LHCf Run status at 7TeV collisions
Takashi Sako(Plots: K.Taki, H.Menjo)
LPC meeting 12-Apr-2010
6,300
2,200
(x10
0)Arm1 Arm2
Shower
Pi-zero (x100)
Statistics during stable beamsFill Shower
Arm1 Arm2 Total
1002 89 162 251
1005 29,048 38,547 67,595
1013 197,980 207,903 405,883
1019 70,212 93,403 163,615
1022 307,734 411,008 718,742
1023 270,860 357,194 628,054
1025 32,037 42,737 74,774
1031 188,999 253,785 442,784
1033 30,407 40,984 71,391
Total 1,127,366 1,445,723 2,573,089
Pi-zero 2,200 6,300 8,500
(Always first 10min is lost for the detector movement)
Blue: X HorizontalRed: Y Vertical
B1/B2 trimmed+/- 0.037mm
B1 trimmed- 0.076mm
7TeV preliminary results
Data only during the stable beam on 31 March
0 degree off center(neutral center)
900GeV results
• ~70% analyzed• Corrected bunch
intensity to be included
• More (x2, x3) statistics appreciated
Run plan for a next month
• Finish configuration (gain, threshold, latency) survey soon
• Accumulate 104 pi-zero with the default setup (200 hours with the current luminosity)
• Accumulate 104 pi-zero at 2-3 different detector positions for PT survey (procedure to be discussed with ATLAS)
• Hope double/triple the 900GeV statistics• Start Xing angle run to enlarge the PT coverage• Studying intermediate beam energy 1.5-2.0 TeV