed: Employee Skills Enhancement Project
ISO 9001:2000 Implementation at Mauritius Telecom
Name of assignment: QMS Implementation
Year : 2003
Location : Mauritius/Rodrigues
Client: Mauritius Telecom Group
Main Project features : ISO 9001:2000 Implementation
Position held: Consultant
Activities performed: Consultancy services for the implementation of a Quality Assurance System in the following branches: Mauritius Telecom Ltd, Cellplus Ltd, Telecom Plus Ltd, Teleservices Ltd, Mauritius Telecom (Rodrigues) Ltd
Biomass Assessment
Name of assignment: Biomass Resource Assessment
Year : 2003
Location : Mauriitus
Client: SOPAC (South Pacific Applied Geosciences Commission)
Main Project features : Biomass Assessment
Position held: Team Leader
Activities performed: Regional Biomass Assessment for six pacific islands and preparation of a strategy for biomass resource management
18
Assessment of Fish Aggregation Devices
Name of assignment: Assessment of Technology
Year : 2003
Location : Rodrigues
Client: FAD / Ministry of Fisheries
Main Project features : Assessment of Fish Aggregation Devices in Mauritius and Rodrigues
Position held: Consultant
Activities performed: Survey of fishers and Economic/Environmental Impact Assessment of FAD technology
Cogeneration Assessment
Name of assignment: Improved Bagasse Cogeneration in Mauritius for Enhanced Carbon Savings
Year : 2002
Location : Mauritius
Client: NEDO, Japan
Main Project features : Feasibility Report
Position held: Consultant
Activities performed: Assess Bagasse Cogeneration in Mauritius
PDF A application for funding
Name of assignment: Application for Funding
Year : 2002
Location : Mauriitus
Client: United Nations Development Programme
Main Project features : PDF A application for funding
Position held: Team Leader
Activities performed: Electrification of Agalega Island using Biofuels from Coconut
Survey on Domestic Electricity Consumption
Name of assignment: Domestic Energy Savings
Year : 2002
Location : Rodrigues
Client: Rodrigues Council of Social Services
Main Project features : Survey on Domestic Electricity Consumption
Position held: Team Leader
Activities performed: Opportunities for domestic energy savings in Rodrigues – Impact of the introduction of CFLs
Flash Diagnosis
Name of assignment: Enterprise Diagnosis
Year : 2002
Location : Mauritius
Client: Fast Fit / Quad Printers / Island Sports/Cover Craft
Main Project features : Flash Diagnosis
Position held: Head of Team
Activities performed: Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance
ISO 14001:2004 Implementation
Name of assignment: EMS Implementation
Year : 2002
Location : Mauriitus
Client: Southern Textile Ltd
Main Project features : ISO 14001:2004 Implementation
Position held: Consultant
Activities performed: Consultancy services for the implementation of an Environment Management System
ISO 9001:2000 Implementation
Name of assignment: QMS Implementation
Year : 2002
Location : Mauritius
Client: Prosimex Ltd / Unicorn Ltd / Alpha Cleaning Ltd
Main Project features : ISO 9001:2000 Implementation
Position held: Consultant
Activities performed: Consultancy services for the implementation of a Quality Assurance System
Seaweed Farming in Rodrigues
Name of assignment: New Farming Systems
Year : 2002
Location : Rodrigues
Client: Ministry of Fisheries
Main Project features : Seaweed Farming in Rodrigues
Position held: Consultant
Activities performed: Feasibility and site identification together with Environmental Impact Identification
Feasibility report on Bagasse cogeneration
Name of assignment: Cogeneration with Sugarcane Biomass
Year : 2001
Location : Mauriitus
Client: National Renewables Energy Laboratory, USA
Main Project features : Feasibility report
Position held: Consultant
Activities performed: Feasibility for Bagasse utilisation in Cogeneration
19
ISO 14001:2004 Implementation
Name of assignment: EMS Implementation
Year : 2001
Location : Mauritius
Client: Queenswear Ltd
Main Project features : ISO 14001:2004 Implementation
Position held: Team Leader
Activities performed: Consultancy services for the implementation of an Environment Management System
ISO 9001:2000 Implementation
Name of assignment: QMS Implementation
Year : 2001
Location : Mauriitus
Client: Data Communications Limited / Il Moro Di Venezia Ltee / PAD & Co Ltd / Bonny Air Travel and Tours Ltd
Main Project features : ISO 9001:2000 Implementation
Position held: Team Leader
Activities performed: Consultancy services for the implementation of a Quality Assurance System
Economic Impact Assessment
Name of assignment: Modeling and Calculation of Economic Rate of Return
Year : 2001
Location : Mauriitus
Client: Montgomery Watson (UK)
Main Project features : Economic Impact Assessment for Plaines Wilhems Sewerage
Position held: Team leader
Activities performed: Performed an Economic Impact Assessment of the Plaines Wilhems Sewerage Project
Environment Planning
Name of assignment: EMP
Year : 2001
Location : Rodrigues
Client: Pleasure Bay Ltd
Main Project features : Environmental planning of proposed hotel in Rodrigues
Position held: Consultant
Activities performed: Environmental planning and facilitation of licenses of a proposed 44 room hotel project in Rodrigues Island
EIA
Name of assignment: EIA
Year : 2001
Location : Mauritius
Client: Italpro Ltd
Main Project features : Environmental Impact Assessment for Wine Factory
Position held: Consultant
Activities performed: Complete EIA report preparation to granting of EIA licence for a proposed wine factory
EMS Implementation
Name of assignment: EMS Implementation
Year : 2001
Location : Mauritius
Client: Esquel Group (Textile Industries Ltd)
Main Project features : ISO 14001:2004 Implementation
Position held: Consultant
Activities performed: Consultancy services for implementation of an Environment Management System
QMS Implementation
Name of assignment: QMS
Year : 2000
Location : Mauritius
Client: Green Cross Medical Laboratory
Main Project features : ISO 9002:1994 Implementation
Position held: Consultant
Activities performed: Consultancy services for implementation of a Quality Assurance System
Workshop
Name of assignment: Workshop
Year : 2000
Location : Mauritius
Client: Association Hôteliers et Restaurateurs de L'île Maurice
Main Project features : Solid Waste Management System
Position held: Trainer
Activities performed: Seminar on Solid Waste Management System for personnel & maintenance managers of over 20 beach resort hotels in Mauritius
20
QMS Implementation
Name of assignment: QMS Implementation
Year : 2000
Location : Mauritius
Client: Universal Fabrics Ltd
Main Project features : ISO 9001:2000 Implementation
Position held: Consultant
Activities performed: Consultancy services for implementation of Quality Assurance System
EMS Implementation
Name of assignment: Implementation of EMS
Year : 2000
Location : Mauritius
Client: Esquel Group (Leisure Garments)
Main Project features : ISO 14001:2004 Implementation
Position held:
Activities performed: Consultancy services for implementation of Environment Management System
Industrial Energy Efficiency
Name of assignment: Energy Management in Industry
Year : 2000
Location : Mauritius
Client: Mauritius Research Council / Private Sector Collaborative Research Scheme
Main Project features : Energy cost Cutting
Position held: Consultant
Activities performed: Energy Management Framework at the Ferney Spinning Mills.
Industrial Energy Efficiency
Name of assignment: Energy Management in Industry
Year : 2000
Location : Mauritius
Client: Mauritius Research Council / Private Sector Collaborative Research Scheme
Main Project features : Energy cost Cutting
Position held: Consultant
Activities performed: Energy Management Framework at the Ferney Spinning Mills.
Biomass Assessment and Cogeneration
Name of assignment: Sugar Factory Co-generation Potential Assessment for Eastern Africa
Year : 1999
Location : Harare, Zimbabwe
Client: UNCTAD (Common Fund for Commodities)
Main Project features : Model to assess cogeneration potential of sugar factories in Southern and Eastern Africa
Position held: Consultant
Activities performed: Sugar Factory Co-generation Potential Assessment for Eastern Africa
PV for Irrigation
Name of assignment: Solar Photovoltaic Irrigation System
Year : 1999
Location : Rodrigues
Client: UNDP GEF/SGP
Main Project features : Small scale PV for micro irrigation
Position held: Consultant
Activities performed: Sustainable Agricultural Technologies for Rodrigues: Solar Photovoltaic Irrigation System,
Solar Desalination
Name of assignment: Solar Seawater Desalination in Pre-selected Coastal Villages in Rodrigues
Year : 1998
Location : Rodrigues
Client: UNDP / GEF-SGP
Main Project features : Design and construction of solar stills
Position held: Consultant
Activities performed: Design, construction, installation and performance monitoring
Renewable Energy Technologies for Mauritius
Name of assignment: The State of Renewable Energy Resources Development in Mauritius, consultancy service for UNICO International Corporation (Japan), Industrial Management Consultants, under contact for Japan International Cooperation Agency (JICA).
Year : 1996
Location : Mauritius
Client: UNICO / JICA
Main Project features : Desk Study of all possible options
Position held: Consultant
Activities performed: Assessment and reporting
21
EIA for power generation plant
Name of assignment: EIA
Year : 1996
Location : Rodrigues
Client: CEB
Main Project features : Noise modeling and simulation
Position held: Consultant
Activities performed: Environment Impact Assessment of the Port Mathurin Power Generation Plant
GHG Implications of various energy strategies for the USA
Name of assignment: Greenhouse Gas implications of various energy strategies for the US economy
Year : 1991
Location : Arligton, Virginia, USA
Client: Applied Energy Services (AES), USA
Main Project features : Modelling and simulation using FOSSIL2
Position held: Consultant
Activities performed: Responsible for a study on the Greenhouse Gas implications of various energy strategies for the US economy