Upload
jonanunson
View
223
Download
0
Embed Size (px)
Citation preview
8/3/2019 LF5038 - Location, Location, Location Slides
1/55
Location, Location, Location, Location50 Models, 50 Contributors, 20 Companies, 5 Buildings, and 1 S
Jon AnunsonBIM Coordinator, URS Corporation
8/3/2019 LF5038 - Location, Location, Location Slides
2/55
Location, Location, Location, Location50 Models, 50 Contributors, 20 Companies, 5 Buildings, and 1 S
Jon AnunsonBIM Coordinator, URS Corporation
8/3/2019 LF5038 - Location, Location, Location Slides
3/55
LF5038 Class Summary
Location can become a big issue in an AutodeskRevitproject.
How do we collaborate between multiple offices?
How do we exchange data, coordinate building position, link modelschaos away when everyone is working in multiple companies, locatioand units?
We will look at lessons learned, and the management tools and techsettle issues of model linking, central file sharing, shared coordinate Server, and model content.
8/3/2019 LF5038 - Location, Location, Location Slides
4/55
Learning Objectives
At the end of this class, you will be able to:
List the capabilities of Revit Server andAutodesk Project Bluestreak Mobile to aid withinter-company communication
Plan model contributions for multiple offices tocollaborate successfully on a multi-firm project
Explain how the shared locations and other file
formats are affected by the use of Revit Server
Describe how Revit Server can function withina multi-location company to help share models
This is a big-pic
concentrating onthe pros & cons
advice from exp
While the suppo
include specifics
technical approa
focus will be on
made while planand their effect o
success.
8/3/2019 LF5038 - Location, Location, Location Slides
5/55
Presenters
Jon Anunson
BIM Coordinator, URS Registered architect, AIA, NCARB
Projects in commercial, education, aviation,healthcare, retail and residential.
20 Years architectural practice
30 years 3D Modeling and animation experience
Computer programmer and database engineer
Written over 500 training tutorials on Modeling,Animation, Construction drawings and BIM
Clients including ACOE, VA, NCG, NFL, GSA, NASA,Starbucks, Yum, MSU, Southern University, Siggraph,Tulane University, House of Blues, TurnerConstruction
B. Arch and M. Arch from Tulane University, NewOrleans
8/3/2019 LF5038 - Location, Location, Location Slides
6/55
Presenters
Marla Caserta
BIM Coordinator, URS Registered architect, AIA, NCARB
Projects in commercial, education, healthcare, retail and residential.
13 Years architectural practice
Clients including US Coast Guard, GSA and Universities
BIM Management of VLP (Very Large Projects)
NEORUG board member
8/3/2019 LF5038 - Location, Location, Location Slides
7/55
URS Corporation
47,000 employees in more than 40 countries in the Americas, Europe, the MiddleEast and Asia-Pacific
Our professional staff includes engineers, architects, planners, scientists, informationmanagement specialists, program and construction managers, and constructioncontractors
We offer full-service capabilities for infrastructure projects
complete life-cycle services from front-end studies through engineering, procurementand construction to facility management and production maintenance
Top-tier contractor to the U.S. federal government
URS provides expertise in the management of threat reduction and chemicalweapons demilitarization programs
We are a major environmental contractor to the U.S. Department of Energy
URS designs, builds, operates and maintains power generation facilities
development and installation of clean-air technologies
URS serves as a leading mining contractor, developing and operating industrial,energy, minerals and metals mines
8/3/2019 LF5038 - Location, Location, Location Slides
8/55
Introductions, agenda
Welcome.
Questions are encouraged
Introductions & Case Studies 0:00
Location 1(Where is your team?) 0:10
Location 2(Where are your Files?) 0:20
Location 3(Where is the Data?) 0:30
Location 4(Where is the Building?) 0:40
Conclusion (Where is your plan?) 0:50
Q&A 0:55
Thank you for attending! 0:00
8/3/2019 LF5038 - Location, Location, Location Slides
9/55
Disclaimer:These are real pro
examples, howev
have been omitte
details generalize
combined with thoprojects for the pu
illustrating this dis
Location 4Why Location is still so critical in a digital pr
8/3/2019 LF5038 - Location, Location, Location Slides
10/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
11/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
12/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
13/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
14/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
15/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
16/55
Municipal Hospital
8/3/2019 LF5038 - Location, Location, Location Slides
17/55
Multi-Use Fast-Track Block Development
8/3/2019 LF5038 - Location, Location, Location Slides
18/55
Multi-Use Fast-Track Block Development
8/3/2019 LF5038 - Location, Location, Location Slides
19/55
Multi-Use Fast-Track Block Development
8/3/2019 LF5038 - Location, Location, Location Slides
20/55
Multi-Station Transit system + Track Alignment & G
8/3/2019 LF5038 - Location, Location, Location Slides
21/55
Multi-Station Transit system + Track Alignment & G
8/3/2019 LF5038 - Location, Location, Location Slides
22/55
Multi-Station Transit system + Track Alignment & G
M l i S i T i T k Ali & G
8/3/2019 LF5038 - Location, Location, Location Slides
23/55
Multi-Station Transit system + Track Alignment & G
M lti St ti T it t T k Ali t & G
8/3/2019 LF5038 - Location, Location, Location Slides
24/55
Multi-Station Transit system + Track Alignment & G
M lti St ti T it t T k Ali t & G
8/3/2019 LF5038 - Location, Location, Location Slides
25/55
Multi-Station Transit system + Track Alignment & G
C ti C t
8/3/2019 LF5038 - Location, Location, Location Slides
26/55
Convention Center
Convention Center
8/3/2019 LF5038 - Location, Location, Location Slides
27/55
Convention Center
Convention Center
8/3/2019 LF5038 - Location, Location, Location Slides
28/55
Convention Center
Convention Center
8/3/2019 LF5038 - Location, Location, Location Slides
29/55
Convention Center
8/3/2019 LF5038 - Location, Location, Location Slides
30/55
Location 1 (Where is your team?)
Understand how the team willcommunicate and collaborate on
models from different locations,networks and cultures.
Team Location: Implications
8/3/2019 LF5038 - Location, Location, Location Slides
31/55
Kickoff
A D D
Round1
T D E
Round2
T D E
Round3
T D E
QC
T D E
Closeout
A P
Team Location: Implications
Communication
Common Meeting Times
Scheduling Updates
Maintaining project Standards
31
PD SD DD CD BC
*Continued:Commissioning,
Occupancy,Renovation,Reuse, Closing,Demolition
C O
Team Location: Tradeoffs
8/3/2019 LF5038 - Location, Location, Location Slides
32/55
Team Location: Tradeoffs
Staffing Flexibility
Consultant freedom
Multiple Projects
Best employee for the job
Construction Site Access
Communication issues Coordination Issues
32
Pair
Collab
M
E
Pwork
Team Location: Organizational Points
8/3/2019 LF5038 - Location, Location, Location Slides
33/55
Team Location: Organizational Points
Plan to talk often
Force frequent updates SCRUM
Standing Meetings
Consider Enforcement
What if your consultants dont deliver
Remember Training and Standards
Verify that theyre the same or Coordinate
them ahead of time
Plan to change standards and train new
staff
Plan to Transfer Files
33
8/3/2019 LF5038 - Location, Location, Location Slides
34/55
Location 2 (Where are your Files?)Understand how the files will betransferred and/or shared. How thewhole projects data must beassembled from information frommultiple locations
File Location - Implications
8/3/2019 LF5038 - Location, Location, Location Slides
35/55
File Location Implications
Multiple Locations
Synchronizations
File Size
Schedule
TTL (time to live)
Management
Email and FTP are unlikely to work with500 MB files.
Dropboxes Careful directory planning
Single Point of Synchronization per-location
35
Single Locations
Hoteling
Cloud (where? Worksharin
Revit Server (Access contr
VPN
Remote Workstations
Citrix (Thin Clients)
File Locations - Tradeoffs
8/3/2019 LF5038 - Location, Location, Location Slides
36/55
File Locations Tradeoffs
File Control/Management
User Access Control
File locking, history
Naming, Directory structures, links
File Accessibility, currency
Age of reference files
Availability of new files
System/infrastructure cost Servers (Citrix, Revit Server)
Bandwidth (all)
WAN Acceleration (WAN, Revit Server)
Services (collaboration websites
36
File Locations Organizational Points
8/3/2019 LF5038 - Location, Location, Location Slides
37/55
File Locations Organizational Points
Organizational Points What mechanisms allow files to be
accessed by a distributed team?
Controlling Access will be important whohas permission and how is it enforced?
Model communication, borrowing,updating, and linking.
Security Concerns
Managing versions
Technical points UNC and Mapped Paths,
Bandwidth
Saving to Central
Firewalls and VPNs
Hardware Requirements
37
BIM Revitmodel
ConstructionDocuments
Accurate, Synchronized 3D Information Staging/Scheduling Clash Detection Shop Drawing
Verification
Re D C P F
QT L
Q
GBXML
Energy Model Lighting Levels Comcheck
DatabasePlugins
StructuralValidation
Energy Modeling System Sizing Design Analysis
Delivery
IFC Facilities
Management
NavisWorks
Solibri
Archibus
FM Systems
Vela
HG
S
B
P
E
Robot
Ecotect
Radiance
IES
Ecotec
GBS
Hap/T
IES
8/3/2019 LF5038 - Location, Location, Location Slides
38/55
Location 3 (Where is the Data?)
Creating data that is compatibleacross multiple files from multiplesources, and with the end deliverablecan be a challenge. Understand howdata must be organized withinindividual files.
Data Location - Implications
8/3/2019 LF5038 - Location, Location, Location Slides
39/55
ata ocat o p cat o s
Break Points & File Size
Finding the data
Locating the data, by theteam members (or withinaccess)
39
WeatherEnvelope /Site Analysis
AutomatedLEED Scheduling
Rapid Prototyping
VRMLwalkthroughs
Solar RadiationStudies
Exterior CFDAirflow Analysis
Interior CFD& Comfort Levels
3D MassingAnd Analysis
RenderingVisualization
BIMRevit model
Artificial Lighting ADaylighting A
2D Construction /Bid Documents
Energy Analysis /PredictiveModeling
Finite ElementAnalysis
Acousticalstudies
Data Locations - Tradeoffs
8/3/2019 LF5038 - Location, Location, Location Slides
40/55
40
Multiple
Models
Waste
Duplicate
Manual C
User Erro
Excessiv
Single model
Large Size Extra Computer Hardware Advanced Techniques
Models
Fast
Small Simple
Multiple
Focused Direct Purpose-
Driven
Data Locations Organizational Points
8/3/2019 LF5038 - Location, Location, Location Slides
41/55
g
Data Types
Units, Coordinates
Translation*
Pre-Planning
Data Delivery
41
A MORE EFFICIENT AND PRODUCTIVE DESIGNPROCESS
FULLER PROJECTUNDERSTANDING
DIRECTFABRICATION
FACILITYMANAGEMENT
MODEL-BASEDQTO AND
CONSTRUCTIONMANAGEMENT
4D/5DCONSTRUCTION
PLANNING
INTEDES
Geometric alignment, Units, Significant Digits
8/3/2019 LF5038 - Location, Location, Location Slides
42/55
g , , g g
8/3/2019 LF5038 - Location, Location, Location Slides
43/55
Location 4 (Where is the Building?)Locating model data relative to othermodel data when involving multiplesoftware/file formats, coordinatespaces, units, and size/flatnesslimitations can be very tricky!
Project Location - Implications
8/3/2019 LF5038 - Location, Location, Location Slides
44/55
44
Revit still has usable coordinate spaceissues
Shared parameters are oftenmisunderstood, easy to mess up, andcan create domino-effect problems inmany linked files.
Many file types dont support shared
coordinates at all. Multi-unit dimensions arent available
in all applications.
Project Locations - Tradeoffs
8/3/2019 LF5038 - Location, Location, Location Slides
45/55
Visible topography in Revit for verylarge sites will require significant file
translation. Updates are difficult.
45
Project Locations Organizational Points
8/3/2019 LF5038 - Location, Location, Location Slides
46/55
Pick a single Coordinate Master file
that everyone will acquire coordinates
from. Determine file types early so you can
plan for other unit and locationsystems
Embedded linked files
Coordination marker
46
8/3/2019 LF5038 - Location, Location, Location Slides
47/55
Location (Where is your plan?)
BIM Execution Plan, Project Technical Plan
8/3/2019 LF5038 - Location, Location, Location Slides
48/55
Elements to be addressed in a completeExecution Plan
1. Project Description
2. Team List
3. Deliverables List & Delivery Schedule
4. Training Needs
5. Modeling Guidelines
6. File Setup
7. File List
8. File Coordination Plan
9. Standards and Procedures
10. 3D Coordination procedure & Schedule11. Cost Estimation Plan
12. Model Progression, Level of Detail & ResponsibilityMatrix
13. Client Submittal Requirements
14. Model Sharing Agreement
1 Project Description & 2 Team List
8/3/2019 LF5038 - Location, Location, Location Slides
49/55
Goals
Team, Including Locations, Networks, Companies
File Sharing Sites, Services
Bluestreak Group Names Do all participants get all notifications?
Multiple Bluestreak Groups, Permissions
Company Bluestreak GroupsProjectName Main ProjectName
DesignProjectName URSInternal
ProjectNameDesignAssistPartners
Project LEADER X X X XDesign Partner 1 X XDesign Partner 2 X XClient XCA/CM XDesign Assist 1 XDesign Assist 2 X
5 - Modeling Guidelines
8/3/2019 LF5038 - Location, Location, Location Slides
50/55
50
14 - Level of Detail / Responsibility
8/3/2019 LF5038 - Location, Location, Location Slides
51/55
8/3/2019 LF5038 - Location, Location, Location Slides
52/55
Questions , Discussion
Autodesk University Session Feedback
8/3/2019 LF5038 - Location, Location, Location Slides
53/55
Your feedback is very important to Autodesk.
You can complete the session survey on your mobile device,
PC, or at a survey station. Each completed session survey enters you in that days
drawing for a free AU 2012 pass. You can help make AU 2012 better!
Complete the AU Conference Survey at a survey station and receive an
AU 2011 T-Shirt.
8/3/2019 LF5038 - Location, Location, Location Slides
54/55
Thanks!For more information, contact
mailto:[email protected]:[email protected]:[email protected]:[email protected]8/3/2019 LF5038 - Location, Location, Location Slides
55/55
Autodesk, AutoCAD* [*if/when mentioned in the pertinent material, followed by an alphabetical list of all other trademarks me ntioned in the material] are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks beloservices offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. 2011 Autodesk, Inc. All rights reserved.