1
Project: Client: Report No.: LIQUID PENETRANT TEST Contractor: Date: Ref. Standard: Page 1 of 1 Doc. No.: Item No.: Total tested length: Removal: Type of joint: Thickness: Acceptance Criteria: Quality Control TPI Inspection Client Name: Sign: Date Name: Sign: Date Name: Sign: Date: Final Result Evaluation Defect Percent Tested L (cm) Weld Identification Date No. Accept After Repair Reject Accept Incomplete Fusion Slag Inclusion Excessive Poro. Piping Porosity Crack Star Crack Crater Crack Transverse Longitudinal

Liquid Penetrant Quality Control and Inspection Report Form 1OK

Embed Size (px)

DESCRIPTION

Liquid Penetrant Quality Control and Inspection Report Form 1OK

Citation preview

  • Project:

    Client: Report No.:

    LIQUID PENETRANT TESTContractor: Date:Ref. Standard: Page 1 of 1 Doc. No.:

    Item No.: Total tested length: Removal: Type of joint: Thickness: Acceptance Criteria:

    Quality Control TPI Inspection ClientName: Sign: Date

    Name: Sign: Date

    Name: Sign: Date:

    Final Result

    Evaluation Defect

    Perc

    ent

    Tested L (cm)

    Weld Identification Date No.

    Acc

    ept A

    fter R

    epai

    r

    Rej

    ect

    Acc

    ept

    Inco

    mpl

    ete

    Fusi

    on

    Slag

    Incl

    usio

    n

    Exce

    ssiv

    e Po

    ro.

    Pipi

    ng P

    oros

    ity

    Crack

    Star

    Cra

    ck

    Cra

    ter C

    rac k

    Tran

    sver

    se

    Long

    itudi

    nal