Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
8/27/2019
1
WELL DESIGN CONCEPTS ACCELERATED WITH THE POWER ENGINE FROM AKER BP: DIGITAL WELL PROGRAM
Alexander Brekke, Aker BP, Drilling Engineer
LIFE2019 – 27 August 2019
1
DISCLAIMER 2019
The contents of this presentation are for informational purposes only. Halliburton** makes no representation or warranty about the accuracy or suitability of the information provided in this presentation and any related materials. Nothing in this presentation constitutes professional advice or consulting services. No contractual relationship with Halliburton is established by attending or viewing this presentation. No rights to intellectual property of Halliburton are granted through this presentation. The opinions expressed in this presentation are those of the author and do not necessarily represent the views of Halliburton. **Halliburton means Halliburton Energy Services, Inc., Landmark Graphics Corporation, and their affiliates.
8/27/2019
2
hi there! i’m the focal point for Aker BP in coordinating and leading the development of “Digital Well Program” and I have a very important message for you –
we are driving the digital well construction!
Alexander Brekke, drilling engineer
presentationagenda
new way of working
who we are?
live demonstration
what isnext?
page4
8/27/2019
3
who we are?eureka
page5
eureka
page6
8/27/2019
4
page7
page8
8/27/2019
5
page9
page10
8/27/2019
6
THINK BENEFITS
THINK BENEFITS
workflow dataflow digital well program
micro-service
data science
alvheimpilot
page12
8/27/2019
7
page13
surveyreminder
Your feedback is very important to us.
Please open the LIFE2019 app to answer a few short questions on this presentation.
www.linkedin.com/in/alexanderbrekke
LinkedIN: