    The Use of Information in Wind Siting

    Vermont -- Lessons from the Field

    1

    Wind Power Siting Workshop

    Sandra Levine

    Conservation Law Foundation

    October 26, 2012

  • 8/11/2019 Levine Slides 10.26.12

    2/15

    Wind Siting can be a Tug of War

    2

    Image courtesy of [email protected]

  • 8/11/2019 Levine Slides 10.26.12

    3/15

    3

    Need to Better Balance Burdens

    and Benefits

  • 8/11/2019 Levine Slides 10.26.12

    4/15

    Vermont Experience

    Long History

    First electric wind

    turbine in VT

    Growing Pains Similar to ski area

    development

    Public Engagement

    Permitting involves

    public

    4

    Lowell Mountain October 21, 2012

    Photo courtesy of P. Zabriskie

  • 8/11/2019 Levine Slides 10.26.12

    5/15

    Status of Projects

    Existing:

    Sheffield Wind

    16 turbines; 40 MW

    Searsburg

    11 turbines; 6 MW

    Under Construction or

    Approved:

    Lowell 21 turbines; 63 MW

    Georgia Mountain

    4 turbines; 12 MW

    Deerfield

    15 turbines; 30 MW

    5

  • 8/11/2019 Levine Slides 10.26.12

    6/15

    Status of Projects

    East Haven

    2004; 4 Turbines; 6MW; not

    active

    Grandpas Knob

    2007; 20 Turbines; 50 MW;

    Seneca Wind

    2011; 35 Turbines; 90 MW

    Stiles Brook Wind (Grafton)

    preliminary

    Vermont Community Wind

    (Ira, Poultney, W.Rutland)

    30-60 Turbines; 90-150 MW;

    not active

    Waitsfield / Northfield 2010; 20 Turbines; 30-60 MW;

    not active

    6

    Others Planned

  • 8/11/2019 Levine Slides 10.26.12

    7/15

    Influential Information

    Issues

    Aesthetics

    Habitat

    Climate Change

    Town / Regional

    Plans

    7

  • 8/11/2019 Levine Slides 10.26.12

    8/15

    -- Aesthetics --

    Lowell Wind Visual Simulation

    8

  • 8/11/2019 Levine Slides 10.26.12

    9/15

    Aesthetics -- Lighting

    9

    Wind tower lighting

    Options for reduced

    impact

    Obstacle Collision

    Avoidance System

    Feasibility Effectiveness

  • 8/11/2019 Levine Slides 10.26.12

    10/15

    Aesthetics -- Comparisons

    10

    Killington Ski Area

    Energize Vermont;

    Construction at Lowell Mountain

  • 8/11/2019 Levine Slides 10.26.12

    11/15

    Habitat & Wildlife

    Bird and Bat (Sheffield)

    Permitting before

    studies completed

    Limited operationduring migration

    Mitigation (Lowell)

    Habitat

    Ecological Needs

    Reduced Project Size(Deerfield)

    11

    Photo courtesy of [email protected]

  • 8/11/2019 Levine Slides 10.26.12

    12/15

    Climate Change

    Studies of Avoided

    Emissions (Deerfield, EastHaven)

    Effect of Renewable

    Energy Credit Sales(Lowell)

    Magnitude of Impact

    12

    Image courtesy of [email protected]

  • 8/11/2019 Levine Slides 10.26.12

    13/15

    Town and Regional Plans

    Town Votes

    Impact Fees

    Neighboring Towns

    Influences State

    support

    13

  • 8/11/2019 Levine Slides 10.26.12

    14/15

    Decisions / Resources

    Links:

    Sheffield:

    http://psb.vermont.gov/sites/psb/files/orders/2007/715

    6_Final_Order.pdf Deerfield:

    http://www.state.vt.us/psb/orders/2009/files/7250finalo

    rder.pdf

    Lowell (Kingdom Community Wind):http://psb.vermont.gov/sites/psb/files/orders/2011/762

    8FinalOrder%20CPG%20Attachment%20A-2.pdf

    14

    http://psb.vermont.gov/sites/psb/files/orders/2007/7156_Final_Order.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2007/7156_Final_Order.pdfhttp://www.state.vt.us/psb/orders/2009/files/7250finalorder.pdfhttp://www.state.vt.us/psb/orders/2009/files/7250finalorder.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2011/7628FinalOrder%20CPG%20Attachment%20A-2.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2011/7628FinalOrder%20CPG%20Attachment%20A-2.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2011/7628FinalOrder%20CPG%20Attachment%20A-2.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2011/7628FinalOrder%20CPG%20Attachment%20A-2.pdfhttp://www.state.vt.us/psb/orders/2009/files/7250finalorder.pdfhttp://www.state.vt.us/psb/orders/2009/files/7250finalorder.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2007/7156_Final_Order.pdfhttp://psb.vermont.gov/sites/psb/files/orders/2007/7156_Final_Order.pdf
  • 8/11/2019 Levine Slides 10.26.12

    15/15

    15

    For More Information: