MarTech LNG LNG Bunkering – From idea to operations Stavanger, 18 September 2013

LIQUILINE - MarTechLNG - Stavanger 180913

Embed Size (px)

Citation preview

Page 1: LIQUILINE - MarTechLNG - Stavanger 180913

MarTech LNG

LNG Bunkering – From idea to operations Stavanger, 18 September 2013

Page 2: LIQUILINE - MarTechLNG - Stavanger 180913

2

About Liquiline

• LNG Midstream operator

• Leading LNG container operator

• Designer and supplier of terminals

• Technology developer

• 20% of resources used on R&D

• Provided as part of our LNG services

• Independent of LNG suppliers

• ISO 9001:2008 certified by DNV

Photo courtesy: Liquiline

Photo courtesy: Liquiline

Page 3: LIQUILINE - MarTechLNG - Stavanger 180913

3

An LNG Midstream partner LNG from point-of-source to point-of-use

LNG

Wholesaler

LNG

Sourcing

LNG

Transport

Receiving

Station Gas use

Bunkering solution

Filling station solution

Regasification solution

Shipping

Transport

Industry

Wholesaler X

Wholesaler Y

Wholesaler Z

Page 4: LIQUILINE - MarTechLNG - Stavanger 180913

4

Head office

Regional offices

Bergen (HQ)

4

Geographical presence

North America

Geographical focus areas

Vancouver

Europe

Asia Pacific

Singapore

Page 5: LIQUILINE - MarTechLNG - Stavanger 180913

5

Some reference projects LNG supply and LNG Logistics

Photo courtesy: Liquiline Photo courtesy: Liquiline

Photo courtesy: Liquiline

Photo courtesy: Liquiline

Photo courtesy: Liquiline Photo courtesy: Liquiline

Page 6: LIQUILINE - MarTechLNG - Stavanger 180913

6

Some reference projects LNG Terminals

Page 7: LIQUILINE - MarTechLNG - Stavanger 180913

7

Some of our clients

Page 8: LIQUILINE - MarTechLNG - Stavanger 180913

8

LNG Bunkering From Idea to Operations

Page 9: LIQUILINE - MarTechLNG - Stavanger 180913

9

Liquiline’s LNG terminal process

1) FEED (Front-End Engineering & Design)

2) Turn-key delivery/EPCIC-contract

i. E – Engineering

ii. P – Procurement

iii. C – Construction

iv. I – Installation

v. C – Commissioning

3) Operations

i. Training and LNG exercise

ii. Daily operations

iii. Service and Maintenance

Page 10: LIQUILINE - MarTechLNG - Stavanger 180913

10

FEED Front-End Engineering & Design

• PFD: Process Flow Diagram

• EFD: Electrical Flow Diagram

• MCL: Mechanical Component List

• ECL: Electrical Component List

• GA: General Arrangement/2D

• CL: Conceptual Layout/3D

• CCE: Complete Cost Estimate

• EX: Ex zones

• RA: Risk Analysis

• DB: Design Basis

Page 11: LIQUILINE - MarTechLNG - Stavanger 180913

11

Detailed Engineering

• PID: Piping & Instrument Diagram

• Hazop: Hazardous Operations

• GA: General Arrangement/2D

• GA: General Arrangement/2D

• CL: Conceptual Layout/3D

• EX: Ex zones

• TCL: Total Component List

Page 12: LIQUILINE - MarTechLNG - Stavanger 180913

12

Procurement

Page 13: LIQUILINE - MarTechLNG - Stavanger 180913

13

Construction

• Civil Work • LiquiStation™/ Process building

Page 14: LIQUILINE - MarTechLNG - Stavanger 180913

14

Installation

• Mechanical installation • Electrical installation

Page 15: LIQUILINE - MarTechLNG - Stavanger 180913

15

Commissioning

• Testing of LiquiStation™ process system in work shop

• First time bunkering of LNG from the terminal

Page 16: LIQUILINE - MarTechLNG - Stavanger 180913

16

Take-Over

Page 17: LIQUILINE - MarTechLNG - Stavanger 180913

17

Bunkering solutions Direct loading

Photo courtesy: Liquiline Photo courtesy: Liquiline

Page 18: LIQUILINE - MarTechLNG - Stavanger 180913

18

Bunkering solutions Multiple loading facility

• Engineered solution for direct loading from containers/trailers to ship

• Can fill from two containers/trailers simultaneously

• Designed by Liquiline

Photo courtesy: Barents Naturgass

Page 19: LIQUILINE - MarTechLNG - Stavanger 180913

19

Bunkering solutions Onsite storage tank

• Bunkering terminal with onsite storage tank

• Civil work and process system etc built for tank no 2

• Turn-key delivery by Liquiline, i.e Engineering, Procurement, Construction

• Liquiline has maintenance contract for facility

• Liquiline provides LiquiSys for all parties involved

Photo courtesy: Liquiline

Photo courtesy: Liquiline

Page 20: LIQUILINE - MarTechLNG - Stavanger 180913

20

LNG Operations Training and LNG exercise

Page 21: LIQUILINE - MarTechLNG - Stavanger 180913

21

LNG Operations Daily operations

• Monitoring of terminal by use of LiquiSys® Terminal system

• Planning logistics by use of LiquiSys® Logistics system

• Daily operations normally done by trained local company or customer

• Prepare and carry out the bunkering work

• Look through the terminal (see, smell, hear)

Page 22: LIQUILINE - MarTechLNG - Stavanger 180913

22

LNG Operations Service and Maintenance

• Monthly Service • LiquiSys Terminal System

Page 23: LIQUILINE - MarTechLNG - Stavanger 180913

23

Terminal possibilities Supply gas locally

• Set up vaporisation solution in connection with bunkering terminal

• Deliver natural gas to local consumer

• Deliver natural gas to local gas distribution pipeline

Photo courtesy: Liquiline

Page 24: LIQUILINE - MarTechLNG - Stavanger 180913

24

Terminal possibilities Supply CNG and LNG as fuel

• LCNG station in Häggvik Stockholm, Sweden

• Delivering CNG to cars, taxis and garbage trucks

Page 25: LIQUILINE - MarTechLNG - Stavanger 180913

25

Summary

• LNG for ships is a proven concept

• It is a thorough process to go from idea to operations

• There are various solutions for setting up a bunkering solutions

• With a bunkering terminal in place, one can also supply gas locally, supply CNG or LNG as fuel for cars, taxis, buses, trucks etc.

Page 26: LIQUILINE - MarTechLNG - Stavanger 180913

Thank you!

Dag Lilletvedt [email protected]

+47 91 64 47 47