ADDENDUM #2
RFP #7551330PH1 TITLE: DESIGN/BUILD SERVICES FOR THE RECONSTRUCTION OF THE ROUTE 6/10 INTERCHANGE SUBMISSION DEADLINE: MARCH 1, 2017 – 11:30 A.M.
______________________________________________________________________________
The following attachments are provided for your reference:
1. Attendance sheet from the pre-bid conference held on February 10, 2017. 2. Questions and Answers from the pre-bid conference held on February 10, 2017. 3. Slide presentation presented at the pre-bid conference held on February 10,
2017.
Lisa Hill ________________________ Lisa Hill Chief Buyer
Route 6/10 InterchangeReconstruction Project
Design Build RFQ Pre-Proposal Meeting
Bid # 7551330PH1
Friday February 10, 2017
Project Overview (Compromise Design)• Reconstruction of the entire Route 6/10 Interchange
• Replace in-kind approach
• Several new ramp configurations
• Addition of bicycles and streetscape facilities
• Includes Several overpasses:• Hartford Avenue, Plainfield St., Westminster St., Broadway, Tobey St.
• New bicycle/pedestrian bridge over AMTRAK
• Existing AMTRAK overpasses to remain• Westminster and Broadway
• KEEP WITHIN THE EXISTING RIGHT OF WAY• Construction Easements most likely will be required
Major variations from Previous Design• Elimination of the 6/10 Viaduct
• Lowering to ground level UNDER Westminster and Broadway
• Elimination of previously planned flyover (10NB to 6WB)
• Replaced with horseshoe overpass at Westminster
• Reconfiguration of Tobey Street crossing
• Access to Harris Street
• Bicycle access
• Elimination of Route 6EB ramp at Plainfield Street
Lowering of 10SB
Missing Link Ramp
Tobey Street Reconfiguration
New Overpasses
Base Technical Concept• The BTC will be a sketch plan (pre-10% design level)
• Suggested Construction sequencing/staging plans will be included
• Showing one way to build it
• Identify acceptable temporary closures
• Includes early coordination with Stakeholders
• City of Providence
• AMTRAK
• Utilities
• Olneyville groups
NEPA Process• NEPA process is underway
• To be completed by RIDOT
Project Goals
• Completion within allotted time
• Completion within budget
• Successful Temporary Traffic Maintenance during Construction
• Adherence to project Contractor Quality Control Requirements
• Minimize Impact of work on the Transportation System and Neighboring Communities
• DBE Goals: 5% for design and 5% for construction
RFQ Process
• This is a qualification based selection process
• Do not submit design details or ideas
• SOQ Contents: Listed on pages 12-16
• RFQ Schedule
• February 10, 2017, 1:30 pm: Pre-proposal meeting:
• March 1, 2017: SOQ Due Date
• Week of April 3, 2017: Shortlist Recommendation
• Week of May 1, 2017: Issue RFP
Anticipated RFP Considerations
• Traditional Design Build RFP process
• RIDOT is considering
• Stipends for unsuccessful bidders (no stipend for RFQ development)
• Alternative Technical Concepts
• Team Interviews
• Goal is to award this contract in October 2017
RECONSTRUCTION OF THE
ROUTE 6/10 INTERCHANGE
BASE TECHNICAL
CONCEPT
PROVIDENCE RHODE ISLAND
NOTE: PROJECT LIMITS NOT SHOWN EXTEND WEST
TO INCLUDE THE HARTFORD AVENUE BRIDGE
NOTE: PROJECT LIMITS NOT SHOWN EXTEND
SOUTH TO BUT NOT INCLUDING THE
UNION AVENUE BRIDGE