Capital Projects Division Recovery and Resilience tinyurl.com/SANDYRECOVERY (212) 306-8532 — [email protected] LINCOLN HOUSES Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding: Building heights: 6-14 stories Total Buildings: 14 8 Property Size: Congressional (D-13): Tenant Association President: NYS Assembly (D-70): NYS Senate (D-30): NYC Council (D-9): • Adriano Espillat • Lea Potter • Inez E. Dickens • Brian A. Benjamin • Bill Perkins 12.67 acres 60 1980 2155 2123 2121 2133 2135 2150 2144 2130 2120 MADISON AVE Funded Buildings Unfunded Buildings Development Information

LINCOLN HOUSES Development Information · LINCOLN HOUSES Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding: Building heights:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LINCOLN HOUSES Development Information · LINCOLN HOUSES Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding: Building heights:

Capital Projects Division Recovery and Resilience

tinyurl.com/SANDYRECOVERY(212) 306-8532 — [email protected]

LINCOLN HOUSES

Development Statistics

Elected Representative:

Tenant Association:

Buildings benefiting from FEMA funding:

Building heights:6-14 stories

TotalBuildings: 14

8

Property Size:

Congressional (D-13):

Tenant Association President:

NYS Assembly (D-70):

NYS Senate (D-30):

NYC Council (D-9):

• Adriano Espillat

• Lea Potter

• Inez E. Dickens

• Brian A. Benjamin

• Bill Perkins

12.67 acres

60

1980

2155

2123

2121

21332135

2150

2144

2130

2120

MAD

ISO

N AV

E

Funded BuildingsUnfunded Buildings

Development Information

Page 2: LINCOLN HOUSES Development Information · LINCOLN HOUSES Development Statistics Elected Representative: Tenant Association: Buildings benefiting from FEMA funding: Building heights:

Project Scope

NYCHA’s Recovery & Resilience Department Questions/Problems, 疑 问/家 里 的 问 题,

Вопросы / проблемы, Preguntas/Problemas (212) 306-8532 — [email protected]

Development Improvements• Removal of existing vacuum pumps at tank rooms in buildings 1, 2, 5, 6, 7, 8 and 11• Installation of new vacuum pumps on raised platform/pad in each of those seven buildings• Installation of new condensate pumps in buildings 1, 2, 5, 6 and 7• Removal of existing domestic hot water heaters/storage tanks in tank room of building #2• Installation of new “semi-instantaneous” domestic hot water systems• Installation of new sump pumps in new and existing sump pits in buildings 1, 2, 5, 6, 7, 8 and 11• Installation of new flood pump in building 9• New interior finishes and painting at tank rooms• Removal and replacement of select interior lighting fixtures at boiler room and auxiliary spaces

as indicated and scheduled• Removal and replacement of select hollow metal doors, frames and hardware• Replacement/repairs of architectural/construction elements at existing tank rooms at buildings

1, 2, 5, 6, 7, 8, 9 and 11. Work includes new louvers with window guards, new hollow metal doors, frames and hardware, new concrete pads for equipment, new painting and finishes, and new railings and platforms.

• Provide new doors, frames and hardware, including new stainless steel exterior doors and frames

• Replacement and/or repair of portions of steam and condensate distribution piping networ within seven buildings

• Asbestos abatement, as needed to complete the above work