Master Builders Pozzolith Logo Use Agreement 2014_V02.docx Page | 1

Lion Nathan East Tamaki Brewery

Lion Nathan East Tamaki Brewery Ucrete DP high performance flooring system Project:

Lion Nathan East Tamaki Brewery Location: Auckland, New Zealand Project completed: 2010 Applicator/Contractor: Topcoat Specialist Coatings Market sector: Food and Beverage Products used: Ucrete DP system Sales contact: Damian Lusty at BASF NZ

The background Lion Nathan’s brewery is situated on a 16.7 hectare site in South Auckland. It is the “home” of many of New Zealand’s top-selling beers including Steinlager, Speight’s, Mac’s, Lion Red, Stella Artois, Corona, Guinness and Wither Hills.

The challenge

The new brewery was commonly referred to as Project Century - in reference to the facility’s projected life-span of 100 years. The facility was developed with a focus on quality, long-term performance and reduced environmental impact. Not surprisingly, the focus was also applied to the floors, and the challenge was to find a floor that could meet performance expectations and be non-slip, non-tainting, non-dusting, microbiologically inert and easy to clean.

Contact: Ben Rix National Sales Manager, Construction BASF Australia and New Zealand Tel: +61 3 8855 6219 Email: [email protected] www.master-builders-solutions.basf.com.au

Page 2: Lion Nathan East Tamaki Brewery - BASF Documents... · Master Builders Pozzolith Logo Use Agreement 2014_V02.docx Page | 1 Lion Nathan East Tamaki Brewery Lion Nathan East Tamaki

STATEMENT OF RESPONSIBILITY (Disclaimer)

The data contained in this publication are based on our current knowledge and experience. They do not constitute the agreed contractual quality of the product and, in view of the many factors that may affect processing and application of our products, do not relieve processors from carrying out their own investigations and tests. The agreed contractual quality of the product at the time of transfer of risk is based solely on the data in the specification data sheet. Any descriptions, drawings, photographs, data, proportions, weights, etc. given in this publication may change without prior information. It is the responsibility of the recipient of our product to ensure that any proprietary rights and existing laws and legislation are observed (09/2013).

Lion Nathan East Tamaki Brewery Ucrete DP high performance flooring system

Application of Ucrete DP in the beer processing area and packaging room

Our solution Project engineers Beca chose Ucrete DP for the beer processing, packaging and warehousing areas. Lion Nathan had previously installed Ucrete DP floors in its Christchurch facility and the performance of these floors, together with its performance in other facilities made Ucrete DP an obvious solution. The customer´s benefit According to Mark Ambridge, General Manager of Topcoat Specialist coatings,

� Quality, toughness, longevity and ease of cleaning were of paramount importance. Ucrete DP delivered outstanding performance on all metrics.

� Ucrete DP offers exceptional resistance to aggresive chemicals, heavy impact and temperatures from 40°C to 120°C

� Another major benefit of Ucrete DP was the speed of application. It was applied to a shot-blasted concrete floor slab at a thickness of 5 – 6mm. This was followed by broadcasting non-slip aggregate and a final roller coat application of the Ucrete topcoat.

Projects facts at a glance

� 6,000m2 of Ucrete installed at East Tamaki, including 1,200m2 in the beer processing area and 3,500m2 in the packaging room.

� With a crew of 12, Topcoat Specialist Coatings laid the 3,500m2 packaging room floor in 5 days.

� The floor’s short curing time enabled foot traffic after 8 hours, and vehicular traffic after 24 hours.

Master Builders Solutions from BASF

The Master Builders Solutions brand brings all of BASF’s expertise together to create chemical solutions for new construction, maintenance, repair and renovation of structures. Master Builders Solutions is built on the experience gained from more than a century in the construction industry. The know-how and experience of a global community of BASF construction experts form the core of Master Builders Solutions. We combine the right elements from our portfolio to solve your specific construction challenges. We collaborate across areas of expertise and regions and draw on the experience gained from countless construction projects worldwide. We leverage global BASF technologies, as well as our in-depth knowledge of local building needs, to develop innovations that help make you more successful and drive sustainable construction. The comprehensive portfolio under the Master Builders Solutions brand encompasses concrete admixtures, cement additives, chemical solutions for underground construction, waterproofing solutions, sealants, concrete repair & protection solutions, performance grouts, performance flooring solutions.