Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1DIMENSIONS
19135
8500 / 5600
10350
3700
8840
8861
4957
1385
4000
915
0° / 20° / 40°
705
R5600
Dimensions are in millimeters.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1RADIUS DIAGRAM FOR T
Dimensions are in meters.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR T
Main boom• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 0 t
Boom length (m)
Ballast (t)
Radius (m)
3 3.5 4 4.5 5 6 7 8 9 10 11 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58
15 0 175 157 139 124 107 72 52 39.5 31 24.3 20 15.7
50 194 178 163 150 139 121 104 90 80 71 64.5 58
87.5 201 185 171 159 148 129 114 102 91 82 74.5 67
20.2 0 152 139 110 90 62 45.5 35 27.3 21.4 17.5 13.6 8.9 5.7
50 152 152 150 139 120 104 91 80 71 64.5 58 48 40.5 34.5
87.5 152 152 152 148 129 114 102 91 82 74.5 67 57 49 42.5
25.4 0 112 91 74 52 39 30 22.9 17.8 14.4 11 6.7
50 152 149 138 120 103 90 79 71 64.5 58 47.5 39.5 33.5 28.3 24.1
87.5 152 152 142 128 113 101 90 81 74 67 56 48 42 37 32.5
30.5 0 71 52 41 33 26.4 21.6 18.3 15 10.6 7.6 5.4
50 121 111 101 91 80 72 65.5 59 48 40.5 34 29.3 25 21.6 18.8 16.6
87.5 121 111 101 93 85 79 73 67 57 49 42.5 37.5 33.5 29.6 26.5 24
35.7 0 45.5 36 28.4 22.7 18.5 15.6 12.6 8.6 5.8
50 90 83 77 71 67 62.5 58 47.5 39.5 33.5 28.4 24.3 20.8 18 15.7 13.7 12
87.5 90 83 77 71 67 62.5 58 52 46.5 41.5 37 32.5 28.7 25.6 22.9 20.7 18.7
40.9 0 35 28 22.8 18.9 16.1 13.4 9.6 6.9
50 73 68 63 60 56.5 53 46.5 40.5 34.5 29.5 25.5 22 19.1 16.8 14.8 13.1 11.5 10.2 9.1
87.5 73 68 63 60 56.5 53 46.5 41.5 37.5 34.5 31.5 28.7 26.5 23.9 21.6 19.6 17.8 16.3 14.9
46.1 0 26.9 22.2 18.6 16 13.4 9.9 7.3 5.3
50 58 55 52 49.3 46.5 41 37 33.5 29 25.3 22.2 19.3 16.9 14.9 13.2 11.7 10.3 9.1 8.1 7.2 6.4
87.5 58 55 52 49.3 46.5 41 37 33.5 30.5 27.8 25.6 23.5 21.8 20.3 18.9 17.6 16.2 14.8 13.6 12.5 10.6
51.2 0 19.8 16.5 14.2 11.9 8.6 6.2
50 46.5 44.5 42.5 40.5 37 33.5 30.5 27.7 25.2 22.2 19.7 17.4 15.4 13.7 12.1 10.8 9.6 8.5 7.6 6.7 6 5.3
87.5 46.5 44.5 42.5 40.5 37 33.5 30.5 27.7 25.3 23.3 21.6 20 18.5 17.3 16.2 15.1 14.1 13.4 12.7 11.8 10.8 10
56.4 0 14.3 12.2 10.1 7
50 37 35.5 34 31.5 29.4 27.2 25.2 23.4 21.7 20 18 16.1 14.3 12.8 11.5 10.3 9.2 8.2 7.4 6.6 5.9 5.3 4.2
87.5 37 35.5 34 31.5 29.4 27.2 25.2 23.4 21.7 20.2 18.7 17.4 16.2 15.2 14.3 13.4 12.6 11.8 11.3 10.7 10.2 9.7 8.4
60 0 9.8 6.9
50 30.5 29 27 25.2 23.5 21.8 20.2 18.8 17.5 16 14.4 13 11.6 10.4 9.3 8.3 7.5 6.7 6 5.3 4.2 3.3
87.5 30.5 29 27 25.2 23.5 21.8 20.2 18.8 17.5 16.4 15.3 14.3 13.5 12.7 12 11.3 10.6 10 9.6 9.1 8.2 5.4
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TA
Dimensions are in meters.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TA
T2A Guyed main boom• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 0 t
Boom length (m)
Ballast (t)
Radius (m)
5 6 7 8 9 10 11 12 14 16 18 20 22 24 26 28 30 32
30.5 50 126 121 107 93 82 73 66 59 48.5 40.5 34 28.9 24.7 21.2 18.2 15.5
75 126 121 112 100 89 80 72.5 65 55 46.5 40 34.5 30 26.4 23.2 20.5
87.5 126 121 113 102 92 83 75.5 68 57 49 42 37 32.5 28.5 25.2 22.4
112.5 113 104 95 87 79.5 72 62 53 46 40.5 36 32 28.5 25.5
35.7 50 96 93 90 81 72 65.5 59 48 40 33.5 28.3 24.1 20.7 17.8 15.3 13 11
75 96 93 90 88 80 72.5 65 54 46 39.5 34 29.5 25.8 22.7 20 17.7 15.7
87.5 96 93 90 88 82 75 68 57 48.5 42 36.5 32 28 24.7 21.9 19.4 17.3
112.5 93 90 88 85 78.5 72 61 53 46 40 35.5 31.5 28 25.1 22.5 20.3
T3A Guyed main boom• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 0 t
Boom length (m)
Ballast (t)
Radius (m)
6 7 8 9 10 11 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 56
35.7 50 90 87 83 79 74 67 60 50 42 35.5 30.5 26.1 22.6 19.7 17.2 15 13
112.5 87 83 79 76 73 70 63 54 47.5 41.5 37 33 29.8 26.8 24.3 22
40.9 50 76 74 72 71 65 59 49 41 35 29.6 25.4 22 19.1 16.7 14.5 12.5 10.8 9.3 8
112.5 76 74 72 71 69 67 62 54 47 41.5 36.5 32.5 29.2 26.2 23.7 21.4 19.5 17.7 16.1
46.1 50 60 59 57 56 55 48 40.5 34.5 29.8 25.6 22.2 19.3 16.9 14.8 12.9 11.2 9.7 8.4 7.2 6.2 5.2
112.5 60 59 57 56 55 53 51 47 41.5 37 33 29.4 26.4 23.9 21.6 19.7 17.9 16.3 14.9 13.6 8.8
51.2 50 47.5 46.5 45.8 45 43.5 40 34.5 29.8 25.9 22.7 19.9 17.5 15.4 13.6 12 10.5 9.2 8 7 6 5.1 4.4
112.5 47.5 46.5 45.8 45 43.5 42 40.5 39 37.5 33.5 30 27 24.5 22.2 20.3 18.5 16.9 15.5 14.2 13 11.9 10.9
56.4 50 38.5 38 37.5 36.5 35.5 34.5 30 26.3 23.1 20.5 18.2 16.2 14.4 12.8 11.3 10.1 8.9 7.9 6.9 6.1 5.3 4.6
112.5 38.5 38 37.5 36.5 35.5 34.5 33 32 31.5 30.5 27.8 25.2 23 21 19.2 17.7 16.2 14.9 13.8 12.7 11.7 10.7
60 50 31 31 30.5 30 29.2 25.8 22.8 20.2 18 16.1 14.4 12.8 11.4 10.1 9 7.9 7 6.1 5.3 4.6 3.5 2.9
112.5 31 31 30.5 30 29.2 28.3 27.6 26.9 26.1 25.3 23 21 19.3 17.7 16.3 15 13.8 12.7 11.7 10.8 9.2 8.4
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TF, TAF
Dimensions are in meters.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TF
Main boom with fixed jib• Outrigger base: 8.9×8.5 m
• Ballast: 87.5 - 25 t
Boom length (m)
Jib length (m)
Jib offset (°)
Radius (m)
12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82
46.1 14 0 25.6 24.1 22.5 21.1 19.8 18.5 17.4 16.4 15.6 14.8 13.8 12.8 11.9 11.1 10.4 9.7 9 8.4 7.9 7.4 6.5 5.3
20 17.3 16.3 15.5 14.7 14 13.4 12.8 12.3 11.8 11.3 10.9 10.6 9.9 9.3 8.6 8.1 7.6 6.7 5.5
40 11.3 11 10.7 10.4 10.2 10 9.8 9.7 9.6 9.4 9.3 9.3 9.3 8.8 8.3 7.7 6.7
51.2 14 0 21 19.9 18.7 17.7 16.5 15.5 14.5 13.6 12.9 12.1 11.4 10.7 10 9.3 8.7 8.1 7.5 7 6.5 5.7 4.9 4.1
20 16.6 15.7 14.8 13.9 13.2 12.4 11.8 11.2 10.7 10.1 9.6 9.2 8.8 8.3 7.7 7.2 6.6 5.8 5 4.2
40 10.8 10.6 10.4 10.1 9.9 9.8 9.6 9.5 9.4 9 8.6 8.3 7.9 7.4 6.9 5.9 5.1
56.4 14 0 16.2 15.4 14.5 13.8 12.9 12.2 11.5 10.9 10.3 9.7 9.2 8.7 8.2 7.8 7.4 7.1 6.7 6.3 5.9 5 4.3 3.7 3.3
20 11.5 10.8 10.3 9.8 9.3 8.9 8.5 8.1 7.8 7.4 7.2 6.9 6.6 6.3 6.1 5.8 5.2 4.4 3.9 3.3
40 9.2 8.8 8.4 8.1 7.8 7.5 7.2 7 6.8 6.6 6.4 6.2 6 5.8 5.4 4.7 4
21 0 11.9 11.2 10.6 10.1 9.5 8.9 8.3 7.8 7.4 7 6.6 6.3 5.9 5.6 5.4 5.1 4.9 4.6 4.2 3.8 3.3 2.8 2.5 2.1
20 7.7 7.3 6.9 6.6 6.2 5.9 5.7 5.4 5.1 4.9 4.7 4.5 4.3 4.1 3.9 3.6 3.4 3 2.6 2.2
40 5.8 5.5 5.3 5.1 4.9 4.7 4.5 4.3 4.2 4.1 3.9 3.7 3.6 3.4 3.2 2.7
28 0 9 8.5 8 7.5 7.1 6.6 6.2 5.8 5.5 5.1 4.8 4.6 4.3 4.1 3.8 3.7 3.5 3.2 2.9 2.7 2.5 2.2 1.9 1.6 1.3
20 5.3 5 4.7 4.4 4.2 4 3.8 3.6 3.4 3.3 3.2 3.1 2.8 2.6 2.5 2.3 2.2 2.1 1.7 1.4
40 3.6 3.5 3.5 3.4 3.3 3.2 3.1 3 2.9 2.7 2.5 2.4 2.3 2.2 2.2
35 0 6.7 6.3 5.9 5.5 5.1 4.7 4.4 4.1 3.8 3.6 3.4 3.2 3 2.9 2.7 2.6 2.3 2.1 1.9 1.7 1.6 1.4 1.2
20 3.4 3.3 3.1 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2 1.8 1.7 1.5 1.4 1.3 1.2 1.2
40 2.2 2.1 2.1 2 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 1.2
42 0 4.9 4.5 4.1 3.8 3.5 3.3 3.1 2.9 2.8 2.6 2.4 2.3 2.2 2 1.9
60 42 0 4 3.9 3.6 3.4 3.2 3 2.8 2.7 2.5 2.4 2.2 2.1 2 1.9
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TAF
T4AF Guyed main boom with fixed jib• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 50 t
Boom length (m)
Jib length (m)
Jib offset (°)
Ballast (t)
Radius (m)
12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82 86 90 92
46.1 14 0 50 28 28 27 25.7 24.6 23.6 21.3 18.7 16.5 14.5 12.8 11.2 9.8 8.5 7.3 6.2 5.2 4.3 3.6 3.1 2.1
112.5 28 28 27 25.7 24.6 23.6 22.6 21.6 20.7 19.8 19 18.3 17.7 16.1 14.7 13.4 12.2 11.1 10.1 9.2 7.5 6
20 50 19.3 18.6 17.9 17.2 16.6 16 15.5 14.2 12.5 10.9 9.6 8.3 7.2 6.1 5.1 4.1 3.5 2.5
112.5 19.3 18.6 17.9 17.2 16.6 16 15.5 15 14.5 14.1 13.8 13.4 13.1 12.8 11.8 10.7 9.7 7.9 6.3
40 50 11.6 11.2 10.9 10.7 10.4 10.2 10 9.8 9.7 9.5 9 7.8 6.7 5.6 4.6 3.8 2.6
112.5 11.6 11.2 10.9 10.7 10.4 10.2 10 9.8 9.7 9.5 9.4 9.3 9.3 9.3 9.2 9.2 8
51.2 14 0 50 22.7 22.4 22 21.5 21.1 20.5 18.3 16.1 14.3 12.6 11.1 9.8 8.5 7.3 6.2 5.2 4.2 3.6 3.1 2.2
112.5 22.7 22.4 22 21.5 21.1 20.5 20 19.4 18.9 18.4 17.9 17.3 16.1 14.7 13.4 12.2 11.1 10.2 9.2 7.5 6.1 4.8
20 50 18.7 18.1 17.5 17 16.5 16 15.5 14.1 12.5 11 9.6 8.4 7.2 6.2 5.2 4.2 3.6 2.6 1.6
112.5 18.7 18.1 17.5 17 16.5 16 15.5 15.1 14.7 14.3 13.9 13.6 13.3 13 11.9 10.8 9.8 8 6.5 5
40 50 11.2 10.9 10.7 10.4 10.2 10 9.9 9.7 9.6 9.1 7.9 6.8 5.8 4.7 3.9 2.8 1.6
112.5 11.2 10.9 10.7 10.4 10.2 10 9.9 9.7 9.6 9.4 9.3 9.3 9.3 9.2 9.2 8.3 6.6
56.4 14 0 50 17 16.8 16.5 16.1 15.8 15.5 15.1 14.7 14.2 12.8 11.4 10.1 8.9 7.7 6.6 5.6 4.7 3.9 3.4 2.4 1.6
112.5 17 16.8 16.5 16.1 15.8 15.5 15.1 14.7 14.2 13.8 13.4 13 12.7 12.3 12 11.6 11.3 10.5 9.6 7.9 6.4 5.1 4
20 50 15 14.4 14 13.5 13.1 12.7 12.3 11.9 11.3 10 8.8 7.6 6.6 5.6 4.6 3.9 2.9 2
112.5 15 14.4 14 13.5 13.1 12.7 12.3 11.9 11.6 11.3 11 10.7 10.5 10.3 10 9.9 8.4 6.9 5.5 4.2
40 50 10.8 10.6 10.3 10.1 9.9 9.8 9.6 9.5 9.4 8.3 7.2 6.2 5.2 4.3 3.1 2.1
112.5 10.8 10.6 10.3 10.1 9.9 9.8 9.6 9.5 9.4 9.3 9.2 9.2 9.1 9 8.8 7.1 5.6
21 0 50 13.5 13.3 13 12.6 12.2 11.8 11.3 10.9 10.5 10.2 9.8 9 7.9 6.8 5.8 4.9 4 3.5 2.5 1.7
112.5 13.5 13.3 13 12.6 12.2 11.8 11.3 10.9 10.5 10.2 9.8 9.5 9.2 8.9 8.6 8.3 8.1 7.8 7.3 6.6 5.3 4.1 3.4 2.7
20 50 10 9.7 9.3 9 8.7 8.4 8.1 7.8 7.6 7.4 7.2 6.3 5.3 4.4 3.3 2.4 1.6
112.5 10 9.7 9.3 9 8.7 8.4 8.1 7.8 7.6 7.4 7.2 7 6.8 6.6 6.4 6.1 5.9 4.7 3.7 2.9
40 50 6.3 6.1 6 5.8 5.7 5.6 5.5 5.4 5.3 5.3 5.2 3.8 2.8 1.9
112.5 6.3 6.1 6 5.8 5.7 5.6 5.5 5.4 5.3 5.3 5.2 5.1 5.1 5.1 5 3.8
28 0 50 10.3 10.2 10 9.7 9.4 9 8.8 8.5 8.2 7.9 7.6 7.3 7.1 6.2 5.3 4.3 3.8 2.8 2
112.5 10.3 10.2 10 9.7 9.4 9 8.8 8.5 8.2 7.9 7.6 7.3 7.1 6.8 6.6 6.4 6.2 5.8 5.5 5.2 4.5 3.6 3 2.4 1.8
20 50 7.2 6.9 6.7 6.5 6.3 6.1 5.9 5.7 5.5 5.4 5.2 5.1 3.8 2.9 2.1
112.5 7.2 6.9 6.7 6.5 6.3 6.1 5.9 5.7 5.5 5.4 5.2 5.1 4.8 4.5 4.4 4.2 4 3.4 2.7 2
40 50 3.8 3.7 3.6 3.5 3.4 3.4 3.3 3.3 3.2 3.1 3.1 2.6 1.8
112.5 3.8 3.7 3.6 3.5 3.4 3.4 3.3 3.3 3.2 3.1 3.1 3 3 3 3
35 0 50 8.2 8 7.8 7.5 7.1 6.9 6.6 6.3 6.1 5.8 5.6 5.4 5.2 4.9 4.3 3.7 2.8 2
112.5 8.2 8 7.8 7.5 7.1 6.9 6.6 6.3 6.1 5.8 5.6 5.4 5.2 4.9 4.7 4.5 4.2 4 3.7 3.5 3.3 3 2.4 1.8 1.4
20 50 4.5 4.4 4.2 4.1 3.9 3.8 3.6 3.5 3.4 3.2 3 2.3 1.6
112.5 4.5 4.4 4.2 4.1 3.9 3.8 3.6 3.5 3.4 3.2 3 2.9 2.8 2.6 2.5 2.4 2.3 1.7
40 50 2.2 2.2 2.1 2.1 2 2 1.9 1.8 1.8 1.8 1.5
112.5 2.2 2.2 2.1 2.1 2 2 1.9 1.8 1.8 1.8 1.7 1.7 1.7 1.7
42 0 50 6 6 5.8 5.6 5.3 5 4.8 4.6 4.3 4.1 4 3.8 3.6 3.5 3.3 2.8 2
112.5 6 6 5.8 5.6 5.3 5 4.8 4.6 4.3 4.1 4 3.8 3.6 3.5 3.3 3.1 2.9 2.7 2.5 2.3 2.2 2 1.9 1.4 1
20 50 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2 1.9 1.8
112.5 2.9 2.8 2.7 2.6 2.5 2.4 2.3 2.2 2 1.9 1.8 1.6 1.6 1.5 1.4 1.3 1.2 1.1
49 0 50 4 4 3.9 3.7 3.6 3.4 3.3 3.1 3 2.9 2.7 2.6 2.4 2.3 2.1 1.9
112.5 4 4 3.9 3.7 3.6 3.4 3.3 3.1 3 2.9 2.7 2.6 2.4 2.3 2.1 1.9 1.7 1.5 1.4
60 42 0 50 5 5 4.9 4.7 4.5 4.3 4.1 3.9 3.8 3.6 3.4 3.3 3.2 3 2.6 1.8
112.5 5 5 4.9 4.7 4.5 4.3 4.1 3.9 3.8 3.6 3.4 3.3 3.2 3 2.8 2.6 2.4 2.2 2.1 1.9 1.8 1.6 1.2
49 0 50 3.3 3.3 3.3 3.2 3 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2.1 1.9 1.6
112.5 3.3 3.3 3.3 3.2 3 2.9 2.8 2.7 2.5 2.4 2.3 2.2 2.1 1.9 1.7
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TN, TAN
Dimensions are in meters.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TN
Main boom with luffing jib• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 25 t
• Boom angle: 82°, 74°, 66°
Boom length (m)
Boom angle (°)
Jib length (m)
Radius (m)
9 10 11 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82 86 88
15 66 17.5 46 41.5 37.5 34
21 41 37.5 34 31.5
28 33.5 31 28.5 26.3 24.4 22.8
35 28 25.9 24 22.4 20.9 19.6 18.4
42 23.6 22 20.5 19.2 18 17 16 15.1 14.3
49 18.9 18.5 17.6 16.5 15.6 14.7 13.9 13.2 11.9
56 15.1 14.8 14.6 14.2 13.4 12.7 11.4 10.3 9.3
63 11.4 11.2 11.1 11.1 10.9 9.8 8.9 8
70 7.4 7.3 7.2 7.2 7 6.4 5.8 5.5
74 17.5 56 51 47.5 43
21 49.5 45.5 42.5 38.5 35.5
28 41.5 39 37 35 32 29.8 27.5 21.9
35 33 31.5 30 29 27.1 25.2 23.5 21.9 19.2
42 26.8 26 25.3 24.6 23.9 23.1 21.6 20.2 19 17.9 16.3 13.2
49 21 20.6 20.1 19.7 19.3 19 18.6 17.5 16.5 15.6 14.7 14
56 16.7 16.7 16.4 16 15.8 15.5 15.2 15.1 14.8 14.3 13.5 12.2 10.2
63 12.4 12.3 12.1 11.9 11.7 11.5 11.4 11.3 11.2 11 10.6 9.6 7.3
70 8.3 8.1 7.9 7.8 7.6 7.5 7.4 7.2 7 6.6 6 5.6
82 17.5 70 67 64 61 57 55 45.5
21 63 60.5 58 53 50 47.5 44 34
28 48.5 47 44.5 42.5 40.5 38 34.5 30.5 24.6
35 38 37 36 34.5 33.5 32 30.5 28.2 26.1 23.7 19.6
42 29.8 29.1 28.6 27.9 27.2 26.6 25.8 24.9 23.2 21.6 20.2 19.1 16.7 14.1
49 22.6 22.6 22.2 21.6 20.9 20.3 19.7 19.1 18.6 18 16.8 15.9 15.1 14 11.8
56 17.3 17.3 17.3 17.1 16.7 16.2 15.7 15.2 14.8 14.4 14 13.6 13.3 12.6 12.1 10.1
63 13 13 13 13 12.8 12.6 12.3 12 11.7 11.3 11 10.7 10.5 10.4 10.2 9.4 7.2
70 9.8 9.5 9.3 9 8.8 8.5 8.3 8.1 7.9 7.7 7.6 7.4 7.3 7.2 6.8 6.2 5.7
25.4 66 17.5 31 28.2 25.9
21 27.9 25.6 23.7
28 23.1 21.4 19.9 18.6 17.4
35 19.5 18.2 17 15.9 15 14.1
42 16.4 15.4 14.5 13.6 12.8 12.1 11.5
49 14.1 13.2 12.5 11.7 11.1 9.9 9
56 11.8 11.1 10.4 9.3 8.3 7.4 6.7
63 9.1 8.9 7.9 7 6.3 5.6
70 6.3 6.2 6.2 5.7 5 4.4 3.9
74 17.5 45 40.5 36.5 33
21 44 40 36 33 30 27.8
28 35 32.5 29.7 27.3 25.2 23.4 21.8
35 27.5 26.8 24.8 22.9 21.3 19.9 18.7 17.5
42 21.4 21.4 21.4 20.8 19.4 18.2 17 16 15.1 14.3 13.5
49 16.4 16.4 16.4 16.4 16.4 15.7 14.8 13.9 13.2 12.5 11.2
56 12.2 12.2 12.2 12.2 12.2 12.2 12.2 12.2 11.8 10.6 9.5 8.6
63 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.2 8.3 7.5
70 6.8 6.8 6.8 6.6 6.5 6.5 6.4 6.3 6.2 6 5.7 5.4
82 17.5 55 55 55 55 54 48 43
21 46 46 46 46 43 39
28 36.5 36.5 36 35 34 33.5 32 29.7 25.2
35 28 28 28 27.6 27 26.3 25.7 25.2 24.7 23.4 20.3
42 22 22 22 21.8 21.4 21 20.5 20 19.5 19 18.6 18.2 17
49 16.9 16.9 16.9 16.9 16.9 16.8 16.4 15.9 15.5 15.1 14.8 14.5 14.2 13.9 13.7 11.7
56 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.6 12.3 12 11.7 11.4 11.1 10.9 10.8 10.6
63 10 10 10 10 10 10 10 9.8 9.5 9.3 9 8.9 8.7 8.5 8.4 8.4
70 7.3 7.3 7.3 7.3 7.3 7.2 7 6.9 6.7 6.6 6.5 6.4 6.3 6.3 6.1 5.7 5.3
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Boom length (m)
Boom angle (°)
Jib length (m)
Radius (m)
9 10 11 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82 86 88
35.7 66 17.5 22.8 21 19.5
21 20.6 19.1 17.7 16.6
28 17.1 16 14.9 14 13.1
35 14.4 13.5 12.6 11.9 11.2 10.6 10
42 12.1 11.3 10.6 10 9.4 8.4
49 10 9.4 8.8 7.8 6.9 6.2
56 8.2 7.2 6.3 5.5 4.8 4.2
63 6 5.7 4.8 4.1 3.7 3.4 3.1
70 4.3 4.1 3.6 3.2 2.9 2.6 2.3
74 17.5 30.5 28.6 27
21 29.5 27.8 26.2 24.7 23.4
28 24 22.9 21.9 20.9 19.7 18.4
35 19.2 19.2 19 18.3 17.6 16.8 15.8 14.8 14
42 14.8 14.8 14.8 14.8 14.8 14.3 13.4 12.7 12 11.3
49 11.2 11.2 11.2 11.2 11.2 11.2 11.2 10.8 9.7 8.7
56 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.2 7.3
63 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6 5.3
70 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.1 3.7
82 17.5 38 38 38 36.5 35
21 32.5 32.5 32.5 32.5 31.5 30.5
28 25.4 25.4 25.4 25.4 25.1 24.7 24.4 24.3
35 19.9 19.9 19.9 19.9 19.9 19.6 19.3 19.1 18.8 18.6 18.4
42 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.3 15 14.8 14.5 14.3 14.2
49 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.7 11.6 11.4 11.2 11 10.8 10.8
56 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9.1 9 8.8 8.6 8.5 8.4 8.4
63 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.5 6.5
70 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7 4.7
46.1 66 17.5 13.5 12.8
21 12.4 11.7 11.1
28 10.3 9.7 9.3 8.9
35 8.5 8 7.6 7.3 6.8
42 7 6.6 5.9 5.4
49 5.2 4.6 4.1 3.8
56 3.8 3.4 3.1 2.8 2.7
63 2.7 2.6 2.3 2.1 1.9 1.7
70 1.6 1.6 1.5 1.3 1.2 1
74 17.5 19.2 18.1 17.2
21 17.5 16.6 15.7
28 14.6 14.3 13.8 13.2 12.6 12.2
35 11 11 11 10.9 10.5 10.1 9.7
42 8.2 8.2 8.2 8.2 8.2 8.2 8.2 8.1 7.7
49 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9
56 4 4 4 4 4 4 4 4 4
63 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7
70 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
82 17.5 22.8 22.8 22.8 22.8
21 19.5 19.5 19.5 19.5 19.5 19.5
28 14.7 14.7 14.7 14.7 14.7 14.7 14.7 14.7
35 11 11 11 11 11 11 11 11 11 11 11
42 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3 8.3
49 6 6 6 6 6 6 6 6 6 6 6 6 6 6
56 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2
63 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8
70 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
Liebherr LTM 1300-6.1LOAD TABLE FOR TN
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Boom length (m)
Boom angle (°)
Jib length (m)
Radius (m)
9 10 11 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82 86 88
56.4 66 21 6.3 5.9
28 4.7 4.4 4.2
35 3.4 3 2.8
42 2.5 2.2 2
74 17.5 11 10.4
21 9.6 9.1 8.6
28 7.8 7.5 7.2 6.9 6.6
35 5.9 5.7 5.4 5.2 5 4.7 4.5
42 4.4 4.2 4 3.8 3.6 3.4
49 3 3 3 2.9 2.7 2.5 2.3
56 1.8 1.8 1.8 1.8 1.6 1.4 1.3
82 17.5 13.7 13.7 13.7 13.5
21 11.8 11.8 11.8 11.8 11.8 11.6
28 8.5 8.5 8.5 8.5 8.5 8.5 8.5 8.5
35 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2 6.2
42 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4 4.4
49 3 3 3 3 3 3 3 3 3 3 3 3 3
56 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
Liebherr LTM 1300-6.1LOAD TABLE FOR TN
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
Liebherr LTM 1300-6.1LOAD TABLE FOR TAN
T2AN Guyed main boom with luffing jib• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 50 t
• Boom angle: 82°, 74°, 66°
Boom length (m)
Boom angle (°)
Jib length (m)
Radius (m)
14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82 86
35.7 66 21 24 22.3 20.8 19.5
28 20.1 18.8 17.6 16.6 15.6
35 17.2 16.1 15.2 14.3 13.5 12.8 12.2
42 14.2 13.7 13 12.2 11.6 10.5
49 10.7 10.7 10.7 9.9 8.9 8.1
56 8.2 8.2 8.2 7.5 6.7 6.1
63 6 6 6 6 5.4 4.8 4.3
70 4.2 4.2 4.2 4.2 4.1 3.7 3.4 3.3
74 21 29.1 28.9 28.8 28.8 27
28 23 22.8 22.7 22.6 22.6 21.4
35 18.6 18.5 18.4 18.2 18.2 18.1 18.1 17.5 16.6
42 14.7 14.7 14.7 14.7 14.7 14.7 14.6 14.4 14.2 13.7
49 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 10.8
56 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4
63 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1 6.1
70 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2
82 21 31 30.5 30.5 30 30 30
28 24.7 24.4 24.1 23.9 23.7 23.5 23.4 23.4
35 19.6 19.6 19.5 19.3 19.1 19 18.7 18.4 18.2 18 17.8
42 15.3 15.3 15.3 15.3 15.3 15.3 15.1 14.8 14.6 14.3 14 13.7 13.2
49 11.6 11.6 11.6 11.6 11.6 11.6 11.6 11.6 11.5 11.3 11 10.8 10.6 10.4 10.2
56 9 9 9 9 9 9 9 9 8.9 8.7 8.5 8.4 8.2 7.8 7.4
63 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.6 6.5 6.3 6.3 6.3
70 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6 4.6
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.
Version 1, 2015-11-06, SAP No. 4000101731
T3AN Guyed main boom with luffing jib• Outrigger base: 8.9×8.5 m
• Ballast: 112.5 - 50 t
• Boom angle: 82°, 74°, 66°
Boom length (m)
Boom angle (°)
Jib length (m)
Radius (m)
14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 54 58 62 66 70 74 78 82 86
46.1 66 21 16.2 16.2 16.2 15.4
28 12.7 12.7 12.6 12.6 12.3
35 9.9 9.9 9.9 9.9 9.9 9.5
42 7.6 7.6 7.6 7.6 7.6
49 5.7 5.7 5.7 5.7
56 3.9 3.9 3.9 3.9 3.9
63 2.6 2.6 2.6 2.6 2.6 2.6
70 1.5 1.5 1.5 1.5 1.5 1.5
74 21 17.3 17.2 17.2 17.2
28 13.7 13.6 13.5 13.4 13.4 13.4 13.4
35 10.4 10.4 10.4 10.4 10.4 10.4 10.4 10.4
42 7.8 7.8 7.8 7.8 7.8 7.8 7.8 7.8 7.8
49 5.7 5.7 5.7 5.7 5.7 5.7 5.7 5.7
56 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9 3.9
63 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6
70 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
82 21 18.6 18.5 18.4 18.3 18.3 18.3
28 14.2 14.2 14.2 14.2 14.2 14.2 14.1 14.1
35 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6 10.6
42 8 8 8 8 8 8 8 8 8 8 8 8 8
49 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9 5.9
56 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1 4.1
63 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7 2.7
70 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
56.4 66 21 8.8 8.7 8.7
28 6.7 6.7 6.6 6.6
35 4.9 4.9 4.9 4.9
42 3.5 3.5 3.5
49 2.5 2.5 2.5 2.5
56 1.5 1.5 1.5 1.5 1.5
74 21 9.6 9.6 9.5 9.5
28 7.4 7.3 7.3 7.2 7.1 7.1
35 5.4 5.4 5.3 5.3 5.3 5.3 5.3 5.3
42 3.8 3.8 3.8 3.8 3.8 3.8 3.8
49 2.7 2.7 2.7 2.7 2.7 2.7 2.7
56 1.6 1.6 1.6 1.6 1.6 1.6 1.6
82 21 10.6 10.5 10.4 10.4 10.3 10.3
28 8.1 8 7.9 7.8 7.8 7.7 7.6 7.6
35 5.9 5.9 5.9 5.9 5.8 5.8 5.7 5.7 5.7 5.7
42 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.2 4.1 4.1 4.1 4.1
49 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8
56 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7 1.7
Liebherr LTM 1300-6.1LOAD TABLE FOR TAN
t = metric tons.The content in this document is mentioned for reference use only. Values may differ
from current data. Always contact Mammoet for current project calculations.