Lifelong Project Value through
Digital Asset Information
Management (DAIM)
Colin Jordan, PSG Chair
Xiangyu Wang, Curtin University
Will Hackney, Aurecon
Industry Drivers
• Construction industry looking to embrace benefits of
digitalisation
• Client demands
• Pressure on O&M budgets
• Streamline the supply chain from design to construction to
asset management
Prof Xiangyu Wang• Curtin-Woodside Chair Professor for LNG Construction and Project Management
• Director of Australasian Joint Research Centre for BIM
• Chair of Curtin Advanced Technology Research and Innovation Alliance (CATRINA)
• College of Experts, Australian Research Council (ARC)
The Journey Towards Digital
Asset Management
ARC Project 2: Bridge Performance Assessment
Topic 1: Multi-Criteria Optimisation for Sensor DeploymentTopic 2: Reserve Capacity Estimation Based on Error Domain Structural Identification Topic 3: BIM Integrated Decision Support System
Digital Asset Information Model Framework
• Asset Classification System
• Asset Information Requirement
• Asset Information Model
• Asset Information Delivery Manual
Asset Classification System
Road Bridge TunnelRailway
Track Signalling and ControlElectrical
Electrical Substation Equipment
DC Circuit Breaker
Rectifier DCCBFeeder DCCB
Arc Chute Control Insulation Main Current Path
Level 0
Level 1
Level 2
Level 3
Level 4
Level 5
Splitter Handle PivotLevel 6
Asset Information Requirement
Asset Data(Graphical and Non-graphical)
Asset Documents
Configuration
Location
Condition
Operational
Maintenance
Financial
Organisational
Manuals
Standards
Drawings
Regulatory
Certificates
Reports
Concessions
Corridor Codes
Location Codes Site Codes
Base Codes Segment Codes
Geo-location System
CityGML
IndoorGML
LandInfra
InfraGML
IFC-Alignment
IFC-Road
IFC-Bridge
IFC-Tunnel
IFC-Railway
BIM-GIS Data Exchange
RailTopoModel
RailML