Linac Status
June 16, 2015Time Meeting
D. Raparia
D. Raparia2
Status Linac running in good condition for polarized proton program (200
MeV) and BLIP at 117 MeV
6/10/15: Maintenance ( ~ 7 HRS) 6/14/15: BLIP beam stopped at 8:00 AM 6/15/15: Changed energy to 117 MeV 6/15/15: Replaced tube 7835 in mod 6 6/15&16/15: Smaller beam (1.1 inch Dia) for Pt target
Average Current and Beam on HRS for BLIP
D. Raparia3
6/8/15 6/9/15 6/10/15 6/11/15 6/12/15 6/13/15 6/14/15 6/15/15 6/16/150
24
48
72
96
120
Average current (μA)
Beam on (HRS/day)
MaintenanceTarget and Energy Changed
FWHM (mm) at Harp 1 and 2
D. Raparia4
6/8/15 6/9/15 6/10/15 6/11/15 6/12/15 6/13/15 6/14/15 6/15/15 6/16/15 6/17/150
5
10
15
20
25
30
H1_FWHM_xH1_FWHM_yH2_FWHM_XH2_FWHM_y
FWHM (mm) at Target (projected)
D. Raparia5
6/8/15 6/9/15 6/10/15 6/11/15 6/12/15 6/13/15 6/14/15 6/15/15 6/16/150
2
4
6
8
10
12
14
FWHMxFWHMy
(RMS)
Beam Center (mm) at Harp1 and 2
D. Raparia6
6/8/15 6/9/15 6/10/15 6/11/15 6/12/15 6/13/15 6/14/15 6/15/15 6/16/15
-20
-15
-10
-5
0
5
10
H1XcH1YcH2XcH2Yc
7
Beamline Location
1. plunging harp2. 6.50” collimator3. bellows (3x)4. raster magnet5. steering magnets (existing, 2x)6. 4.00” collimator
7. plunging harp (opposite side)8. laser profile monitor9. beam current transformers (2x)10. beam position monitor11. beryllium window (existing)12. aluminum bellows (existing)
21’14’
HARP1
D. Raparia8
HARP2