2
SONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJAS ONDJFMAMJJASONDJFMAMJ SONDJFMAMJJASONDJFMAMJJASONDJ FMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJ 2001 2002 2003 2004 2005 2006 2007 2001 2002 2003 2004 2005 2006 2007 Paddington Bond Street Tottenham Court Road Farringdon Liverpool Street Test Running Test Running Commissioning Commissioning 111000 111000 110500 110500 110000 110000 109500 109500 109000 109000 108500 108500 108000 108000 107500 107500 107000 107000 106500 106500 106000 106000 105500 105500 105000 105000 104500 104500 104000 104000 103500 103500 103000 103000 102500 102500 102000 102000 101500 101500 101000 101000 100500 100500 100000 100000 Boring - West Boring - East 105.30 105.02 107.61 108.47 108.75 ALG. -WORK AREA 670 CUT & COVER OPEN CUT DRIVE COMMENCEMENT CHAINAGE LIS DRIVE COMMENCEMENT CHAINAGE C.L. G.T. WEST RD CUT & COVER DRIVE No 1 (6m DIA) DRIVE No 2 (6m DIA) 101.58 101.16 100 LIS 50 TCR * FAR BOS CUT & COVER PAD PAD 675 CUT & COVER DRIVE No 4 (6m DIA) DRIVE No 3 (6m DIA) PAD. WORK AREA NOTE * PLATFORM TUNNELS PRE DRIVEN (9m DIA) HYPS 605 (Drives 3/4) LONDON CLAY WOOLWICH & R. BEDS PALS TCR BOS BORED TUNNELS RELS 600 (Drives 1/2) VIADUCT FAR RIVER THAMES N 101.86 104.00 104.28 107.33 CAMBRIDGE HEATH ROAD BRIDGE OPEN CUT Example The diagram on the left shows what LinearPlus is capable of producing. This example is a high level chart created for a proposed underground line in London and illustrates many of the key features of the product. Activities at stations such as shaft sinking appear as horizontal bands, with their vertical position based on the distance of the station from the datum. The diagonal brown lines show tunnel boring, and the chart shows that there are two boring machines being used, one from each end of the line. The diagonal pink lines represent track laying – again taking place from each end of the site, but meeting up at a different location. The staggered sequences of blocks show the installation of power, signalling and services through the tunnel, with all of these operations starting at the west end (top of chart). The large pale green and pale blue blocks show final commissioning works and test running of trains, both spanning the entire length of the tunnel. Also included alongside the chart are imported CAD drawings with the plan and elevation of the line, scaled to match up with the chart itself. Summary of Features Activities Supports baseline and schedule dates; durations can be entered directly or computed from progress rates; early and late constraints. Support for 6 types of activity (linear, block, single location, zone access, complex area, parallelogram) and milestones. Relations All standard relation types supported; relations may also have leads/lags and working calendars associated with them. Resources Supports resource definitions and assignments, with total or rate based values. Related resources can be grouped together, and resource definitions can be stored as a shareable library. Resource usage curves can be displayed below the schedule data. Calendar Up to 256 working calendars can be defined and applied to activities, relations and resources, or used as a backdrop for charts. Graphics Create or import graphics and store in shareable symbol libraries. Annotate charts with text or graphics. Interfaces Import and export data between LinearPlus and other systems, with wizards for both Primavera and Microsoft Project. System 32/64bit Windows (Win2K – Windows 7) with at least 256Mb RAM and 30Mb free disk space. Output Any output device supported by Windows. Charts can also be published as web pages for use on an intranet or the Internet. Licensing LinearPlus is available as a single or multi user system. Discounts are available for Government institutions, educational establishments and registered charities. To request your free trial of LinearPlus, please visit www.linearplus.com or contact PCF for details of your local representative. BoxCharts, LinearPlus and QEI Exec are trademarks of PCF Limited. All other trademarks and registered trademarks are the property of their respective owners and are acknowledged as such. Copyright © 2010 PCF Limited. PCF Ltd 41 Marlowes Hemel Hempstead Hertfordshire HP1 1LD United Kingdom Tel: (+44) 1442 355100 Fax: (+44) 1442 355001 Web: www.pcfltd.co.uk Registered in England 05504589 LinearPlus The Challenge of Linear Projects Many civil engineering projects take place in worksites with restricted access along an overall line of route. Such projects include: Roads Power Lines Railways Sea Defences Tunnels Waterways Pipelines In this type of environment, planners must pay particular attention to the physical restrictions associated with the worksites in addition to the normal constraints imposed by activity sequencing and resource availabilities. Unfortunately, traditional planning tools based on Gantt charts cannot display where activities are taking place, nor do they take account of any location-related constraints when performing a time analysis. Time Chainage charts (also known as Time Distance or Time Location charts) were developed to resolve this problem. Time Chainage Principles A Time Chainage chart displays time on the horizontal axis like a Gantt chart and position – expressed as distance from some datum - on the vertical axis. This implies that overlapping activities are occurring at the same place as well as at the same time, providing instant visual warning of a potential scheduling problem. Activities that take place at one location are displayed as a horizontal bar, while activities which occur between two points are shown either as a diagonal line or a rectangle. To illustrate the concept, consider the Gantt chart at upper right. All we can deduce from it that the two activities are taking place at roughly the same time. In contrast, the Time Chainage chart below shows much more information. We can now see that Activity 1 starts at location L2, 250m from the datum, and progresses until it reaches location L1, 100m from the datum. Activity 2 starts at L1 a short while before Activity 1 starts, and ends 200m from the datum shortly before Activity 1 ends. Most importantly, we can now see that at approximately midday on 12 th December both activities are occurring simultaneously, at about 170m from the datum. If these two operations both involve heavy machinery in a tunnel or on the same railway track, then there is obviously a potential problem, but the planner can now see this and can if necessary adjust the schedule. LinearPlus Interactive time chainage charts for linear projects pcf DEC 10 11 12 13 14 DEC 10 11 12 13 14 01 DEC 01 DEC L1 100 50 50 300 300 L2 250 250 L2 100 L1 150 200 200 150 A ctivity 2 Activity 1 A ctivity 2 DEC 10 11 12 13 14 DEC 10 11 12 13 14 01 DEC 01 DEC ACT-2 ACT-1

LinearPlus brochure A3 DS v3 · of these operations starting at the west end (top of chart). The large pale green and pale blue blocks show final commissioning works and test running

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LinearPlus brochure A3 DS v3 · of these operations starting at the west end (top of chart). The large pale green and pale blue blocks show final commissioning works and test running

S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J

S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J

2001 2002 2003 2004 2005 2006 2007

2001 2002 2003 2004 2005 2006 2007

Paddington

Bond Street

Tottenham Court Road

Farringdon

Liverpool Street

Test R

unning

Test R

unning

Com

missioning

Com

missioning

111000111000

110500110500

110000110000

109500109500

109000109000

108500108500

108000108000

107500107500

107000107000

106500106500

106000106000

105500105500

105000105000

104500104500

104000104000

103500103500

103000103000

102500102500

102000102000

101500101500

101000101000

100500100500

100000100000

Boring - West

Boring - East

105.30

105.02

107.61

108.47

108.75

AL

G. -

WO

RK

AR

EA

67

0

CU

T &

CO

VE

R

OP

EN

CU

T

DR

IV

EC

OM

ME

NC

EM

EN

TC

HA

IN

AG

E

LIS

DR

IV

EC

OM

ME

NC

EM

EN

T C

HA

IN

AG

E

C.L. G.T.WEST RD

CU

T &

CO

VE

R

DR

IV

E N

o 1

(6m

DIA

)

DR

IV

E N

o 2

(6m

DIA

)

101.58

101.16

10

0

LIS

50

TC

R

*

FA

R

BO

S

CU

T &

CO

VE

R

PA

D

PA

D

67

5C

UT

&C

OV

ER

DR

IV

E N

o 4

(6m

DIA

)

DR

IV

E N

o 3

(6m

DIA

)

PA

D.

WO

RK

AR

EA

NO

TE

* P

LA

TF

OR

M T

UN

NE

LS

PR

E D

RIV

EN

(9

m D

IA

)

HY

PS 6

05 (

Drives 3

/4)

LO

ND

ON

CL

AY

WO

OL

WIC

H &

R. B

ED

S

PA

LS

TC

R

BO

S

BO

RE

D T

UN

NE

LS

RE

LS

60

0 (

Drives 1

/2)

VIA

DU

CT

FA

R

RIV

ER

TH

AM

ES

N

101.86

104.00

104.28

107.33

CAMBRIDGE

HEATH

ROAD

BRIDGE

OP

EN

CU

T

Example

The diagram on the left shows what LinearPlus is capable of producing. This example is a high level chart created for a proposed underground line in London and illustrates many of the key features of the product.

Activities at stations such as shaft sinking appear as horizontal bands, with their vertical position based on the distance of the station from the datum.

The diagonal brown lines show tunnel boring, and the chart shows that there are two boring machines being used, one from each end of the line. The diagonal pink lines represent track laying – again taking place from each end of the site, but meeting up at a different location.

The staggered sequences of blocks show the installation of power, signalling and services through the tunnel, with all of these operations starting at the west end (top of chart). The large pale green and pale blue blocks show final commissioning works and test running of trains, both spanning the entire length of the tunnel.

Also included alongside the chart are imported CAD drawings with the plan and elevation of the line, scaled to match up with the chart itself.

Summary of Features

Activities Supports baseline and schedule dates; durations can be entered directly or computed from progress rates; early and late constraints. Support for 6 types of activity (linear, block, single location, zone access, complex area, parallelogram) and milestones.

Relations All standard relation types supported; relations may also have leads/lags and working calendars associated with them.

Resources Supports resource definitions and assignments, with total or rate based values. Related resources can be grouped together, and resource definitions can be stored as a shareable library. Resource usage curves can be displayed below the schedule data.

Calendar Up to 256 working calendars can be defined and applied to activities, relations and resources, or used as a backdrop for charts.

Graphics Create or import graphics and store in shareable symbol libraries. Annotate charts with text or graphics.

Interfaces Import and export data between LinearPlus and other systems, with wizards for both Primavera and Microsoft Project.

System 32/64bit Windows (Win2K – Windows 7) with at least 256Mb RAM and 30Mb free disk space.

Output Any output device supported by Windows. Charts can also be published as web pages for use on an intranet or the Internet.

Licensing LinearPlus is available as a single or multi user system. Discounts are available for Government institutions, educational establishments and registered charities.

To request your free trial of LinearPlus, please visit www.linearplus.com or contact PCF for details of your local representative.

BoxCharts, LinearPlus and QEI Exec are trademarks of PCF Limited. All other trademarks and registered trademarks are the property of their respective owners and are acknowledged as such. Copyright © 2010 PCF Limited.

PCF Ltd 41 Marlowes Hemel Hempstead Hertfordshire HP1 1LD United Kingdom

Tel: (+44) 1442 355100 Fax: (+44) 1442 355001 Web: www.pcfltd.co.uk

Registered in England 05504589

LinearPlus

The Challenge of Linear Projects

Many civil engineering projects take place in worksites with restricted access along an overall line of route. Such projects include:

• Roads

• Power Lines

• Railways

• Sea Defences

• Tunnels

• Waterways

• Pipelines

In this type of environment, planners must pay particular attention to the physical restrictions associated with the worksites in addition to the normal constraints imposed by activity sequencing and resource availabilities. Unfortunately, traditional planning tools based on Gantt charts cannot display where activities are taking place, nor do they take account of any location-related constraints when performing a time analysis. Time Chainage charts (also known as Time Distance or Time Location charts) were developed to resolve this problem.

Time Chainage Principles

A Time Chainage chart displays time on the horizontal axis like a Gantt chart and position – expressed as distance from some datum - on the vertical axis. This implies that overlapping activities are occurring at the same place as well as at the same time, providing instant visual warning of a potential scheduling problem. Activities that take place at one location are displayed as a horizontal bar, while activities which occur between two points are shown either as a diagonal line or a rectangle.

To illustrate the concept, consider the Gantt chart at upper right. All we can deduce from it that the two activities are taking place at roughly the same time. In contrast, the Time Chainage chart below shows much more information.

We can now see that Activity 1 starts at location L2, 250m from the datum, and progresses until it reaches location L1, 100m from the datum. Activity 2 starts at L1 a short while before Activity 1 starts, and ends 200m from the datum shortly before Activity 1 ends. Most importantly, we can now see that at approximately midday on 12

th December both activities are occurring

simultaneously, at about 170m from the datum.

If these two operations both involve heavy machinery in a tunnel or on the same railway track, then there is obviously a potential problem, but the planner can now see this and can if necessary adjust the schedule.

LinearPlus Interactive time chainage charts for linear projects

pcf

DEC 10 11 12 13 14

DEC 10 11 12 13 14

01 DEC

01 DEC

L1 100

50 50

300300

L2 250250 L2

100 L1

150

200200

150

Activity 2

Activity 1

Activity 2

DEC 10 11 12 13 14

DEC 10 11 12 13 14

01 DEC

01 DEC

ACT-2

ACT-1

Page 2: LinearPlus brochure A3 DS v3 · of these operations starting at the west end (top of chart). The large pale green and pale blue blocks show final commissioning works and test running

Introducing LinearPlus

LinearPlus gives planners working on linear projects all the features they need when working with time chainage charts, and completely eliminates the three principal historical problems associated with their creation:

Speed Once set up for your project, LinearPlus can create a chart automatically in a matter of seconds, instead of the hours or even days associated with manual or semi-manual processes.

Accuracy LinearPlus can import data directly from a wide variety of sources, ensuring that schedule and resource information is correct and up to date. The Standard Edition of the product enforces this by preventing users from modifying any imported values whilst allowing them to format or display data in any way they wish.

Ease of Use LinearPlus has been designed specifically for the creation and manipulation of time chainage charts, with over 15 years of customer feedback incorporated into its design.

Plan

Within LinearPlus, you can do everything that you would do in a normal planning system – create and edit activities and logic, assign resources and perform time analysis. The system uses an intuitive CAD-like metaphor to construct plans, with activities and relations created using simple mouse based “point and click”. Once you have created the plan, you can change activity dates by dragging them on screen or using the internal critical path scheduler.

Unlike a normal planning system, LinearPlus also knows where your work is taking place. By defining start and end locations for activities as you plan, the system can display the progress of work along the worksite, and if required can calculate activity durations between two points automatically based on a work rate. The system supports five different types of activity, each of which has a different on screen representation.

Visualise

Once you have created your plan, the next step is to decide how it is to be presented. LinearPlus allows you to generate any number of views from the same plan using a wide variety of techniques. You can for example elect to create a high level chart based on WBS elements rather than activities, break down a long worksite into a series of short sections to be presented inidividually, or filter the activities to produce a chart based on one specific type of work. Standard rules for colouring activities can be defined and combined together to produce a “look and feel” for a particular view or set of views.

For all views, you can elect to display resource loads and availabilities. LinearPlus provides sophisticated resource display functions, including the ability to generate incremental or cumulative curves, to stack curves together, or even create curves based on spreadsheet-like operations on other curves.

You can import or create symbols for use as annotation on the plan or associated with locations; these can be stored in a library for reuse. Photographs or CAD drawings of the worksite can be imported and incorporated alongside the plan to enhance the presentation.

Communicate

LinearPlus can produce output in a variety of formats, depending on your requirements. It supports paper sizes up to A0 or greater, and can print out to any device supported by Microsoft Windows, including PDF generators. You can group views together for printing in a single operation.

As an alternative, LinearPlus also provides facilities for publishing plans to the Internet or a company intranet as web pages, including the option of using SVG vector graphics for unsurpassed image quality.

Synchronise

Rather than create and maintain your plan in LinearPlus, you may prefer to import it from an existing planning system and then periodically update LinearPlus with changes. This is not a problem – the product has been designed to integrate with external sources such as Microsoft Project or Primavera, and can import and export data in a wide variety of formats. When transferring a project for the first time, the system will import all relevant data (including resources and working calendars) to ensure that both versions remain completely synchronised. Changes made within LinearPlus can then be exported back to the source system, providing a complete “round trip” facility.

Customers

PCF created the world’s first time chainage based planning system in 1989 for Transmanche Link, the constructors of the Channel Tunnel. Our time chainage software is currently used around the world by a wide variety of organisations, including:

• Network Rail

• Laing O’Rourke Construction

• Crossrail

• RZD (Russian Railways)

• Channel Tunnel Rail Link

• Mott MacDonald

• Leighton Kumagai JV

• East London Line

Custom Solutions

The full functionality of LinearPlus is also available as an add-on module for PCF’s graphical planning system QEI Exec. When the software is deployed in this fashion, users can switch seamlessly between Time Chainage based views and traditional Gantt, PERT and WBS charts. This environment provides several additional time chainage features and access to QEI Exec’s sophisticated baselining and earned value calculations.

For the most demanding requirements, QEI Exec’s built in application programming language permits the rapid development of bespoke solutions specifically tailored to your own systems and procedures.