Linac 4 Instrumentation Needs K.Hanke & M.Pasini. Overview of Instrumentation Needs. 3MeV front-end. 95keV. 3MeV. 40MeV. 90MeV. 160MeV. H-. RFQ. CHOPPER. DTL. CCDTL. SCL. rf volume source (DESY) 35 kV extrac. 60kV postacc. chopper 352 MHz 3.6 m 11 em quad 3 rf cavity. - PowerPoint PPT Presentation
Citation preview
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Linac 4 Instrumentation NeedsK.Hanke & M.Pasini
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Overview of Instrumentation Needs
DTL CCDTL SCL
40MeV 90MeV 160MeV
Drift Tube Linac• 352 MHz• 13.4 m• 3 tanks• 5 klystrons• 4 MW• 82 PMQuad
Side Coupled Linac• 704 MHz• 28 m• 20 tanks• 4 klystrons• 12 MW• 20 EMQuads
Cell-Coupled Drift TubeLinac• 352 MHz• 25.3 m• 24 tanks• 8 klystrons• 6.5 MW• 24 EMQuads
RFQ
chopper 352 MHz3.6 m11 em quad3 rf cavity
H-
3MeV95keV
rf volume source(DESY)• 35 kV extrac.• 60kV postacc.
CHOPPER
RFQ (IPHI)• 352 MHz• 6 m• 1 Klystron• 1 MW
3MeV front-end
Linac 4 TDR CERN-AB-2006-084 ABP/RF
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Commissioning and Operation
commissioning phase:
• moveable bench for different stages of the DTL Faraday Cup, SEM grid, transverse and lonitudinal emittance diagnostics, 2 pick-ups (tof) - for DTL tank-by-tank commissioning - SNS experience with “D-Plate”
• IPHI diagnostic line for the 3 MeV front-end wire scanners, spectrometer, pick-ups, transformers, time-of-flight → see presentation P.Ausset
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Source & LEBT
diagnostics box(Faraday cup, SEM)
- emittance scanner- spectrometer- fixed Faraday cup- transformer
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Source & LEBT
instrument position energy [MeV] intensity[mA]
resolution
retractable Faraday cup
betweensolenoids
0.095 80 0.1 mA
fixed Faraday cup
before RFQ 0.095 80 0.1 mA
SEM grid betweensolenoids
0.095 80 2 mm
SEM grid after spectrometer
0.095 80 1 mm
transformer 0.095 80 1 mAemittance movable 0.095 80 1 mrad
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Chopper Line
2 slow wire scanners
2 transformers
BSHM
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Chopper Line
instrument position energy [MeV] intensity[mA]
resolution
slow wirescanners
upstream anddownstream of chopper
3.0 80 0.1 mm
transformer between first two and last two quads
3.0 80 0.5 mA
beam shape and halo monitor
end of chopper line
3.0 80 1 ns1 mm
K.Hanke / Linac 4 instrumentation review / May 9, 2007
BSHM: Requirements
2.84 ns 1st objective:measure residual H- in (not completely) chopped buncheswith a sensitivity of ~ 1000 ions, in the vicinity of full bunches (~108 ions). detector must be turned on/off within 1 ns, dynamic range 1:106
2nd objective:transverse imaging, halo diagnosticsbeam core: ~108 H-/bunch/cm2
beam halo: ~103 H-/bunch/cm2
active area of detector 4 × 4 cmdynamic range: 1:106
~108 ions~103 ions
K.Hanke / Linac 4 instrumentation review / May 9, 2007
3 MeV test place in the PS South Hall including source, LEBT, RFQ, chopper line and IPHI diagnostic line
IPHI diagnosticline
3 MeV Test Place
K.Hanke / Linac 4 instrumentation review / May 9, 2007
DTL
DTL tank1 DTL tank2 DTL tank3
BLMBLM
BLM
SEM grid
beam loss monitor
beam current transformer
position, intensity and phase pick-up
K.Hanke / Linac 4 instrumentation review / May 9, 2007
DTL
instrument position energy [MeV] intensity[mA]
resolution
pick-up(phase, position, intensity)
after every tank
10/20/40 40 0.1 deg0.1 mm0.5 mA
SEM grid after tank 3 40 40 0.5 mm
transformer after tank 3 40 40 0.5 mA
K.Hanke / Linac 4 instrumentation review / May 9, 2007
CCDTL
CCDTL module1 CCDTL module2
CCDTL module3 CCDTL module4
BLM
BLM
BLM
SEM grid
beam loss monitor
beam current transformer
position, intensity and phase pick-up
K.Hanke / Linac 4 instrumentation review / May 9, 2007
CCDTL
CCDTL module5 CCDTL module6
CCDTL module7 CCDTL module8
BLM
BLM
BLM
SEM grid
beam loss monitor
beam current transformer
position, intensity and phase pick-up
K.Hanke / Linac 4 instrumentation review / May 9, 2007
CCDTL
instrument position energy [MeV] intensity[mA]
resolution
pick-up(phase, position, intensity)
after every module
45.9/52.2/58.6/65/71.5/78.1/84.6/91.1
40 0.1 deg0.1 mm0.5 mA
SEM grid after modules 4 and 8
65/91.1 40 0.5 mm
transformer after module 8 91.1 40 0.5 mA
K.Hanke / Linac 4 instrumentation review / May 9, 2007
SCL
BLM
SEM grid
beam loss monitor
ceam current transformer
position, intensity and phase pick-up
SCL module1 SCL module2
SCL module3 SCL module4
BLM
BLM
K.Hanke / Linac 4 instrumentation review / May 9, 2007
SCL
instrument position energy [MeV] intensity[mA]
resolution
pick-up(phase, position, intensity)
after every moduleplus 1/module
106.7/124.7/148.8/164
40 0.1 deg0.1 mm0.5 mA
SEM grid after modules 2 and 4
124.7/164 40 0.5 mm
transformer after module 4 164 40 0.5 mA
K.Hanke / Linac 4 instrumentation review / May 9, 2007
Transfer Line and PSB Injection
transfer line: • pick-ups, BLMs, profile monitors as in the linactransfer line design pending• emittance diagnostics at the exit of the linac andbefore PSB injection
Booster injection period:profile/position measurement to adjust the beamon the stripper foils