PUBLIC HEARING DOCUMENTATION REPORT LIMESTONE QUARRY AND PORT
FACILITY EXPANSION PROJECT
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 1 Solid Earth Development Corporation
SUMMARY OF THE PUBLIC HEARING
Limestone Quarry and Port Facility Expansion Project
Project Title : Limestone Quarry and Port Facility Expansion Project
Project Location : Quarry Component: Barangays of Tinubdan, Tananas, Tonggo, Basak, and South Poblacion
Port Component: Barangays of South Poblacion and Panadtaran All within the Municipality of San Fernando, Province of Cebu, Region VII,
Philippines
Project
Proponent
: Solid Earth Development Corporation (SEDC)
Venue : South Park Convention Center, Barangay Panadtaran, San Fernando,
Cebu
Date : November 27, 2020
Time Started : 8:00 AM (registration)
Time Ended : 12:49 PM
Facilitator : Atty. Unalee Monares, DENR-EMB Region VII
1 INTRODUCTION
The proposed Environmental Compliance Certificate (ECC) amendment of the SEDC Limestone Quarry
and Port Expansion Project involves the integration of the two ECCs issued for the SEDC Limestone
Quarry and Port facility. These include ECC Ref. No. 0401-001-302 which covers MPSA 205-2004-VII
and ECC Ref. No. 1709-0018 covering MPSA 067A-1997-VII. Considering the location of MPSA 205-
2004-VII which is totally enclosed by MPSA 067A-1997-VII the quarry operations of both MPSAs can
be integrated which is the current practice of SEDC. The amendment also proposes to increase the
combined total ECC Area to 641.57 hectares and combined Production Area to a total of 329.87
hectares. Finally, SEDC shall increase the combined Total Annual Production Capacity to 4,800,000
MT of limestone material. There will be no changes in the current port dimensions as the new facilities
and installations will be constructed and installed on the existing port structure. The proposed expansion
shall contribute in addressing the shortage of domestic cement necessary for local and national
infrastructure and development programs. Furthermore, this project shall benefit the national and local
government through generation of revenues, boosting of local employment, increase in livelihood
opportunities and improvement of carbon sink through reforestation programs. Increase in Social
Development and Management Program (SDMP) allocation is also foreseen with the increase in
revenues arising from the expansion of operations.
In compliance with the DENR Administrative Order 2017-15: “Guidelines on Public Participation under
the Philippine Environmental Impact Statement System (PEISS)”, the conduct of Public Hearing is
required for all Environmentally Critical Projects (ECPs) for which public scoping was undertaken and
for PEIS-based applications; and is a formal process initiated and conducted by DENR-EMB to promote
dialogues and communication between and among the project proponent, DENR-EMB, relevant
government agencies, LGUs and stakeholders.
Furthermore, in compliance with the DENR-EMB Memorandum Circular No. 2020-30: “Interim
Guidelines on Public Participation in the Implementation of the PEISS (PD 1586) during the State of
National Public Health Emergency”, public consultations may be conducted using one or combination
of two (2) options: 1) The proponent is allowed to conduct public hearing with project’s major
stakeholders through video conferencing for not less than two hours, with sufficient time for open forum
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 2 Solid Earth Development Corporation
and discussion of EIA results with mitigating measures as provided in its Environmental Impact
Statement Study (EIS) or Environmental Performance Report and Management Plan (EPRMP); 2) The
proponent shall undertake public hearing by sector in small groups following the minimum health
standards recommended by the IATF. All documentation materials, including video conferencing
recordings shall be submitted to DENR-EMB. For this project, the proponent opted to conduct the
combination of the two options.
This Public Hearing Documentation Report summarizes the notification methods, presentation of results
of the Environmental Impact Assessment (EIA), and the comments, and concerns received at the Public
Hearing, both in the actual venue and via Zoom Meeting.
2 NOTIFICATION OF THE PUBLIC HEARING
2.1 INVITATION LETTERS
Invitations were sent to stakeholders of the Project at least 10 days prior to the Public Hearing schedule.
The notices contain the Zoom Meeting ID and Passcodes for those who want to join via online platform.
The received invitation letters/notices are attached in Annex 1. The list of invited stakeholders is
presented in the following table:
Table 1. List of Invited Stakeholders
AGENCY
/INSTITUTION
NAME OF
REPRESENTATIVE DESIGNATION ADDRESS
Barangay Agencies
San Fernando:
Barangays Tinubdan,
Tañañas, Tonggo,
South Poblacion,
Basak and
Panadtaran
Dioscoro B. Pacquiao, Jr. Barangay Captain Tinubdan, San
Fernando
Casiano T. Canoy Barangay Captain Tañañas, San
Fernando
Virgilio P. Siarot Barangay Captain Tonggo, San
Fernando
Dioscoro E. Esbra Barangay Captain South Poblacion, San
Fernando
Genaro B. Sarol Barangay Captain Basak, San Fernando
Vavy Montreah H. Dayao Barangay Captain Panadtaran, San
Fernando
Municipal Agencies
San Fernando
Municipal
Government
Lakambini G. Reluya Municipal Mayor
Mun. Building, San
Fernando, Cebu
Ricci Regen G. Reluya Municipal Vice-Mayor
Nelson B. Soronio Municipal Agriculturist
Engr. Shelley B. Rias Mun. Planning & Dev’t.
Officer
Dr. Alfredo S. Manugas, IV Mun. Health Officer
Engr. Simeon A. Lauronal Municipal Engineer
Alicia A. Brobo MSWD Officer
Rosario D. Tormis MENRO
Interest Groups
Fisherfolk’s group Sofronio B. Alfeche Pres., South Poblacion
Fishermen Association
(SoPoFiAs)
South Pob., San
Fernando, Cebu
Youth group Riyadh Christopher V.
Oacan
SK Federation
President
Sangat, San
Fernando, Cebu
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 3 Solid Earth Development Corporation
AGENCY
/INSTITUTION
NAME OF
REPRESENTATIVE DESIGNATION ADDRESS
Senior Citizen’s
group
Ponciano S. Alaña Head, OSCA South Pob., San
Fernando, Cebu
Farmer’s group Neria G. Canoy President, Tinubdan
Farmer’s Assn.
Tinubdan, San
Fernando, Cebu
Women’s group Apolonia C. Caño President, KALIPI Tonggo, San
Fernando, Cebu
Education Sector Dr. Victor A. Ybañez PSDS San Fernando
District 1
North Pob., San
Fernando, Cebu
Dr. Joel B. Umbay PSDS San Fernando
District 2
Sangat, San
Fernando, Cebu
Religious Sector Msgr. Alfredo O.
Romanillos, Jr.
Leader, Team of
Pastors, St. Isidore The
Farmer Parish
South Poblacion, San
Fernando
Business Sector Lolita O. Pinatil
Visitacion C. Villamero
Kazuhiko Ichizawa
Proprietor – Casa
Tarcila Dragonfruit
Farm
Owner – Vissy’s Store
Pres. – Taiheiyo
Cement Phils., Inc.
Tinubdan, San
Fernando, Cebu
Tinubdan, San
Fernando, Cebu
South Poblacion, San
Fernando, Cebu
2.2 NEWSPAPER ADVERTISEMENTS
The Notice of the Public Hearing was posted twice on Manila Bulletin on November 06 and 13, 2020
(Annex 2 – Proof of Publication from Manila Bulletin).
2.3 FLYERS AND POSTINGS
Notices were posted at public areas such as barangay and Municipal offices a week prior to the event.
The postings were documented in the following images:
Figure 1. Posting of Notices in Barangay and Municipal Offices
2.4 OTHER NOTIFICATION MEDIA
The Notice of Public Hearing was posted at the DENR-EMB website (www.emb.gov.ph) with the
Project’s Environmental Performance Report and Management Plan (EPRMP) as an attachment that
is publicly available for download. EPRMP is not available in printed copy due to COVID-19 restrictions
in terms of handling and direct contact.
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 4 Solid Earth Development Corporation
The proponent also posted the Notice of Public Hearing in their Official Facebook Page:
Figure 2. Posting of Notice of Public Hearing in SEDC Official Facebook Page
3 PUBLIC HEARING
3.1 LOCATION AND ATTENDANCE
The Public Hearing was held on November 27, 2020 at the South Park Convention Center, Barangay
Panadtaran, San Fernando, Cebu with a live and interactive broadcast via Zoom. The hearing was
attended by a total of 58 participants composed of 42 participants from the actual venue and 16
participants from Zoom (Annex 3 – Attendance Sheets). The summary of attendees by sector is
presented in the following tables:
Table 2. Number of Representatives per Stakeholder Group in the Venue
Stakeholder Group/Sector Number of Representatives Attended
LGU-San Fernando 3
South Poblacion LGU 1
Tinubdan 2
Church 2
Tonggo LGU 2
Basak LGU 1
Panadtaran 1
Tananas LGU 1
DEPED 1
OSCA 1
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 5 Solid Earth Development Corporation
Stakeholder Group/Sector Number of Representatives Attended
Fishermen’s Group 1
Business 1
Farmers 1
EMB 7 2
SEDC 18
TCPI 3
TOTAL 41
Table 3. Number of Representatives per Stakeholder Group in Zoom Meeting
Stakeholder Group/Sector Number of Representatives Attended
DENR Region 7 2
CENRO Argao 2
EIARC 2
EMB Central 4
San Fernando LGU 1
Biodiversity Management Bureau 1
Mines and Geosciences Bureau - CO 1
SEDC 3
RHR Consult Services 6
TOTAL 16
3.2 MEETING FORMAT AND CONTENT
The following table shows the program of activities during the Public Hearing. The PowerPoint
presentations used are attached in Annex 4.
Table 4. Program for Public Hearing
Project Title: Project Location: Quarry Component: Port Component: Project Proponent: Date and Time of Hearing: Venue/Address: Virtual Platform:
Limestone Quarry and Port Facility Expansion Project Municipality of San Fernando Barangays of Tinubdan, Tananas, Tonggo, Basak, and South Poblacion Barangays of South Poblacion, and Panadtaran Solid Earth Development Corporation (SEDC) November 27, 2020, Friday, 8:00AM (registration) South Park Convention Center, Panadtaran, San Fernando, Cebu Zoom Meeting ID: 884 4801 3034 Passcode: 233847
Program of Activities Person Responsible
Registration RHR Consult Services, Inc. via Zoom Group Chat SEDC for attendance at the venue
Opening Prayer RHR Consult Services, Inc. via Zoom
National Anthem RHR Consult Services, Inc. via Zoom
Acknowledgement of Participants Mr. Gines Boltron Community Relations Officer, SEDC
Welcome Remarks Mr. Neil Papas Municipal Administrator of San Fernando, Cebu
Briefing and Orientation on the Purpose of the Public Hearing and EIS System
Engr. Rosauro L. Dividina EMB Region VII
Presentation of the proposed Limestone Quarry and Port Facility Expansion Project
Engr. Joel Sombelon SEDC
Presentation of EIA Study Engr. Jess Addawe
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 6 Solid Earth Development Corporation
Program of Activities Person Responsible
Project Manager, RHR Consult Services, Inc.
Mr. Russel Baniqued Terrestrial Flora and Fauna
Ms. Hazel Mae Añabieza
Marine Ecology
Engr. Ronald Pahunang Meteorology, Air and Noise Quality
Mr. Henry James Botengan
Socio-Economic/People Module
Presentation of House Rules on the Conduct of the Public Hearing
Atty. Unalee Monares Public Hearing Officer, DENR-EMB Region VII
Open Forum
Atty. Unalee Monares Public Hearing Officer, DENR-EMB Region VII
Summary of Issues/Concerns/Impacts raised by the public and Response of the Proponent
Closing Remarks and Next Steps in the EIA Process
Atty. Unalee Monares Public Hearing Officer, DENR-EMB Region VII
The program commenced at 9:15 AM with an opening prayer followed by the singing of the national
anthem. Engr. Rosauro L. Dividina of EMB Region VII facilitated the official start of the program at the
site.
Mr. Gines Boltron, Community Relations Officer of SEDC, acknowledged the venue’s participants such
as LGU and sector representatives. Engr. Dexter Tabada, on the other hand, introduced the participants
from the Zoom Meeting who include representatives from EMB Central Office, EIA Review Committee
Members for the project, Biodiversity Management Bureau, Mines and Geosciences Bureau, DENR
Region VII, and CENRO Argao. Mr. Jess Addawe also presented the EIA team members and
presentors of the EIA results.
Afterwards, Mr. Neil Papas, the Municipal Administrator of San Fernando, welcomed the participants
as the representative of the San Fernando LGU. Mr. Papas provided a brief background of the EIA
process and emphasized the importance of stakeholder participation in the public hearing.
Engr. Rosauro Dividina of DENR-EMB Region VII then discussed the Philippine Environmental Impact
Statement System (PEISS) in Bisayan language.
The project description of the proposed Limestone Quarry Expansion was presented by Engr. Joel
Sombelon, SEDC’s Mining Operations Department Manager while the Port Facility Expansion Project
was presented by Engr. Nilo Yap, the company’s Consultant on Safety, Health & Environment.
After the presentation of the Project Description, Mr. Jess Addawe of RHR Consult Services, Inc.
formally introduced the members of the EIA team, discussed the EIA study schedule, study area, and
the EPRMP outline (in Zoom Meeting). Consequently, Mr. Russel Baniqued virtually presented the
results of the Terrestrial Flora and Fauna Assessments conducted in the impact areas in San Fernando,
Cebu. Ms. Hazel Mae Añabieza proceeded to discuss the marine ecology study for the port facility
component of the project in Bisayan language. Afterwards, Engr. Ronald Pahunang presented the Air
Quality study results also in Bisaya. On the other hand, Engr. Catherine L. Addawe reported the water
quality monitoring results for the EIA study. For the results of the Social Impact Assessment, Mr. Henry
James Botengan detailed the methods, results of perception survey, and mitigating measures. Each of
the above presenters have shown the results of corresponding modules and their proposed
environmental management and monitoring plans.
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 7 Solid Earth Development Corporation
Atty. Unalee R. Monares of EMB Region VII facilitated the open forum and provided guidelines and
mechanics of the activity. At 12:49 PM, he officially adjourned the Public Hearing for the proposed
Limestone Quarry and Port Facility Expansion Project.
Figure 3. Registration of participants at the venue
Figure 4. Opening Prayer
Figure 5. Singing of the National Anthem
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 8 Solid Earth Development Corporation
Figure 6. Acknowledgement of Participants led by Mr. Gines Boltron in the Zoom Meeting
Figure 7. Welcome Remarks from Municipal Administrator of San Fernando - Mr. Neil Papas
Figure 8. Presentation of the Philippine Environmental Impact Statement System by Engr. Rosauro Dividina
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 9 Solid Earth Development Corporation
Figure 9. Presentation of the Project Description by SEDC
Figure 10. Presentation of EIA Results by the EIA Team Members
Figure 11. Open forum facilitated by Atty. Unalee Monares of EMBR7
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 10 Solid Earth Development Corporation
Figure 12. Participants raised issues and Concerns during the Open Forum
Figure 13. Recapitulation of issues and concerns raised and the proponent’s response, and adjourning of the
Public Hearing
3.3 PUBLIC HEARING COMMENTS
The Open Forum, facilitated by Atty. Unalee Monares – Public Hearing Officer, served as a venue for
participants to ask, suggest, clarify, and/or comment their issues and concerns about the project. The
Public Hearing Officer reminded the participants regarding the guidelines to properly identify
himself/herself (name, organization and/or position) before airing their clarifications, questions,
comments, and concerns. The participants were also informed that the open forum will be properly
documented through audio and video recordings to accurately note their statements and the
proponent’s responses.
Topics eliciting the largest number of verbal comments at the public hearing were the listed in the
following:
• Programs for COVID Pandemic response
• Hiring of forester to monitor tree survival rate
• Hiring of marine biologist in the protection of marine life
• Person-in-charge of IEC activities
• NGO Representative in the MMT
• Impacts to mangroves
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 11 Solid Earth Development Corporation
• Solid waste affecting Luknay Creek and Coastal Clean Up Programs
• Fruit-bearing trees consideration during reforestation
• Forest establishment
• Coral health measures
The summary of the Open Forum is presented in Table 5:
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 12 Solid Earth Development Corporation
Table 5. Issues and Concerns raised during Open Forum of the Public Hearing
Issues and Concerns Stakeholder/s Who Raised
the Issue Response Respondent
1. Asked what programs of SEDC for those affected by the Covid-19 pandemic, especially the victims and those whose livelihoods are affected.
Alicia A. Brobo, MSWD of San Fernando
MGB instructed mining companies to realign funds to support the government’s response against Covid-19. As early as March, the company has already extended assistance to the LGU, both on the municipal and barangay level. The company also extended assistance to the Municipal Health Office. However, with regards to this concern, SEDC is still in the process of addressing it. At present there is no formal program but SEDC has been active in coordination for Covid-related assistance. Funds for Social Development has been allocated already and has been/is being spent accordingly. SEDC shall also be coordinating with the MSWD for this concern. (MGB, through a memorandum, ordered all mining companies, SEDC included, to realign portion of the SDMP budget to support communities affected by CoVid-19 and SEDC responded by donating relief goods to the communities and also frontliners. In terms of livelihood project for CoViD-19 “victims”, at present there is no formal project yet but SEDC will coordinate and support any program of MSWD of this purpose through SDMP.)
Mr. Gines Boltron, SEDC CRO
2. Pointed out the correction on the Project Description Presentation on the mention regarding the Tenement and Barangays and their inclusion/relations.
Mr. Neil Papas, San Fernando Municipal
Administrator
SEDC welcomed and noted the correction made by the municipal administrator.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
3. Inquired the tree planting survival rate of the planted trees by SEDC. To check and mitigate the low survival rate, the LGU recommends SEDC to hire a forester.
Mr. Neil Papas, San Fernando Municipal
Administrator
The SEDC has been seeking to address this need and has already hired several foresters in the past, however due to incompetence, this did not turn out well. The company has actively searched to fill this vacancy and has currently hired a new forester who
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 13 Solid Earth Development Corporation
Issues and Concerns Stakeholder/s Who Raised
the Issue Response Respondent
started a few weeks back. Hopefully, this will already address this concern.
4. With regards to the adverse effects of the port project, he recommended hiring a marine biologist to ensure marine life protection.
Mr. Neil Papas, San Fernando Municipal
Administrator
SEDC duly noted and grateful for the comments and recommendations.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
5. With regards to the IEC, which kept being mentioned in the presentations, he inquired who is handling the IEC efforts of the company.
Mr. Neil Papas, San Fernando Municipal
Administrator
SEDC replied that the CRO attends to the IEC activities, assisted by the Com Rel Coordinator and the Admin Staff.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
6. Regarding the Multi-Partite Monitoring Team, he inquired who the NGO representative in the MMT is.
Mr. Neil Papas, San Fernando Municipal
Administrator
SEDC answered that the NGO Representative is the one appointed by the Mayor.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
7. Regardless of the Mayor’s appointment, a person more representative of the sector should be considered (relating to the NGO representative in the MMT)
Mr. Neil Papas, San Fernando Municipal
Administrator
SEDC duly noted the comment and will be discussed with the respective offices.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
8. The EIA Results show there is already very few mangroves in the study area. DENR Region 7 representative. She inquired if there will be mangroves that will be affected by the project.
For. Elizabeth M. Rivac CENRO-Argao Representative
With the FLC with the CENRO as well as the approved survey plan for the applied MLA area, there is no mangroves within the project area nor will there be any directly impacted. This of course does not take into account yet what may be indirectly impacted.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
9. There is no mention of Solid Waste Management. She asked the company’s measures to address the wastes along the Luknay creek, as well as those along the coastline as she is aware that the company participates to the “Adopt an Estero Program” of the EMB.
For. Elizabeth M. Rivac CENRO-Argao Representative
SEDC implements regular clean-up activities along the Luknay Creek, as well as Coastal Clean-up. It has just been paused during the onset of the Covid-19 Pandemic. But this November, a coastal clean-up along the port shore line was done.
SEDC SHED Officer
Public Hearing Documentation Report
Limestone Quarry & Port Facility Expansion Project 14 Solid Earth Development Corporation
Issues and Concerns Stakeholder/s Who Raised
the Issue Response Respondent
10. The solid waste management should be enhanced and broadened, and be included in the IEC, so as just not to keep cleaning up the creek but once and for all address the source of the wastes being thrown in it.
For. Elizabeth M. Rivac CENRO-Argao Representative
Solid Waste Management has been a practice and is strictly implemented in SEDC Work Areas and Facilities. The Municipal Administrator was designated as the Solid Waste Management Czar by the Mayor of San Fernando and has programs for its propagation starting at the household level.
SEDC SHED Officer
Mr. Neil Papas, San Fernando
Municipal Administrator
11. With regards to the tree planting and reforestation program, fruit bearing trees are recommended for biodiversity enhancement. This will encourage birds towards the area and thus help the biodiversity process. There should also be a similar guardianship program of the forest area, similar to that of the bantay dagat. It is recommended that those tasked with the guardianship be coordinated with the DENR for orientation and deputization.
For. Elizabeth M. Rivac CENRO-Argao Representative
SEDC delegates Forest Guards, 3 at present. This is also in conjunction with the EPEP. SEDC will coordinate with the DENR7-CENRO to enhance this endeavor.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
12. The perspective should be to “Make Forests” and not just Tree Growing. As forest guards are being mentioned, but there are no forests yet to guard.
Mr. Neil Papas, San Fernando Municipal
Administrator
Duly noted by SEDC. Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
13. Asked what measures with regards to the Coral Health are to be implemented by the company.
For. Elizabeth M. Rivac CENRO-Argao Representative
SEDC is under the process of attending to Marine Resource Stewardship. SEDC has initially consulted with a Marine Biologist Consultant for this and will coordinate with the DENR office for Technical Assistance.
Ms. Mitzie Almira I. Carin,
SEDC HRA Manager
ANNEXES
1. RECEIVED INVITATION LETTERS
2. PROOF OF PUBLICATION
3. ATTENDANCE OF STAKEHOLDERS & THE GENERAL PUBLIC
4. POWERPOINT PRESENTATIONS
Annex 1
RECEIVED INVITATION LETTERS
Republic ofthe Philippines
DepaItment Of E重置Vironment and NaturaI Resources
魁的Vl陣の対ME対すAL醐ANÅG曲勘鰹光明富野U襲EÅU
DENR Compound, Visayas Ave刷e, D緬an Quezon City = 16
丁eiephone No§∴ 〈632)927-15・17, 928-37-25; Fax討o∴ (632) 920-22-58
Website: http:〃聞w.emb.gov.ph / Emai白rna"@emb.gov.ph
MR. VAVY MONTREAH H. DAYAO
BaI岬Ilgqy, Cqplain
Barangay Hall ofPanad ar州, San Fernando, Cebu
(032) 488921 1
November 3, 2020
Su勘ect: Public Hearing of the proposed SEDC Ljmestone Quarry and Port Operations
Expansion PrQiect of Solid Ea巾h Development Corporation
Dea「駒r. Dayao;
We are pleased to invite you and your constituents to attend the Public Hearing of the
Propo§ed SEDC Limestone Quarry and Port Operations Expansion Prqiect ofthe Solid Earth
Developme11t Corporation. The said hearing is scheduled on:
D租書e �Time �Venue �zoomDe亡ai賞s
27November2020 �8:00AM �SoしIthParkConvention �MeetingID:88448013034 RegisII■alわnsla融 �Center,Panadtaran,San
(Friday) ���Passcode:233847 a17.・30AM �Fe「nando,Cebu
The Public Hearing w川be conducted as part ofthe requirements ofthe proponent,s application
for an Environmental Compliance Cer揃cate・ Interested parties will be given the opportunity to
express freely their concemsIsupport/opposition/questions about the prqject.
Kindly register or submit a concise pos誼on paper to this O飾ce via email at i迦繋出血,
血ee (3) days before the scheduled Pu班c Hearing∴「hose whO are unable to register online or submit
POSition papers may still join the discussion on the day ofthe hearing.
Attac霊led herewith is thc prQject’s Executive SummaIγ for the PubIic (ESP) for your reference.
The prqiect’s EnvironmentaI Perfomance Report and Management Plan (EPRMP) is dowuloadable at
Our Website ww.eia.emb`gOV.Ph. Kindly access the Notice ofPublic Hearing/ Consultatien link foundin our web page). The copies ofthe ESP and EPRMP are available at the fo11owing o飾ces:
● 隠MBRcgion7
Greenplains Subdivision, Banilad, Mandaue City, Cebu
(032) 345-3905
e LGU輸San Fernando, Cebu
Municipa臨y of San Femando, Province of Cebu
Should you have any qしIeStion, yOu may COntaCt Engr. Dexter Tabada, PrQject Case Handler,
Environmenta=mpact Assessment and Management Division (EIAMD), at teIephone numbers +632
8920-2240 and十632 8920-224上
Since「cIv yOu「S,
陸鵡圏雪国W賞LL霊AM P. CU内ADO
OIC-Director
Vの思川諦槻P′◆0柄I I力e c面It’層′,榊/… P/./,/ef/ /妬…
Repしl掘c ofthe Philippines
Department of Envi「onment and Natural Resources
曲的V耶雷O師描配的TAし醜ANAG圏M玉村ず蹄町碍理AモJDENR Compound誰SayaS Avenue, D緬man Quezon Ci!y = 16
丁e厄ph°鴫Nos∴ (632)927-15-17, 928-37-25;戸a州0ふく632) 920-22-58
Website:間p:/柄ww.emb,gOV.Ph / Em訊[email protected]
November 3, 2020
MR. D嘉OSCORO B. PÅCQUIAO, JR.
Ba′柳略の, CやわiI~
Bara鵬gay Hall ofTi肌bdan, San Fernando, Cebu
O91 2- 1 072982
Subject: PしIblic Hearing of the proposed SEDC Limestone Quarry and Port Operatious
Expausion P「Qject ofSolid Earth Development Corporation
Dear Mr. Pacquiao, Jr.:
We are pleased to invite you and your constituents to attend the Public Hca血g of the
Propo§ed SEDC Limestone Quarry and Port Operations Expansion Pr《函Ct Of the So]id Earth
DeveIopment Corpo「ation. The said hearing is scheduIed on:
Date �Ti血e �Ve血ue �zoo鵬Deのりs
27November2020 �8:00AM �SouthPa「kConvention �Meeting!D:88448013034 Regis17.ationslaI.応 �Center,Panadtaran,San
(Friday) ���Pass○○de:233847 a17:30AM �Fema富ldo,Cebu
The Pu描c Hearing will be conducted as part ofthe requirements ofthe PrOPOnent’s application
for an Envirol-mental ColnPliance Cer輸oate. Intere§ted parties w組be given the oppo血nity to
express freely thei「 concems/support/opposition/questions about the p「Qject.
Kindly register or submit a concise position paper to軸s O鯖ce via email at裏rfu軸2b,
three (3) days before the scheduled Public Hearing. Those who are unable to register online or submit
position papers may s刷join the discussion on the day ofthe hearing.
Attached herewith is the pr匂ect’s Executive Summary for the Public (ESP) for your reference.
The prQject,s Environmental Performance Report and Management Plan (EPRMP) is downloadable at
o町Website -.eia.emb.gov.ph. Kindly access the Notice of Public Hearing/ Consultation link found
in our web page). The copics ofthe ESP alld EPRMP are available a=he fo11owing o航ces:
。田MBReg盲on7
Greenplains Subdivision, Banilad’Mandaue City, Cebu
(032) 345-3905
0 LGU-San Fer皿ando, Cebu
Municipality of San Femando, P「ovince of Cebu
ShOuld you have any question, yOu may COntact E鵬gr. Dexter Tabada, PrQject Case Handler.
Environmenta=mpact Assessment and Management Division (剛AMD), at telephone numbers +632
8920-2240 and十632 8920-224 1.
Sincerely yours,
田豊国雪国P. CU雨ADO
PI・(Jl紺I I尿謝l・il・個I7硝l…件の沈・I I妬.,
O重C-D i rさc章or
蕎CA持7
Sを責ニ.
」ノじ-そo
陣epしlblic or佃さP踊押ines
Depa11ment of EnviroI聞ent and Na血ral Reso…CCS
駐韓Ⅴ膿㊦河朋旧聞甘Å巴醐A閏A鵡記翻閲園丁瓢用地A調
胃 雷驚言繕謹鷲織笠Novembe丁3, 2020
M恥. SOF隠ON細O磨. Aし『困C鵬E
PIセSiくね励
South Poblacion Fisllermen A§§Oeiati伽(SoPoFiAs), South Poblacion. Sa調Fe叩ando, Cebu
c/0 (032) 2668749 -母rgy. Hall
S噂ect: Pl暮blic Hea血g of the proposed SEDC Limestone Quarry and Port Operations
Expansion PrQjec書of Solid Earth Dcvelopment Corporation
Dear Mr. Atfeclle:
We are pleascd to invite you to attend the PubIic蘭脚血g of’the Proposed SEDC Lime§tOne
Q雌rry and Port Operatlon§ E叩an§ion Prqiect of the Solid Ea皿Development Corporation. The
Said血eむrin呂is schさduled on:
Da‡e �Ti調e �Ven職e �zoo鵬De書証Is
27November2020 �8:00AM �Sou砧ParkCo職vcn書ion �MeetinglD:88448013034 R培i勅.aIions約手Is �Ce血er,Panad書ar租n,San
(Friday) ���P謎scode:233847 a17.・30AÅI �Fem紬do,Cebu
The Pu掘c Hearing w川be conducted as part ofthe reqllir合ments ofthe proponent’s application
for an Environmental Compliance Certificate. Interested parties w紺be given the oppo11uIl王ty to
express froely their concerns/support/oppositio函uestions about the pr句ect.
Kindly register or submit a concise position papcr to this O恥e via email at通」壇摸!漣や山地,
three (3) days before the scheduled Pu掘c Hearing. Those who are unabIe to register online or submit
POSition papers may s航りOin the discussion on the day ofthe hearing.
Attached hcrewith短he prQiect’s Executive Summary for the Public (ESP) for your reference.
丁he prqiect’s Environmental Perfurmance Report and Management Plan (EPRMP) is downloaぬble at
Our Website www・eia.emb.gov`ph. Kindly access the Notice ofPubIic Hea血g/ Cons亜ation link fomd
in our web page). The copies ofthe ESP and EPRMP a「c ava温ble at the following o欄ces:
O 鴫M髄恥egio血7
Greenplalns Subdivision. Banilad, Mandaue City, Cebu
(032) 345置3905
e LGU-San Fernando, Cebu
Mし面cipality of San Femando, P「ovince of Cebu
Should you have any question, yOu may ContaCt Bngr. Dexter Tab分d租, P「qiect Casc Handler,
Enviromenlal Impact Assessment and Management Division (EIAMD), at teleph0ne叩mbers +632
8920-之240租nd十632 8920_224上
Si腿ccrely yoしI裏・S,
轟吉〆雷〆蜜
しし富A棚甲. CU内ADO
O喜C輸Direc10「
l与`′l私I Il小間高I・`個刷I...柄海でI l弥.. 四囲四囲
璽 RepしIblic ofthe Ph消ppines
Depa11ment of Enviromnent and Natural Resources
曲押VI蹴O討弼E恥了AL轍A卵AG窮醐瑠刺門∵鯵U蹴EA請D削R Compo皿d, Visayas Avenue. D胸an Quezon City = 16
丁el印hone Nos∴ (632〉927-15-17, 928・37-25;戸a州〇二(632) 920-22-58
Website: ht巾:〃w抑/.emb.gov.ph l ∈m細ma待@帥b.gov.ph
MR. CASIANO T. CANOY
Bの′・aI7誹りC叩Iain
Barangay Hall of Ta慮a軸s, San Fernando, Cebu
O906-330 1 369
November 3, 2020
Su匂ect: Pub=c Hearing of the proposed SEDC Limestone Quarlγ and Port Operations
Expansion PrQiect of Solid Earth Development Corporation
Dear肌r. Canoy;
We are pleased to invite you and yoし一r COnStituents to attend the Public Hea血g of the
Proposed SEDC Limestone Q櫨ar「y and Port Operatio鵬取panSion Prqiect of the Solid Earth
Developme11t Corporation. The said hearing is scheduled oll:
Da章e �Timc �Ve調ue �zoomDe章aiIs
27November2020 �8:00AM �SouthParkConvention �MeetingID:88448013034 Regis′7・aIioI7SIarls �Center,Panadtaran,San
(Friday) ���Passc○de:233847 aI7.・30AM �FemandoつCebu
The Public Hearing will be conducted as part ofthe requirements ofthe PrOPOnent,s applieation
for an E【一Virormental CompIfanee Certifroate. Intel.eSted parties w航be given the opportunity to
express free ly their concems/suppo「t/oppositio函uestions about the prQject.
Kindly legister or submit a concise position paper to this Office via email at e証蛙111b.掌O¥可l,
three (3) days before the scheduled Public Hea血g. Those who are unable to register o証ne ol. Submit
POSition papers may still join the discussion on the day ofthe hearing.
Attached herew軸is the prqiect’s Executive Summary for the Public (ESP) for your rcference.
The prQject’s Environmental Performance Report and Management Plan GPRMP) is downloadable at
Our Website www'eia,emb.gov・Ph. Kindly access the Notice ofPublic Hearing/ Consultatio掴nk found
in our web page). The copies ofthe ESP and EPRMP are avaiIable at the following o飾ces:
e BM魅Re如O観7
Greenplains Subdivis on, Banilad, Mandaue City, Cebu
(032) 345-3905
O LGU-San Fernando,Cebu
Municipality ofSan Femando, Province ofCebu
Should you have any question, yOu may COntaCt Engr. Dexter Tahada, Prqject Case Handler,
E11Vironmenta吊mpact Assessment and Management Division (EIAMD), at telephone numbers +632
8920-2240 and十俄2 8920-224l.
Sincc「ely yours,
●富〆〆一一㌦‾
W!しし賞ÅM P.
OIC-Director
CU内ADO
I国中 P′●ひ庇/ /庇の八、i′・0′槻e,′/… P’・。/CC′ /妬“
R印u輔c o唖le Ph轟ppines
DepaI.ment Of Environment alld Natural Resources
E卵V重融O肘脱出的甘AL i殺A囲A脅班朋思弾で鯵U REAUD酬R Compound, Visay∂S AveⅢe. D紬man Quezon Ci申l 16
丁elephone上れS∴ (632)927-15-17. 928-37-25守ax No∴ (632〉 920・22-58
Website: http:〃肌飾emblgOV.Ph / Em訓: mall@emb"gOV.Ph
November 3, 2020MS. ROSAR喜O D. TORMIS
M棚icやa/動面oIm7eI7/の/ a′7d Nc沈〃廿I R錆0~IrCeS Q(殖er
M皿童c申al B重dg. ofS分n Fernan寄o, Ce心u
(032) 272 1079
Su匂ect: Public Hearing of the proposed SEDC Limestone QしIaI|γ and Port Opel.ations
Expansioll Pr匂ect of Solid Earth Developmenl Corporation
Dear Ms. To「mis:
We a「e pleased to invite you to attend the Public Hearing ofthe Proposed SEDC Limes‡one
Quarry and Port Operation取pansion Project ofthe Solid Earth Development Corporation. The
Said hearing is scheduled on:
Da書e �’富i鵬e �Venりe �乙oo鵬De書租i置s
27Novembe「2020 �8:00AM �SouthParkConvention �MeetinglD:884480再034 RegisIγaIionslaIイS �Center,Panadtaran,San
(F「iday) ���Passcode:23う847 a17.・30AM �Femando,Cebu
The Public Hearing w川be conducted as part ofthe requirementS Ofthe PrOPOnent’s application
for all Envil・Onmentai Compliance Cel.描cate. lnterested parties wi11 bc given the oppoltunity to
express freely their concems/supportノopposition/questions about the prQject.
Kindly registel・ Or SしIbmit a concise position paper to this O飾ce via email at ci高相11l).如¥’.吐,
three (3) days before the scheduled PしIblicしIearillg. Those who are unable to registel● Or亜ne or submit
POSition papers may s剛join the discussion on the day ofthe hearing.
Attached herewith is the prqiect’s Executive Summary for the Public (ESP) fo「 yoIIr 「eference.
The prqject’s Environmental Perfomance Report a書ld MaIlagement Plall (EPRMP) is downloadable at
Our Website www.eia.emb.gov.ph. Kindly access the Notice ofPub塙c Hearing/ ConsしIltation冊k found
in o冊Web page). The copies ofthe ESP and EPRMP are available at the following offices:
。勘MBRegion7
Gl・eenPlains Sllbdivision, Banilad, Mandaue City, Cebu
(032) 345-3905
。 LGU-San Fernando,Cebu
Mu11icipality ofSan Femalldo, Pl’OVince ofCebu
Should you have any question, yOu may COntact Engr. Dexter Tabada, PrQiect Case Handler,
Environmental lmpact Assessment and Management Division (EIAMD), at telephone numbers +632
8920-2240 and十・632 8920-224 1.
Sincerely yoし1rS,
国王冒ILL事AM P. CU内ADO
p硬高所.。聞出,.(,l間柄画鱒華
Republic o刷Ie P姐ippincs
Depflrtment Of Environmel章t and Natural Resoul.CeS
駐軸V曹RO前醐隠酌ずÅ運髄A鞠A(渦潮曲的’ざ蹄も賦駐在liDENR Compound. VisaγaS Ave佃e. D軸紬Quezon City =碕
≡夢細 喜怒認諾語鴻鵠吾Nove皿bcr 3, 2020
MS. VすS冒TÅC竃ON C. V書LLAMERO
規Iぶi)タeSS O†1仰eI・
Vi§Sy,§ S章o「e
Timbdan, San Femando, Cebu
9394う74084
Sl璃ect: Pu掘c Hea血g of the proposed SEDC Limestone Qua∬y and Port Operations
Expa11Sion Pr(垂ct of So舶Earth DevelopmeIlt Corporation
Dear M§. Villamero:
We are pleased to invite you ‘O attend the Pub置ic鵬糾ing ofthe Propo§ed S圏DC L緬esto調e
Q咽rry and Port Operation§ Exp狐nsion Prqject ofthe Solid Earth Development Corpora証on・ The
Said hea血g is schedlIled oll:
D租tc �Ti鵬e �Venue �乙のo調De船舶
27Nove調bcr2020 (Friday) �8:00AM �So面hPa章・kConven書ioll �Mce血営教D:884480書与034 Passc○dc:2鵜847 RegisI7.aIioI7SIuI●ls �Center,Panadtaran,San
a17:30A太〆 �Fe「舶nd○○Cebu
The Public手Iearing w紺be co11ducted as pat ofthe requirements ofthe proponent’s ap函cation
for an Environmental Comp壇ance Cert描cate. 1nterestcd pa「ties w紺be given thC OPPOl.tunity to
expres§ freely their conccms/support/opposition/questio11S about the prqject.
Kindly register or sし1bmit a concise position paper to佃s O徹ce via email at ±j±生娘連投L由
thrce (3) days befol・e the schedule〔l Public ‖宅aring∴l’hose who are unable to regi§ter O揃ne or submit
position papers may st町Oin the discl-SSion on the day ofthe hcaring.
Atlached herewit吊s the pI旬ect’s Executive Summary for the Public (ESP) for your reference.
The pr句ect,s Envil‘O叩ental Performa霊事Ce Report a重1d Management Pla11 (EPRMP) is downloadable at
our website www.eia.emb.gov.ph. Kindly access the Notice ofPublic Hearing/ Consultation link found
in our web page). The copies of油e ESP and EPRMP are available at the following o雌ices:
。鳴M職Re轡ion7
Greenplains S‘lbdivisiol一, Banilad’Mandaue City・ Cebu
(032)事4う・3905
0 しGU -S郷n臼e肌分れdo,Cebu
M1micipality of Sall Femando, Province of Cebu
ShOuld you have any question, yOu may COntaCt Engl.. Dexter Tab租d鑓, Pr匂ect Case Ha11dlel‘,
Environ】nCntal ImPaCI Assessment and ManageInent Div轟on (EIAMD), at telephone mll11bers +632
89之0-之240紬d十632 8920-224上
Sincerely yo肌s,
声へ弓 〆・・〆〆㌦トー
隠語霊.‾霊。蜜OIC重DiTeCtO「
[与(II短・出血当初l、iI・硯I冊III… l与()I(・し・l
萱蓋重
R合pl輔c of the Ph溝ppincs
Department Of Environment and Nafural Resources
彊NV聡O閏期間周甘A曽.棚A弼A屯鴎醐盟撞丁朗煉激AUD削R Co叩ound, Visay∂S Avenue, D軸a[ Quezon C時= 16
了e廟トo鵬的os・‥ (6線〉927輸15・17, 928}37・飴膏秋岨・ (632) 920-22・58
鵬b§iくe: h輝〃鵬博e∩↑b・90V・Ph I Ema旧n劉@帥b.90V.Ph
PC. KAZUH書KO ICH喜ZAWA
PタでSiくね〃I
l“aiheiyo Ccme皿t Phils.,置nぐ.
Sou章h PobIacion, San Fe調紬do
O32)2322688; (0つ2)2307鵜3
November 3, 2020
Su華Ct: Public Hea血g of the proposed SEDC Limestone Quarry and Port Operation§
Expansion Pr(海ct of Solid Earth Development Co巾oration
De狐Pc.霊ぐhi捌W耽
We are pleased to i11Vite you to attend the Publie Hcaring ofthe Proposed SEDC Limestone
Quarry and Port Opcration§ E叩ansion Pr(函Ct Of lhe So闘Ea血Development Corporation. The
Said hearing is schedllled on:
D租書e �Ti調e �Ve競りe �zoo調Deね鵬
27Nove叩bc「2020 �8:00AM �SouthPal・kConvention �Mcc血留肥:88448013034 Regiぶl棚IioI国al●Is �Center.Panadt紺an,San
(Friday) ���Passcode:2鵜847 a17:30AM �Femalldo,Ccbu
The Pu掘c鵬aring w紺be conducted as part ofthe requirements ofthe proponent’s application
for an Environmental Complia11Ce Certificate.血erested parties w紺be give11 the opport肌ity to
expl.eSS freely their concems/support/opposition/questions abo[lt the pr(来ct.
Kindly register or sしIbmit a concise position paper to輔s O鯖ce via email at ds聖地亜畏捜L由
three (3) days befol.e the scheduled Pub障c Hgaring, Those whO are unable to register on輔e or submit
POSition papers may s細join the discussion on the day ofthe heari11g.
Attached hel・eWitl吊s tlle PrQiect’s軟ecutive Summary for the Public (鴨SP) for you‖refe「ence.
The Pr匂ect’s Environmen融Perfi正1anCe Report and Mana畠ement Plail (EPRMP) is downtoadable at
our website www.eia.emb.gov.ph. Kindly access th8 Notice ofPu輔c Hearing/ Cons両創ion li撮fo¥lnd
in our web page)∴rhe copies ofthe ESP and EPRMP are available at the following o飾ces‥
e 賦朋職恥egio調7
Greenplains Subdivision, Ban航d, Mandaue City. Cebu
(032) 345-3905
e LGU-San Fern紳ndo, Cebu
M皿icipality ofSan Femando, Province ofCebu
Should you have ally queStion, yOu may COntaCt Engl.. De強ter Tab鵠d鑓, PrQject Case lねndler,
Environmenta‖mpact Assessmcnt and Ma一一agement Division (EIAMD), at te!eph0ne個nbers +632
8920-2240 and十億2 8920-224上
Si調cercly yりすS,
∴高言/詰‾〆’“小で生き-p〇㌔¥
ENtf轍WILLiAM P. CU内ADO
O!C-Dircclo「
航)樹/ /柄cI柄I・(肋I聞I…柄,/“/ /沈‥ 四囲
RepしIblic ofthe Philippines
Department of Environment and Natural Resources
鴎飾V駈!O肘鵡語N甘AL j淘Å討ÅG班朋五郎でB町恥勤AUD削R Compound, Visayas Avenue, D柵an Q]eZOn City = 16
丁el印hone Nos∴ (632〉927-15-17. 928-37-25; Fa州o.: (632〉 920-22-58
Website: http‘伽柵W.emb.gov.ph / Ema蛤ma"@emb.gov ph
November 3, 2020MR. D事OSCORO E. ES職RA
BaI・a-柳, Cα7Ia所
要ねra唯ay Hall ofSouth Poblacion, San Fernando, Ceb調
(032) 2668749
Subject: Public Hearing of the pl"OPOSed SEDC Limestone Quany and Port Operations
Expansion PrQject of SoIid Earth DeveIopment Corporation
Dear Mr. Esbra:
We are pleased to invite you and your consstituents to attend the PubIic Hearing o「 the
Propo§ed SEDC Limestone Quarry and Port Operation§取pansion Project of the Solid Ealてh
Development Corporation. The said hearing is scheduled on:
Da章e �Time �Venue �zoomDetails
27November2020 �8:00AM �SouthParkConvention �MeetinglD:88448013034 Reg融ナaIior7SIα・ls �Center,Panadaran,San
(F「iday) ���Passcode:233847 a17:30AM �Femando,Cebu
The Pub]ic Hearing will be conducted as par[ ofthe requiremel-tS Ofthe proponent,s application
for an Environmental CompIiance Certi廉cate. Intcl.eSted parties will be given the OPPOrtunity to
express freely their concems/suppoIVoppositiorl/questions about the PrQject.
Kindly register or submit a concise position paper to this O鯖ice via email at eia証emb璽出血,
three (3) days before the scheduled Public Hearing. Th0Se Who are unab]e to registe「 on=ne or §ubmit
POSition paper§ may Stilljoin the disc11SSion on the day ofthe hearing.
Attached herewith is the prQiect’s Exccutive Summary for the Public (ESP) for your reference.
The prQject’s Environmental Performance Report and Management Plan (EPRMP) is downloadable at
Our Website www.eia.emb.gov,Ph. Kindly acces§ the Notice ofPublic HearingI Consultation ]ink found
in our web page). The copies ofthe ESP and EPRMP are ava温ble at the fo11owing o珊ces:
e 鴫朋恥Regio調7
Greenplains Subdivision, Banilad, Mandaue City, Cebu
(032) 345-3905
o LGU-San Fernando,Cebu
M皿icipality of San Femando, Province of Cebu
Should you have any question, yOu may COntaCt Engr. Dexter Tabada, PrQiect Case Handler,
Environmenta=mpact Assessment and Management Division (EIAMD), at telephone numbers +632
8920-2240握nd十632 8920-224 L
即IIイデーわ竹I佑助′
P′・の/cT/ //7“用・irr,川,一個/... PI・()/C。/ /碑
AM P. CU内ADO
OIC-Director
Republic ofthe Philippines
Deparment ofEnvirol置me11t and Natural Rcso冊CeS
配的V轍ひ押期間調ずÅ虹鯛A閏AG観髄鵜的丁凱賦親銅I
高士三㌢ 丁。薄黒薄露盤盤盤盤薄霧8博I命ト(高倉・ h書それ・l信用相′ `ゝnhト′、(,, _」 I各州_高,_{打席、(.強」 __,.輸」間e幽鏡h砂〃肌棚爪b・gOV・ph l自問ai同訓@e調b,gOV ph
MSGR書AしFREDO O. ROMÅNILLOS, JR.
Le轟I・
Tcam of Pastors, St. Isidore Tlle Fal.mer ParisII
South Poblacion, San Fel・nando
(032) 4880097
Novcmber 3, 2020
S喧ct‥ P輔c He証n呂of the proposed SEDC L涌ostone Qし一al.ry and Port Operatio!一S
Expansion PrQject of SoIid Earth Development Corporation
Dear Msgr. RomanilIo§, JI..:
Wc are pleased to in‘′ite you to a‘tend the恥bIic Hearing ofthe Pr叩osed SEDC Limestone
Quarry and Port Opera鉛ns E叩nSion Prqiect ofthe So]id Ea軸Developmcnt Co「pora血. TIle
Said hearing is scheduled on:
Da書c �Time �Ve調置置e �zoo調勘efむil§
27Novenlbe「2020 � 8:00AM Rン● ● �Sou‡hPa「kCo競ve調書ion �Meetin忠霊D:88448013034
(F「iday) �egIS庇雄OI7諏aIIs u17.・30AM �Cen章el,Panadtaran,S鮒 Fe「n紬do,Cebu �Passcodc:233847
Tl置e P輔c Hearing刷be conducted as part o佃e requiremcnts ofthe proponel-t's applicatioll
for an Environmel血Compliance Cer捕eate.血erested paTties wil~ be give一一fro oppo軸lity to
CxpreSS froely their concerns/support/opposition/ql‘eStions abollt the prqjecし
Kindly rcgister or submit a col-Cise position papcr to this Of加e via emai】 a痩地鎚d逗軸虹
thrce (3) days before tl-e SCheduIed P‘lblic蝿ring・ Those who are ul-able to register onIine or submit
POSition papers IT'ay S細join the discussion ol- the day ofthe lmrillg.
Attached hcrewith is the pr噂vtis Execu{ive Summary fo「 tl置e P踊c (ESP) for yollr r鴫re11Ce.
Thc pr垂ct’s E一一Vironmental Performance Report and M鮒ageme一一t Plan (EPRMP) i§ down]oadable at
Our Website www・eia.emb.gov.ph. K脚y access the Notice ofP輔c Hearing′ Consultation link fou重ld
i11 Our Web page). Tl-e COPies ofthe ESP alld EPRMP a一・e aVa軸Ie at tl-e剛owjng officcs:
O E朋鯵Regio職7
Greenplains Subdivision’Ban融, Mandaue City, Cebu
(032) 345-3905
e LGU-San Fernando, Cebu
Municipa航y of San Femando, Province of Cebu
SI置Ould you l-aVe any quCStion’yOu may ContaCt Eng「・ Dexter Tab鑓da, Prqiect Case Handler,
Envirollmel-taI lmpact Assessn-ent and Manage一一一ent Division (EIAMD). at telcphone numbe「s +632
8920-2240細d十632 8920-224上
Si調cさ「cly yoしl「§,
O重C"Di鳩c章o「
航/ut I/一雄両用′,聞′/..‘ P′・()l聞/炉
Repllb“c oftlle P皿ippines
Department of EllVholl賞ne章lt and Nat面al ResoしIrCeS
鵜的Ⅴ彊親の的鯛難的甘Å麗.鯛Å関AG隠蹴兇対照“蹄む阻隠AミDENR Compo聞d, Visayas Av即ue, D柵an Quezon Ci申出6-○○‾ 〇〇〇、〇〇
芋蔓㌢ 丁鵠蕊詩織宝器豊討諾議書器Novc爪ber 3, 2020
HON. LAKAM聯NI G. R闘LUYA
人血肩c巾al勅ゆ0′・
桝u請ici岬置軽さdg. ofSan 『er調紬doうCebu
(032) 2721 079
経、
Subiect: Pub臨Hearing of the pl.OPOSed S烏DC Linestone Quarry and Port Operati高…i!望一
ExpansioれPrQiect of SoIid Earth Development Corporatio調
Dcar H〇億. ReI叫ya:
We al・e Pleased to invite you a11d your constitしlentS tO attend the Public鱒eari帆g of the
Proposed SEDC鵬mestollC Qu紺ry紬d Por! Operations Expansion PrqiecさOfthe Solid Earth
Dcvelopment Corporation. The said h飼ring is schcduled on:
D種でe �Time �Vemりe �乙oo鵬Detaits
27Novcmbe「2020 �8:00AM �SollthParkConvention �Mccting着Dこ884480重30う4 R(培高II擁ioIl」佃I塙 �Center,Panadtaran,San
(Friday) ���Passcodc:2鵜847 a17、・30A勅 �Fema11do,Cebu
The Pu輔c Hearing wiIl be conducted as part ofthe requirements ofthe prOPOnent’s appIication
for an E!w証onmental Compliance Cert細cate. lnterested parties w紺be given the oppolt胴ity to
CxpreSS frocly their concelTIS!support/oppositionIquestions about the prQject.
Kindly registel. Ol. Sub証t a concise positio叩ape!・ tO tllis O鯖ee via ema紺ot高・高11ll..即.〇両,
血ce (3) days before the SCheduled Public Hearing∴rho§e Who are unable to l.egistor online ol・ Submit
PO§ition papers may s細join the discussion on the day ofthe hearing・
Attached herew軸is虹e pr句ect’s Exccutive Summary for the PIIblic (ESP) for your reference.
The Prqiect’s Environme【1tal PeI.formance Report and Managemenl PIan (EPRMP) is downloadab!e at
Ollr Website wow.eね.emb.gov.ph. Kindly access the Notice of Pu掘c Hearing/ Consultation link found
in our web page). The copies ofthe ESP and EPRMP al.e availabIe at the following o情ces:
e 隠M脇Regio調7
Greenp]ains Subdivision. Banilad, Mandaue City, Cebu
(032) 345置3905
e LGU-S増n恥m肌do,Cebu
Mu11icipality of San Femando, Province of Cebu
ShOuld you have any question, yOu may COntaCt Engr. Dexter Tabada, PrQject Case Handlel.,
E11ViI.Onmenta‖mpact Assessment and Management Division (EIAMD), a=elephone恥mbers十632
8920-2240 and十償2 8920-22匂上
Since胎Iy your§,
冒ししIAM虹CU内ADO
OIC-Dircctor
柄硬・l II-出′高・研〃I`′柄・・ P′・()柄・I I碑…
Republic ofthe P刷ippines
Department of EnviroIlment and Natural Resources
曲NV霊最〇㍍棚田邸でAL朋こA討AG圏朗丑的ず蹄U武田A町DENR Compound, Visayas Ave刷e, D軸an Quezon City = 16
丁el印hone Nos∴ (632)927-15-17, 928-37-25守秋No.: (632) 920-22・58
Website:崎:勅許W.emb.gov.ph / Ema組[email protected]
MR. GENARO B. SAROL
BaI●a′lg坤, C呼,Iain
Barangay Hall of Basak, San Fernando, Cebu
C/o O905-3529488 - SK Chairpe「son
November 3, 2020
Su勘ect: Public Hearing of the proposed SEDC Limestone Quany and Port Operations
Expansion PrQject of So置id Earth Development Corporation
Dear Mr. Sarol:
We are pleased to invite you and your constituents to attend the Pu唖c Hearing of the
Pl.OPOSed SEDC Limestone Quarry and Port Operations Expansion Prqject of the SoIid Earth
Development Corporation. The said hearing is scheduled on:
Da書e �Ti鵬c �Venue �乙oomDe書租ils
27November2020 �8:00AM �SouthParkConvention �MeetinglD:8844801う034 RゆかalionsIa7・持 �Center,Panadtaran,San
(F「iday) ���Passcode:233847 a17:30AM �Fe「nando,Cebu
The Public Hearing will be conducted as part ofthe requlrementS Ofthe proponent,s application
for an Environmental ComPliance Ce一輔cate. Interested pa面es wi11 be given the OPPOrt皿fty to
express freely their concems/suppoIVoppositionlquestions about the PrQject.
Kindly '‘egister or submit a concise position paper to this Office via email at i遜un車o¥’.通,
three (3) days before the schedしIled Public Hearing. Those who areしInable to register o踊ne or submit
POSition papers may still join the discussion on the day ofthe hearing.
Attached hereWith is the prQject’s Executive Summary for the Public (ESP) for your reference.
The pr可ect’s Environmental Performance Report and Management Plan (EPRMP) is downloadable at
Our Website www・eia・emb・gOV.Ph. Kindly access the Notice ofPnblic Hearing/ Consultawion link found
ill Ou「 Web page). The copies ofthe ESP and EPRMP arc available at the following o飾ces:
o 曲M鯵Region7
Greenplains Subdivision, Banilad, Mandaue City, Cebu
(032) 34う-3905
e LGU-San Fernando,Cebu
Municipa冊y of SaII Femalldo, Pl.OVince of Cebu
Shou】d you have any question, yOu may COntaCt Engr. Dexter Tabada, PrQject Case Handler,
Environmenta‖mpact Assessment and Management Division (EIAMD), at telephone numbers +632
8920-2240 and十632 8920-224 L
Sincerely yours,
P. CU丙ADO
OIC-Director
Pl’0/CCl //l招w‘,i’.0研一研/… PI・(沈C./ /碑.
因四四四回
Repu描c 〇千章he Pl捕ppines
Dep餌ment of Enviro置lmeut and Nalural Resoul`CeS
瞬鄭明椀0鐘轍静岡町Åし醐A阿A甥配醐班的甘敬服謡AU
帝 葦嵩欝諾鷲畿磐Novembe「 3, 2020
D龍, Aし円陣EDO S.駒ANUGAS霊V
M諦i壇)aI H融勅〔砺ceI・
M皿ici匹l劇d争OFS的中ernando, Cebり
(032) 4889703
S噂e魚∴∴∴ Pub=c重iearing of lhe proposed S罵DCしimestone Q蝿ny and PorL Operations
Expansion PrQiect of Solid Earth Developmcnt Co叩Oralion
D命ar D富. M種油ug鋤s賞Vこ
We al.e Pleased to invite you to袖end the Put踊c舶cari鴫ofthe Pro叩§e億SEDC Limestone
Q調rry an億Port Ope「ations取pansion Prqうect ofthe Solid Ea血Development Corporation. The
Said hearing is scheduled oIl:
Dかe �T王鵬e �Venue �zoo鵬De書郷ils
27Nov8調ber2020 �8:00AM �SouthParkConvention �Mee血豊lD:884480は034 R呼応II●αioタブS同・応 �Ccnter,Panadta丁aれ,San
(『riday) ���Passcode:2三3847 u17.・30AM �Fe岬l紬do,Cebu
The Public Hcaring will be conducted as part o「the requlrementS Ofthe proponent’s ap函catio11
for an E11Vironlnental Compliance Ccr輔cate. Interested parties w刷be given the opportunity to
expl・eSS舟eely th誼concerns/sしIPPOrt/oppositio函uestionsねout the prQject.
Kindly register or sしIbmit a co11Cise position papcr to輔s O範e v・ia email at r料寮現時g型.由
佃ee (3) days beforc the schedl庇d Public Hearing. l.‘hose who are unable to register online or submit
POSition papers may s剛join the discu§Sion on the day ofthe hearing.
Attached herewi鮎s the prQjectts Executive Sし一mmary for thc Public (ESP) for your I.efereIICe.
The prqject’s Environmental Perfomance Repori and Management剛an (EPRMP) is downlo8dable at
Ou「 Website www・eia・emb.gov‘Ph. Kindly access the Notice ofPublic Hearing/ Consultation link fouIld
in our web page). The copies ofthe ESP and EPRMP are available at the followirlg O珊ces:
〇 日駒BRe容ion7
Greenpl壷ns Subdivision, Ban温d、 Ma11daue City. Cebu
(032) 343-3905
e しGU置S掛れFern郷ndo, Cebu
Municipality of San Femando, P章▼OVince of C曲ll
Should you have any question裏yOu 11喜ay COntaCI Engl.. Dexter T@ha庇l, Prqiect C謎e Handler,
EnviroI-merlta‖mpact Assess一一一ent and Management Divi§ion (EIAMD), a=elephOne numbers十632
89之0-2240 and十綿2 8920-224 l.
l与ぐ痢〔・/ //′“′両で棚ic’〃/... r/.硬宮/i有.
W喜しし書AM P. CU内AD○
○IC-Di鳩CtO「
日間回田
Republic ofthe Philippines
Depalてment of E11Vironment and Natura! Resources
ENVIRO珊瑚肥前TAL MANAG亜MENT BUREAUDENR Compound’Vi§ayaS Avenue, D胸an Q=eZOn Cily = 16
Telephone Nos・弓632〉927-1 5.1 7, 928-37-25; Fa掴o∴ 〈632) 920-22-58
Website:唖p誰棚γ・emb.gov.ph / Ema冊a"@emb.gov.ph
Novemberう、 2020
DR. JOEL B. UMBAY
Pz/blic Sc力oo/ D応面h S岬eIγ;∫Or (PSDS)
Dep聞San Ferれando District 2
Sangat, San Femando, Cebu
O933-5765982; (032) 4888I 34
Sし喧ect: PしIblic Hearing of the proposed SEDC Limestone Qllarry and Port Operations
Expansion PrQject of Solid Ea「th Development Corporation
Dear Dr. Umbay:
We are pleased to invite you to atte-1d the Public Hcaring ofthe ProI}OSed SEDC Lime§tone
Q脚rry and Port Operations Expansion Prqiect of the Solid Ea血Deve10Pment Corporation. The
Said l-earing is scheduled on:
Da書c �Time �Vcnue �zoomDe書ai書s
27November2020 � 8:00AM Rッ● �SouthParkConvention �MeetingID:88448013034
(F「iday) �egIS研aIIOnSla所S a17.・30AM �CenteT,Panadtaran.San Fel・IlaIldo,Cebu �Passc○de:233847
’「he PubIic Hearing will be conducted as part ofthe requlrementS Ofthe proponent’s application
fdr an Environmental Compliance Cert揃eate. lntere§ted parties w批be given the opportunity to
CXPreSS freely their concems/support/opposition/questions about the prqject.
Kindly register or submit a concise position paper to this O綿ce via email a蓮華血迷鎚垣,
three (3) days before the scheduled PublicトIearing. Those who are unable to register onIfne or sllbmit
POSition papers may sti11join the discussion on the day oftlle hearing.
Attached herewith is the prQject,s Executive Sulrmary for the Public (ESP) for your refdence.
The prQject’s Environmental Perfo「mance Report and Management Plan (EPRMP) is downloadable at
Our Website www.eia・emb.gov.ph. Kindly access the Notice ofPublic Hearing′ Consultatjon l撮foulld
in ollr Web page). Tl-e COPies ofthe ESP and EPRMP are available at the following o飾cesこ
O EM鯵Regi〇億7
G重・eenplains Subdivision’BaniIad, Mandaue City, Cebll
(032) 345-3905
e LGU-San Fernando,Cebu
M…icipality ofSan Femando, Province ofCebしI
Should you l-aVe any question, yOu may COntaCt Engr. Dex`er Taba億a、 PrQject Case Handler,
Environmenta。mpact Assessment and Management Div子sion (EIAMD), at teIephone numbers +632
8920-2240 and十俄2 8920_2241.
圏圏圏国0!C-Di「ec(Or
P′’0/個/有昭面′・。′7催〃/… PI・0煩/ /(/信
R印Il揃c o白he Ph掴ppincs
Depa巾ment of Environment and Natural Resources
龍的V服の肘脱脂即すA己醐ÅNÅ簿E暗記N甘罷職棚番Å巳-
≡妻戸 葦諒鰭諾諾認許M恥. NEしSON嘘. SO龍ON霊O
初高松やal AgI.i鋤l短所I
Mun!cipal Bl心筈. of§an Ferれ紬do, Cebu
O9 15-906443 I
Nove調be重3, 2020
S喧ject‥ Pu鞘c Hearing of the proposed SEDC Limesto調e Quanγ and Port Operations
Expansion PrQject of Solid EarIh Development Corporation
Dear M「. Soronio:
We are pleased to invite you to attend the Public朗Iearing ofthe Proposed SEDC Lim鞘tone
Q囲富ry and Po巾Operations E鵜panSion Prqieet of the Solid Earth Development Corpor証on. The
Said hearing is scheduled onこ
D種子書e �Ti鵬e �V側面c �zoomDe書a鵬
27Novcmber2020 �8:00AM �SouthParkConvention �Meeti書嶋!D:8844801事034 R呼応かution封a南 �Ce]1ter,Panadtaran,San
(Friday) ���Passcode:233847 α7〇・30AM �Fe「nando,Cebu
’rhe Public Hearing w川be conducted as part ofthe requirements ofthe proponent,§ apPlication
for al- Environmental Compliancc Cer輸oate. Interested parties w紺be given the opportuI-ity to
express freely their concems/support/oppositio陣/questions about the prqiect.
KindIy register or submit a concise position paper to th王s Offroe via email at送迎班一b点l、・、心
thl‘ee (3) days befoI`e the scheduled l,u掘c Hcaring. Those who are unablc to register o嗣ne oI" Submit
POSition papers may sti11 joiI自Lhe discussion on the day ofthe hearing.
Attached herew触is the prqject‘s Executive Summ紺y for the PubIic (ESP) for your reference.
The prqject’s Environmental Performance Report紬d Management Plan (EPRMP) is downloadabie at
Our Website www・eia.emb.gov.ph. Kindly acce§S the Notice of PubIic Hea血g/ Cons亜atio両nk found
in our web page). The COPies ofthe ESP and EPRMP are available at the foIlowing o塙ces:
〇 日M聴取捲i〇億了
G「eenplains Subdivi§ion, Ba調ilad, M狐daue City, Cebu
(032) 345-鋤05
e LGU-Sam Fem袖do,Cebu
M皿icipa航y ofSan Femando, Province ofCebu
Shou地yo両ave any question、 yOu may COntaCt Engr. Dexter Tab袖a守rQiect Case曲ndler,
Environmenta=mpact Assessl¶ent and Ma-1agement Division (巴IAMD), at telephone 11umbers +632
8920輸2240 and十俄2 8920_224上
儲劃勘の ほ年 ー∴ 詔囲囲
Since「dy yours,
手 話高言一言〆君
子鯵、¥. β
巴N遼蕊、繭しし書A航甲. CU内AD○
○暮C- Di rec書or
御!ウノの
柄,庇・l II7ぐ胡高調栂′五〇鮎)肌l砕‥
Republic ofthe Pl証ppines
Depa「tment of Environme重lt and Natural Resoul・CeS
E即VI蹴OⅣ既鼠軸TÅL朋Å押A蜜最期田岡で魅UR瑠AUD酬R Com印刷d, Visayas AvenJe. Dmman Quezon Cjty宮16
丁el印hone Nos∴ (632)927-15-1 7, 928・37-25膏秋No∴ (632) 920・22-58
Websile判書p肋個W.emb.gov.ph / Em紬[email protected]
November 3, 2020
MR. RIYADH C軸RISTOPHER V. OACAN
SK FとくねI・aIioI7 PI・eS加わnI
O部ce of SK Federation, San Fernando, Cebu
Sangat, San Femando, Cebu
(032) 488%79
Subject: Pub!ic Hearing of the proposed SEDC Limestone Quarry and PoIt Operations
Expansion Pl・匂ect of So樟d Earth Development Corporation
Dea「 Mr. Oacan;
We a∫e Pleased to invite you to attend the Pub量ic He分ring ofthe Proposed SEDC LimesIone
Quarry and Port Operation§ Expansion Prqject of the Solid Earth Development Corporation. The
Said hea富ing is scheduled on:
Da章e �Time �Ve細りc �zoomDe書ails
27November2020 �8:00AM �SouthParkConvention �MeetinglD:884480再034 RegisかalionsIaI’Is �Center,Panadtaran,San
(Friday) ���Passcode:233847 aI7:30AM �Fernando,Cebu
The Public Hearing will be conducted as part ofthe requirements ofthe p「oponent’s application
for an Envirormental Compliance Cer輔cate. ]nterested parties w紺be given the opportundy to
express froely their concems/support/opposition/questions about the pl句ect`
Kindly register or sし一bmit a concise position paper to this Office via email at高崎it:111b.竺O臆l二」2h,
three (3) days before the SCheduled Public Hearing. Those who are unable to register o輔ne or submit
POSition papers may st紺join the discussion on the day of the hearing.
Attached herewith is the prQject’s Executive Summary for the Public (ESP) for your reference.
The prQject’s Environmental Performance Report and Management Plan (EPRMP) is downloadable at
Our Website www.eia.emb.gov.ph. Kindly access the Notice ofPublic Hearing/ Consultation link found
in ou「 web page). The copies ofthe ESP and EPRMP are available at the following o楕ces:
。 EM職Region7
Greenplains Subdivision, Banilad, Mandaue City, Cebu
(032) 345-3905
e LGU-San Fernando,Cebu
MunicipaIity of San Femando, P「ovince of CebしI
ShOuld you have any qしIeStion, yOu may COntaCt Engr. Dexler Tabada, PrQject Case Handler,
Environmental Impact Assessment and Management Division (EIAMD), at telepho-1e numbel“S +632
8920-2240 and十632 8920-224 1.
Sincerely yoしIrS,
嘱繭国雪国’賞LL置AM P. CU内ADO
O’C‾Director 中古
辞ec両d b9:
P/.0/招/ //J理研,iI・(,I槻蹄/... P/.ひ/c,C/ /碑‥
Republic ofthe Ph描ppines
Departme重1t Of Environment and Natural ResouI.CeS
思NV書取〇㍍醐田押TAし脱A河AG班朋隠郊帽∵鯵U忠正AUD削R Compound誰Say∂S Ave佃e, D柵an Quezon Crty = 16
TeIephone Nos∴ (632)927・15-17, 928-3アー25; Fax No∴ (632) 920-22-58
Websile:輔p肋棚.emb.gov.ph / E爪a航mail@帥b.gov.ph
November 3, 2020
MS. APOLONIA C. CA内O
PI・eSiくね部
KALIPl - Women’s Group
Tonggo, San Femando, Cebu
C/0 0917-39]4776 - Brgy. Capt.
Su申ject: Public Hearing of the proposed SEDC Limestone Quarry and Port Operations
Expansion Pr匂ect of Solid Earth Development Corporation
Dear Ms. Ca岳o:
We are pleased to invite you to attend the Public Hcaring ofthe Proposed SEDC Limestone
Quarry and Port Ope「ation§ Expansion Prqiect of the Solid Ea血Development Corporation. The
Said hearing is scheduled on:
D盆書e �Time �VeⅡue �zoomDe書a軸§
27November2020 �8:00AM �SouthParkConvention �Mee血gID:884480日0釣 RegねかaIio購ta所S �Center,Panadtaran,San
(Friday) ���Pa§SCOde:233847 a17.・30AM �Fe「llando,Cebu
The Public Hearing w紺be conducted as part ofthe requirements ofthe proponent’s application
for an Environmenta! Compliance Cert楯cate. lnterested parties will be given the opportunity to
express freely their concems/suppori/opposition/questions about the prQject・
Kindly register or submit a concise position paper to this O鮪ce via email at通運担う1h虻O¥.吐,
threc (3) days before the SCheduled Public I十earing. Those who are unable to register online or submit
POSition papers may sti町Oin the discussion on the day of the hearing.
Attached herewith is the prQject’s Executive Summary for the Public (ESP) for your reference.
The prQiect’s Environmental Perfemance Report and Management Plan (EPRMP) is downloadable at
Our Website www.eia.emb.gov.ph. Kindly access the Notice ofPしIblic Hearing/ Consultation link folmd
in our web page). The copies ofthe ESP and EPRMP are available at the following o珊ces:
。 EMRRegion7
Greenplains Subdivision, Banilad, Mandaue Ctry, Cebu
(032) 343-3905
O LGU-San Femando,Cebu
Municipality ofSan Femando, Province ofCebu
Should you have any que§tion, yOu may COntaCt E噂r. Dexter Tabada, PrQiect Case Handler,
Environmental ○mpact Assessment and Managemeut Division (EIAMD), at telephone numbers +632
8920-2240 and十632 8920-224 l.
圏圏起OIC-Director
PI・olピ(・l ll-ピe′7-・i′・(,l槻ピ′7I… 1,I・OIe。川舟.
璽 Repu輔c ofthe Philippines
Department of Envil・Onment and NatlIra! Resources
隠醐親O珊嶋田鄭TÅL漸A肘AGE轍遜勘で蹄U良彊AUDENR Compound, Visayas Avenue, DMman Quezon Ci申1 16
Tetephone Nos; (632)927-15-17, 928・37・25; Fax No.: (632〉 920-22-58
Websile: h時:侮時間.emb.gov.ph / Ema紺m∂[email protected]
November 3, 2020MR. VIRGILIO P. SIAROT
BaI峨′柳, C華,IaiI 7
B伍rangay Hall ofTonggo, San Fernando, Cebu
O91 7-3914776
Su曲ect‥ Public Hearing of the proposed SEDC Limestone Quarry and Port Operations
Expansion PrQject of Solid Earth Developme書1t Corporation
Dear Mr. Siarot:
We are pleased to invite you and your constituents to attend the Pub書ic Hearing of the
Proposed SEDC Limestone Quarry and Port OI)erations Expansion Prqiect of the Solid Earth
Development Corporation・ The said hearing is scheduled on:
Date �Ti血e �Venue �zoo鵬Deta軸s
27November2020 �8:00AM �SouthParkConvcntion �Meeting!D:88448013034 RegisI7・alio′1SlaI・Is �Center,Panadtaran,San
(Fl・iday) ���Passcode:2鵜847 a17.・30AM �Femando,Cebu
The Public Hearing w紺be conducted as part ofthe requlrementS Ofthe proponent’s application
for an Environmental Compliance Certificate. Interested parties will be given the oppo血nity to
express freely their concems/support/opposition/questions about the P「qject.
Kindly register or sしIbn教it a concise position paper to this O飾ce via email at ri頭蛙逗蔓退出,
three (3) days before the scheduled Public Hearillg. Those who are unable to register online or sしIbmit
POSition papers may stilljoin the discussion on the day ofthe hearing.
Attached herewith is the prqiect’s Executive Summary for the Public (ESP) for your reference.
The prQject’s Environmental Performance Report and Management Plan (EPRMP) is downloadable at
Our Website www.eia.emb.gov.ph. Kindly access the Notice ofPublic Hearing/ Cons亜ation link fou11d
in our web page). The copies ofthe ESP and EPRMP are avaうlabIe at tlle following o塙ces:
O E朋膿Region7
Greenplains Subdivision’Banilad, Mandaue City’Cebu
(032) 343-3905
e LGU-San Fernando,Cebu
Municipality ofSan Femando, Province ofCebu
Should you have any question, yOu may COnぬCt Engr. Dexter Tabada, Pr句ect Case Handler,
Enviromenta=mpact Assessment and Managelnent Division (EIAMD), at telephone numbers +6328920-2240 and十632 8920_224 1.
Sincerely yours,
園調整豊国OIC-Director
甲両i高手
柄)/賞●I /庇c′両′・`,研〃e’I仁P/.祝C'/ /砂..
Republic of the Ph航ppines
Depariment of Environment alld Natural Resoul`CeS
超NV且R㊤N弼E即すAL駒ANAG囲納EN甘酸U環視A巳)DENR Comp伽nd, VISayaS Av郎Ile, DiIiman Quezon City = 16
了eI印hone国OS∴ (632)927-15-17. 928-37-25; Fax母o∴ (632〉 920-22・58
Website: h時侮/WW.emb.gov.ph I Email’[email protected]
November 3, 2020
HON. RICCI REGEN G. RELUYA
」軌II7icやal V油e Mむ′Or
Mullicipal BIdg. ofSan Fernando, Cebu
(032) 4889679
SしIt)ject: PしIblic Hearing of the proposed S巳DC Limestone Quar「y and Port Operations
Expansion PrQiect of Solid Earth Development Corpol‘ation
Dear櫨o皿. Reluya:
We are pleased to invite you to attend the Public Hcaring ofthe Proposed SEDC Limestone
Quarry and Port Operations Expansion Prqiect ofthe Solid Eal.th Development Corporation. TheSaid hearing is sclleduled on:
Da章e �Timc �Venue �乙oo血De書貧ils
27Novembe「2020 �8:00AM �SouthParkConvention �Meeti11gID:88448013034 RegistI・ationsla所S �Ce!lter,Palladtaran,San
(Friday) ���Passcode:233847 aI7〇・30Aムイ �Femando,Cebu
The Public Hearing wi‖ be conducted as part ofthe requirements ofthe proponent’s application
for an Environmental Compliance Certificate. [nterested partics will be give章1 thc opportunity to
express freely their concems/supporuoppositio函uestioIIS about lhe prQject.
Kindly register o「 submit a concise position paper to this O飾ce via email at sj±埴連載J2.盟i通,
three (3) days before the scheduled Public Hearing. Those who are unable to register online or submit
position papers may sti11 join the discussion on the day ofthe hearing・
Attached herewith is the pr匂ect,s Executive Summary for the Pu描c (ESP) for yo即reference.
The Prqiect’s Environmental Performance Report a-1d Management Plan (EPRMP) is downloadable at
our website www.eia.emb.gov"Ph. Kindly access the Notice ofPし一blic Hearing/ Consし11tatio掴nk found
in our web page). The copies ofthe ESP and EPRMP are available at the following of龍es:
o EMBRegion7
G「e帥Plains Subdivision, Banilad, Mandaue City, Cebしl
(032) 345-3905
o LGU-San Fernando,Cebu
Mしmicipality ofSall Fernando’Province ofCebし一
ShOuld you have劃Iy queStion, yOu may COntaCt Engr. Dexter Tabada, PrQject Case HandIer,
EllVironmenta=mpact Assessment and Management Division (E!AMD), at teleph0ne皿mber§ +632
8920-2240 and十632 8920-224 1.
SincereIy you章’S,
÷/--一一一一一一一- ‾ ‾‾‾、
P. CU内ADO
OIC-Director
馨翠P/.。IピぐI /l弛C′高/.。研l聞/… PI〇°/“・/ /海‥
璽 Republic of the Ph消ppines
Depaltment Of Environment and Natural Resources
聴NVI蹴㊦邸朗田圃TÅ確醜ANA寄E桝田即で鯵U鞍馬AUD削R Compound, Visayas Avem嶋. D踊an QJeZOn Cily = 16
丁彊phoneト!os∴ (632)927-15-17, 928-37-25;戸a州o.弓632) 920-22-58
Websi厄http:休酬・emb.gov函/ Ema粧[email protected]叩h
MR. PONCIANO S. ALANA
Presi〔お面
0鯖iee of Senior Citizen Association
South Pob., San Femando, Cebu
C/o(032) 231 1615 - MSWDO
November 3, 2020
Suhiect: Pub]ic Hearing of the proposed SEDC Limestone Quany and Port Operations
Expansion PrQject of Solid Earth Development Corporation
Dear Mr. A量a吊a:
We are pleased to invite you to attend the Pub書ic蘭ea「ing ofthe Proposed SEDC Limestone
Q雌rry and Port Operation§ Expansion Prqiect of the Solid Earth Development Corpo「ation. The
Said hearing is scheduled on:
Date �Time �Ve調ue �zoo鵬Detai書s
27November之020 �8:00AM �SouthParkConvention �Mee宜nglD:88448013034 R弓gis什ationsI(IrI$ �Center,Panadtaran,San
(Friday) ���Passcode:233847 a17:30AM �Femando,Cebu
The Public Hearing wi“ be conducted as part ofthe requirements ofthe proponent’s application
for an Environmental Compliance Certifroate. Interested parties wi‖ be given the opportunity to
express free ly their concems/support/opposition/questions about the pxpject.
Kindly register or submit a concise position paper to this O鮒ce via email at ei遥c用b.捜玉垣,
thrce (3) days before the scheduled Pub!ic Hearing. Those whO are unable to register online or submit
POSition pape「s may stm join the discussion on the day ofthe hearing.
Attached hereWith is the pr(加ct’s Executive Sし1mmary for the Public (ESP) for yoし1r reference,
The prQject’s Environmental Perfomance Report and Management Plan (EPRMP) is downloadable at
9ur Website Ww.eia・emb・gOV.Ph. Kindly access the Notice ofPublic Hearing/ Consし'ltation link foundm our web page). The copies ofthe ESP and EPRMP are available at the following o綿ces:
e EMRRegio鵬7
Greenpiains Subdivision, Baniiad, Mandaue City, Cebu
(032) 345-3905
0 LGU-San Fernando,Cebu
Municipality of San Femando, Province ofCebu
Should you have any qし一eStion, yOu may COntaCt Engr. Dexter Tabada, Prqject Case Handler,
Environmenta旧mpact Assessment and Management Division (剛AMD), at telephone numbers +632
8920-2240 and十632 8920-224 1.
Sincerely yours,
掴小味も梱
PI▲。/“/ ′/7ピC′高’.`),7′,7硝I… PI・0/c'Cl /妬..
国璽国冒しM P. CU丙ADO
OIC-Di 「ector
Repu輔c ofthe Philippines
Department of Enviro11meIlt and NatlIral ResoしIrCeS
彊薄明汲0酉醗照的丁A柵醐ANÅ隼婦醐蛸的岬、鍬腰鰭Aし「
華声 帯蕊欝驚諾…認許壁壁
MS. ALICIA A. BROBO
勅棚i垂)al &,Cial脇的ne and Devel叩柳鋤I物ceγ
朋u調香ci囲l聴ldg. of S細『e「龍郷ndo, Ccbu
(032)2封1615
Novenlber 3, 2020
Suliiect: Public Hearing of the proposed SEDC lふmestone Quarry and Port Operations
Expansion PrQiect of Solid Ea11h Developme11t Corporation
D合ar Ms. Brobo:
We are pleased to invite you to attend the恥闘c Hcaring ofthe Proposed SEDC Limestone
Quarry amd Port Ope富ations Expansion Pr{函短of the SoIid Earth Development Coxpol証on. The
Sald hearing is scheduled o11:
D分筆e �T竃調e �Vc調ue �zoo競lDo書租ils
27Novembe「2020 �8:00AM �SouthParkConvention �Mceting賞D:884480130事4 Reg親者αtio′-Sla′“Is �Centcr,PanadtaraIl,San
(F丁iday) ���Passcode:233847 aI7.・3ひAM �Fe「nandoうCebu
The Pu揃c liearing wi冊e conducled as part ofthe requirelnentS Ofthe proponent’s application
fo an Environmental Compliance Certificate. IlltereSted陶rtie§ Wi‖ be given the OPPO血nity to
express freely their conce1「1S/suppo競/opposition/qlleStions about the prQject.
Kindly register ol, Submit a concise position paper to this Office via ema栂t d並ut測地,
血ce (3) days before thc schedulcd Public Hea血g∴「hose who al.e unable to register o刷れe or submit
POSition pape「s may s刷join the discussion on the day ofthe hearing,
Attached hereWilh is the pr句ect’s Execlltive Summary for the Pll踊c (ESP) for your rcference.
Thc prqiect’s Environmental Performa11Ce Report and Management Plan (EPRMP) is downloadable at
Our Website ww.eia.emb.gov・Ph. Kindly access the Notice ofPl離c Hea血gI Consllltation link found
in our web page). The copies oftlle ESP and EPRMP are avaiIabIe at the following omces:
e ∴曲朋駐恥e留ion 7
GreeれPlains Subdivision, Banilad, Mandaue City, Cebu
(032) 345-3905
O LGU -San Fernando,Cebu
Municipa航y ofSan Femando, Province ofCebu
ShOuld you have any questioIl, yOu may COntaCt EngI.. Dex・e「 Tab租da, PrQiect Case HandIer,
巴IIVironme11tal Impact Assessmc面and Manage富nCnt Division (剛^MD), at teIephone nlImbers +632
89之0-2240 and十632 8920-224上
S inccl●ely yours,
田国書喜劇人¥
すLLIAM P. CU下lADO
OIC-Di「ector
帥晒仙術恥体
擁,I耽.1 //一理研i月個’′硯/・・・ Pj.‘,l“/ /妬‥
璽 Republic ofthe Ph航ppines
Department of Envil・Onment and NatしIral Resources
隠NVIRO肘M正郎TAL耽ANA奪曲ME郎甘露U龍距AUDENR Compound, Visayas AvenJe, D柵an QJeZOn City = 16
丁e!印hone Nos; (632〉927・15"1了, 928-37-25;戸ax No∴ 〈632〉 920ゼ2-58
Website:帥p誰据相.emb.gov.ph / Ema航[email protected],Ph
ENGR. SHELLEY B. RIAS
踊′扉cゆal PIanni碓a諦Develq,〃-e所α加e手
Municipal Bldg. ofSan Ferれando, Cebu
(032) 2721 079
Nove鵬be「 3, 2020
Subject: P‘lblic Hea血g of the proposed SEDC Limestone Qua章ry and Port Operations
Expansion PrQject of Solid Earth Development Corporation
Dea「 Engr. Ria§:
We are pleased to invite you to attend the P叫bIic Hearing ofthe Proposed SEDC Limes書one
Qua「ry and Port Operatio調S Expansion P「qiect ofthe Solid Ea血Development Co「poration. The
Said hearing is scheduled on:
Date �Ti鵬e �Venue �zoo鵬De青a鵬
27November2020 �8:00AM �SouthParkConvention �Meeting!D:88448013034 Reg心有.aIio17SIa′.tS �Center,Panadtaran,San
(Friday) ���Passcode:233847 a17:30AÅ{ �Femando,Cebu
The Public Hearing wi‖ be conducted as part ofthe requirements ofthe P「OPOnent’s application
for an Environmental Compliance Cert買ecate. Interested pa11ies w紺be given the opportunity to
express freely thei「 concems!sしIPPOrVopposition/questions about tlle PrQject.
Kindly register or submit a concise position paper to輔s Office via email at送迎emb亮哩定立!,
thl・ee (3) days before the scheduled Pし一blic Hea∫ing. ThOSe Who are unable to register online or submit
POSition papers may s剛join the discussion on the day ofthe hearing.
Attached herewith is the Prqject’s Executive Summary for the Public (ESP) for your reference.
The prQject’s Environmental Perfomance Report and Management Plan (EPRMP) is downloadable at
9ur Website www.eia.emb・gOV・Ph. Kindly access the Notice ofPublic Hearing/ Consultatio掴nk foundIn Our Web page)∴「he copies ofthe ESP and EPRMP are available at the following o珊ces:
O 困M膿Rcgion7
GreenpIains Subdivision, Banilad, Mandaue City, Cebu
(032) 345-390S
o LGU-San Fernando,Cebu
Municipality ofSan Femando, Province ofCebu
Should you have any question, yOu may COntaCt Engr. Dex書er Tabada, PrQject Case HandIer,
Envil.OrLmental lmPaCt Assessment and Management Division (EIAMD), at telephone numbel`S +6328920-2240 and十632 8920輸224上
Sincerely yours,
困園田四国 、仰IO`P. CU内ADO
O] C-Director
I′イ掴/仰初
音ol紺I I毎酬・iI・t)l棚帥I… l,I・〈)I竹中佃.
Republic o「the Pl満ppines
Department of軌vil.Onment and Natural Resources
盤郊V聡⑯柑朋彊苅丁ÅL醜A閃Å綿租髄親貯門珊耽彊A聯
毒手 雷嵩繕謹認諾・58ENGR. S車MEON A. LAURONAL
勅-ni函ul EIゆI7eeI▲
M調nicip盆書載ldg. ofS紬恥部軸ndo, Cめり
(032) 272 1 079
November 3, 2020
Su鴫ct: Public Hearing of the proposed SEDC Limestone Quarry alld Port Operations
Expansion Prqiect of Solid Earth Development Co叩Oration
Dear Bngr. LauroIl種l;
We are pleased to invite you to attend the Pu輔ぐ軸earin轡ofthe Proposed SEDC鵬mesto珊e
Qりarry and Port Oper租tio鵬E坤rnsion Prqject of the So舶Ea面Development Corporation∴「he
Said hca置・i噂与s scheduled om
勘a書e �Ti肌e �Venue �zoo鵬De章ai寡s
27November2020 �8:00AM �SouthParkConvention �Meetin昌lD:88448013034 Regislralio月競〔汁Is �Ccntc「,Pamd(a隠n,S織n
(輔d租y) ���Passcode:2うう847 u17:30AM �Fe調紬do,Ccbu
The Public Hearing will be conducted as part ofthe req11置rements Ofthe proponent’s app[ication
for all Environmental Compliancc Cer輸oate. Interested pardes w冊be given the oppoltur証y to
expl・eSS freely their concems/support/opposilioIV’questions about the PrQject.
Kindly l‘egister or §ubmit a concise pQSitio叩apc重・ to拙s O餓ce via email at通子亙担be華南
three (3) days before the SCheduled Pllblic l.lea証ng.刑ose who al.e unable to register o硝11e Ol` Submit
POSitiorl PaPerS may S剛join the di§CuSSion oI- the day ofthe hearing.
Attached herewith is the prQiect’s Exect南ve Sulnmary for the Public (腎SP) for your reference.
The p「qject’s Environmental Perfomance Report and Management Plan (EPRMP) i§ downloadable at
Our Website www.eia.emb.gov.ph. Kindly acce§S the Notice of Pu輔c He紺ing/ ConsしIltatto硝nk found
i11 Our Web page). The copies of仙e ESP and EPRMP are available at the fo1lowing o請ces:
o E朋鯵耽e轡ion7
Gree叩lains Subdivision, Banilad, Mandaue City, Cebu
(032) 345-3905
0 し屯U-S練れ耳er舶ndo,Cobu
Municipality of San Femando, Province of Cebu
Should you have ally queStionうyOu may COntaCt Engr. D譲ter Tabad@, PrQject Case Handle「,
En壷onmentaI喜mpact Assessme-1t and Management Division (EIAMD), at telephOne恥mbers †ト632