Upload
samer-bayati
View
26
Download
11
Embed Size (px)
DESCRIPTION
Liquid Penetrant Quality Control and Inspection Report Form 1OK
Citation preview
Project:
Client: Report No.:
LIQUID PENETRANT TESTContractor: Date:Ref. Standard: Page 1 of 1 Doc. No.:
Item No.: Total tested length: Removal: Type of joint: Thickness: Acceptance Criteria:
Quality Control TPI Inspection ClientName: Sign: Date
Name: Sign: Date
Name: Sign: Date:
Final Result
Evaluation Defect
Perc
ent
Tested L (cm)
Weld Identification Date No.
Acc
ept A
fter R
epai
r
Rej
ect
Acc
ept
Inco
mpl
ete
Fusi
on
Slag
Incl
usio
n
Exce
ssiv
e Po
ro.
Pipi
ng P
oros
ity
Crack
Star
Cra
ck
Cra
ter C
rac k
Tran
sver
se
Long
itudi
nal